Loading...
Resolution_42-20_11/12/2020RESOLUTION NO.42-20 A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, FLORIDA, ADOPTING A REVISED SCHEDULE OF FEES AND CHARGES FOR THE PROVISION OF WATER SERVICES RENDERED BY THE VILLAGE OF TEQUESTA FOR ITS CITIZENS AND OTHER MEMBERS OF THE PUBLIC; PROVIDING THAT THIS REVISED SCHEDULE OF FEES AND CHARGES SHALL BE AVAILABLE FOR INSPECTION AT ALL TIMES AT THE VILLAGE HALL DURING REGULAR BUSINESS HOURS; PROVIDING AN EFFECTIVE DATE; AND FOR OTHER PURPOSES. WHEREAS, the Village Council of the Village of Tequesta, Florida, desires to adopt a revised schedule of fees and charges relating to the provision of water services rendered by the Village of Tequesta for the citizens of the Village of Tequesta, Unincorporated Martin County, Unincorporated Palm Beach County, and the Town of Jupiter Inlet Colony and for other members of the public; and WHEREAS, the Village Council desires to incorporate all such fees and charges assessed in accordance with Section 74-61 of the Code of Ordinances into one comprehensive fee schedule; and WHEREAS, the Village Council desires to make certain the schedule of fees and charges are available for inspection such that any member ofthe public may be aware ofthe cost of each and every service provided by the Village of Tequesta's Utility Department. NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AS FOLLOWS: Section 1: The Village Council of the Village of Tequesta, Florida, hereby officially adopts the Schedule of Fees and Charges attached hereto as "Exhibit A" which is hereby made part hereof as if fully set forth herein. The revisions adopted herein create a new special charge category for new service connections on Harbor Road North in unincorporated Palm Beach County. Section 2: This duly adopted Schedule of Fees and Charges shall be available at the Village Hall for inspection by the public during normal business hours. Section 3: This Resolution shall take effect immediately upon adoption. RESOLUTION Date 42-20 11 /12/20 Motion Council Member Frank D'Ambra Second Vice -Mayor Kyle Stone Mayor Abigail Brennan Vice -Mayor Kyle Stone Council Member Laurie Brandon Council Member Frank D'Ambra Council Member Bruce Prince FOR AGAINST ABSENT CONFLICT 0 ❑ ❑ ❑ ❑x ❑ ❑ ❑ ❑ ❑ ❑x ❑ ❑x ❑ ❑ ❑ ❑x ❑ ❑ ❑ The Mayor thereupon declared the Resolution duly passed and adopted. MAYOR OF TEQUESTA: ATTEST: Lori McWilliams, MMC Village Clerk . PO ,rG, SEAL :9RPORATED: /E 4 1 Exhibit "A" Village of Tea uesta Water Utilities Fees and Charges A. Residential and Non -Residential Rate Schedule -Base Facilities Charges - The Base Facilities Charge is the minimum monthly charge and is based on meter size and monthly billing period as follows: Meter Size: Base Facilities Charge Table Amount 5/8" or 3/4" $19.67 1" $49.11 1.5" $98.46 2" $157.21 3" $294.77 4" $491.23 6" $982.50 B. Metering of Multi -family Buildings (M.F.) - Where a single meter is installed in a water connection serving a multi -family structure, the minimum monthly service charge shall be the greater of i) an amount equal to the number of dwelling units multiplied by the minimum charge for a 5/8 inch meter, or ii) the base facilities charge for the installed meter size. In the event there is a single meter measuring quantities of water for two (2) or more residential units, the gallons measured and charged pursuant to the terms of this section shall be prorated by dividing the total number of gallons metered by the number of units included on the single meter. C. Metering_ of Multi -Unit Buildings - Non -Residential - In the case of any non- residential multi -unit building housing more than one (1) business or entity, each business or entity therein shall be metered individually. Monthly minimum service charges shall be based on the established charge by meter size. Where an existing single meter is installed in a water connection serving two (2) or more businesses or entities, the minimum monthly service charge shall also be based on the established charge by meter size. Fire protection charges for fire lines shall be separately included; see paragraph number 2 herein below. D. Quantity Rate Charges for Residential and Non -Residential Rate Schedule _ Applicable to all quantities of water shown by meter readings to have been delivered as follows: Quantity Step Rate Table Per 1,000 gallons or fraction thereof Amount Step 1 $3.12 Step 2 $5.25 Step 3 $7.13 Step 4 $9.14 Gallon a a Allowance per Quantity Step Rate Table Meter Size Step 1 Step 2 Step 3 Step 4 3/4" 1 - 12,000 12,001 - 25,000 25,001 - 40,000 Above 40,000 1" 1 - 30,000 30,001 - 62,000 62,001 - 100,000 Above 100,000 1.5" 1 - 60,000 60,001 - 125,000 125,001 - 200,000 Above 200,000 2" 1 - 96,000 96,001 - 200,000 200,001 - 320,000 Above 320,000 3" 1 - 180,000 180,001-375,000 375,001 - 600,000 Above 600,000 4" 1 - 300,000 300,001 - 625,000 625,001 - 1,000,000 Above 1,000,000 6" 1 -600,000 600,001 - 1,250,000 1,250,001 - 2,000,000 Above 2,000,000 A. Monthly Charge - See Section 74.63, Village Code of Ordinances Within the Village.............................................$1.30 monthly Outside the Village............................................$1.30 monthly B. Private Fire Connection - * The following monthly service charges shall apply to private fire lines for sprinkling systems or other fire protection systems: Meter Size Amount 2" $12.49 3" $28.54 4" $51.73 6" $124.89 B" $214.05 10" $279.07 No taps will be allowed which may be used for other than fire protection purposes; and there shall be no connection with any other source of water. 3. Meter Installation Charge - All water meters shall be installed by the Village of Tequesta, and the charge for making such meter installations or replacement of a meterof a different size upon request of the customer shall be as follows (all meters installed remain the property of the Village): let 10. Meter Installation Only Meter Size Amount 3/4" $281.57 1" $316.79 1.5" $633.54 2" $967.91 Above 2" Actual Cost Plus 10% Meter Installation with Water Main Tap (includes service line - maximum 100 LF) Meter Size Amount 3/4" $844.74 1" $1,003.12 1.5" $1,337.49 2" $2,886.19 Above 2" Actual Cost Plus 10% 4. Interrupted Service Charges A. Meter Turn-On/Account Service Fee - (New Accounts).$44.10 B. Meter Turn -On or Turn -Off; Customer Request - (vacation or close-out of account) During business hours ......................................... $26.38 Non -business hours.....................................................$56.53 C. Meter Turn -Off; for Non -Payment - 4x min. monthly service charge for the specific meter D. Transfer of Service............................................................. $17.59 5. Capital Connection & S n e e i a l ChaEW A. Capital Connection Charge Meter Size 3/4" Water $3,470.86 1 " $8,677.06 i 1.5" $17,354.14 3" $52,062.90 4" $86,771.48 6" $173,542.97 B. Special Distribution Line Charge — Harbor Road North New service connections on Harbor Road North in unincorporated Palm Beach County shall be required to pay a Special Distribution Line Charge of $2,462.27 per connection. This special charge shall be in addition to any other new services charges required. Meter Size Amount 3/4" (adjust per index) $114.38 I" (3x month Service Charge) $147.33 j 1.5" (3x month Service Charge) $295.37 2" (3x month Service Charge) 3" (3x month Service Charge) $471.63 j $884.30 -1 4" (3x month Service Charge) $1,473.68 6" (3x month Service Charge) $2,947.49 7. Interest on Degosits - See Section 74-68., Village Code of Ordinances. 8. Meter or Hydrant Re -location for Customer's onvenience - Actual cost plus 10% of all related charges. See Section 74-69., Village Code of Ordinances. 9. Emergency Bulk Water Service Rate. per 1.000 s-... .... 55 gallon__ ........................ $�. 10. Capacity Reservation Fee (monthly per ERU1..........................................$11.92 11. Water Restriction Surcharge Adjustment - See Section 74-74., Village Code of Ordinances. 12. Excessive Variance Steil Adjustment - The Utility Director may approve an excessive usage credit (EUC) to a water bill, which, due to circumstances beyond the customer's control (e.g. leaks on the customer' s side of the meter), reflects consumption in an amount that is at least two times the customer's average monthly usage over the previous three (3) month period No customer shall be eligible for such an adjustment more than once per three (3) calendar year period. No such adjustment shall be granted in the event that the adjustment would cause a violation of Village Code Section 74-78 regarding prohibited free service, or Village Code Section 74-81 regarding the provision of adequate revenue to cover all costs of operation, maintenance and debt service. Any downward adjustment shall be made based on the Village's then current step rates. The lowest step rate that results in an adjusted water bill commensurate with the customer's average water bill over the previous three (3) months of billing shall be applied. In the event that application of the lowest step rate results in an adjustment that continues to exceed an amount that is double the customer's average water bill over the previous three (3) months of billing, then an adjustment equal to an amount equivalent to double the customer' s average water bill over the previous three (3) months of billing shall be made. The Utility Director shall determine that the customer meets each of the following criteria prior to approving any EUC: Customer notifies the Village of Tequesta's Customer Service Department of an excessive water bill that may be related to a leak or other circumstance beyond the customer's control. • Water consumption exceeds two times the customer's average monthly usage over the previous three (3) month period. • Customer acted promptly to remediate excessive water use (e.g. had leak on Customer's side of the meter repaired as soon as practicable) as documented by repair receipts or other acceptable methods. • The request for EUC was made within 1 month of the remedial action. No EUC may be approved where any of the following circumstances exist: • Excessive consumption is due to seasonal usage such as watering of sod, gardening, or usage from filling swimming pools and hot tubs/whirlpools , or washing vehicles, etc. • A leak resulting in excessive consumption was caused by a third party from whom the customer is able to recover their costs. Examples include. but are not limited to, theft, vandalism, negligence and construction damage, including unoccupied or vacant properties. • When excessive consumption continues for two (2) or more months, there will be no adjustment for the second or subsequent months. • "The meter has been accessed, tampered with, or turned on/off by anyone other than a Village of Tequesta Utility employee and that action results in excessive consumption. • The EUC would violate Village Code Sections 74-78 or 74-81. • A EUC was approved within the past three (3) calendar years at the same property. Notwithstanding the above provisions of this Excessive Variance Step Adjustment policy, the Village Manager may, from time to time, allow for step adjustments in excess of once per three (3) calendar years at the same property when extenuating circumstances exist that warrant the granting of relief. All such requests shall be reviewed on a case- by -case basis. Any relief granted by the Village Manager pursuant to this provision shall be limited to the same relief that would otherwise be available pursuant to the above EUC policy. 13. Miscellaneous Fees and Charges A. Returned Check- $25.00 if the face value does not exceed $50.00; $30.00 if the face value is more than $50.00 but does not exceed $300.00, $40.00 if the face value is more than $300.00. B. Late Payment Fees - 1 % of outstanding delinquent amount with a minimum charge of $5.00. C. Past Due Amounts on Disconnected Service - A 1 % per month penalty will be charged on all past due amounts after discontinuance of service plus any and all costs associated with securing collection of the past due amount. D. Meter Re -read ..................................................... $17.59 E. Meter Testinm 3/4 .............................................................................................. $ 79.2 3 1"..............•........................................................... $96.80 1.5 -------------------------------------------------------------------------------------------- $114.40 211 ........................................................................... $ 1 5 8.3 7 F. Field Premise Visit Duringbusiness hours............................................$26.38 Non -business hours..................................................$56.53 G. Line Location Services ................................................................ $70.41 H. Plan Review_...........3%oftheconstruction cost $150.00minimum I. Inspection Fee Per Visit ............................................... $100.67 J. Personnel & Equipment Charizes Field Technician*............................................$40.00/hour Lead Technician*............................................$50.00/hour Medium Equipment.........................................$45.00/hour Heavy Equipment............................................$60.00/hour Materials.........................................................Actual Cost *Includes use of pickup truck, hand tools, and small equipment. All labor charges incurred outside of Regular Business Hours will be charged at 1.5 times the hourly rate. 14. Tamnerin A. Removal charge..............................................................$123.94 B. Re -installation charge 3/4.................................................................................. $309.75 1 " or Larger ................................................Actual Cost C. Destruction of meterrelated equipment (1) Assessment for replacement of meter or meter related equipment (2) A minimum of $28.58 administrative charge per occurrence 15. Surcharge - Customers Outside the Village'- 25% surcharge on monthly rates, fees, and charges except for those set forth at Section 13.C. will be imposed for all customers located outside the corporate limits of the Village. 16. Automatic Annual Rate Adjustment - See Sections 74-72 and 74-73, Village Code of Ordinances.