Loading...
HomeMy WebLinkAboutResolution_77-05/06_05/18/2006RESOLUTION NO. 77-05/06 A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AWARDING A CONTRACT TO REGAL CONTRACTORS, INC., OF WEST PALM BEACH, FLORIDA, IN THE AMOUNT OF $10,725.00 FOR SITE WORK, CONCRETE SLABS, INSTALLATION FOR THE SKATE PARK EQUIPMENT AND SHADE .ZONE CANTILEVER UNIT FOR THE SKATE PARK FROM BUDGETED ACCOUNT #303-316-663.672 AND AUTHORIZING THE VILLAGE MANAGER TO EXECUTE THE CONTRACT ON BEHALF OF THE VILLAGE. THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE LAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AS FOLLOWS: S tion 1. Consideration to award a contract to Regal C tractors, Inc., of West Palm Beach, Florida, in the amount o $10,725.00 for site work, concrete slabs, installation for t Skate Park equipment and Shade Zone Cantilever Unit for t Skate Park, attached hereto the proposal as Exhibit "A" a is hereby approved, and the Village Manager of the V' lage of Tequesta is authorized to execute the contract on b alf of the Village. T FOREGOING RESOLUTION WAS OFFERED by Council Member W kips, who moved its adoption. The motion was seconded by C ncil Member Genco, and upon being put to a vote, the vote w~ as follows: FOR ADOPTION Jim Humpage Tom Paterno Geraldine A. Genco Pat Watkins AGAINST ADOPTION T a Mayor thereupon declared the Resolution duly passed adopted this 18th day of May, A.D, 2006. YO age ATTEST: '1 r'. wen Carlisle Vill .,,~, \+\~~~,, ~ ~:,~~ Hump ~~ ~ `~ ~ . ~ ~ "iii ~~~v ~O~p 0'99 pG ~~~~ v G ~'~ ~ ~ : t<` . N . :~_ _ SEAL '~= ' INCORPORATED: C ~~. ~~ 9T G~,~ 4 ,0y1 `QQ'` tt~ TEQUESTA e April 26, 2006 Mr. Greg Corbitt Parks and Recreation Department 399 Seabrook Road Tequesta, FL- 33469 RE: Shade Structures Installation Constitution Park Dear Mr. Corbitt: Regal Contractors Inc. proposes to furnish the required materials, labor and equipment to complete the following scope of work for the above referenced project. All work will be completed in a neat and first class manner and in a timely schedule. SCOPE OF WORK: Installation of Shade Structure per Ball Products Inc. proposal #23912 15'x 26' with 8' entry height $ 3,700.00 Permit fees $ 300.00 We exclude all storage, security, landscape, sod, irrigation, engineered drawings, site preparation and surfacing. Owner will locate all underground ., utilities, provide adequate survey and site plan, easement agreements, water for the installation and unobstructed access to the site:. Payment is due upon completion. Thank you for the opportunity to provide this quote. Respectfully, Paul L. Martin President April 26, 2006 Mr. Greg Corbitt Parks and Recreation Department 399 Seabrook Road Tequesta, FL 33469 RE: Concrete Slab On Grade Installation Constitution Park Dear Mr. Corbitt: Regal Contractors Inc. proposes to furnish the required materials, labor and equipment to complete the following scope of work for the above referenced project. All work will be completed in a neat acid first class manner and in a timely schedule. SCOPE OF WORK: Installation of 4" thick concrete slab I5'x 25' with fibermesh $ 2,250.00 Permit fees $ 100.00 We exclude all storage, security, landscape, sod, irrigation; engineered drawings, site preparation and surfacing. Owner will locate all underground utilities, provide adequate survey and site plan, easement agreements, water for the installation and unobstructed access to the site. Payment is due upon completion. Thank you for the opportunity to provide this quote. Respectfully, Paul L. Martin President April 28, 2006 Village of Tequesta 399 Seabrook Road Tequesta, FL 33469 RE: SkateWave Equipment Installation Constitution Park Play Area Dear Mr. Corbitt: Regal Contractors Inc., a certified installer of SkateWave and a~ state licensed General Contractor, proposes to furnish the required materials, labor and equipment to complete the following scope of work for the above referenced project. All work will be completed in a neat and first Blass manner and in a timely schedule. SCOPE OF WORK: ~` " Installation of SkateWave per proposal #23903 $ 3,850.00 & the reconfiguration of the existing equipment Receive, off-load, and handle all equipment deliveries $ 300.00 Terms are balance is due upon completion and acceptance by the owner. We exclude all storage, security, surfacing, site prep, permits and engineered drawings. Owner will locate all underground utilities; provide water for the installation and unobstructed access to the site. Respectfully, Paul L. Martin President Apri128, 2006 Mr. Greg Corbitt Village of Tequesta 399 Seabrook Road Tequesta, FL 33469 RE: Shade Structure Installation Constitution Park Dear Mr. Corbitt: Regal Contractors Inc., a certified installer of DuMor Inc. and a state licensed General Contractor, proposes to furnish the required materials, labor and equipment to complete the following scope of work for the above referenced project. All work will be completed in a neat and first class manner and in a timely schedule. SCOPE OF WORK: Installation of 2 DuMor Inc. trash receptacles $ 225.00 Terms are balance is due upon completion and acceptance by the owner. We exclude all storage, security, landscape, sod, irrigation and engineered drawings. Owner will locate underground utilities,. provide water for the installation and access to the site. Respectfully, Paul L. Martin President