HomeMy WebLinkAboutResolution_93-05/06_08/17/2006RESOLUTION N0.93 -05/06
A RESOLUTION OF THE VILLAGE COUNCIL OF
THE VILLAGE OF TEQUESTA, PALM BEACH
COUNTY, FLORIDA, APPROVING A PROPOSAL
FROM WYNN AND SONS ENVIRONMENTAL
CONSTRUCTION, INC. OF WEST PALM BEACH
FOR THE INSTALLATION OF A NEW PATHWAY
ALONG TEQUESTA DRIVE IN THE AMOUNT OF
$74,999.80 (ACCOUNT #303-390-663.650)
WHEREAS, The Village budgeted $75,000.00 for the installation of a
sidewalk along the north side of Tequesta Drive, continuing west from the existing
sidewalk and;
WHEREAS, Wynn and Sons Environmental Construction, Inc. submitted a
proposal to complete the installation in the amount of $74,999.80 and;
WHEREAS, Wynn and Sons Environmental Construction Inc.'s proposal is
piggybacked on Town of Jupiter Contract EPW-2005-25;
NOW, THEREFORE, be it resolved by the Village Council of the Village of Tequesta,
Palm Beach County, Florida, as follows:
SECTION 1: Consideration to award installation of Tequesta Drive pathway to Wynn and Sons
Environmental Construction, Inc. in the amount of $74,999.80 (account #303-390-663.650) is
hereby approved and the Village Manager of the Village of Tequesta is authorized to execute the
same on behalf of the Village.
THE FOREGOING RESOLUTION was offered by Council Member Genco, who moved its
adoption. The Resolution was seconded by Council Member Watkins, and upon being put to a
vote, the vote was as follows:
FOR ADOPTION
Jim Humpage
Tom Paterno
Geraldine A. Genco
Pat Watkins
AGAINST ADOPTION
The Mayor thereupon declared the Resolution duly passed and adopted this 17th day of August.
A.D., 2006.
MAYOR OF TEQUESTA
~ i;
~ ~~
Jim um a e
ATTEST: ~~`~~C~~ O F T FQ ~~~i~~
j ~ `:vP~~RP ORq j: GIN
=-'
(~ ~
_, ~ ~~_ __~: SEAL ~~_
_~. -,~ f~..._
' :INCORPORATED:
Gwen Carlisle % c~ :. _ ._:
Village Clerk
INTEROFFICE MEMORANDUM
TO: VILLAGE MANAGER
FROM: R GARLO, ASSISTANT MANAGER.
SUBJECT: TEQUESTA DRIVE PATHWAY
DATE: 8/4/06
CC: VII.AGE MAYOR AND COUNCIL
The Village budgeted $'75,000.00 in the FY 2005/2006 budget account #303-390-663.650 for
Pathway Improvements. The area identified for this project was Tequesta Drive. Specifically, the
extension of the existing pathway on the north side of Tequesta Drive slightly west of Seabrook
Road. The extension would go west, connecting the existing fragments along the way, and continue
as far as Armour Manor located at Tequesta Drive and Pinetree Drive. The pathway will be 4 feet
wide concrete to conform with the existing pieces.
The work proposal is from Wynn & Sons Environmental Construction, Inc. and pricing is based
on Martin County annual government contract #AR-05-343 and is not to exceed the budgeted
amount of $75,000.
Note that if this work is completed, the pathway will not connect to the corner of Country Club
Drive, and there will remain a section without a pathway in front of Bermuda Terrace.
JN & SONS ENVIRONMENTAL CONSTRUCTION. INC.
84".. st Lane South
West palm Beach, FL 33411 Phone 561»686-607
Fax 561-686-2433
June 15, 2006
Village of Tequesta
250 Tequesta drive
Suite 300
Tequesta, Florida 33469
Attention: Mr. Bob Garb
Reference: Tequesta Drive sidewalk extension
Martin County annual contract
AR-05-343
ITEM # 5 INSTALLATION OF 4 "CONCRETE
9375 SQ. FT. ~ $4.00 PER SQ FT $37,500.00
ITEM #10 INSTALLATION OF TRUNDICATED DOME DETECTABLE WARNING
34 SQ FT @ $30.00 PER SQ FT $1020.00
IT~" " "" 1$ INSTALLS FDOT TYPE D-CURB
550' @ $12.00 PER LF X00.00
ITEM # 36 EXCAVATIONS OF SOILTO IMPLIMENT IMPROVEMENTS
618CY@$10.OOPERCU $6180.00
ITEM # 37 SUPPLIES CLEAN ENBANKMENT
869 CY ~ $10.00 $8690.00
ITEM # 50 BAHIA SOD
20,000 SF ~ $ .25 PER SF $5000.00
ITEM # 51 FLORITAM SOD
16,666 SF @ $ .30 $4999.80
ITEM # 53 MISC. LABOR (FLAGMAN)
167 HOURS Gm $30.00 $5010.00
TOTAL PROPOSAL $74,999.80
THANK YOU