HomeMy WebLinkAboutDocumentation_Regular_Tab 03_11/17/2005VILLAGE OF TEQUESTA
MEETING AGENDA ROUTING SHEET
MEETING DATE: November 10, 2005
AMENDED MEETING DATE: /~- i 7- oS
SUBJECT: Lighting System at Tequesta Park
COVER MEMO ATTACHED: Yes
CONSENT AGENDA OR REGULAR AGENDA: Unfinished Business
RESOLUTION OR ORDINANCE NUMBER:
ORIGINATING DEPARTMENT: Assistant Manager
r----._
DEPARTMENT HEAD APPROVAL ~~~Q-~
FUNDING SOURCE: 2005/2006 BUDGET
ACCOUNT NUMBER: E(°~ - a-3 n ~ ~~~ . 3 a 3
CURRENT BUDGETED AMOUNT AVAILABLE: $ ti~~'.
AMOUNT OF THIS ITEM: $ t / 3 ~~0 ~
BUDGETED BALANCE REMAINING: v/j~
(PIGGYBACK CONTRACT NAME AND #
OR
COMPETITIVE BID FOR ANYTHING OVER $10,000 -ATTACH 3 BIDS)
APPROVALS:
FINANCE DIRECTOR
VILLAGE MANAGER
VILLAGE ATTORNEY (if Needed) Yes
PLEASE RETURN TO VILLAGE CLERK TO PLACE ON THE AGENDA
INTEROFFICE MEMORANDUM
TO: VILLAGE MANAGER
FROM: R. GARLO, ASSLSTANT MANAGER ~~
SUBJECT: TEQUESTA PARK LIGHTING
DATE: 11 /1 /05
CC: VII,I.AGE MAYOR AND COUNCIL
All existing lighting in Tequesta Park was destroyed in last year's hurricanes. This included the
following damages:
Tennis courts 16 luminaires
Baseball fields 481uminaires
Basketball courts 8 luminaires
Control panel security fencing
During our FEMA disaster relief efforts, the Village was approved for this project in the
amount of $98,976.00. Also approved was an additional $1,979.52 for Village administrative
expenses. The total approved project is $100,955.52. (See attachment 1)
Accordingly. FEMA has already disbursed 90 percent of the project funding to an account with
the State Department of Community Affairs where it awaits request for reimbursement This
amount is $91,057.92. The state of Florida will then disburse an additional 5 percent state match to
the Village. State matching funds of $4,552.89 plus FEMA funds of $91,057.92 will provide the
Village with a total of $95,610.81 for the project.
The state will disburse these funds to the Village as soon as a notice to proceed is given to the
approved contractor. Subsequently, the Village is not required to provide payment in advance of the
actual reimbursement.
Immediately after the hurricanes, the Village solicited quotes for the cost of repair and
replacement to all lighting. Because of the nature of the field lighting systems, there was a limited
response and two reliable companies responded. Quotes were received from Arlington Electric and
Musco Lighting.
At the July 2005 council meeting, Council directed staff to proceed with efforts to repair the
lighting systems. (See attachment 2)
Because of the cost of the repairs, a set of bid documents was prepared and a Request for
Proposal was sent out in September 2005. No responses were received at that time.
Accordingly, it is staff's recommendation that the repairs be performed by Arlington Electric
who provided the most affordable quote. (See attachment 3)
• The cost for repairs is as follows:
1. Tennis courts $22,600
2. Baseball fields $88,900
3. Basketball courts $11,700
4. Control panel security fencing $ 2,300
It is staffls request to proceed with items 1,2 and 4. The cost for these repairs would total
$113,800. This amount, less the FEMA reimbursement in the amount of $95,610.81, would require
an additional $18,189.19 be appropriated for the repairs.
The alternative would be to limit the current scope of work to the ball fields and security
fencing which would be covered by the allocated FEMA funding.
~:
•
DATE: 06/15/2005 FEDERAL EMERGENCY MANAGEMENT AGENCY
PROJECT APPLICATION SUMMARY (P.2) AttaChP17@11t 1
DISASTER #: 1545
PACKAGE NO: 60
P.A. ID: 099-71525-00 APPLICANT: TEQUESTA, VILLAGE OF
PW# VSN CAT INF COST SHR PROJECTED COMPL DATE APPROVED PW AMOUNT
3991 0 G N N 03/04/2006 $98,976.00
Site Number: 1
DAMAGED TEQUESTA PARK
FACILITY:
TEQUESTA PARK (2280 COUNTY LINE ROAD, JUPITER, FL)
FACILITY
LOCATION: WORK TO BE COMPLETED BY CONTRACTUAL SERVICES:
LIGHTING SYSTEM:
SCOPE OF WORK: ~ ~g SPORTS LIGHT POLES AND FIXTURES IN TOTAL (BETWEEN 40' AND 80' HIGH) WITH MULTIPLE {2-8) FIXTURES
PER POLE ARE TO BE REALIGNED AND/OR REPAIRED AT TEQUESTA PARK. THE BASKETBALL COURTS NAVE 4
LIGHTS (WITH 2 FIXTURES EACH); THE BASEBALL FIELD HAS 6 LIGHTS (WITH 8 FIXTURES EACH), AND THE
TENNIS COURTS HAVE 8 LIGHTS (WITH 2 FIXTURES EACH) IN TOTAL.
NOTE: A COPY OF THE LEASE FOR THIS PARK FROM THE STATE WAS INCLUDED IN THE BACK-UP FOR PW#
A-005SM FOR THIS APPLICANT (FEMA PW# 1528).
ALL BACK-UP DOCUMENTATION IS RETAINED BY THE APPLICANT FOR POSSIBLE FUTURE AUDIT PURPOSES.
LIGHTING SYSTEM FOR TEQUESTA PARK IS NOT COVERED UNDER THE VILLAGE OF TEQUESTA INSURANCE
POLICY, HELD BY PREFERRED GOVERNMENT INSURANCE TRUST.
1 PW $ AMOUNT ELIGIBLE $ FEDERAL SHARE
PWs: $98,976.00 $89,078.40
SUBGRANTEE ADMIN EXP: $1,979.52 $1,979.52
TOTAL: $100,955.52 $91,057.92
GRAND TOTAL: 1 PW
$ AMOUNT ELIGIBLE $ FEDERAL SHARE
PWs: $98,976.00 $89,078.40
SUBGRANTEE ADMIN EXP: $1,979.52 $1,979.52 GRANTEE
TOTAL: $100,955.52 $91,057.92 ADMIN EXP: $455.29
APPROVED BY: JUSTIN DEMELLO DATE: 06/10/2005
pISASTER RECOVERY MANAGER
Page 1 of 1
MINUTES -Village Council Regular Meeting 07/14/05
Page 26
Attachment 2
MOTION: Yice Mayor Watkins moved to approve setting the ftrst public hearing date
for Wednesday, September 7, 2005 at 6:00 p. m., and the Regular Council Meeting at
7: 00 p. m., in the Tequesta Recreation Center, 399 Seabrook Road; motion passed S-0.
24.
.DELETED-
25. Council discussion for Repair of Lighting system at Tequesta Park.
Mr. Greg Corbitt, Director of Pazks and Recreation mentioned he had been
working with Mr. Dan Gallagher, Risk Manager, and Assistant Manager
Robert Gazlo regarding the repair of the lighting at Tequesta Pazk. He
indicated Mr. Gallagher had experience with park lighting systems out in
California, and Mr. Gazlo had been working with FEMA for
reimbursement due to the damage caused by the hurricanes. Mr. Corbitt
noted the lighting on all three azeas in the park, which included the
basketball court, the tennis court and the front field, needed to be repaired.
He commented Staff received two quotes on this project, Musco Lighting
and Arlington Electric, because they were the only two companies that
would bid the project. He mentioned after meeting with both companies
Staff recommended Musco do the lighting for the ballfields and the
basketball courts. He indicated the reason Musco was chosen was for their
experience, and to focus the lights in the proper directions so there were
no dark spots on the fields. He noted Arlington does electrical and can
handle the lighting for the tennis court, but lighting for the tennis courts
was basic directional lighting.
Mr. Corbitt commented the quote received from Musco to do the two
areas would be $76,032.00, including a controlled link monitoring system.
He mentioned this one time fee included ten year warranty. He noted the
only thing during the ten years the Village would be responsible for would
be changing out a fuse. He noted Musco would have a tum around time
within 24 hours for repairs. He explained the monitoring system would be
on 24hrs/7 days a week. He pointed out another quote on the materials was
a quote from William Murphy, General Contractors to enclose the
electrical area currently in the pazk. He mentioned since being employed
by Tequesta he had heard coaches and players were jumping the fence and
turning on and -off the lights. He ,explained Staff had tried everything
including locking the fence. He suggested adding an enclosure so no one
could enter, and the proposed price would be $24,300.00. He noted FEMA
would be reimbursing the Village $98,976.00, and the Village could
receive 90% of that amount in advance. Council Member Genco asked the
cost of lighting the tennis courts. Mayor Humpage responded $30,888.00.
Council Member Genco asked if that would be in addition to the
$76,032.00.
26
MINUTES -Village Council Regular Meeting 07/14/05
Page 27
Mr. Corbitt responded in summary the total cost would be Musco Lighting
- $84,032.00, Arlington Electric - $30,888.00, Musco -Additional wiring
for the monitoring system - $10,000.00, and the building enclosure
$24,300.00 for a total project cost of $148,420.00. Village Manager
Couzzo asked Council for direction on how to proceed, whether they
would want to pay for it in this years budget, or budget for next fiscal
yeaz. Council Member Resnik asked how much would FEMA pay for
reimbursement. Village Manager Couzzo explained 90%. Mayor
Humpage noted the Village would be receiving $98,976.00 from FEMA,
so there would be a $50,000.00 shortfall. ,Village Manager Couzzo noted
FEMA would not be reimbursing for the building enclosure, and that
would be deducted before the reimbursement. Mr. Corbitt explained the
building would not be eligible for FEMA reimbursement.
Council Member Resnik questioned what was being paid by FEMA. Mr.
Corbitt noted FEMA would reimburse 90% of the $84,032.00 and
30,888.00; the Village would -pay for the additional wiring and the
enclosure. Mayor Humpage mentioned prior to getting elected to Council
he maintained the electrical needs at the pazk, and he went through the
prices with Mr. Gallagher. He mentioned basically the Village would be
spending approximately $115,000.00, in which FEMA would give
$98,000.00. He noted the additional fees come from the additional wiring
for the .monitoring system. He pointed out ,the advantages of the
monitoring system was it actually monitored the system to make sure it
was functioning properly, and had built in safeguazds such as phase
failure, phase surges, etc. He mentioned before he was on Council he also
took care of the tennis court lighting. He noted the equipment had
continual problems, because there was not a safeguard system in place. He
mentioned the enclosure had been so damaged by everyone that a crow bar
was needed to enter the premises. He stressed another thing would be the
liability issues, if they could get into the electrical area. He felt if Council
was going to spend the $115,000.00 that they should consider spending
the additional funds to protect the. Village's investment, because it was a
major investment. He noted where the $50,000.00 comes from he was not
certain at this time.
Council Member Genco asked if the electrical system goes anywhere neaz
the pavilion. Mayor Humpage noted it was probably 60 feet away. Council
Member Genco commented she noted the Village was going to be doing
improvements to the building, and asked if it could be placed in there.
Mayor Humpage felt the problem would be the transformer system, and
FPL having to redo it. Mr. Corbitt noted he might be able to do better on
the price of the enclosure. Council Member Patemo questioned on the
Musco proposal for the tennis courts, when he counted up the lights there
were only twice as many as the basketball, but the prices were out of
alignment, even more than the baseball.
27
MINUTES -Village Council Regulaz Meeting 07/14/05
Page 28
Council Member Paterno felt the $88,000.00 may not be correct. Vice
Mayor Watkins noted she thought it was an error also. Mr. Corbitt noted
the $88,245.00 quoted by Musco on the tennis courts .included
replacement of everything, where as Arlington was only going to replace
the fixtures. Council Member Paterno noted Musco would be controlling
the lighting system for the basketball and baseball fields, but not the tennis
courts. He noted there would be two separate systems. Mayor Humpage
indicated the tennis courts were on a separate control system, and that it
was remote from the main controller. He noted there was already
sufficient .power and that they were currently hurricane rated. Council
Member Paterno noted the warranty would take caze of everything except
the tennis courts. He asked if the Village would have to fix the tennis
courts. Mayor Humpage commented by law Arlington would have a
warranty for one yeaz, parts and labor, but did not know what the
manufacturer would give on the fixtures.
Council Member Paterno handed out some pictures on the enclosure. He
mentioned when he visited the site the gate was open -and the lock was
unlocked, and there were no locks on any of the boxes. He felt it was very
easy for someone to damage or vandalize the area. He noted if it was
locked, and a fence placed over the top it would be fixed at a minimal
cost. Mayor Humpage explained the gray transformer inside the fence was
susceptible to the weather, and felt it would increase the longevity of the
equipment to enclose it. Village Manager Couzzo pointed out this was a
discussion for Council input, but there was a lot more work that needed to
be done, such as plans and specifications on the building. He asked
Council if it was something that they wanted Staff to move forward on.
Mayor Humpage asked if the Village had received the FEMA money, and
whether there was any criteria to secure the money. Village Manager
Couzzo noted the Village had not received the FEMA money, and did not
know if the criteria required it be done in a certain amount of time. Mayor
Humpage commented he would like to see the residents start using the
park again. Village, Manager Couzzo agreed, and noted Staff needed to
look at some of the alternatives for the building, and put together some
firm numbers.
Vice Mayor Watkins asked if the Village could proceed with the lighting
this yeaz, so the FEMA money could be collected, and build the building
out of next years budget. Village Manager Couzzo indicated that was a
possibility also. He mentioned he wanted to see how long it was going to
take to get the FEMA money. He mentioned if they receive the money in
advance, it still could take up to 90 days, which would be in next years
budget. Council Member Genco agreed it would come out of next years
budget. She asked if the proposed lighting fixtures could be lowered for
hurricanes. Mayor Humpage responded no, and explained the cost of the
poles that could be lower were very expensive.
28
~,
MINUTES -Village Council Regular Meeting 07/14/05
Page 29 ~ ~~
Mayor Humpage mentioned the proposed fixtures have to be hurricane
rated to withstand a hurricane, just like the ones at the tennis courts that
were still there. Council Member Paterno commented he was all for doing
the lighting immediately, as long as the Village would be reimbursed from
FEMA, but that he would like to discuss the building in more detail.
Village Manager Couzzo noted Musco was so detailed that .the lights
would remain after a hurricane, but they would need to be adjusted. Mayor
Humpage summarized it was a Consensus of Council to move forward
with the lighting to get-the park hack in operation, but to take another look
at what could be saved on the building.
XI. ANY OTHER MATTERS
Council Member Paterno noted at the March 28, 2005 Council Workshop there
was discussion regarding the Council Summary procedures. He asked if the item
had been tabled to -the following Council Meeting. Village Manager Couzzo
indicated Council had approved the, revised procedures. Council Member Paterno
noted Council was to go over the new Goals and Objectives in April for the
following budget year. He mentioned that had not been done to date, and asked if
it could be placed on the agenda for the next Council Meeting in August. Mayor
Humpage noted Council was to give the Village Manager the goals for the
upcoming year. Council Member Resnik asked for clarification on the goals, and
what was Council trying to achieve since the budget was basically done for next
yeaz. Council Member Genco felt it was still an operational priority. Mayor
Humpage explained it would not hurt for Council to give some idea of their
desires, and if it was not in this coming years budget, it could be placed in
2006/2007 budget. Consensus of Council agreed to place it on the August 11,
2005 Regular Council Meeting agenda.
Council Member Genco asked if the pazk attendant could make sure all the locks
were locked in the morning and in the evening. Mr. Greg Corbitt, Director of
Parks and Recreation agreed to make sure Staff would check the locks, in the
mornings and in evenings.
XII. ADJOURNMENT
MOTION: Council Member Resnik moved to adjourn the meeting; seconded by Yice
Mayor Watkins; motion passed S-0.
The meeting was adjourned at 10:00 P.M.
Gwen Carlisle
Village Clerk
29
1d-13-' g5 ID'! ; 9'! rHUCI-HtSl,Hll15 nnr.5n i~IHUU1v
ARLINGTON
ELE~TRI~
E~rennc:w~ Cc~vrn~c~a~gf
Qctober 12, 2005
ARCADIS RMA, Inc.
641 S Lake Worth Road
Suite 307
Lake Worth, F133453-2947
Attn: Thomas C. Jensen
)tire: 'Village of requests
Tequesta Park Lightittg
1. Lighting l~rovcxncnts
~ol~s~savJll
~ -,~
Attachment 3
.... s~•e:K~:.tir~,r S 8VlNG FtoR1QA ~/NCE 19i6b _ _
1, Tannic Courts - Replscs 16 turninairas SC22,600.00
2.8aseball Field -- Itepltice 48 Luminaires $88,900.00
3. Basketball Coups- Replace 8 Luminaires $11,700.00
4. Control Panel Secwlty Fencing Z 300.00
Total BBSC Bid S 125~SD0.00
lI. Alternate Bid 1tCtn l - No Bid
1. Wire R,;plaacm~t
A. Softball Fields *S No Bici
B. Basketball CourL~ tS No Bid
*No plan or informat~or on w1rSt Size wire is c:aisring.
NOTES:
I. Pe~ratit Pees not included.
II. Replacing lumirtialres with same look as axistiti8.
IYI. Photometric®not included, If Headed they cdn be famished for arl additional charge_ A
C.A.13. drawing or a iet oI'bluaprints need to ha provided.
IY. 1b000 - 2,01- root cEtrtdtcs as shown csn'tbe guaranteed.
V, Restoraeion oFdarrtaftsed suePaces not inoludad.
Respectfully,
Roy A. Wright
Sr. 'Vice President
RAW/dk
Arlington Electric !nc_
3251 $.E. pixie Hwy, ~ PO box b3 -Stuart, FL 34995 • (772) 287-1353 • 800-330.1353 • www.arlingtonelectricirtt_com
LiCtlr-ied ElBttrical Cornraceors • Florida EC0000127
TOTRL P.02
OCT-13-2005 06:48AM FAX:5614338011 Id: PAGE:002 R=96%
RESOLUTION NO. 29-05/06
• A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA,
PALM BEACH COUNTY, FLORIDA, AMENDING THE 2005/2006 GENERAL FUND
#001 BUDGET $95,611 BY APPROPRIATING ADDITIONAL FUND BALANCE AND
INCREASING REVENUES AND EXPENDITURES TO PAY FOR THE REPAIR OF
DAMAGES TO TEQUESTA PARK LIGHTING SYSTEMS ASSOCIATED WITH HURRICANE
FRANCES AS FOLLOWS:
Revenues:
Reimb. FEMA Acct #001-000-369.104 $91,058
Reimb. Florida DCA Acct #001-000-369.106 4,553
$95,611
Appropriated Fund Balance 18,190
$113,801
Expenditures:
R & M -Tequesta Park Acct #001-230-546.323 5113,801
WHEREAS, the Village of Tequesta estimates that it will need
to increase the General Fund #001 2005-2006 budget $113,801 as
a result of estimated costs associated with Hurricane Frances
and;
WHEREAS, The Village of Tequesta expects the General Fund #001
to be reimbursed approximately $95,611 for such costs and;
WHEREAS, The Village of Tequesta needs to appropriate
• approximately $18,190 of additional Fund Balance to cover the
remaining non-reimbursable costs associated with Hurricane
Frances and;
NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE OF TEQUESTA, PALM
BEACH COUNTY, FLORIDA, AS FOLLOWS:
A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM
BEACH COUNTY, FLORIDA, AMENDING 1'HE 2005/2006 GENERAL FUND #001 BUDGET
$113,801 BY APPROPRIATING ADDITIONAL FUND BALANCE AND INCREASING
REVENUES AND EXPENDITURES TO PAY FOR COSTS ASSOCIATED WITH HURRICANE
FRANCES IS HEREBY APPROVED
THE FOREGOING RESOLUTION WAS OFFERED by Councilmember who
moved its adoption. The motion- was seconded by Councilmember
and upon being put to a vote, the vote was as follows:
FOR ADOPTION
AGAINST ADOPTION
•
• The Mayor thereupon declared the Resolution duly passed and adopted this
day of, A.D.,
MAYOR OF TEQUESTA
Jim Humpage
ATTEST
Gwen Carlisle
Village Clerk