Loading...
HomeMy WebLinkAboutResolution_82-05/06_06/08/2006RESOLUTION NO. 82-05/06 A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AWARDING A CHANGE ORDER TO CONE & GRAHAM INC., OF WEST PALM BEACH, FLORIDA, IN THE AMOUNT OF $56,669.00, FOR THE ADDITIONAL REPAIRS TO THE TEQUESTA DRIVE BRIDGE, AND APPROPRIATING ADDITIONAL FUND BALANCE OF $56,669.00 FROM THE GENERAL FUND #001, AND AUTHORIZING THE TRANSFER OF THESE FUNDS TO THE CAPITAL IMPROVEMENT FUND #301, ACCOUNT # 301-337-653.605, TO FUND THE ADDITIONAL COST OF THE TEQUESTA DRIVE BRIDGE REPAIRS AND AUTHORIZING THE VILLAGE MANAGER TO EXECUTE THE APPLICABLE CHANGE ORDER ON BEHALF OF THE VILLAGE. WHEREAS, the FDOT (Florida Department of Transportation) conducted a Post Rehabilitation Inspection of the Tequesta Drive Bridge; WHEREAS, the FDOT has requested certain immediate, additional repairs to the bridge based on that inspection; WHEREAS, Cone & Graham, Inc. have reviewed the report and proposed to complete the necessary repairs as a change order to their original repairs in the amount of $56,669.00; WHEREAS, the Village's bridge engineers have reviewed the FDOT report and the proposed scope of repairs and approve of same; NOW, THEREFORE, be it resolved by the Village Council of the Village of Tequesta, Palm Beach County, Florida, as follows: Section 1. Consideration to award a change order to Cone & Graham, Inc., of West Palm Beach, Florida, in the amount of $56,669.00, for the additional repairs to the Tequesta Drive Bridge, attached hereto as Exhibit "A", and incorporated by reference as a part of this resolution is hereby approved and the Village Manager of the Village of Tequesta is authorized to execute the same on behalf of the Village. tion :The appropriation of additional fund balance of $56,669.00 from General Fund #001 and authorizing the transfer of such amount from General Fund #001 to the Capital Improvement Fund #301, account # 301-337-653.605, to fund the additional cost of the Tequesta Drive Bridge Repairs is hereby approved. THE FOREGOING RESOLUTION was offered by Council Member Watkins, who moved its adoption. The Resolution was seconded by Council member Genco, and upon being put to a vote, the vote was as follows: FOR ADOPTION Jim Humpage Tom Paterno Geraldine A. Genco Pat Watkins AGAINST ADOPTION The Mayor thereupon declared the Resolution dul ass d and adopte is 8 day of June A.D., 2006. ~` ~~ ~---~f - ,z Mayor Jim Hu pag ATTEST: `\\~0-1---nr~~~~~~ ' ('~-~~t_ ~~~C~E OF TFQ,~~~ 0 V' lage Clerk Gwen Carlisle _ ~ . GS "9>~ .~~+ _ .~ : EAR :n= N,INCORPORATED: ~~~~i~~F F1.~P~~~~~ ~~~~lit t i ~~-~~~~ _ , ~ ~ CONE & GRAHAM, INC. ~~ ~ HEAVY CoNSTRUCT1oN P. 0. BOX 310167 TAMPA, FLORIDA 33680 (813) 623-2856 RC/rc EAST COAST DIVISION 1767 HILL AVENUE WEST PALM BEACH, FL. 33407 561-842-3196 (PHONE) 561-842-3197 (FAX) 5201 CONE ROAD TAMPA, FLORIDA 33610 FAX (813) 620-1602 PROPOSAL SUBMITTED TO PHONE DATE VILLAGE OF TEQUESTA (561) 575-6201 May 31, 2006 Attn Bob Garlo FAX (561 575-6245 STREET JOB NAME TEQUESTA DRIVE EMERGENCY BRIDGE REPAIR TEQUESTA COUNTRY CLUB BRIDGE CITY, STATE AND ZIP CODE JOB LOCAT]''. ~ VILLAGE OF TEQUESTA, F1. 33469 I TEQUESTA ARCHITECT/ENGINEER DRAWING Nc - -- --- - - --- T _ _ _ _ _ _ - -1 BRIDGE DESIGN ASSOCIATE N ~ A Cone & Graham, Inc. (C&G) proposes the following: 1. In spans 2 and 4 remove all loose concrete from the underside of the deck units. Clean all rust from rebar and strand. Paint an epoxy material over All spalled areas. 2. On the east end bent remove the spalled concrete from the Southeast corner of the bridge, clean all rebar and paint an epoxy material over the spalled areas. 3. Make all other repairs referenced in Bridge design associates letter dated May 8, 2006 to the Village of Tequesta. Exclusions: Notes: Fifty Six Thousand Six Hundred Sixty Nine - - - - 00/100 dollars ($56,669.00). Accepted by: By: ~ , NC. URE Randy Cropp, East Coast Division Note: rn;s proposal tttay be withdrawn by us if not accepted within - 30 -days. I, r ~~ l (Fir N 4 SIGNATU Title: Ipf Date: (~~1~(~~ ACCEPTANCE OF PROPOSAL _ The abo~ P~ and conditioner are sativfectory and are hereby aeeepted. Yua are aatnua;zed to do the work as apecifa;d. The above quotation is subject [o all teams and conditions of both sides hereof, and becomes s contract when acceptance is signed by an authorized agent of each party. Payment will be made as outlvted in the Terms and Conditions of Contract on the reverse side of this proposal. - over - CONE ~ GRAHAM, INC. HEAVY CONSTRUCTION P. O. BOX 310167 TAMPA, FLORIDA 33680 (813) 623-2856 EAST COAST DIVISION 1767 HILL AVENUE MANGONIA PARK, FLORIDA 3:1407 561-842-3196 (PHONE) • 561-842-3197 (FAX) June 16, 2006 Village of Tequesta 2J V Tell il.JtCl Ll 1 V Z Suite 300 Tequesta, FL 33469-6203 RE: Tequesta Drive Bridge Repairs -Proposal dated 3/31/06 Attention: Gwen Carlisle Gentlemen: 5201 CONE ROAD TAMPA, FLORIDA 33610 FAX (813) 620-1602 Received JUN161p~ Vi~l~9~ ~igr'~ Cuff Attached please find original proposal dated May 31, 2006 which has been signed by Randy Cropp, East Coast Division Manager for Cone & Graham, Inc. If you have any questions, please feel free to give me a call. Sincerely, Yvette Gulick Office Manager Enc.