RESOLUTION NO. 87-04/05
A RESOLUTION OF THE VILLAGE COUNCIL OF THE
VILLAGE OF TEQUESTA, PALM BEACH COUNTY,
FLORIDA, AWARDING A PROPOSAL TO MURRAY LOGAN
CONSTRUCTION, INC., OF WEST PALM BEACH,
FLORIDA, IN THE AMOUNT OF $28,000.00 FOR BANK
STABILIZATION at US 1 BRIDGE, WITH FUNDING
COMING FROM THE DRAINAGE MAINTENANCE ACCOUNT
#403-250 546.308 AND AUTHORIZING THE VILLAGE
MANAGER TO EXECUTE THE APPLICABLE PROPOSAL ON
BEHALF OF THE VILLAGE.
NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE
COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH
COUNTY, FLORIDA, AS FOLLOWS:
Section 1. Consideration to award a proposal to
Murray Logan Construction, Inc., of West Palm
Beach, Florida, in the amount of $28,000.00, for
Bank Stabilization, attached hereto as Exhibit ~~A"
and incorporated by reference as a part of this
Resolution is hereby approved and the Village
Manager of the Village of Tequesta is authorized
to execute the same on behalf of the Village.
THE FOREGOING RESOLUTION WAS OFFERED by
Councilmember Resnik, who moved its adoption. The
motion was seconded by Vice Mayor Watkins, and
upon being put to a vote, the vote was as follows:
FOR ADOPTION
AGAINST ADOPTION
Jim Humpage
Pat Watkins
Geraldine A. Genco
Edward D. Resnik
Tom Paterno
The Mayor thereupon declared the Resolution duly
passed and adopted this llt'' day of August, A. D,
2005.
MAYOR OF TEQUESTA
!- - ~ ~
`~-- 9 u
Jim Humpag
`~~~ ~ ~ O F TF iii
ATTEST : w~`vP~' ~POR. 4~Gi~'~
~L~--~-~ L ~~ ~ o~~ _,nvcSEAL :a
N ,. ~RP~RATED: ?
Gwen Carlisle ~ ~ ~'G 9y1 ~ Q
~i 9 ~ NF
Village Clerk ~~~~~~FOF ~`~~`~~~
~lll i 11111
_, HURRA'Y' Y,OGAN CONSTRUCTION, YNC.
Ceuerafl Contractors
313 63° frail North
West Palm Beach, FZ, 33413
Phone: 561-686-3948
Pax: 561-b86-7465
FA7~ TRANSII~TTAL COVER SHEET
DATE: 7/11/2005
PLF~ISE DELIVER TO: Russell White
COMPANY: Village of Tequesta Fax 575-6245
FROM: bavid Logan
SUBJECT: US1 Bridge RO OutFall Shoring
Quotation attached for two options discussed on site. Also included a Concephaal Sketch for clamcation.
Call me with any questions.
David Logan
TOTAL PAGES INCLUDING COVER SHEET.
EXCEL/FAX CGVER.xls
~ ~d ~s~s~oN wd~a:a. c~.1~ . ~:.
M'(JRRA'Y LOGAN CONSTRUCTION, INC.
General Contractors
313 65'~ Trail North
West Palm Beach, FL 33413
TELEPHONE 561-686-3948
FAX 561-686-7465
QUOTATION
DATE: 7/11/05
TO: 'Village of Tequesta
P.O. Box 3273
Tequesta, FL 33469
Attn: Mr. Russell Whitc
NAME OF PROJECT:
RO Outfall Bank Erosion Protection
T.ACATION:
C7S 1 Bridge over 3upiter Inlet
PLANS AND SPECIItICATIONS:
Tequesta
WE PROPOSE TO ]FrTRNTS)EI ALL LABOR, MATERIAL AND EQUIPMIENT TO PERFORM THE FOLLO'GV'YNG:
Provide Erosion Prouction For RO Outfall Pipe at Northwest Comer of CJS 1 Bridge as follows:
Option 1-Steel Sheet Piling:
A Mobilize.
B. Supply/install SO feet of steel sheet piling up to ZO' long. Sheeting to be coated prior to installation with coal tar
epoxy. Sheeting to be placed between existing bag riprap and outfali pipe. See conceptual sketch.
C. Demobilize.
FOR THE LUMP SUM OF $48,000.00
Alternate To Add Concrete Cap $11,000.00
Total With Concrete Cap $59,000.00
Option 2 -- Rock Riprap Siope Protection.
A. Mobilize.
B. Supply/install filter cloth.
C_ SupplyJinstali 2' thick blanket of rock riprap on filter cloth. Rock to be placed against waterward face of existing
bag riprap. See conceptual sketch.
D. Demobilize.
FOR THE LCJMI' SUM OF $2$,000.00
NOTES:
1. Engineering, permits and fees eyceludcd.
2. Murray Logan Construction, Inc. will honor all terms and conditions of our existing annual contract with Northern
Palm Beach County I~mprovetnent District should you elect to piggy back said contract for this work
3. Attached Conceptual Sketch represents quoted options as discussed at site visit.
HU'YERS' SIGNED ACCA.PTANCE CONSTtTtTIES A BINDIIdd CONTRACT. IN THE E'V'ENT TITT3RE IS ANY DEFAULT IN PAYII~NTS DUH UNriER
TEILS CONTRACT' AND 7HE SAME LS PLACEb IAI TRH HANDS OF AN ATTORNEY FOR COLLECTION, THE PURCIIASI3R qND/OR PURCHASERS
HEREBY AGREE TO PAY ALL COST OF COLLECTION INCLUDING, BUT NOT LIMPrirb TO, A REASONABLE ATTORNEY'S FEE. TERMS NLT 30
DAYS.
ACCEPTED:
DATE
MURR.AY LOGAN CONSTRUCTION, INC.
TTTLE: David Lo ice President
z .d 5s«~~N
wd~a~a~ ~ooz ~ <<~ i~r
Village of Tequesta
Purchase Order Requisition
(Not a Purchase Order) Date: 8/11/2005
Date Purchase Order is Req'd: ASAP
Department: Utilities
Req. #:
Quotes Received: (See Attached)
Vendors Recommended Vendor: Vendor #:
Murra Lo an Construction, Inc.
Sole Provider Address: 313 65th Trail North
2 City: West Palm Beach
3 State & Zip: Florida, 33413
Comments:
Pricin is i backed from the Northern Palm Beach Coun Im rovement Districts anuual contract
#N0024-06
Manuf./ Available Balance
Item Descri tion Part# Q Unit Price Total Cost Account # Finance Use Onl
Stabilization $28,000.00 403-250 546.308
Total: $28,000.00