Loading...
HomeMy WebLinkAboutResolution_87-04/05_08/11/2005,~ . . t RESOLUTION NO. 87-04/05 A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AWARDING A PROPOSAL TO MURRAY LOGAN CONSTRUCTION, INC., OF WEST PALM BEACH, FLORIDA, IN THE AMOUNT OF $28,000.00 FOR BANK STABILIZATION at US 1 BRIDGE, WITH FUNDING COMING FROM THE DRAINAGE MAINTENANCE ACCOUNT #403-250 546.308 AND AUTHORIZING THE VILLAGE MANAGER TO EXECUTE THE APPLICABLE PROPOSAL ON BEHALF OF THE VILLAGE. NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AS FOLLOWS: Section 1. Consideration to award a proposal to Murray Logan Construction, Inc., of West Palm Beach, Florida, in the amount of $28,000.00, for Bank Stabilization, attached hereto as Exhibit ~~A" and incorporated by reference as a part of this Resolution is hereby approved and the Village Manager of the Village of Tequesta is authorized to execute the same on behalf of the Village. THE FOREGOING RESOLUTION WAS OFFERED by Councilmember Resnik, who moved its adoption. The motion was seconded by Vice Mayor Watkins, and upon being put to a vote, the vote was as follows: FOR ADOPTION AGAINST ADOPTION Jim Humpage Pat Watkins Geraldine A. Genco Edward D. Resnik Tom Paterno The Mayor thereupon declared the Resolution duly passed and adopted this llt'' day of August, A. D, 2005. MAYOR OF TEQUESTA !- - ~ ~ `~-- 9 u Jim Humpag `~~~ ~ ~ O F TF iii ATTEST : w~`vP~' ~POR. 4~Gi~'~ ~L~--~-~ L ~~ ~ o~~ _,nvcSEAL :a N ,. ~RP~RATED: ? Gwen Carlisle ~ ~ ~'G 9y1 ~ Q ~i 9 ~ NF Village Clerk ~~~~~~FOF ~`~~`~~~ ~lll i 11111 _, HURRA'Y' Y,OGAN CONSTRUCTION, YNC. Ceuerafl Contractors 313 63° frail North West Palm Beach, FZ, 33413 Phone: 561-686-3948 Pax: 561-b86-7465 FA7~ TRANSII~TTAL COVER SHEET DATE: 7/11/2005 PLF~ISE DELIVER TO: Russell White COMPANY: Village of Tequesta Fax 575-6245 FROM: bavid Logan SUBJECT: US1 Bridge RO OutFall Shoring Quotation attached for two options discussed on site. Also included a Concephaal Sketch for clamcation. Call me with any questions. David Logan TOTAL PAGES INCLUDING COVER SHEET. EXCEL/FAX CGVER.xls ~ ~d ~s~s~oN wd~a:a. c~.1~ . ~:. M'(JRRA'Y LOGAN CONSTRUCTION, INC. General Contractors 313 65'~ Trail North West Palm Beach, FL 33413 TELEPHONE 561-686-3948 FAX 561-686-7465 QUOTATION DATE: 7/11/05 TO: 'Village of Tequesta P.O. Box 3273 Tequesta, FL 33469 Attn: Mr. Russell Whitc NAME OF PROJECT: RO Outfall Bank Erosion Protection T.ACATION: C7S 1 Bridge over 3upiter Inlet PLANS AND SPECIItICATIONS: Tequesta WE PROPOSE TO ]FrTRNTS)EI ALL LABOR, MATERIAL AND EQUIPMIENT TO PERFORM THE FOLLO'GV'YNG: Provide Erosion Prouction For RO Outfall Pipe at Northwest Comer of CJS 1 Bridge as follows: Option 1-Steel Sheet Piling: A Mobilize. B. Supply/install SO feet of steel sheet piling up to ZO' long. Sheeting to be coated prior to installation with coal tar epoxy. Sheeting to be placed between existing bag riprap and outfali pipe. See conceptual sketch. C. Demobilize. FOR THE LUMP SUM OF $48,000.00 Alternate To Add Concrete Cap $11,000.00 Total With Concrete Cap $59,000.00 Option 2 -- Rock Riprap Siope Protection. A. Mobilize. B. Supply/install filter cloth. C_ SupplyJinstali 2' thick blanket of rock riprap on filter cloth. Rock to be placed against waterward face of existing bag riprap. See conceptual sketch. D. Demobilize. FOR THE LCJMI' SUM OF $2$,000.00 NOTES: 1. Engineering, permits and fees eyceludcd. 2. Murray Logan Construction, Inc. will honor all terms and conditions of our existing annual contract with Northern Palm Beach County I~mprovetnent District should you elect to piggy back said contract for this work 3. Attached Conceptual Sketch represents quoted options as discussed at site visit. HU'YERS' SIGNED ACCA.PTANCE CONSTtTtTIES A BINDIIdd CONTRACT. IN THE E'V'ENT TITT3RE IS ANY DEFAULT IN PAYII~NTS DUH UNriER TEILS CONTRACT' AND 7HE SAME LS PLACEb IAI TRH HANDS OF AN ATTORNEY FOR COLLECTION, THE PURCIIASI3R qND/OR PURCHASERS HEREBY AGREE TO PAY ALL COST OF COLLECTION INCLUDING, BUT NOT LIMPrirb TO, A REASONABLE ATTORNEY'S FEE. TERMS NLT 30 DAYS. ACCEPTED: DATE MURR.AY LOGAN CONSTRUCTION, INC. TTTLE: David Lo ice President z .d 5s«~~N wd~a~a~ ~ooz ~ <<~ i~r Village of Tequesta Purchase Order Requisition (Not a Purchase Order) Date: 8/11/2005 Date Purchase Order is Req'd: ASAP Department: Utilities Req. #: Quotes Received: (See Attached) Vendors Recommended Vendor: Vendor #: Murra Lo an Construction, Inc. Sole Provider Address: 313 65th Trail North 2 City: West Palm Beach 3 State & Zip: Florida, 33413 Comments: Pricin is i backed from the Northern Palm Beach Coun Im rovement Districts anuual contract #N0024-06 Manuf./ Available Balance Item Descri tion Part# Q Unit Price Total Cost Account # Finance Use Onl Stabilization $28,000.00 403-250 546.308 Total: $28,000.00 Finance/Administrative Use Only: De artment Head Si nature: Date: e Director Si nature: Date: Villa a Mana er A royal: Date: Villa a Council A royal: Resolution #: Date: PO#: Processed By: Date: