Loading...
HomeMy WebLinkAboutDocumentation_Planning and Zoning_Tab 2_10/18/2018 Site Plan and Environmental impact report .� „ t �------------------------ �''- ��I I ,( .�� r I�F � �!� ��I-',�,�� � I�,�s ���r � DEPARTMENTAL USE ONLY ; i Ck.# ' ll�partment of Community Develo;���;n�� �. � Fee Paid: ; �� 345 Tcc�uesta Zlri��e � i Intake Date: , - 'i'equesta,Florida 33�:v�' � � � , � Phr 561-7fi8-0451/Pax:56� 7v€' ;;4 ' � PROlEC7 q: i wwcv.Yequesta.ou> i � i � � i i ' i 4�������'���������������� APPLICATION FOR SITE P1AN REVIEW DRC � PLANNING &ZONING BOARD � Meeting Date: VILLAGE COUNCIL � Meexing Date: INSTRUCTIONS TO APPLICANTS: 1. Please complete all sections of this application.If not applicable,indicate with N/A. 2. Provide all required documents as shcwn on the attached checklist.If not applicable,indicate with N/A. AI!construction, additions, and/or alterations withrn the Vidage, except in distrlcts R-IA and R-1, must be reviewed by the Planning& Zoning Board. The Planning&Zoning 8oard meets the third 7hursdoy of every month at 5:30 p.m.,as needed in the Village Hall Council Chambers,345 Tequesta Dr/ve. The app/lcant wll!be informed by letter of their scheduled meeting date. The PJanning and Zoning eoord shall have general auihority as outlined in Sec.22.53. After review and recommendotion by the Planning&Zoning Boord,applicatfons will be heard by the Village Councr!for frna!approval. The VilJage Council meets regularly on the second Thursday of every month at 6:OOp.m.,in the Viilage Ha!!Councii Chambers. 1. PROJECT OESCRIPTION&OWNER/AGENT INFORMATION PROJECT NAME: Blowing Rocks Condominiums PROJECT ADDRESS: 1500 and 1550 Beach Road, Tequesta, FL 33469 DESCRIPTION OF PROJECT: Site Plan Approval Request for 21 Condominium Units --___ _ ._ _ Property Control Number(PCN),list additional on a separate sheet: See AttBChed Sheet Estimated project cost: NA Property Owner(s)of Record: Turnberry Beach Road, LLC c/o Michael Gilbert Address: �9950 West Country Club Drive, 10th Floor, Aventura, FL 33180 Phone No.: 305-682-1142 Fax No.: E-mail Address:mgilbert@turnberry.com Applicant/Agent(if other than owner complete consent section on page 3): rvame: George G. Gentile of Gentile Glas Holloway O'Mahoney &Associates, Inc. Address: 1947 Commerce Lane, Suite 101, Jupiter, FL 33458 Phone No.: 561-575-9557 Fax No.: 561-575-5260 E-mail Address:9eorge@2gho.com,alec@2gho.com 1 . II. LAND USE&ZONING R-3 Multifamily Residential Density Residential Medium Density A) ZONING DESIGNATION _____. B) FUTURE LAND USE DESIGNATION __ __ �c) Existing use(s} Residential Condos _ _ _ ---- -- --- - _ �) Proposed Use(s),as applicable Infill Redevelopment including 21 multifamily units on two combined lots ---- --�--- � III. ADJACENT PROPERTIES Name of Buslness/ Land Use Zoning Existing tlse(s) Approved Use(s) Subdivision Designation Designation - --••.............. .___.._...•-••.___..__.__—. _--------•---- ---�----••----•-----•--••--._.._...--•---- ----— __ ---- NORTH Coral Cove Park Recreation R-OP Park Park ..---•-•---•---•- --------�_.,_..._._.. __ . . . ---- — —•--•._...._..---•--......._..--------------�--- souTH Coral Cove Park Recreation RH Park Park ..._.............•-- -------.._.�----� _._ .._------------------ --------------------------------------- --------- - - -- �►sr Atlantic Ocean NA NA Atlantic Ocean Atlantic Ocean .................... ..___._-------------_. _- --------- ----------------------•---•----.._.......-• ---- -- _ _ _ ._. WEST IntracoastalWtwy ,NA NA Intracoastal Wtwy Intracoastal Wtwy IV. APPLICANT'S STATEMENT OF JUSTIFICATION Provide a statement of use from the applicant that the submitted site plan is consistent with the goals, objectives, and all other provisions of the village comprehensive development plan, and further that the projected use is specifically authorized by development ordinances and regulations. The statement shall include, but not be limited to, speci�c references to those sections of the comprehensive plan relating to the prvposed development. Attach additional sheets if necessary. See attached justification statement included in this package 2 � v. o�,�,,,�t�rr a�wcon�r I ta�nt�e(to be�ifow�r f�uda�.n a�tj V+� �� � �►� aor�art to �,•a o.�r.,�u.t�.a..�eew.r�r•a.ee�a...r� � �t on my/our b�l�lf m submlt t�ts�atb�.aN neq�tlnd tinterf�l�nd dowmar4��nd ettba�d and reptea�t meJus�d��s #nd publk Itearir�a p�rt�►i�ta the app�cttion aad PmPe►i1►1/we own de�atribed In tha�Pp�tlon. �Y+�18 th�dooume�►Vwe affirm thit 1/we u�errt�nd snd wHl�otnppr wlth ttie p�avisbas rnd►e�uteUons of tM VNh�e of'Ii�qua�y Florida Coda af OrdM�anoes. 1/�re tu�iter ceRify tl�t�N of tbe fnb�mation conafned (n th� apppc�on uul.p!ha doa�nan�bn�t�aue b!M be,e ot m�rlae►la�owledw. �r e..�n�aa uc aoa.oaa o.�.�u► Owners Nan�e{pde�e prh� AppitontJr4:�,,rs i,�.n►; �pleasa print) _ ' --. . Oame�':St�nature Ap�pMca�#/Agenrs Si��tu� aa o.ee � ,�. ,,��,��� _ i li� �PIP��+ �9• A p�ppilcatbn s�t� n�ing shal ba held wltt� tbe owner and/or a�►A�wnt�nd hl;/t�er des(�n ta�m and the tommunity deMat�pnnant dG+ecOor�nd h1s/iter deuelopment stsff. ��- 'A 5800.09 f�a�pli�. ��} ltevlew by the Dtvelqpnu�ntits�la�v[arxrd�iss(l�Jt�'J.TI�Qammttnity Devebpmertt Dtrac�rw d� shaN wbmit�ucfr ap�licatlon f�deparq�nhl steff�nd amwlbnt reaiew witbin 3D�of recelpt of a aoanpttted appNcetlon. ���40D.ov iee appies. (�) �bY�����9��The CommunEty Deuaiapmenc ukector or dest�nee shep s�mit such applket�far Pl�nrting�nd Zoning 6oard r+evieMr vWithin 45 iyrs af reoatpt of�oanpl�rd app�ntfon. g�t■ $�.�fse(�1�rpV�91�P�� pB s 5�0.00 tee{n�r�er�do�n ro f/faape courullJ�pPil� M) �bY�R Coana�Wkhin 45 days of rovlew by tho Plaimin�end Zantns 8oard,the Comm�mity Qaveloi�t Dlrect�or de�nee slafl ti�en wbmk su�fi App�cation,Indudhrg tf�recomme�etlons of the PIanN�and Zoning Boaed,tor1Alla�e Caundl re�riew. ff�t a 5s�00.0�fee pius an�t�b�d on the ertimamd oost M wak apppes. 1b cover ap �ddldo�ad rdrnf�a►sq.oeprii or�ntl�ad, hdrd�,aut not Itmlt�d to.�fea�, eoraukeat fea u�d spedN�udi�,tl�e e�p�ra�t Aul1 mnpeeqate tlie vHe�e/orali aCh oo�pAor to the proa�ln�ef tlte�tlon ar nat aMr�rn 80 dwt dtar�i sp�lonion appro+ral yddrho�er is deba�lnad n�nn�•a ar a�e �����+P��1►be�far noc k��6uqdlus�or xon1A�p�re1R rerqAate af oaeup� C�assodued wBh�fior�hir I�rtup end atha putdk�ofie�reqnFroma�ts in IM ra�on�ty of dis e�.�rr.rne r.��ne�ne�ro�eud►�eee�t���-h�tia�e na��naa�e. Ownars S�etut�tio Adc�wl��e 3 i VII.APPLICATION SUBMITTAL REQUIREMENTS AND REVIEW PROCESS The applicant will submit to the Village of Tequesta Department of Community Development the following documents for review by the Development Review Committee (DRC}, forty-five business (45) days prior to the meeting date: 1) Seven(7)11x17 sets and Three(3)full size sets of professionally prepared site plans showing a!!exJst/ng and proposed structures, setbacks, parking and loading layout, ingress and egress, sldewalks and walkwoys, exterior lighting layout, dimensions of street frontages,property lines and al!signage. 2f Fourteen (14J 11x17 sets and Two (2J full size sets of Landscaping Plans in accordance wf[h Village of Tequesta Code of Ordinances, Division lV,Londscaping. 3) Fourteen (14) 11x17 sets of multi-dimensionol color renderings and/or photographs are to be provided. The Planning&Zoning eoard requires an exact rendering of the proposed madification, construction or addition. Color photographs or prints as close to the actuat colors to be used must be suppiied. Since color printers often do not display the correct color, it is recommended that samples of the paint chips, as well as a sample of the support materials(i.e., canvas, wood, metal, etc.J be provided. 4J One(1J CD disk wfth PDF�Ies including the completed application. 5J Any other documents,maps,photographs,or drawings thot may help clarify the positlon of the applicant. NOTE: All renderings,models,drowinps,photos,etc.,wll/become the property of the Village of Tequesta. Pre-application meeting 1 APPLICATION SUBMITTAL DEADLINE Deadline is 45 business days prior to P&Z Meeting date DRC Meeting Held within 2 weeks of application submittal 1 DRC comments provided to Applicant � within 1 week of DRC meeting � 1 Re-submit application Planning&Zoning Board Meeting- i Deadline is 2 weeks following receipt of -� recommend approval � DRC comments (3'�Thursday of each month) 1 Village Council Meeting-�nal approval � (2"d Thursday of each month) � 4 � � VIII. SITE PLAN REVIEW APPLICATION SUBMITTAL CHECKLIST GENERAL (1) A completed application signed by owner, agent/applicant. Authorization must be attached if applicant is other than owner. (2) Required application fees. (3) Statements of unity of title,warranty deed,or purchase contract of the subject property. (4) General location map, showing relation of the site for which site plan approval is sought to major streets, schools, existing utilities, shopping areas, important physical features in and adjoining the project,and the like. (5} A recent aerlal photograph of the site. SURVEY {1) A signed and sealed boundary survey(not more than one year old)and legal description of the property, including any and all easements of record as well as existing topographical conditions of the site. (2) Existing streets and roadway improvements (medians, driveways, signage, etc.) and existing structures within 100'of the project boundary. (3) Existing utilities within 100'of the project boundary. (4) Existing trees identified by caliper and species. SITE PLAN (1) A site plan containing the title of the project and names of the architect, engineer, project planner and/or developer,date,and north arrow, and based on an exad survey of the property drawn to a scale of sufficient size to show: a. Boundaries of the proJect, any existing streets, buildings, watercourses, easements, section lines, and water and sewer lines, well and septic tank locations, and other existing important physical features on the site and on property adjacent to the site. b. Tabular project data to include: Total gross site area in acres&square feet 1.776 aC/77,366 Sf _. _____�--- _._._. _ ------.�_._..._------ Total number of units(multi-�amiiy) 21 multifamily units �� Total square feet of each primary structure Main tower=210, 428 Sf Total square feet of accessory structures �Existing Building - 1,481 sf Total footprint of each building in sq ft&% �� Ma�n suiiding ze,557(33%j Exist.Pavil(on 1,484SF{1.9%) Overall mean buflding height&number of stories 101' Above top of dune-- 11 stories Flnished floor elevation for all structures T�� Main Building+g.5'Existing Pavilion+ 14.49' Total project density in unRs per acres,if applicable 21 units @ 12 du's(ac Total proposed off-street parking spaces ^ �46 Height and location of proposed fences and/orwalls i g•relalnlnpwellonswlhcldeafpropeity,ex� btlng 3'woaQ hnW CBS watl on nortl�oWa Proposed drtve aisle width �NW� ��� 2Q� at Project Entry ^ � Proposed stdewalk width � ��� �� �g'sidewalk on east and west sides of property. 5 c. Pravide site data and setbacks: Lot coverage � Impervious area � Open space area _.�__..._._._�_....__....__--••---••----- ----------- -----------------------------------------------E---------------------------------- TOTALSQFT ; 25,038 sf 27,980 sf � 34,993 sf ---------------------------------------�----------------------••--•__-____ ............-•••--•__.._.._.__._-------+---------•--•-----_—_�_--____�_ PERCENT(%)OF S1TE ! 34.9% , 36% ! 45°l0 I Front � Side � Side � Rear "��._.....-."'_'.._._'_"'_—�—_ T'._.�____.............�__. — " _ ' ' "' " ' '' •• j� ' ' '" ' Primarystructure i 21'7" tower � 20'1" tower , 20'1" tower 132'93/8"tower ; ( ) � ( ) - I ----------------- ----- -----------______...._.___._..--�--- - - ...------------------------ --------------�. Accesso structure � � � � �� � �� � �� --T------___.__—__.__ � I NA � 14 3 �Q Q i 64'01/4'�axlating eccessory) d. Plans and location for recreation facilities, if any, including buildings and structures for such use. e. All mechanical equipment and dumpster locations,screens and buffers. f. Refuse collection and service areas. g. Access to utilities and points of utilities hookups and location of all fire hydrants close enough for fire protection. h. Plans for signage including size, location and orientation. i. Project information on beds, employees, seating, etc. as necessary depending upon the type of development. j. Exterior lighting of all buildings, parking areas and the overall site, addressing glare,traffic safety, economic effect and compatibility and harmony with adjacent properties. k. Proposed topographic considerations including natural vegetation, berms, retaining walls, privacy walls,and fences. (2} Required floodplain management data: a, Flood zone designation b. Base flood elevation c. Coastal high hazard design considerations ENGINEERING PLANS (1) Proposed access (ingress/egress) to project, drive aisles, driveways, streets and sidewalks with dimensions and turn radii for internal and external vehicular traffic. (2) Proposed traffic control signs. (3) Preliminary storm drainage and sanitary sewage plans or staternents. If the village determines that the drainage and/or sewage plans require independent review,the applicant shall pay for such review by an independent engineer. (4) Plans for the extraction of fill and mineral resources and alterations or modifications to the slope, elevation,drainage pattern, natural vegetation and accessibility of the development. (5) A comprehensive traffic study, provided by an engineering firm. The study shall be paid for by the applicant and shalf include but not be limited to the following_ a. Future right-af-way dedications. b. Intersection improvements. c. Traffic control devices. d. Traffic generation analysis. e. Distribution and assignment of traffic access, f. Additional roadway needs. 6 g. Traffic safety standards, including the separation of pedestrian and�ehicular tra�c. h. Compliance with Palm Beach County Performance Standards Ordinance. LANDSCAPE PLANS (1) Landscaping plan, including types, sizes and locations of vegetation and decorative shrubbery, and showing provisions for irrigation systems. Plans shall also provide delineation of existing trees and information as to which trees will be reused or removed. Landscaping plans shall comply with section 78-4Q0. In addition, landscaping plans shall include irrigation plans in accordance with section 78-398, and shall demonstrate compliance with Florida Friendly Landscaping design standards as required by section 78-394,as applicable{See section 78-392 for applicability). (2J Plans shall provide clear sight lines. (3) Location of fight poles. {4) Provide landscape plan data: i Required i Provlded ___------------------------�•--------------------------------------------�---_—__.__...._._____-----��-------------------------------- Number of trees(including percent nati�e) ! 52 (50% native) � 69 (42 native) __—_-----------------------�------------------------------------- +---�----------�-------------------- - t-----------_____�__.__...______._._i Number of shrubs(including percent native) � 733 shrubs i 1,481 shru6s(1,360 native) ___.__.....�.___—•-•--•--•—••.__.._.._.__-••__.-------------------- -----------��__._�..----------�------------------_••-___��_ Amount of groundcover{including percent i i native) � 1,223 groundcovers� 1,223 groundcovers -------.___._.--------------_._.___._.______�.___._......__ � ----__.__- ----------------�--------- Total percent af native vegetation � 50o�p �87%TreealPa�ms56%shrvbslgroundcovera ARCHiTECTURAL PLANS (1) Architectural elevations and color renderings for buildings in the development, and exact number of units,square footage and types,together with typical floor plans of each type. (2) Type of construction of all buildings per Florida Building Code. (3) Color finishes and material examples and/or samples for all structures including roof, walls, trim, pavers,etc. ADDITIONAL REQUIREMENTS (1) Environmental impact study/assessment. All proposed new development and major redevelopment, as part of the site plan review and subdivision review process, shall submit a environmental statement describing how the proposed development will affect the estuarine water quality of the class III waters of the village, and also an environmental impact assessment study prepared by a qualified ecologist or other professional qualified to do such an assessment. The study shall meet the requirements Ch. 50 Article II, pertaining to environmentaily sensitive lands. (2) Notification of neighboring jurisdictions of any external impacts that a proposed project might have within those jurisdictions and assessment and mitigation of those impacts shall be required. (5) If common facilities (such as recreation areas or structures, comman open space, etc.) are to be provided for the development, statements as to how such common facilities are to be provided and permanently maintained. Such statements may take the form of proposed deed restrictions, deeds of trust, surety arrangements, or other legal instruments providing adequate guarantee to the village that such common facilities will not become a future liability for the village. (b} If development is to occur in phases, those phases should be clearly delineated on the site plan and identified in the plans and requirements appurtenant to that site plan, and each development phase shall be subject to site plan review by the village. 7 (7) The substance of covenants, grants of easements or other restrictions proposed to be irnposed upon the use of the land, buildings and structures, including proposed easements or grants for public utilities, if applicable. {8) A statement that the development/redevelopment will provide the necessary infrastructure to meet the following level of service standards pursuant to the criteria outlined in Sec.78331(h): a. Traffic(roads and rights-of-way) b. Sanitary sewer c. Drainage d. Potable water e. Recreation f. Fire flow requirements g. Pedestrian walkways (9) A statement from the applicant or landowner that all pertinent permits are concurrently being sought from the applicable county, state, and federal agencies listed below. Include a copy of the letter/document with the application. Such permits shall be secured prior to the issuance of a building permit for any development on property included within the site plan. a. Palm Beach County Health Department b. Palm Beach County School District c. Tequesta Fire-Rescue Department(Fire Marshal) d. Loxahatchee River Environmental Control District(ENCON) e. Palm Beach County Department of Environmental Resources Management(DERM) f. South Flarida Water Management District(SFWMD} g. Florida Department of Transportation (FDOT) h. Metropolitan Planning Organization of Palm Beach County(MPO) i. Palm Beach Traffic Engineering Division j. Martin County Metropolitan Planning Organization k. Martin County Traffic engineering Department I. Florida Power& Light m. Telephone service provider, as applicable n. Solid Waste purveyor o. Tequesta Water Department p. Other municipal, county,state and/or federal agencies as may be applicable, 8 PCN Numbers for Units at 1500 Beach Road, Tequesta FL 60434030130001010 60434030130001020 60434030130001030 60434030130001040 60434030130001050 60434030130002010 60434030130002020 60434030130002030 60434030130002040 60434030130002040 60434030130002040 60434030130002040 60434030130002050 PCN Numbers for 1550 Beach Road 60-43-40-30-21-001-0000 r ��� ��� LandscapeArchitects Planners EnvironmentalConsuita+it�, i.r-o����i�- GEN fILE GLAS HOLLOWAY O'MAHONEY� �,�;�;:,�;.. . :�:;, , .E�� �,�,,��. M.Iroy Holloway ASU Emily M.O�MdBOlM}'IASLA r�� �'i �'�..`-����� t. , ,�;�� August 29, 2018 � Nilsa Zacarias Village of Tequesta 345 Tequesta Drive Tequesta, FL 33469 RE: Blowing Rocks; SPR 1-18 Dear Ms. Zacarias: Pursuant to comments received from staff on August 5, 2018 based on a submittal of July 12, 2018 please accept this letter as a written response.Afso, included with this letter are the revised plans, which address the comments where applicable. For your convenience we have prepared our responses in bo/d italics. Additionally, as this staff report keeps a running list of comments made throughout the site plan review process, we have highlighted the comments that have been satisfied, as stated by the applicable DRC reviewer. Future Land Use Map Amendment Application Comments — All the followinq comments were ADDRESSED. 1. Change title from "Comprehensive Plan Map Amendment"to Future Land Use(FLU) Map Amendment. SAT/SF/ED 2. Provide current FLU map and proposed FLU map of both parcels. SATISFIED 3. Provide zoning map of both parcels. SATISFlED 4. Include on Justification Statement that both parcels have R-3 zoning designation. SA TISFIED Variance Application Comments —All the followin� comments were ADDRESSED. 1. Justification Statement indicates that proposed development is consistent with the Village's Comprehensive Plan. Please note that currently one parcel requires FLU map amendment; so, the proposed development as proposed is not consistent with FLU map designation. SAT/SF/ED 2. Based on the site plan review comments additional variances will be required unless proposed development complies with Village code. The applicant reviewed the site plan and only one variance is proposed at this time, a. Provide evidence of site hardship and data regarding other developments in the same area that are not in compliance with Code (since the application is indicating this). SATISF/ED b. See review letter of Spencer Schroeder, P.E. from Mock Roos. SATISFIED I'3t{� t:uniini�tcr lnkt�, SttitF ►U1 �lE��l1F:r`, F�cirl�f�� :�:3���i 'rEi�(•5i5-�`i:�i '.,iii��`ri!i-314i(i I.,r�� t���vt;.i�lii�..vr�n � � Blowing Rocks Response Letter August 29, 2018 Page 2 of 94 Site Plan Review Comments —Zoninca 1. Provide full size drawings on scale. Architectural drawings indicate scale 1"=20', this is not accurate. PROVlDED 2. Revise all other plansldrawings affected by revisions to Site Plan. PROVIDED 1, Select address for proposed development. Currently, development has two (2) addresses. PROVlDED 2. Provide color chips and sample material of all exterior finishes including buildings and hardscape. Exterior finishes include monument sign: PROVIDE FINISHES- outstanding with regard to entry monument sign. What color are the metal letters? What font are the letters? Provide logo information: material and color. Will this entry sign be illuminated? Provide information. Response: The proposed monument sign will have a marble veneer with a light wood grain texture (sample provided). The 3" and 8"raised bronze /etters (font: book antiqua) will be pinned to the sign wall. Project/ogo, if any, is undetermined at this time. The sign will be illuminated by an FWC approved ground flood light. 3. Relocate entry monument sign to provide 10 ft. setback. Now is encroaching the front setback. Response:Entry sign re/ocafed outside of 10'front setback. 4. Provide landscaping on base of entry monument sign. Response: Ground cover provjded at base of enfrance sign. 5. Adjust entry monument sign dimensions to 30 sq. ft. Now is 36 sq. ft. Response: Sign has been redesigned to be a maximum of 30 sq. ff. (3=3"in height x 9'in length). 6. Add setback dimension to the ramp lacated on the north west area fordumpsters removal. Response: Dimension added. 7. Provide sign wall drawing. LH-1 Hardscape Plan indicates sign wall at the entrance. SAT/SFIED 8. Provide col�r elevation of building and entrance wall fence including green wall and gates. SATISF/ED 9. Provide setback dimensions to ALL structures including accessory structures and swimming pool. SAT/SFIED 10.Remove shadescape umbrellas on side setbacks. SAT/SFIED 11.Provide loading and dumpster area. Clarify trash removal from property. SATlSFIED N:IBlowing Rock-Condominiums Turnberry 17-05131ApplicationslSite Plan 20181Agency Correspondence\Blowing Rocks Response Letter 8 29.18.docx � Blowing Rocks Response Lefter August 29, 2018 Page 3 of 94 12.With regard to proposed marina: provide DEP approval, demonstrate compliance with Code Section 76-20; provide utility services. The applicant indicates that DEP approval is in process. The Special Exception Use cannot be reviewed without DEP and Army Corps approvals. Also, see review comment letter of Spencer Schroeder from Mock Roos. Response: Comment previous/y acknow/edged. _ . R-3 Zoning REQUIRED BY CODE PROPOSED COMMENTS - District Minimum I 10,000 sq. ft. for the first 77, 366 sf(1.776 /N COMPLIANCE Lot Size ; multifamily dwelling unit, plus acres) � 3,356 sq. ft. for each 21 dwelling units � additional dwelling unit to a � maximum of 12 dwelling units per acre. —-- --- - — ------ -- - Minimum 80 ft. Provide overall site Provide overall Lot Width 200 ft.* dimensions on site � sife dimensions * Minimum buildable lot depth plan: width and on site p/an: width cannot include submerged length ' and/ength. lands, conservation easement SATlSFIED areas, protected wetlands, mangrove stands or similar protected areas. Accessory structures, not exceeding one story/ten feet in height, may be constructed on lots with less than the minimum lot j � depth. See the definition for lot �� depth in section 78-4 for ' additional requirements. - - -- - -- --- - Front Yard � Main Structure: 20 ft. 20' !N COMPUANCE � Accessory: 0 ft. for an accessory structure not exceeding one story/10 ft. in height used for the parking of vehicles only(covered parking) and provided that the design of the front of the covered parking structure includes fully landscaped grade and/or raised planters that provide a minimum of 10 ft. of landscaped width alang the full frontage of the covered ' parkiny structure. N:161owing Rock-Condominiums Turnberry 17-05131ApplicationslSite Plan 20181Agency CorrespondencelBlowing Rocks Response Letter 8 29.18.docx 8lowing Rocks Response Letfer August 29, 2098 Page 4 of 14 Rear Yard � Main Structure: 20 ft. plus 2 Not provided. Provide setback ft. for each additional 10 ft. or dimensions to � portion thereof over SO ft. in Main and height of the main building or Accessory structure. structures. Accessory:10 ft. for any accessory one-story PROVIDED building or structure. Plus 2 ft. for each additional story of the accessory building or structure. _ - ---- Side Yard - Main Structure: . North 20 ft. plus 2 ft. for each r�r��,z IN COMPLIANCE additional 90 ft. or porfion e�eas�+t�g-e�9 thereof over 50 ft. in heighf of #� the main building or structure. A�li6a� �eer-sr�e�-E� �a+��es#� Accessory: 10 ft. for any se�lia+�se: �a�iaws� accessory one-story building IN COMPL/ANCE or structure. Plus 2 ft. for each �-er��e+#� additional story of the . accessory building or IN COMPLIANCE structu re. eqsfeasb+p�-e� se#ba� _ —--- _ - -- - - ---- Side Yard - Main Structure: 20 ft. plus 2 Not in compliance. South ft. for each additional 10 ft. or 6a�a�ge-a�e 1N COMPLIANCF portion thereof over 50 ft. in eps�easl� A�� height of fhe main building or #� �es�e� structure. �raNa+�se-/N COIVfPLIANCE Accessory: 10 ft. for any accessory one-story building Two (2} staircases . or structure. Plus 2 ft. for each � and �-e� /N COMPLIANCE additional story of the ' " accessory building or structure. I One staircase is still . _ _ on setback. _ CLAR/FIED Lot Max 35% Coverage pe�i�el�de-�eer� �'" ��� �'��n°*°ep e� e: 34.9% !N COMPL/ANCE Breakdown sq. ft. Green roof, canopy, __ __ buildiny footprint _ ( Building 19 stories/901 ft. measured 116'6" Indicate in � Height _ from the averac�e heic�ht of the drawing A3.01 N;1Blowing Rock-Condominiums Turnberry 17-05131Applications\Site Plan 20181Agency CorrespondencelBlowing Rocks Response Letter 8 29.18.docx � Blowing Rocks Respa�se Letter August 29, 2098 Page 5 of 94 _ __ crest of fhe sand dune line, for Re�M height according main buildinq or sfructure easf ' to code (STILL of Beach Road, and measured �e+�sede: MISSING) from grade west of Beach Penthouse was Road 4.2 stories/20 ft. for any removed. . accessory building or lN COMPLIANCE. structure. __ ---- -- - ----- -- __ -- _ Parking Sec. 78-705 j81: 45 spaces (4 Number of parking � c. Multiple-family: Two exterior, 42 garage) spaces in spaces per dwelling unit. compliance. REQUIRED: 42 spaces Provide dimensions 1N � COMPLIANCE. ADA: (1 exterior ADA Compliance is and 2 interior) reviewed by Traffic Engineer and � Buildin� Official. - - _ _ _ __ -- - ----_ 1_ --- _ ___. _-- Landscape Min 30% �la�i#y-��ev� (2) See definition Open of Open Space Space ���-e€�eper� � � Clarify how A VARIANCE applicant provides MIGHT BE 64% NEEDED. PROVIDED 45% !N COMPLIANCE. _ _ _ _ Sidewalks Per Sec. 78-331 (h)(7): Provide width of Provide width of Pedestrian walkways must be concrete walk sidewalk on east a minimum of 5 ft wide, No Sidewalk on side. parallel to roadways and a min West side. IN COMPLIANCE of 4'from edge of roadway. Provide sidewalk on west side. STILL MISSING. I PROVIDED. I PROVIDED , i � � I i _ __ � --- _- -- _ -- - _ . _--- — ------ ; N:1Blowing Rock-Condominiums Turnberry 17-05131ApplicationslSite Plan 20181Agency CorrespondencelBlowing Rocks Response Letter 8 29.18.docx � Blowing Rocks Response Letfer August 29, 2098 Page 6 of 14 Site Pian (A0.02a) Drawinq Comments Revise site data to include correct information: 1. Revise lot coverage calculation per following Village Code definition: Sec.78-4. - Definitions. "Lot coverage means that portion of the area of a /of, plot, or building site, expressed as a percentage, occupied by a!l buildings or structures which are roofed or are ofherwise covered, exclusive of its eaves, and any portion of such building covered by a roof which qualifies as open space or any covered terrace, balcony, breezeway or porch or portion thereof not inc/uded in the floor area of a building sha!!be included in /ot coverage. For example, a lot containing 90,000 square feet has principal and accessory buildings planned or existing whose ground -floor area (footprinf) is 2,500 square feet; fhus lot coverage is 25 percent. Unscreened patios or swimming pools shal! not be considered in computing lot coverage. Screened-in pools or patios shall be considered in computing lof caverage, but shall be computed as only 50 percent of their actual coverage."— SATISFIED 2. Provide open space calculation per follow Village Code definition: Sec. 78-4 — Definitions: "Open space means that part of a lot, inc/udrng courts or yards, which is open and unobstructed and is available for entry and use from its lowest level to the sky, and is available for enfry and use by the occupants of the buildings on the premises and may include space located and treafed to enhance fhe amenity of the development by providing landscaping and/or screening for the benefit of the occupants or neighboring areas. Open space may include water surfaces that comprise not more than ten percent of tota! open space; however, required parking sha/l not be computed as required open space."—SAT/SFIED 3. Revise proposed building height data. Still missing. Penthouse Lounge is not up to code. Penthouse was removed. PROV/DED. Site Plan Review— Division 2 Comments Sec. 78-331. - Required; development standards; required facilities and infrastructure. By the terms af this chapter, all permitted uses in all zoning districts except R-IA and R-1, all special exception uses as approved by the village council, all planned residential development (PRO), planned commercial development {PCD), and planned mixed-use development (PMUD), all miscellaneous development and redevelopment, all subdivisions, and all uses or construction lying partially or entirely in special flood hazard areas shall comply with the following: a) Site plan review is required. SPR APPLICATION UNDER REVIEW b) Conceptual review of the overall development, if phased, is required. c) The development shall conform to all minimum requirements of this chapter and any other applicable laws and regulations. SPR APPLICATION UNDER REVIEW d) The development shall be compatible with the intent of the zoning district wherein it is proposed to be located and compatible with adjacent land uses. N:161owing Rock-Condominiums Turnberry 17-05131ApplicationslSite Plan 20181Agency CorrespondencelBlowing Rocks Response Letter 8 29,18.docx Blowing Rocks Response Lefter August 29, 2018 Page 7 of 14 e) No building permit shall be issued for the purpose of erecting any structure or building, or for structural alterations in any existing structure or building, until after the planning and zoning advisory board has reviewed and made recommendations to the village council, and the village council shall have finally approved the site plan in accordance with this section. However, for the items specified in section 22-53(b), the planning and zoning advisory boarc! has final appraval authority, and those items do not require further approval by the village council. SPR APPLICATION IS CURRENTLY UNDER REVIEW. NO BUILDING PERMITS WILL BE ISSUED UNTIL VILLAGE COUNCIL APPROVAL IS OBTAINED. f) No building permits or development orders shall be issued unless public facilities and services which meet or exceed the adopted level of service standards are available concurrent with the development impacts. Campliance with this requirement may be accomplished through one or more or a combination of the following processes: 1) Installation of all required public facilities/infrastructure/services prior to or concurrent with the dev�lopment impacts. SITE IS LOCATED WITHIN URBAN SERVICE AREA OF VILLAGE 8� HAS ALL MUNICIPAL SERVCIES AVAILABLE 2) Phasing of all required public facilities/infrastructure/services: a) By local government (capital improvements element). b) By the developer(development agreements). 3) Phasing of the development. THE APPLICANT DID NOT RESPONSE TO THIS ITEM. PROV/DED g) All proposed development and or redevelopment shall be coordinated with andlor obtain approvals and/or permits from the following agencies: 1) Palm Beach County Health Department. PROVIDE LETTER— Applicant provided statemenf. 2) Tequesta Fire-Rescue Department (Fire Marshal). PRUVIDE LETfER — ApAlicant provided statement. 3) Loxahatchee River Environmental Control District(ENCON). PROYIDE LETTER- PROVIDED. 4) Department of Environmenta! Resources Management (DERM). Applicant: PROVIDE LETTER OR STATEMENT—CLARIFY FOR MARINA APPLICATION. Response: Please note, the applicant will submit an application for the marina after the currenf applicafion receives site plan approval. The permits that are required for the marina are in the process of being requesfed, and fhe currenf application will not impact the FDEP appravals process at this time. 5) South Florida Water Management District (SFWMD). PROVIDE LETTER — Applican��rovided statement. N:\Blowing Rock-Condominiums Turnberry 17-05131ApplicationslSite Plan 2018Wgency Correspondence161owing Rocks Response Letter 8 29.18.docx � Blowing Rocks Response Letter August 29, 2098 Page 8 of 14 6) Florida Department of Transportation (FDOT). PROVIDE LETTER. SEE TRAFFIC ENGINEER REVIEW COMMENT. 7) Reserved. 8) Metropolitan Planning Organization of Palm Beach County (MPO)._. N/A 9) Palm Beach County Traffic Engineering Division. TPS LETTER WAS RECEIVED FROM PBC. 10)Martin County Metropolitan Planning Organization. N/A 11)Martin County Traffic Engineering Department. NIA 12)Florida Power& Light Company. PROI//DE LETTER-PROV/DED. 93)Telephone service provider, as applicable. PROVIDE LETTER-PROVIDED 14)Solid waste purveyor. PROV/DE LETTER-PROV/DED. 15)Tequesta Water Department. PROVIDE LETTER- Applicant provided statement. 16)Other municipal, county, state and/or federal agencies as may be applicable. Evidence of final acceptance of the development or redevelopment project by agencies listed in this subsection must be submitted to the village prior to review by the village council pursuant to section 78-334(d). h) All new development and/or redevelopment must provide the necessary infrastructure to meet the following level of service standards. Each application submitted pursuant to this section shall be required to provide a certification from a licensed engineer in the state that the proposed development and/or redevelopment meets or exceeds the level of service standards for the listed infrastructure as follows: 1) Traffic (roads and rights-of-way). TRANSPORTATION CONSULTANT TRAFFIC STATEMENT - - - -_._ - — ----- _ _Roadway Ty_� _(LOS) Standard (LOS Peak Collector* C D, *Except Country Club Drive and Seabrook Road which are C Urban minor arterials C D - - -- — Principal arterials C D 2) Sanitary Sewer. A central wastewater level of service standard of 108 gallons per capita per day is hereby adopted, and shall be used as the basis of estimating the N:1Blowing Rock-Condominiums Turnberry 17-05131ApplicationslSite Plan 20181Agency CorrespondencelBlowing Racks Response Letter 8 29.18.docx . Blowing Rocks Response Letfer Augusf 29, 2098 Page 9 of 74 availability of capacity and demand generated by a proposed development project. PROVlDE STATEMENT. Appllcant prov/ded statement. 3) Drainage. A public drainage facilities level of service standard of a 25-year frequency, 24-hour duration storm event is hereby adopted, and shall be used as the basis af estimating the availability of capacity and demand generated by a proposed development project. As a general drainage requirement, each proposed praject and/or site must maintain 95 percent of all stormwater runoff on-site. PROVIDE STATEMENT. APPL/CANT IS REQUESTING VARIANCE. 4) Potable wafer. The following potable water level of service s#andards are hereby adopted and shall be used as the basis for estimating the availability of facility capacity and demand generated by a proposed development project: PROV/DE STATEMENT. Applicant provided statement. a. Average day wafer consumption rate: Residential: 175 gall�ns/capita/day b, Maximum day water consumpfion (including irrigation)� Residential: 180 gallons/capita/day Nonresidential"': 3,030 gallons/acre/day 5) Recreation level of service standards table. PROVIDE STATEMENT. —A licant rovided statement. Area/activity (unit/populationj Classification standard Neighborhood parks 2 acres/1,000 --- -- --_ Community park 2 acres/1,000 Beaches 1 mile/31,250 Golf courses 9 holes/30,000 Tennis 1 court/2,500 Basketball 1 court/2,500 Baseball/softball 1 field/7,200 -- - _ _ __ _ Football/soccer 1 field/4,800 - . _—_ — _ Playc�round areas 1 acre/3,600 Beach access easements 1 per '/� mile of developed or , redeveloped beach frontage 6) Fire flow requirements. All development and/or major redevelopment must provide the necessary infrastructure improvements for fire suppression, including adequate fire hydrant placement, to meet the development's fire flow requirements in accordance with NFPA #1, Uniform Fire Code, Florida edition. PROVIDE STATEMENT. Response: As discussed with the Village of Tequesta City'S Llfe Safety Consultant, "The proposed building will provide a �re suppression system and a fire pump (750 GPM) to meet the IYFPA requirements for the structure. The building's �re f/ow area will be between 112,T01 s.f, and 127,000 s.f. N:IBlowing Rock-Condominiums Turnberry 17-05131ApplicationslSite Plan 2018Wgency CorrespondencelBlowing Rocks Response Letter 8 29.18.docx . � Blowing Rocks Response Letter August 29, 2098 Page 1 D of 14 Per NFPA Tab/e 18.4.5.1.2 and NFPA 98.4.5.3.2 the building wiH need a �re flow rate of(3,750 gpm reduced by 75%) 1,000 gpm': 7) Pedestrian wa/kways. All development and/or major redevelopment must provide a minimum five-foot wide continuaus path of travel for pedestrians (sidewalks}. Sidewalks shall be parallel to all roadway surfaces and be at least four feet from the edge of the roadway pavement. All sidewalk improvement s shall be installed and maintained by the adjacent property owner. Location, set back, width and material shall be approved by the village. PROVIDE COMPLETE SIDEWALK ON SITE PLAN. The proposed sidewalk is only on east side, provide sidewalk on the west side. STILL MISSING. APPLICAIVT PROV/DED S/DEWALK ON THE WEST SIDE TOO. i) Reserved. j) The development shall project for the reservation and preservation of existing and future rights-af-way as may be determined by the village and in conformance with the caunty and village right-of-way protection plan. PROV/DE STATEMENT. PROV/DED. k) Site plans shall be required which incorporate innovative urban, architectural, and/or engineering design of impervious areas (e.g., parking lots) to maximize the retention of rainfall to these areas which will increase the recharge of groundwater while reducing stormwater runoff. PROV/DE STATEMENT. PROVIDED. I) All new developments shall be required to limit post-development surFace water runoff rates and volumes to predevelopment conditions. PROVIDE STATEMENT—APPLICANT lS APPLYlNG FOR A VARIANCE. m) All proposed new development and major redevelopment within the coastal building zone of the village must provide for the dedication of public access easements meeting the adopted level of service standards. N/A n) All proposed new development and major redevelopment, as part of the site plan review and subdivision review process, shall submit a drainage/environmental statement describing how the proposed development will affect the estuarine water quality of the class III waters of the village, and also an environmental impact assessment study prepared by a qualified ecologist or other professional qualified to do such an assessment. The study shall meet the requirements of chapter 50, article II, pertaining to environmentally sensitive lands. PROVIDE STATEMENT— PROVlDED. o) New development and redevelopment shall not be permitted within the coastal high- hazard area of the village as defined in section 78-832 except in accordance with the mandates of chapter 78 article X 11. PROVIDE STATEMENT — REVIEWED BY THE BUILDING DEPARTMENT. N:181owing Rock-Condominiums Turnberry 17-d5131ApplicationslSite Plan 20181Agency Correspondence\Blowing Rocks Response Letter 8 29.18.docx Blowing Rocks Response Letter August 29, 2018 Page 91 of 94 pJ Notification of neighboring jurisdictions of any external' impacts that a proposed project might have within those jurisdictions and assessment and mitigation of those impacts shall be required. PROVIDE STATEMENT. VARIANCE AND MAR/NA SPEClAL EXCEPT/OIV USE APPLICATION WILL BE NOTIFIED TO SURROUNDING RESIDENTS. q) Determination of needed public facility improvements shall be made during the site plan andlor subdivision review process and prior to the issuance of a development order and building permit. PROVIDE STATEMENT. Applicant provided statement. r) Stormwater management facilities including curbs, gutters, piping, culverts, ditches, etc., shall be provided based on engineering calculations and design standards to ensure that all drainage improvements are in conformance with.chapter 74, article IV. SPR APPLICATlON UNDER REV/EW. APPLlCANT /S APPLY/NG FOR A VARIANCE. (Ord. No.42-93, § 1,2-93-2094) BuildinA Department Review Comments Mr. Jose Rodriguez, Village of Tequesta Buifding Official, has no comments at this time Trafflc Enqlneerinq Review Comments — Trent Ebersole, P.E. from McMahon Associates, Inc. Concurrencv Statement McMahon agrees that the proposed development is in compliance with the Palm Beach County Traffic Performance Standards, as stated. Applicant provided a copy of Palm Beach County Traffic Performance Standard (TFS) approval letter. Site Plan Revtew (Traffic and ParkinA) Comments 1. A gate queuing analysis should be provided based on the methodology outlined in Transportation and Land Development, 1988, published by the Institute of Transportation Engineers (ITE). Gate analysis should use peak hour of generator trips per ITE. RESOLVED 2. Provide autotum for vehicle path in the front entryway/Fire and EMS staging area. RESOLVED 3. Indicate on the site plan which lane is for visitors. If visitors cannot gain access, how do they turn around? It appears the gate is befinreen the visitor kiosk and the turnaround area in the driveway. RESOLVED 4. Provide an Engineering Plan for garage level or indicate elevations and slopes inside the garage on Architectural Plan. RESOLVED 5. Site Data indicates four(4)extra spaces, but anly three (3) spaces are labeled on the site plan. RESOLVED N:161owing Rock-Condominiums Turnberry 17-05131ApplicationslSite P►an 20181Agency CorrespondencelBlowing Rocks Response Letter 8 29.18.docx Blowing Rocks Response Letter August 29, 2018 Page 92 of?4 6. Site Data indicates one (1) ADA space, which is insufficient for 46 spaces. Is the interior ADA garage parking included? RESOLVED 7. Indicate the driveway radii on site plan. RES�LVED New Stte Plan Review Comments 8. Improvements such as sidewalk, parallel parking, driveways, etc. within SR 707 right-of- way will require a FDOT permit. Provide a copy of the FDOT permit, when received. Applicant acknowledged providing the FDOT permit, once obtained. Sewer, Drainaqe and Water Review — Spencer M. Schroeder, P.E. from Mock Roos � Associates. 1. Our previous comment regarding the level of detail in the Conceptual Engineering Plan and the Drainage Statement has been satisfied with this re-submittal. — SATISFIED 2. Our previous comment regarding utility connections to the proposed marina facility is withdrawn now that the proposed marina is no longer included in this site plan application. The requirements will stand with the Phase 2 submitta! for the marina. — SATISFIED 3. We take no exception to the findings and analyses presented in the "Existing Developments Drainage Study." The analyses presented would also appear to be supported by a search of the SFWMD permitting archives, which indicate that none of the other developments in the area appear to have ever been issued an ERP for construction of a surface water management system. Response: Comment acknowledged. 4. Please provide documentation-through flow test or other means - that the potable water distribution system is capable of ineeting both now and pressure (minimum pressure at �re pumps) requirements of the fire flow demand as calculated per NFPA #1 and referenced in Section "Site Plan Review- Division 2 78-331 (h)(6)"of your response letter. Response: The attached Tequesta Fire Rescue Fire Hydranf Tesf Reports and Hydrant Information Sheet with calculated F/ow in Ga!lons per Minute (GPM) at 20 PSl indicate �hat the existing system provides approximately 2248 GPM at the projecf site at 20 PSI. This flow and pressure mee�s the listed Fire flow demand referenced in section "Sife P/an Review—Division 2 78-331(h)(6)"of this Response Letter. See attached blue mark-u��s from Mr. Tom Jensen, P. E, from Kimtey Horn, on behalf of the Water Deparfinent. The subiecf depar�ment is requestinq relocation of 10"water pi��es as shown on the mark ups. Response: The requested replacement and re%cation of the existing 8"Asbestos Cement water main with a 10"PVC water main for fhe limits of the projecf's frontage has been reflected on the Concepfual Engineering P/ans. What was shown on Mr, Tom Jensen, P.E. from Kimley Horn's mark-ups was coordinated further to /eave the proposed �re hydranf (part of the Phase 2 Marina lmprovements, under a separate applicafion) on the West side of South Beach Road wifhin a proposed N:1Blowing Rock-Condominiums Turnberry 17-05131ApplicationslSite Plan 20181Agency CorrespondencelBlowing Rocks Response Letter 8 29.18.docx 8(owrng Rocks Response Lefter August 29, 2D 18 Page 13 of 14 Utilify Easemenf as previously shown. AI! of Mr. Jensen's red nofes were a/so discussed, verif}ring that they were mafters that couid be resolved furfher in the design process. Law Enforcement Review Comments - APPLICANT NEEDS TO PROVIDE FURTHER CLARIFICATION REGARDING THE BELOW PREVIOUS COMMENTS. NO ADDITIONAL COMMENTS. APPLICANT PROVIDED INFORMATION. 1. Provide entrance method to site (Knox key, electronic gate code, etc.) for law enforcement. — SATlSF/ED 2. Provide lighting plan for garage.- SAT/SFIED 3. Clarify access system to exterior doors and service elevator (physical keys, electronic, etc.) —SATISFIED Fire Safetv Review Comments. NO ADDITIONAL COMMENTS. APPLICANT PROVIDED INFORMATION. 1. Provide height of canopy in front entry.-PROVIDE Height from driveway to canopy- SATISFIED 2. Provide radio of circular driveway for ambulances and other pubiic safety vehicles. SA TISFIED 3. Provide dry pipe fire protection for dock/marine area. SATJSF/ED 4. Provide 4500 service elevator. SERVICE ELEVATOR NEEDS TO COMPLY WITH THIS REQUIREMENT. SATlSF1ED 5. Provide fire hydrants. SA71SFlED 6. Provide entrance code for entry to the site. CLARIFICATION PROVIDED. SAT1SFlE'D 7. Clarify if power is off how does the gate open SA TISFIED Landscape Review Comments —Stephen Park, RLA Perimeter Landscapinq 1. South Property Line: The two (2) parallel parking spaces encroach in the 5' wide landscape buffer. Shift spaces out of buffer. Tree and shrub requirements have been met. Response: Parking spaces have been modi�ed and are now located outside of the 5'wide landscape buffer 2. West Property Line: There is still an overlap of the lift station in the 10' wide landscape buffer. Per discussion with DS Boca, during the permitting process every effort shall be made to shift the lift station out of the buffer. Currently, a 4' height DwarF Pitch Apple hedge (2'taller than required) has been proposed to buffer the station. This is acceptable at this point. Tree and shrub requirements have been met. — SAT/SFIED. N:1Blowing Rock-Condominiums Turnberry 17-05131ApplicationslSite Plan 20181Agency CorrespondencelBlowing Rocks Response Letter 8 29.18.docx � Blowing Rocks Response Letter August 29, 2018 Page 94 of 94 3. North Praperty Line: East Property Line: All requirements have been met. SAT/SFIED 4. East Property Line: 5'wide landscape buffer has been met(except at existing structure). Tree requirement has not been met, shrub requirement has been met. Per discussion with OS Boca, trees have not been provided in the landscape buffer due to view considerations. Instead palms have been provided west of the buffer, still situated on the east side of the building. Additional Sabal Palm groupings have been added on the north and south sides of the building. This provides an acceptable solution. SAT/SF/ED General Landscape Comments 1. The three (3) Sabal Palm groupings on the north and s�outh sides of the building are a welcome addition to the plans. Recommend adding three (3) more groupings of three (3) palms to fill in gaps. These should be a different variety (e.g. Coconut Palms or Thatch Palms)to add to the diversity of species. Response: Three groupings of(3) Thatch Palms have been added along the north property line. 2. The portion of property on the west side of Beach Raad has been noted to be developed at a later date, therefore is not a part of this review. Response: Acknowledged Fire Rescue — Chief Weinand Third submittal meets Fire Department requirements. Should you have any questions regarding the resubmittal please do not hesitate to contact me at 561-575-9557 or email me at :�: >:�c�!��: ,. RespectFully, Gentile Glas Holloway O'Mahoney& Associates, Inc. r �" George G. Gentile, PLA, FASLA, LEEDC�AP, BD&C Senior Partner N:1Slowing Rock-Condominiums Turnberry 17-05131ApplicationslSite Plan 2018�Agency CorrespondencelBlowing Rocks Response Letter 8 29.18.dacx /11 ��� land��dpe ar�h�iecc� Planner• Lmitonr►t�ni«1(un>uli�nt, _.. . . GENTILE GLAS HOLL�WAY O'MAHONEY�a,��r�,i��. George G.Gentile IA11A M.Iroy Holloway l3tA Emily M.O'Mahoney}AiL� Dodi Bucicmaster Glas AICP September 17,2018 Village of Tequesta Attn:Ms.Nilsa Zacarias—Community Development Director 345 Tequesta Drive Tequesta FL,33469 Re:Blowing Rocks Condominiums(SPR 1-18) Dear Nilsa: Pursuant to comments received on September 10, 2018, based on a submittal of August 29, 2018, please accept the following application package needed to allow the development of a 21 unit multifamily condominium building. Note as the outstanding comments are minor in nature, we have provided a responses to the stafPs issues raised below. Additionally,we have provided ONE SET needed for review. 1) Provide statement indicating the applicant will pay for the new water main along beach Road. Response: The applicant acknowledges this will be a condition of approval placed on the project,however, the applleant is still engaging in conversations with the water department to determine if any credits are associated with the upsizing of the water main along Beach Road. 2) Revise Open Space Calculations on page Z1.01 Response: Sheet Z1.01 has been revised to contain the correct open space number. 3) Revise entire justification statement document after Variance Council Hearing. Response: The Site Plan Review Justitication Statement has been revised to indicate the approval of the stormwater management facility variance,as approved by Village Council on September 17,2018. 4) Revise Description of work on the site plan review application. Response: Acknowledged. The description of work on the site plan review application form has been revised to only include site plan approval for 21 condominium units. 5) Remove unity of title from all documents and replace with replat. Response: The documents have been revised accordingly. 6) Providing landscaping at the base of the entry sign. Response: The previously submitted Iandscape plan provides for landscape at the base of the entry sign. This area has been highlighted on the landscape plan. Please note,the Village landscape consultant has approved the landscape plans as previously submitted. With the exception of the comments addressed above, all other comments with regards to the site plan application have been addressed and approved by the other consultants. Should you have any questions or need any additional inforuiation, do not hesitate to contact us at 561-575-9557 or Respectfully, Gentile Glas Hoflo���ur O'Mahoney&Associates,Inc. �5���i ge�;.Gentile,PLA,FASLA,LEED�AP,BD&C Senior Partner ��i17 t�t)n�ttsel�.�e t�+nc-, 5i�iiEs iU1 )+���r(ci� f1uYi�1�E :i:SFlf.iti .`rf�F7 �,�,�/'���ti:,�ri !rf;1 -;3/.'e��Ce261� I-tek �:��,i��."l��I�u.e',tn� ��� ��� Landscape Architects Planners Environmental Consultants GENTILE GLAS HOLLOWAY O'MAHONEYnn�������e�,�nc. `�;:'���;`�;������;;;;��:�; �,»��,.� �,:,,,�„� . . , �,,,,�,��:..�,: � ,,,,<�'�,. . BLOWING ROCK3 GONDOMINIUM3 'I�00 BEACH ROAD TEQUE3TA, F�LORIDA SITE PLAN REVIEW JUSTIFICATION STATEMENT MARCH 16, 2018 REVISED SEPTEMBER 19, 20'18 Introduction/Request: On behalf of the Owner, Turnberr•y Beach Road, LLC, Gentile Glas Holloway O'Mahoney & Associates, Inc. respectfully requests review and approval concerning the pr•operties located at 1500 and 1550 Beach Road, in the Village of Tequesta. The subject proposal will br•ing a unique one of kind design (inspired by internationally known design architect Carlos Zapata) into the Village of Tequesta, which will be maiveled for yeais to come. The Owner's overall development program consists of the following: 1. Replat to combine both parcels; 2. Small scale coinprehensive plan map amendment fi•om Residential Low Density to Residential Medium Density for the Noi�th Parcel; 1550 Beach Road (approved by Village Council on Septe��aber 13, 2018); 3. Site plan for an infill r•edevelopment consisting of 21 multi-family, condominium units, and amenities area located on�1.78 acres. (Note, the amenity area will use inost of the existing amenities on the existing 1500 Beach Road parcel). 4. Variance Request regarding stot7nwater management facility systems (approved by Village Couizcil on Septenzber•13, 2018). Note, this Nart°ative ONLY add�-esses Site Plan Review portion of the applicant's proposal. About The Owner: Turnberry has a world renowned reputation in transforming ordinaiy into extraordinaiy. For more than 50 years, the owners have continually imagined and r•ealized what many can only dream. From buildings, to cities, to world-class entertainment and hospitality experiences, Turnberry has always had the unrelenting vision to go above and beyond. The owners az•e committed to cultivate cultur•e and build communities; while being di•iven by their beliefs which ai•e quality, integrity, and family. It is with this mindset that they intend to deliver an exceptional pr•oduct to the Village of Tequesta. They have partnered with Perko Development Partners, Phillip Perko, a Jupiter•resident who has inore than 20 years of exper•ience deliver•ing quality residential projects. His knowledge of the local communities in the northern end of Palm Beach County and his twenty years of experience with the Tui�nbei7y bi•and makes for•an exceptional development team to bring the proposed project to reality. Conceptual Presentation: On Febt•uaiy 8, 20]8, at the rec�uest of Village staff, Gentile Glas Holloway O'Mahoney&Associates, Inc. presented the applicant's proposal foc•Blowing Rocks Condominiums to the Village Council. The feedback received was positive. As such, the project team has finalized the drawings and documents 1�S�d,� C. t�til111t'ii.�i' IJilt�� ��Ul1i' �l�l �ll�)It(`I� I�nir[�,s .,,i-?��i> -�lil-.�i.r-�;.�:vi .'�(il-.>,'�� �. i,ilir.�: 11'11'11'.t�tiilt�.i�t�ili Blowing Rocks Condominiums Tequesta,Florida Site Plan Review March 16,2018 rev Septeinber 24,2018 to technical standards and with this submittal, starts the process of bringing the Village of Tequesta a highly desired, thoughtfully designed, infill redevelopment project. Compatibility with Surrounding Properties: The subject properties are uniquely situated on Beach Road, bordered on the east and west by the Atlantic Ocean, and Intracoastal Waterway respectively, and by Coral Cove Park to the north and south. With this location, it allows the owner and design team a mechanism to t�uly design around nature. Below is a chart showing the surc•ounding Land Use and Zoning. As previously mentioned,the land use map amendment to i•esidential medium density will increase the compatibility between the two properties. Pro er Future Land Use Zonin Subject Properties Residential Low R-3 Multifamily Residential Existing Residential Densities/Medium Density Residential North Recreation R-OP- Public Owneiship Coral Cove Park South Recreation RH Multifamily Residential Coral Cove Pariz High Densit East N/A N/A Aticzntic Ocean West N/A N/A Intracoastal Watefrway Project Justification: Over the last few years, the owner has diligently researched the housing market in the Village of Tequesta, and has determined that the cuirent market trends are excellent to offer a well-designed "infill"r•edevelopment pr•oject that provides a �nodest impact to growth and seivices in the ai•ea. The proposed infill development will not have significant traffic impacts on the sui7•ounding t•oadway network, and will bring an increase to the taxes and values of both parcels. Further, the project will have no impact to the existing sur7•ounding land uses. As Tequesta continues to distinguish itself as a pi•emier destination in northern Palm Beach County for locals and visitors alike,the applicant is excited to bring this project for consideration by the Village Council's foi•approval. SITE PLAN REVIEW: Section 78-331 states that all permitted uses, development and redevelopment activities are i•equii•ed to go tlu•ough the Site Plan Review process. The submitted application package contains all necessar•y docutnents as stipulated in the development application and zoning code. The pi•oject scope is consistent with Section 78-175(a) of the Village's zoning code as it provides lands within the Village of Tequesta for a higher density range of multi-family residential uses. Project Overview: The vision behind the proposal is to infuse the surrounding elements of nature to ci•eate a tropical modern nautical-themed st�ucture that grows fi•om the ground up that will take advantage of the unmatched views of air and light. The proposed project consists of 21 units with enclosed private N:AI31o�ving Rocl;-Condominiums 1'i�mbcin•17-0513\�Applicacions\Siec Ylan 2018\Submittals\Stl�S��bmittal\Sitc Plan Rc��ic���Justification 9.1).78.Docs Blowing Rocks Condominiums Tequesta,Florida Site Plan Review March 16,2018 rev September 24,2018 garage space.Each units will feature floor to ceiling glass and are surrounded by expansive balconies, and has been designed to pay respect to the neighboring units. The owner and design team have continuously worked together through the conceptual phase,and will now demonstrate how each of the following site elements are incorporated into this dynamic infill proj ect. Drainage: Beach Road does not have a formal stormwater conveyance or stormwater management system. Stormwater runoff from Beach Road sheet flows off the roadway onto the adjacent properties. There is a culvert system along the east side of Beach Road along the project frontage and this system allows surface water runoff north of the project site along Beach Road and stormwater runoff from this site to discharge south into the undeveloped state-owned land south of the project site. There are no existing water quality treatment facilities located on-site. The proposed stormwater management system will be constructed to meet the standards of the South Florida Water Management District. Stortnwater runoff will be reduced from the pre-development conditions. Water quality treatment facilities will be designed to treat stormwater runoff prior to discharge. Legal positive outfall will occur west into Beach Road and ultimately to the undeveloped property to the south via bubble up structures or a hard pipe connection to the drainage system on Beach Road. Please see submitted Drainage Statement for additional information. Additionally, as previously mentioned,the applicant has applied for and received a variance for stormwater management facilities systems,which was approved on September 13, 2018 by the Village Council. Traffic: As this is a residential infill redevelopment project, the proposed project will generate fewer than 20 peak hour trips, and as such a traffic, study is not required. It is anticipated that the proposed project will have an insignificant impact on the surrounding roadways, and will be in compliance with Palm Beach County Traffic Performance Standards. Please refer to the Traffic Report prepared by PTC Transportation Consultants, Inc. for additional information. Traffic Report prepared by PTC Transportation Consultants, Inc. Landscaping: Since 1985, Raymond Jungles, Inc. (RJn,under the leadership of Raymond Jungles,has developed a dynamic practice inspired by the ethic of stewardship of the land. The firm's work is innovative yet timeless, proposing design solutions that respond to surrounding natural systems while restoring nature's balance and harmony on a micro-scale. RJI's completed gardens personify timelessness and beauty, with verdant spaces that entice participation and soothe the psyche. The landscape design intent is to provide a lush tropical oceanfront setting for the intended residents to enjoy the various amenities provided for them. The intent is to provide the living and play experience in a more residential scale than typically found in a condominium project. N:\Blowing Rock-Condominiums Turnberry 17-0513\Applications\Site Plan 2018\Submittals\Sth Submittal\Site Plan Review Justification 9.19.18.Docx Blowing Rocks Condominiums Tequesta,Florida Site Plan Review March 16,2018 rev September 24,2018 The owner's plan on accomplishing this is by providing a picketed sculptural entrance gate opening onto a palm lined motor court with a water feature as the focal point. The motor court driveway will feature large coral rubble flagstone pavers. All access walkways will have a coral stone finish. The motor court area will feature a water wall and wire trellises that will screen the garage wall. The ocean frontage will feature a renovated pool cabana building with a pool terrace on the south side and a fire pit/social terrace and private beach on the north side. The pool terrace will feature a zero edge swimming lap pool with an `infinity' edge on the east side to capture the reflected ocean views beyond. The swimming pool will be framed by chaise day beds. The fire pit and social terraces will feature a sculptural bench and social seating in close proximity to the pool terrace's water feature. The private beach will allow residents to enjoy the oceans views from the seating areas provided. These areas will be surrounded by coconut palm groupings. The garden shrub and groundcover beds will be wind and salt tolerant and will blend in with the restored dune vegetation. The above landscape will be provided within the confines of the Village of Tequesta's landscape provisions. Architectural Design and Influence: The Owner is proposing to redevelop Blowing Rocks condominiums as a multi-family residential structure consisting of 21 residential units, for a total of 151,552 square feet of A/C saleable area (inclusive of the units, terraces penthouse roof and private cabana building). Twenty-one enclosed private garage spaces will be provided for the main tower which is proposed to have an overall gross axea of 210,028 square feet. A generous 10,500 square feet of outdoor amenity space will be provided for the end user to aid in creating a sense of place. The main building draws its inspiration from its spectacular site located at 1500-1550 Beach Road in the Village of Tequesta in Palm Beach County. As mentioned elsewhere in this narrative,the site,a two parcel assembly(lots# 1500 Beach Road and lot# 1550 Beach Road), is surrounded by the Atlantic Ocean to the east,the Intracoastal Waterway to the west,Coral Cove Park to the north and Coral Cove Park to the south. It is a site surrounded entirely by nature with no other structures in the immediate surroundings. The main structure is positioned to follow the geometry of the site, stretching from east to west,with 13 units facing north, east and west, 7 units facing south, east and west, and a spectacular full floor penthouse of over 9, 500 square feet. The building leans gently to the east, responding to the receding movement of the ocean waves, providing an elegant nautical presence. Both the base and the building are tapered at the south west side of the site to allow for the lush landscaped car courtyard that gives access to the private parking areas, and to the ground floor lobby from which the residents start their upwards journey to their residences. The landscaped courtyard is populated by native plants that transition visually into Coral Park south, creating a continuous green canopy that ties the modern nautical glass structure with the lush green site. The residences are enclosed with floor to ceiling glass and surrounded by expanding balconies that shift gently from west to east as they ascend, creating a water ripple effect. The balconies slice the building horizontally,articulating the diagonal nautical movement of the main structure and grounding it to its site. N:\Blowing Rock-Condomuuums Turnberry 17-0513\Applicaaons\Site Plan 2078\Submittals\Sth Submitta]\Site Plan Review Justification 9.19.18.Docx Blowing Rocks Condominiums Tequesta,Florida Site Plan Review March 16,2018 rev September 24,2018 The result is a dynamic structure that incorporates itself into the existing landscape of nature. Site Plan Considerations The owner would like to stress that the proposed redevelopment project is not a detriment to the community and aims to provide the Village of Tequesta with a valuable asset for years to come. The propose developments provides for the following: 1. Consistency with the goals, objectives, and policies of the Village of Tequesta's Comprehensive Plan; 2. Consistency with applicable countywide land development regulations. The applicant will be submitting a School Concurrency Application,in addition to a traffic study to the appropriate Palm Beach County agencies for their review. Additionally, through the review process the applicant will seek permits from the other jurisdictional agencies. 3. Designed to comply with all of the applicable provisions set forth in the Village of Tequesta zoning code. Where the project doesn't comply, a variance has been requested(and approved) for relief; 4. Compatible with the existing character of the area. As the site is surrounded by nature on all sides, the proposed property will not be a deterrent to the surrounding areas; 5. Insignificant impact on traffic, as shown on the submitted traffic statement prepared by PTC consultants; 6. Use of the existing facilities/infrastructure on site, holding to the true essence of infill redevelopment. Prior to this submittal, we have requested confirmation of availability of service letters from the applicable utility and service provider agencies in the area; 7. Will not reduce light and air to the adjacent properties; 8. Expected increase in property values in the adjacent areas, and stimulation of the Village of Tequesta's tax base; 9. Will not create any noise or visual pollution to the adjacent areas; 10. Will work in synergy with the surrounding parks and water, and will not have a negative impact on the adjacent natural systems or public facilities; 11. A development which will include approximately 4,500 square feet of indoor amenities and 10,500 square feet of outdoor amenities. 12. The proposed redevelopment will provide the necessary infrastructure to meet the following level of standards pursuant to the criteria outlined in Sec. 78-331(h). Conclusion: To recap, the applicant, who is responsible for building several high end products domestically, and internationally, are proposing; 1) a replat to combine two parcels; 2) small scale comprehensive plan map amendment from Residential Low Density to Residential Medium Density(approved September 13, 2018); 3) Site plan for an infill redevelopment consisting of 21 multi-family, condominium units, and amenities located on �1.78 acres. 4) Variance Request regarding Stormwater Management Facilities (approved September 13, 2018 by Village Council); Note, the other portions of the applicant's proposal have been submitted under separate cover. The owners have been extremely diligent in working with Village staff, and the design team; even being considerate enough to use local consultant's familiar with the area to ensure that the final product is sensitive and respectful to the existing community. This narrative has demonstrated that the proposal N:\Blowing Rock-Condominiums Turnberry 17-0513\Applications\Site Plan 2018\Submittals\Sth Submittal\Site Plan Review Justification 9.19.18.Docx Blowing Rocks Condominiums Tequesta,Florida Site Plan Review March 16,2018 rev September 24,2018 is consistent with particular elements of the Village Comprehensive Plan, and will not be a detriment to any goals, objectives, and policies. Additionally, the submitted site plan shows compliance with the R-3 zoning district, and other portions of the code, and where it isn't,justification for relief has been requested. With the approval of this dynamic project, Tequesta will further their mission in establishing itself as premier destination in northern Palm Beach County,and with that,Gentile Glas Holloway O'Mahoney &Associates,Inc.,respectfully request review and approval of the submitted application package.The project team at Gentile Glas Holloway O'Mahoney&Associates, Inc. consists of George G. Gentile, PLA, Patricia Lentini, and Alec Dickerson. N:\Blowing Rock-Condominiums T�nberry 17-0513\Applicaaons\Site Plan 2018\Submittals\5th Submittal\Site Plan Review Justification 9.19.18.Docx �1� ��� Landscapc Architccts Plamiers Environmental Consuliants GENTILE GLAS HOLLOWAY O'MAHONEY&As���a�ps,�nc. `'�+"i�:����+.'.��;�°a:��:�"� In,�i�\t.f>'\I.�h�,n�� \`�.1 I���,li I'.u�t.i����iri(.I.�..1 . BLOWING ROCKS GONDOMINIUM3 'I�OO BEACH ROAD TEQUESTA, FL,ORIDA REPLAT JUSTIFICATION STATEMENT MARCH i 6, 2018 REV[SED SEPTEMBER 'I 9, 2018 Introduction/Request: On behalf of the Owner, Turnberiy Beach Road, LLC, Gentile Glas Holloway O'Mahoney & Associates, Inc. respectfully requests review and approval concerning the properties located at 1500 and 1550 Beach Road, in the Village of Tequesta. The subject proposal will bring a unique one of kind design�inspired by internationally known desi�n architect Carlos Zapata) into the Village of Tequesta, which will be ma�veled for yeais to come. The Owner's ovec•all development program consists of the following: 1. Replat to combine both parcels; 2. Small scale comprehensive plan inap ainendment fi•om Residential Low Density to Residential Mediuin Density for the North Parcel; 1550 Beach Road (approved Septe�nber l3, 2018); 3. Site plan for an infill i•edevelopment consisting of 21 multi-family, condominium units, and ainenities area located on �1.78 acres. (Note, the amenity area will use most of the existing amenities on the existing 1500 Beach Road parcel). 4. Variance Request with regards to stoi�rn water management facilities (app�•oved by Village Cou�zcil on Septe�nber 13, 2018); Note, this Narrative ONLY add�esses the replat portio� of the applicarat's proposal. About The O�vner: Tuinber-�y has a world i•enowned reputation in transforming ordinaiy into extraordinary. For• inor•e than 50 years, the owners have continually imagined and realized what many can only dream. From buildings, to cities, to world-class entertainment and hospitality experiences, Turnbei-�y has always had the unrelenting vision to go above and beyond. The owners are committed to cultivate culture and build communities; while being driven by their beliefs which are quality, integrity, and family. It is with this mindset that they intend to deliver an exceptional product to the Village of Tequesta. They have pai�tnered with Per•ko Development Partner•s, Phillip Perko, a Jupiter resident who has more than 20 years of exper•ience delivering quality residential projects. His knowledge of the local coinmunities in the northei�n end of Palm Beach County and his twenty years of experience with the Turnbei7•y brand makes foi•an exceptional development team to bring the proposed project to reality. Conceptual Presentation: On Februaiy 8, 2018, at the request of Village staff, Gentile Glas Holloway O'Mahoney&Associates, Ine.presented the applicant's proposal for Blowing Rocks Condominiums to the Village Council. The feedback received was positive. As such, the project team has finalized the drawings and documents I')11; ( mm�u��<<• I.iti� , Suitc I111 Ju��itcr, Iluiid.� i.t-1';tt '�hl-;;'i-'/:ii% i(�1-57i-;1(�11 I�i� ��t��t.'l};I���.c��m Blowing Rocks Condominiums Tequesta, Florida Replat March 16,2018 rev: September 17, 2018 to technical standal•ds and with this submittal, star�ts the process of bringing the Village of Tequesta a highly desired, thoughtfully designed, infill redevelopment project. REPLAT: The owner intends to use the two subject parcels, both now owned by the Applicant, to yield the proposed developinent program. Cur-�•ently, the land use on the south parcel has a designation of Residential Medium Density and is zoned R-3 Multifamily Residential, and the north parcel has a current land use designation of Residential Low Density and a zoning designation of R-3 Multifamily Residential. Cur-��ently, the northern property has an inconsistent land use with the designated zoning dist�•ict. As the two pi•operties have the saine zoning district,the applicant recently r•eceived approval to change the land use designation to Residential Medium Density to ensure consistency across both parcels. Additionally, to create a seamless project, the applicant will request a replat to combine both parcels to make one unified project. The Village of Tequesta has been provided a draft replat document, and once approved, it will be recorded into the Official Records of Palm Beach County. Compatibility with Surrounding Properties: The subject properties are uniquely situated on Beach Road, border•ed on the east and west by the Atlantic Ocean, and Intracoastal Waterway t•espectively, and by Coral Cove Park to the north and south. With this location, it allows the owner and design team a mechanism to tiuly design around nature. Below is a chart showing the surrounding Land Use and Zoning. As previously mentioned, the land use map amendment to residential medium density will inci•ease the coinpatibility between the two properties. Pro er Future Land Use Zonin Subject Properties Residential Low R-3 Multifamily Residenrial Existing Residential Densities/Medium Density Residential North Recreation R-OP- Public Ownership Coral Cove Park South Recreation RH Multifamily Residential Corc�l Cove Park High Density East N/A N/A Atic�ntic Ocean West N/A N/A Intracoastal Waterway Project Justification: Over the last few years, the ownei• has diligently researched the housing market in the Village of Tequesta, and has determined that the cur-�•ent market trends are excellent to offer a well-designed "infill"redevelopment pr•oject that provides a modest impact to growth and seivices in the area. The proposed infill development will not have significant ti•affic impacts on the sur7•ounding roadway network, and will bring an inerease to the taxes and values of both parcels. Further, the project will have no impact to the existing sui7•ounding land uses. As Tequesta continues to distinguish itself as a N:ABlo�ving Kock-Condominiums 'I'urnbccr}�17-0513\Applications\Rcplat\Rcplat'f usufication 9.17.18.11oc1 Blowing Rocks Condominiums Tequesta,Florida Replat March 16,2018 rev: September 17,2018 premier destination in northern Palm Beach County for locals and visitors alike,the applicant is excited to bring this project for consideration by the Village Council's for approval. Conclusion: To recap, the applicant, who is responsible for building several high end products domestically, and internationally, are proposing; 1) a replat to combine two parcels; 2) small scale comprehensive plan map amendment from Residential Low Density to Residential Medium Density (approved on September 13, 2018 by Village Council); 3) Site plan for an infill redevelopment consisting of 21 multi-family, condominium units, and amenities located on t1.78 acres. 4) Variance Request with regards to storm water management facilities (approved on September l3,2018 by Village Council); The owners have been extremely diligent in working with Village staff, and the design team; even being considerate enough to use local consultant's familiax with the area to ensure that the final product is sensitive and respectful to the existing community. This narrative has demonstrated that the proposal is consistent with particular elements of the Village Comprehensive Plan, and will not be a detriment to any goals,objectives, and policies. Additionally,the submitted site plan shows compliance with all elements of the R-3 zoning district, and is only requesting a variance to help mitigate challenges with stormwater management. With the approval of this dynamic project, Tequesta will further their mission in establishing itself as premier destination in northern Palm Beach County,and with that,Gentile Glas Holloway O'Mahoney &Associates, Inc.,respectfully request review and approval of the submitted application package.The project team at Gentile Glas Holloway O'Mahoney &Associates, Inc. consists of George G. Gentile, PLA, Patricia Lentini, and Alec Dickerson. N:\Blowing Rock-Condominiums Turnberry 17-0513\Applications\Replat\Replat Justification 9.17.18.Docx J 1 ,< 4��ACN c � o�� Marcl� 28,2018 oa � � =-=- o �Lo�I�g. Ms.Nilsa 7.acarias Village Planner Village of Tequesta 345 Tequesta Drive Department of EngineerIng Tequesta, FL 33469 and Pubtic Worlcs P.o.�oX z�zz�� RE: Blowing Rocics Concios West Palm Beach,FL 33416-1229 Project#: 180308 (56])684-4000 Traffic Performance Standards Review FAX:(5G1)689-4050 Dear Ms. 7.acarias: www.pbcgov.com The Palm Beacl� County Traffic Division has reviewed the Blowing Rocks Condos Co�icurrency Statement, dated March 13, 2418, pursuant to the Trafflc Performance U Standards in Aiticle 12 of the Palm Beach County Unified Land Dcvelopment Code (ULDC). The project is summarized as follows: Palm Beach Coiuity Municipality: Village ofTequesta Board of County Commissioners Loeation: F,ast of Beach Road PCN#: 06-43-40-30-21-001-0000; 60-43-40-30-21-000-0010; 60- n�e�issa n-icxinlay,mayor 43-40-30-13-000-]010; -1020; -1030;-1040;-1050;-2010; Mack Bernard,Vice Ylayor -ZOZO;-2�3�; -2���;-2�$� Access: Full access on Beach Road(project}�roposed,not necessarily Hal R.Valeche implies approval by County through this TPS letter,see later) Paulette Bw�dick Existing Uses: Single Family Residential= 1 DU Residential Coudos= 10 DUs �ave�<erner Proposed Uses: Residential Condos=21 DUs Steven L.Abrams New Daily Trips: 63 New Pealc Hou�•Trips: 6(2/4)AM; 6(4/2) PM �9ary l.ou Berger Build-out: December 31,2020 Bzsed on our review,the Traffic Division has determined the proposed development does not have significant peak hour traffic impact(as defined in PBC TPS)on the roadway County Administrator network and,therefore,meets the Traffic Performance Standards of Pahn Beach County. veraen�a c.saker Please note the receipt of a Traffic Performance Staudards(TPS)approval letter does not constitute the review and issuance of a Palm Beach County Right-of-Way (R/W) Construction Pennit nor does it eliminate any requirements that may be deemed as site rclatcd. For work within Palm Bcach Cotuity R/W, a detailed review ofthe projeet will Ue provided upon submittal for a R/W permit application. The project is required to comply with all Palm Beach County standards and may include R/W dedication. A discussion with Palm Beach Cotu�ty, involving at a minimtun Traffic Division, Land Development Division,and Roadway Production Divisioi�,is advisable for access related issues of tl�e site plan on County maintained roadways before a site plan is submitted to the municipality for consideration. .nn F.qiud Oppoiviuiit�, Af(irmnlire Acfion Emplo)�er.. prinfed on sustainable and recycled paper Ms. Nilsa Zacarias �tiAcN�o March 28, 2018 '� �� Page 2 �\`�� ,i �� �� �� 0 0 No building permits are to be issued by the Village after the build-out date specified �Ln�X�)� above. The County tcaffic concurrency approval is subject to the Project Aggregation Rules set forth in the Traffic Performance Standards Ordinance. The au�i�oval letter shall be valid no longer than one year from date of issuance,unless an ap�lication for a Site Specific Development Order has been approved an application for a Site Specific Develoument Order has been submitted or llie approval letter has bee�i supecseded by another a�proval letter for the same propet�tv. If you have any questious regarding this determination, please contact me at 561-684-4030 or email OB�ri(c�pbc�ov.org. Sincecely, ��/��"""G��fc��� Qua�i Bari, P.E. Senior Professional Engineer Traffic Division QB/DS:bc ec: Addressee: Linda Riccardi,P.E.,Pinder Trouttnan Consulting. Inc. Dominiquc Simeus,E.L,Vroject Coordinitor II,Traffic Division Steve I3ohovsky,Technical Assistant III,TrafYic Division Pile: General-TPS-Mun-Traffic Sludy Review N:\TRAFFICIDS\MUNICIPALITIES�APPROVALS\2018\180308-BLON'ING 20CKS CONDOS.DOC , Page 1 of 4 Issue Date: February 15,2018 Effective Date:July 2,2018 Case No.: 18-04-1101P LOMR-APP o�c'�����, J ���G � Federal Emergency Management Agency � ^w � �>, s� Washington, D.C. 20472 `��ND SF�`� LETTER OF MAP REVISION DETERMINATION DOCUMENT COMMUNITY AND REVISION INFORMATION PROJECT DESCRIPTION BASIS OF REQUEST Village of Tequesta NO PROJECT COASTAL ANALYSIS Palm Beach County UPDATED TOPOGRAPHIC DATA Florida COMMUNITY COMMUNITY NO.: 120228 IDENTIFIER Blowing Rock Condo LOMR APPROXIMATE LATITUDE AND LONGITUDE: 26.958, -80.077 SOURCE: Precision Mapping Streets DATUM: NAD 83 ANNOTATED MAPPING ENCLOSURE ANNOTATED STUDY ENCLOSURES TYPE: FIRM' NO.: 12099C0179F DATE: October 5,2017 NO REVISION TO THE FLOOD INSURANCE STUDY REPORT Enclosures reflect changes to flooding sources affected by this revision. 'FIRM-Flood Insurance Rate Map FLOODING SOURCE AND REVISED REACH Atlantic Ocean-an area centered approximately 2,270 feet north of the intersection of U.S.Highway 1 and Waterway Road SUMMARY OF REVISIONS Flooding Source Effective Flooding Revised Flooding Increases Decreases Atlantic Ocean Zone VE Zone AE NONE YES BFEs' BFEs YES YES Zone X(unshaded) Zone AE YES NONE No BFEs BFEs YES YES *BFEs-Base Flood Elevations DETERMINATION This document provides the determination from the Department of Homeland Security's Federal Emergency Management Agency(FEMA) regarding a request for a Letter of Map Revision(LOMR)for the area described above. Using the information submitted,we have determined that a revision to the flood hazards depicted in the National Flood Insurance Program(NFIP)map is warranted. This document revises the effective NFIP map,as indicated in the attached documentation. Please use the enclosed annotated map panels revised by this LOMR for floodplain management purposes and for all flood insurance policies and renewals in your community. This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If you have any questions about this document,please contact the FEMA Map Information eXchange toll free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,3601 Eisenhower Avenue Suite 500,Alexandria,VA 22304-6426. Additional Information about the NFIP is available on our website at http://www.fema.gov/national-flood-insurance-program. V� --�^�"'0 Patrick'Rick'F.Sacbibit,P.E.,Branch Chief Engineering Services Branch Federal Insurance and Mitigation Administration 18-04-1101P 102-I-A-C Page 2 of 4 Issue Date: February 15,2018 Effective Date:July 2,2018 Case No.: 18-04-1101 P LOMR-APP �cf�R r,�,t 0���':1y. J�:��=� Federal Emergency Management Agency __ �,, � �.� Washington, D.C. 20472 c• .� ��n�o sec LETTER OF MAP REVISION DETERMINATION DOCUMENT (CONTINUED) COMMUNITY INFORMATION APPLICABLE NFIP REGULATIONS/COMMUNITY OBLIGATION We have made this determination pursuant to Section 206 of the Flood Disastei•Protection Act of 1973 (P.L.93-234)and in accordance with the National Flood Insurance Act of 1968,as amended(Title XIII of the Housing and Urban Development Act of 1968,P.L.90-448), 42 U.S.C.4001-4128,and 44 CFR Part 65. Pursuant to Section 1361 of the National Flood Insurance Act of 1968,as amended, communities participating in the NFIP are required to adopt and enforce floodplain management regulations that meet or exceed NFIP criteria. These criteria,including adoption of the FIS report and FIRM,and the modifications made by this LOMR,are the minimum requirements for continued NFIP participation and do not supersede more stringent State/Commonwealth or local requirements to which the regulations apply. COMMUNITY REMINDERS We based this determination on the 1-percent-aimual-chance stillwater elevations computed in the FIS for your coimnunity. A comprehensive restudy of your community's flood hazards could establish greater flood hazards in this area. Your community must regulate all proposed floodplain development and ensure that permits required by Federal and/or State/Commonwealth law have been obtained. State/Commonwealth or community officials,based on knowledge of local conditions and in the interest of safety,may set higher standards foi•constiuction or may limit developinent in floodplain areas. If your State/Commonwealth or community has adopted more restrictive or comprehensive floodplain management criteria,those critei•ia take precedence over the minimum NFIP requirements. We will not print and distribute this LOMR to primary users,such as local insurance agents or mortgage lenders;instead,the community will serve as a repository for the new data. We encourage you to disseminate the information in this LOMR by preparing a news release for publication in your community's newspaper that describes the revision and explains how your community will provide the data and help interpret the NFIl'maps. In that way,interested persons,such as property owners,insurance agents,and mortgage lenders,can benefit fi•om the infonnation. We have designated a Consultation Coordination Officer(CCO)to assist your community. The CCO will be the primary liaison between your community and FEMA. Far information regarding your CCO,please contact: Mr.Jesse Munoz Director,Mitigation Division Federal Emergency Management Agency,Region IV Koger Center-Rutgers Building,3003 Chamblee Tucker Road Atlanta,GA 30341 (770)-220-5406 This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If you have any questions about this document,please contact the FEMA Map Information eXchange toll free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,3601 Eisenhower Avenue Suite 500,Alexandria,VA 22304-6426. Additional Information about the NFIP is available on our website at http://www.fema.gov/national-flood-insurance-program. �.i ' --�^�"'(/ Patrick'Rick'F.Sacbibit,P.E.,Branch Chief Engineering Services Branch Federal Insurance and Mitigation Administration 18-04-1101P 102-I-A-C Page 3 of 4 Issue Date: February 15,2018 Effective Date:July 2,2018 Case No.: 18-04-1101P LOMR-APP "�����``�; �� �'�'� Federal Emergency Management Agency � � -=' � ,,�, `�� Washington, D.C. 20472 �'9ND 5F� LETTER OF MAP REVISION DETERMINATION DOCUMENT (CONTINUED) STATUS OF THE COMMUNITY NFIP MAPS We will not physically revise and republish the FIRM for your commuuity to reflect the modifications made by this LOMR at this time. Wl�en cllanges to the previously cited FIRM panel wai•rant physical revision and republication in the futw•e,we will incorporate tl�e modifications made by this LOMR at that time. This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If you have any questions about this document,please contact the FEMA Map Information eXchange toll free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,3601 Eisenhower Avenue Suite 500,Alexandria,VA 22304-6426. Additional Information about the NFIP is available on our website at http://www.fema.gov/national-flood-insurance-program. ���-�.�� Patrick'Rick'F.Sacbibit,P.E.,Branch Chief Engineering Services Branch Federal Insurance and Mitigation Administration 18-04-1101 P 102-I-A-C Page 4 of 4 Issue Date: February 15,2018 Effective Date:July 2,2018 Case No.: 18-04-1101 P LOMR-APP �aitit ��C�-..;�lt � � J��= Federal Emergency Management Agency � ^� � .,, �� Washington, D.C. 20472 C��qNU SF�`\ LETTER OF MAP REVISION DETERMINATION DOCUMENT (CONTINUED) PUBLIC NOTIFICATION OF REVISION A notice of changes will be published in the Feder•al Register.This infonnation also will be published in your local newspaper on or about the dates listed below,and through FEMA's Flood Hazard Mapping website at litt��s:l/w������.�lu��dma��s,G�iiiti.z<���iiliinil>f�� .�tauis/I�fc intiin.�is�> LOCAL NEWSPAPER Name:Pahn Beach Post Dates:Febivary 23,2018 and March 2,2018 Within 90 days of the second publication in the local newspaper, any interested party may request that we reconsider this determination. Any request for reconsideration must be based on scientific or technical data. Therefore,this letter will be effective only after the 90-day appeal period has elapsed and we have resolved any appeals that we receive during this appeal period. Until this LOMR is effective, the revised flood hazard determination presented in this LOMR may be changed. This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If you have any questions about this document,please contact the FEMA Map Information eXchange toll free at 1-877-336-2627(1-877-FEMA MAP)or by letter addressed to the LOMC Clearinghouse,3601 Eisenhower Avenue Suite 500,Alexandria,VA 22304-6426. Additional Information about the NFIP is available on our website at http://www.fema.gov/national-flood-insurance-program. ���-�.�� Patrick'Rick'F.Sacbibit,P.E.,Branch Chief Engineering Services Branch Federal Insurance and Mitigation Administration 18-04-1101 P 102-I-A-C � �� ZONE AE FLOOD HAZARD INFORMATION � � \, (EL 4) � IS NOT SHOWN ON THIS MAP j � 9�,�REAS OUTSIDE OF ' PALM BEACH CO�JNTY i ti �� ZONE VE o� (EL 10) � � O ' I 1 Withou[Base Flood�evation(BFE) \ �� WithBFEorDepth�: \ \ SPECIALROOD RegulatoryFloodway .` � HAZARD AREAS \N�-E�C � Palm Beach County I 0.2%AnnualChanceFlaodHarard,nreas � n � Unincor oratedAreas �I ofi/annualchancefloodwithaverage Cj Y depth less than one foot orwith drainage QP•�-M �' \ 12�19G I areas of Iess than one square mile z��;, � � <y� .�FutureConditiansi%Annual Chance Flood HazarU r. OTHER AREAS OF _ .. - Area with Reduced Flood Risk due to Levee FLOODHAZARD � � . .. �eNotes. %.�-��-.�� NpRBOR RD S ^ F 1J', ?; NE AE .,T_ e s -_ j � (EL 5) ; SCALE sra���_� q�r� �_ _ Map Protectlon: \ ZO N E A E � NAD 1983 HARN StatePlane Floritla East FIPS 0901 Fcet: INTRACOASTAL � western Hemisphere:Vertical Datum:NAVD 88 �'R REVISED (E� 7� 3 1 inch-500 feet 1:6,000 Village of Tequesta AREA -- '"� ° 25° 5°° ,,°°° Feet 12022g � � ZONE VE o �s tso 300eters INTRACOASTAL CIR� ��� ' �EL 'I 2� _ _ _ _ J`�� ^ , ,— 30 � � � -_ _ •; �o t .E , —' �4� , o PALM BEACH COUNTY,RORIDA ^,^ � � w � and Incorporated Areas j l_ WATERWAY� � �/ y w � raNa 179 oF 1200 `v�� c RD ��' Z f i� _ � � � � Q � COMMUNIfY NUMBER PANEL SUFFlX ' WATERWAY �O 1UPRERMLEfCOLONV, 125120 0179 F � TOWN OF /� RD �\ � )UPfiER,TOWN OF 125119 0179 F PALM BEACH COUNTv 120192 0179 F = TEQUESTA,VILLAGE OF 120228 0179 F 0 � ?EVISED TO . � o CORAL PL z ?EFLECT LOMR . � m y ._ _ ____ . .__ _ � W z , ;� ZONE VE _ ,_ ::; , N ,4� 1 � ._��.5!ONNUMBER w PEBBLE PL � EL 'I O � 30 _ 2.1.3.0 ",�AP NUMBER 12099C0179F COVE RD �I 29 '='��'iv=oe.- OCTOBER 5,2017 ! �nvironmental ►S ervices, Inc. BLOWING ROCKS 1500 Beach Road & 1550 Beach Road Section 30, Township 40 South, Range 43 East Palm Beach County, Florida ENVIRONMENTAL IMPACT REPORT Prepared For: Tuf�nbef•fy Beach Road,LLC 19950 W. Country Club Drive,FL 10 Mia»ai,FL 33180 Prepared by: DLSE�tvirofa�nental Services,Iric. 1901 SW Yellowtail Avenue Port St.Lucie, Florida 34953• , (772)215-3997 Fax: (772)879-4520 E»tail: danna(a�,dlsenvirorz�nentalservices.cont phone: 772-215-3997 • fax: 772-879-4520 • email: danna@dlsenvironmentalservices.com address: 1901 SW Yellowtail Avenue, Port St. Lucie, FL 34953 web: www.dlsenvironmentalservices.com � TABLE OF CONTENTS 1.0 INTRODUCTION.....................................................................................................1 1.1 PROJECT LOCATION......................................................................................... 1 1.2 PURPOSE.............................................................................................................. 1 2.0 PROPERTY DESCRIPTION..................................................................................1 2.1 SOILS.................................................................................................................... 1 2.2 NATURAL COMMUNITIES AND LAND COVER...........................................2 2.3 WETLANDS AND OTHER SURFACE WATERS.............................................3 3.0 ENDANGERED,THREATENED AND SPECIES OF SPECIAL CONCERN.3 3.1 OBJECTIVE..........................................................................................................3 3.2 METHODOLOGY................................................................................................3 3.3 CONCLUSION......................................................................................................4 4.0 ARCHEOLOGICAL AND HISTORIC FEATURES...........................................5 5.0 GEOLOGICALLY SIGNIFICANT FEATURES.................................................5 6.0 PROJECT DESIGN AND OPERATION...............................................................5 7.0 PROJECT ALTERNATIVES/MITIGATION.......................................................5 7.1 VEGETATION......................................................................................................5 7.2 WILDLIFE.............................................................................................................6 7.3 WETLANDS .........................................................................................................6 7.4 CONCLUSION......................................................................................................6 FIGURES Figure 1 Location Map Figure 2 Soils Map Figure 3 FLUCFCS Map Figure 4 Proposed Site Plan Figure 5 Proposed Landscape Plan APPENDICES Appendix A Soils Report Appendix B FNAI Biodiversity Matrix Appendix C Drainage Statetnent for Blowing Rocks Pagei b ENVIRONMENTAL IMPACT REPORT 1.0 INTRODUCTION 1.1 PROJECT LOCATION The 1.78± acre-property covered by this Enviromnental Iinpact Report is located in Section 30, Township 40 South, Range 43 East, Palm Beach County, Florida (Figur�e 1). The property is bordered to the north by Coral Cove Park, to the south by undeveloped lands owned by the State of Florida Trustees of the Internal Iinproveinent Trust Fund (TIITF), to the east by the Atlantic Ocean, and to the west by the Intracoastal Waterway. Surrouilding uses beyond the iminediate park and undeveloped property consist of condoininiuins. 1.2 PURPOSE This report docuinents and characterizes the natural resources found on-site, discusses the current regulatory status, and identifies potential impacts that may result from the consri-uction of the pt•oposed residential development. This report has been pr•epared in accordance to Chapter 50, Article II of the Code of Ordinances,Village of Tequesta, Florida. 2.0 PROPERTY DESCRIPTION The property located at 1500 Beach Road is currently developed as a condominium with associated parking and pool. This property is fully developed on the east side of Beach Road to the seaward edge of the existing dune and contains two beach boardwalks with a small area of native dune vegetation (sea oats) near the south beach boardwalk. The section of the propet•ty located on the west side of Beach Road contains a dock and a mix of native and exotic vegetation. The property located at 1550 Beach Road appears to be currently developed as a single family residence. The majority of the property is developed on the east side of Beach Road with a srnall area of dune vegetation. The section of the properry on the west side of Beach Road contains a mixture of native vegetation. Both properties are bordered by surface waters ou the east (Atlantic Ocean) and west side (Intracoastal Waterway). A nan•ow fringe of mangrove wetlands is present on the west side of both properties iimnediately adjacent to the Intracoastal Waterway as shown in Figur•e 2. 2.1 SOILS Project soils were mapped according to the Soil Sun�ey of Palm Beach Counry Area, Florida, December 1978, United States Deparrinent of Agriculture, Soil Conservation Service. A copy of the Soil Survey Map depicting the project boundaries and soil type(s) is included as Figure 3 and a copy of the Soils Report is included (see Appefadix A). The Page 1 two properties contained three soil mapping units, all of which traverse both properties. A general description of the soil types are as follows: Ar•eitts- Uf�ba�z la�ad comnlex, 0 to 5 pef•cent sloves(4) This complex consists of nearly level, somewhat poorly drained, sandy soils and urban land. The soils fonned in thick layers of sandy fill material that were placed over low, wet inineral soils to make the areas suitable for urban use such as golf courses, subdivisions, condominium developments, roadways, etc. The soil material is generally rapidly penneable in all layers. The available water capacity is low or very low. Beuches(9) This mapping unit consists of narrow strips of tide-washed sand along the Atlantic coast line. As inuch as half of the beach may be covered by water during daily high tides, and all of the beach may be covered during stonn periods. Most areas have no vegetation, but the inland areas may be covered with moonvine, railroad vine, sea oats, and seashore bennudagrass. Depth to the water table is highly variable and ranges from 0 to 6 feet or inore, depending on the distance froin the water, the height of the beach,etc. Palm Beaclt- Urba�t laftd co»zplex, 0 to 8 pef�cefat sloves(27) This coinplex is nearly level to sloping, excessively drained, and consists of Paltn Beach sand and urban land. The majority of this complex is open land such as lawns, vacant lots, and undeveloped areas however about 30 to 50 percent is covered by sidewalks,streets,parking lots,building and other structures. 2.2 NATURAL COMMUNITIES AND LAND COVER The following is a suimnary of the land cover and vegetation coimnunities found on the two properties. Land cover and vegetative cominunities were mapped based on the Florida Land Use, Cover and Fonns Classification System (FLUCFCS) developed by the Florida Department of Transportation. Field reconnaissance and aerial photograph interpretation were utilized in mapping the vegetative communities on the project site. There are five different FLUCFCS classifications cun-ently present on the site. A land cover map of the observed community types is included as Figu��e 2. Fixed SiraQle Fa»tilv Units(111)—0.53#acr•es This land cover accounts for the majority of the property at 1550 Beach Road which appears to be a single fainily residence with associated driveways and landscaping including sod. The maj ority of the landscaping is exotic and ornainental vegetation including java plurn, coconut palms, and a ficus hedge. Resideiatial HzQh Densitv (130)—0.78#acr•es This land cover accounts for the majority of the property located at 1500 Beach Road which is condominiums with an associated pool, parking areas and landscaping, including sod. Page 2 ,, Coastal Scrub (322)—0.077f acres Small areas on the east side of the project site adjacent to the beach and on the west side of the pr•oject site adjacent to Beach Road fall into this category and contain a mixture of sea grape (Coccoloba u>>zfera), half flower (exotic) (Scaevola taccada), coin vine (Dalbergia ecastaphyllum), cabbage palms (Sabal palmetto), buttonwood (Conocarpus erectus) and sea oats(Uniola paniculata). Mafa�f�ove Swafnns(612)—0.091f acres A inangrove fringe exists on the western side of the project site adjacent to the Intt•acoastal Waterway. The mangrove fringe extends landward of inean high water and consists of red, white and black mangroves. Mangroves extending waterward of mean high water are not considered to be within the boundaries of the property(those would be on state owned submerged lands) therefare they are not included in the acreage identified. Beaches Other Tha�r Swinaf�titaQ Beaches(710)—0.31±acf•es A beach exists on the eastern side of the project site adjacent to the Atlantic Ocean between the remnants of the dune line and mean high water. 2.3 WETLANDS AND OTHER SURFACE WATERS The presence or absence of wetlands was determined using the State Unified Methodologies identified in Chapter 62-340, FAC and 1987 Corps of Engineers Field Guide for Wetland Delineation. Based upon this methodology, the mangrove fringe on the western side of the project site adjacent to the Intracoastal Waterway would qualify as jurisdictional wetlands. These wetlands have been flagged and located by survey for the purpose of this Enviromnental Impact Report. The wetland line will be reviewed and verified by the appropriate state pennitting agency (South Florida Water Management District or Flor•ida Department of Environmental Protection) as part of the overall pennitting process for the proposed residential developinent. This verification will not affect the overall proposed site plan since no activities are proposed on the west side of Beach Road within the inangrove fringe other than maintenance/repair of the existing dock access for the purpose of the future docking facility. 3.0 ENDANGERED,THREATENED AND SPECIES OF SPECIAL CONCERN 3.1 OBJECTIVE Review Florida Natural Areas Inventory (FNAI) to detennine the likelihood of occurrence of federal and state protected species on the project site, conduct a systeinatic survey for flora and fauna that may occur on-site, and note the presence of any endangered, threatened, and species of special concein as identi�ed by Florida Fish and Wildlife Conseivation Commission and the Florida Department of Agriculture and Consumer Services. 3.2 METHODOLOGY Biologist conducted pedestrian transects which ineandered through the project site. During the pedestrian transects, the biologist recorded and noted sightings, tracks, scat, tree inarkings,nests, cavities, and burrows. Page 3 r 3.3 CONCLUSION Review of the information obtained from FNAI indicated the potential presence of the following habitat; scrub, scrubby flatwoods, and beach dune. FNAI indicated the potential presence of the following listed species; four-petal pawpaw (Asimina tetramera), perforated reindeer lichen (Cladonia perforate), leatherback sea turtle (Dermochelys coriacea) and inartial scrub-hairstreak (Strymon martialis). The FNAI Biodiversity Matrix also indicated the likelihood of 9 other species and the potential of 36 other species, all of which are listed in Appendix B. Field review of the project site revealed no evidence of the following: • Scrub • Scrubby flatwoods • Listed plant species by either the state or federal agencies • Other species identified in the FNAI Biodiversity Matrix Based upon field observations beach dune habitat was present. There is the potential that the following would utilize the beach dune or mang-rove wetlands for foraging and/or nesting: • Loggerhead sea turtle (Caretta caretta) • Green sea turtle(Chelonia mydas) • Hawksbill sea turtle(Eretmochelys imbricata) • Snowy egret(Egretta tl2ula) • Wood stork(Mycteria Americana) • Piping plover(Charadrius melodirs) The field observations revealed no evidence of the above listed species nesting or foraging within the existing beach dune and mangrove wetlands. The proposed residential development does not contain new impacts to the beach dune or mangrove wetlands. The proposed new dune crossing location replaces one of the existing dune crossings and the dock access within the mangrove wetlands is to remain in the same location as what currently exists. No Bald Eagle nests were located within the boundaries of the project site. A review of the FWCC Eagle Nest database indicated there are no Bald Eagle nests located within one (1)mile of the project. The FNAI Biodiversity Matrix indicates there is a likelihood of Johnson's seagrass (Halophila johnsonii) and West Indian manatee (Trichechus f�tanatus) on the project site however these species would not be located within the actual project boundaries. They would occur waterward of inean high water and would be taken into account as part of the review by the state and federal permitting agencies for any in-water work associated with the proj ect. No wildlife was observed during the site reconnaissance other than curly tailed lizards. Page 4 4.0 ARCHEOLOGICAL AND HISTORIC FEATURES The properties are currently developed therefore the presence of archeological or historic features is highly unlikely. A request for review of the site for archeological and/or historic resources has been subinitted to Florida Depart�nent of State, Division of Historic Resources to confinn this aspect. The result of that review will be provided upon receipt. 5.0 GEOLOGICALLY SIGNIFICANT FEATURES The properties do not contain any geologically signi�cant features. 6.0 PROJECT DESIGN AND OPERATION The Site Plan is included as Figure 4 (due to the detail, it is not at the same scale as the FLUCFCS Map included as Figuf•e 2). The project site is located in Flood Zone AE and Flood Zone X with current elevations varying from 4.17 feet to 15.75 feet. The pt•oposed first floor elevation of all buildings is 8.5-feet NAVD so all floor elevations will be ineet the miniinuin required. The project is a residential developinent and as such, is not proposed to have operations which deal with hannful substances or emit pollutants. The project has been designed to provide more than double the minimuin open space requirement— 30-percent required and 64-percent proposed. A Planting Plan is included as Figuf�e 5. Also, the site cun•ently has no pre-treatment of surface water run-off which drains off-site onto the adjacent state-owned lands. The project provides an improveinent in water quality treatment by means of a surface water management systein designed to provide pre-treatinent prior to discharge as identified in the Drainage Statement included as Appendix C. Other approvals will be necessary for the proposed development, including state (Florida Department of Enviromnental Protection or South Florida Water Manageinent District) approval and U.S. Army Corps approval for the proposed docking facility. 7.0 PROJECT ALTERNATIVES/MITIGATION 7.1 VEGETATION The inajority of the project site has been impacted by the previous activities. Based upon the Site Plan, the majority of the existing native vegetation (Sabal palmetto) will remain and no new impacts are proposed within the natural vegetative communities on the project site (Coastal Scrub and Mangrove Swamp). In addition, the Planting Plan provides open space and native plant inaterial in excess of the requireinents for the site. Page 5 7.2 WILDLIFE The wildlife which may utilize the project site would be within the mangrove area or the dune area in which no iinpacts are proposed; therefore iinpacts to wildlife are not anticipated as a result of the project. 7.3 WETLANDS No unpacts to wetlands are proposed for the project. 7.4 CONCLUSION State, federal, and local requireinents have been considered during the preparation of the Site Plan (Figui�e 4). Building setbacks, zoning, landscape, and buffering requirements have been considered based upon the Village of Tequesta,Code of Ordinances. The proposed development has been designed to preserve the majority of the existing native vegetation and no new iinpacts are proposed within the natural vegetative communities on the project site (Coastal Scrub and Mangrove Swamp). The Planting Plan (Figur•e 5) deinonstrates an improvement to the existing conditions on the project site. The Site Plan demonstrates avoidance of wetland impacts. In review of the existing conditions coinpared to the proposed conditions for the project site,no alternatives or mitigation would be necessary. The Site Plan (which includes pre- treatment of stonn water) along with the Planting Plan demonstrate an avoidance of impacts and an improvement from the existing site conditions. Page 6 , � � �., PROJECT SITE N n . , . +, , , � Tequesta i) �: �� �� „ Jupiter � Inlet Colo�ry Cer�ter SY 'F516te�-Fsrk � 708 . o upiter � e>> Carlin P A. l M B E ". � �� � Purk Toney'�Penna Dr PALM BEACH COUNTY � d 4 J % BIOWfl9 7, Hell Gate; ' „Rocks � PROJECT SITE o � U po w Q 4 UJ � ��c0 ub..Dr...........County Line Rd y ...................... z � �� �m,�i y am � q VNIa9e �Md A7 4? A t ! a n t i r. a+ Willow `�+ �B7 O c e a n �. � �po�o W� � 6 +p '� = N Dover Rd Tequesta dr �Tequesta pr $e�on St �is,��� � � � � Cove Rd R�� o � � c m � .. � Jupiter Mlet � � y Colony o�,�, �a,� 5 � o g, � V O a ,�1 m � SECTION 30,TOWNSHIP 40 SOUTH,RANGE 43 EAST � �nvironmental Location Map �i� ��t"V1CeS, il`iCo BlowingRocks 1901 SW Yellowtail Avenue 1500 Beach Road and 1550 Beach Road Port Saint Lucie,FL 34953 Tequesta, Florida Phone:772-215-3997 Fax:772-879-4520 www.dlsenvironmentalservices.com scn�e. N.T.S. MAY 2018 FIGURE 1 � '.Jy`� �� �` � �� � .. : .� � � •' .�'�� ► ; ''. ¢ � �� � ' �.,�� �' � - � . -� �� -; .: r : . �-� � � - - . � ' `°;- � � "��., . � �� �;; .,}�w�� � ��, _t� �� ^� � - � ,�� , . . � ,.� ,y '�.� `��'. .��*r � �._ "S' # R ,i 3 'f� . . '� ��•�� i � , �' �,�•'���r. � �� ' .� ~ t'�S'� � 4 ,41 ��r� •7 � � 1 r � .�� 'r �_ /. � .�R��.j.� . . . . '�,,1 a .i��'4 W �. e�l���Jt. '�► ���� .��'� � - !}� Z"(.�t! ,,T�,`� ., a'� � .Y . �� 'S7R •' .4Y . � . .n _�{. r ' � � � � . � r ",��+ Y� � '�,��{1 �. �i+,.'�. ,'. ; ,.��",°�' ;.`.� � � ` s a.. ,r�*�.v ` " .,� .c� � J.� ' / r� 7 f, � �s �` �r• � ' �; - ' , li' '~ Iq '.. .��` �` �� � . � q r• �� �,y ' � `�'+.+��, -�� . .. .. . . :r:'.� ..Wi..it� �` t��R�,�.�L� •'�S,�'c�t . ��' '' �-all�. t�"1�. �1 ��.�.� �� ����� _If .. `�ry�a �f' � �- -� S i.i\1' '11 ��� � .=�'�,,� � ! e `�,. ,� f� ..�r , � 322' ,'•: � ri- , �� ������i � . . �1 � �� -.��. �.�,� -�•� a�: ry`��lN r � - 1['.��'..., ', o�)f�`� � 710 � S .{32`�t' "x 1;'1 � �' �' I • .�,`, „a � �� 130 • . I ' „'612 � �}. ' lt � e � 1 ' }� t� { 1Yi. -. ���� i`� � . � �J�.i�L ��1�'��__, t � . e• �F ` '��i�+ L .'d }� �y Y,��~ * • �� - _ � �1 �! . '♦ "�'� . 'r . .�.1�L ._ . ' � � ' � " � r �'�s ��' . � , �,� +�+s'.x�`r:�:��" .;"4�'�� -: � ,j y , 322 .� • t r� � '�, tiC;� ��� ``'��,`; �..i �+ "�+rt}¢M ^ ,. , '� i _�"+� .••.:v�r�` �� � j�it y'. �+'�ii!!► . F S�/ Y � ' �T� i�• .�; i, { "y aK. ��l!! . a t„ r �}� " a�T: 'x . �:+�� �!a t_Y,'.bF j �, ���1� �.. . L ■ � �.f � �t�� � t'�.'� �'�v� ' . ''1..� � ' � 7 � a . . � b��#4Z ♦ . • 'S,�� s� � '.• e -�'' ,�f�`:� .��' � . .�� .�. t r. - c' +r, l�, � '�:' ,�":�. ..•�.�L!�' ," _ �.� � �t +�� ir .°t -r�'.�� ,. r FLUCFCS CODES: FIXED SINGLE FAMILY UNITS (111)—0.53f ACRES RESIDENTIAL HIGH DENSITY(130)—0.78�ACRES COASTAL SCRUB (322)—0.077t ACRES MANGROVE SWAMPS (612)—0.091t ACRES BEACHES OTHER THAN SWIMMING BEACHES 710 —0.31f ACRES Envirc�ni��ental FLUCFCS Map S�I"VICeS, 11`iG. BlowingRocks �' 1901 SW Yellowtail Avenue 1500 Beach Road and 1550 Beach Road Port Saint Lucie,FL 34953 Tequesta, Florida Phone:772-215-3997 Fax:772-879-4520 www.dlsenvironmentalservices.com SCALE: N.T.S. MAY 2018 FIGURE 2 F_� y �.' ; 'y� �� ��'• 'Y '� �► ����t��` � .'r'4 a�"�� '�='F� � '�4 •- r ' � t ., ' 3 t r . y t� � � � ♦�ti 1ti` � � J � � r � L i' + -!�•-� '�}�� , � .. 'Ir`) ;, . r, •y. �t,"�;-. `i�$�'.�r '.I�, , . . � -+�� � ..Y M '� �.• {.� � ♦ :'�1 Y �"t � 1 e + r ~ \y ,�•� i.�� }.'I •���1 ! . � '�•�� 1 ,,{�; � � ��: 1 ~' 1 , +�t��.. ' �Y f � �.R . .. +�1, . - :�" ,�,���. . � r�` �t7"a,;` ;,'�a".- .� *- .� • �� � � � � � s ' 1J !1 � 1� -� •� 1�•.Y �yy �'/� �,�1_ i�,_�' N» �� y�` �'� �rp!, �y mr�',' � t �L`-i •�+ . � "T. � I \. � a� �f� ��' ��s � .L,A ' ��- �� '1 .. �7}`. �+ i� . i r'. '�?�t '_i-• . 7''� , tR i��(,JQ� ' ' ��`. . . . ,Y �`r��' r +� � � �V` • f i{.._ � e�}f,�� . .�. � • �y,, + �A+n/� �� *�r. .'�"�� �'A._�s'y ..� - .� �� ,'S'.,�'r .r �� . . '►F• ��+ � *" y ��- �►���`ti�.:��� �f�. ,7'. 1����AF .. h �� ���• r . , . _y �A4� ,� � ,M.�`�j -� i �. . �1� . # � �""'�� 27� �,,:"•.,r �.�.�,��.,., �, � � . - ;t�,�,�,;�9 ..'�,_ , ,,�,. • � � �� � `4,.' ''w w� _ �, � ,�� , . . . , '�'�•�. , " ✓ .�'� f ��t ' ` Y �t `�.'*�. � �~r�� ����l � _3� _.Sa+.���� ' �� , �a . �. _ � � � - �� • • a ' ?��;��i�y►r�� r # •�L .�1 M1_ ' ' -t ��.� .��'"�.�(( ��� .,�`4�:. �IM , � �i s M` ��F��' �r •.+1.� . �1�J�"'". � ��1 � '��� i�M.y�7� ' � s ��P, �, �}� ;��'� '�*` :r �, * ;M•.'�* , J. �'�+ � , �• ' fii: � : � �.,•.� � �� . ' ��` .�1 f�•� �` '� 'l{,+7 ',''' ��4�r",��� ! '. tS''`��. 7V r iR` •r'. • ',{ r � � '�� , ,,,��!�` . ,� ��;'' ;'�'��+: » � ''�� � r.1 s�. y � . . Source: hftp://websoilsurvey.nres.usda.gov/app/WebSoilSurvey.aspx Viewed on May 25,2018 SOILS: ARENTS-URBAN LAND COMPLEX,0 TO 5 PERCENT SLOPES (4)-NON-HYDRIC R��CHES (9)-!��M-HYDRIC PALM BEACH-URBAN LAND COMPLEX,0 TO 8 PERCENT SLOPES (27)-NON-HYDRIC � Envirc�nmental Soils Map �� ��I"V1CeS, l. l'1G. BIOWingROCkS 1901 SW Yellowtail Avenue 1500 Beach Road and 1550 Beach Road Port Saint Lucie,FL 34953 Tequesta, Florida Phone:772-215-3997 Fax:772-879-4520 www.dlsenvironmentalservices.com SCALE N.T.S. MAY 2018 FIGURE 3 so �nuvtmeuurr " .� . p - .__•.a_s�.c-•......�._ `� r�rnw.wm -. __. _�r.__�:.. - ...,.. . � . .. . _. ._. _.. ..�._. _�____ . _..___ . ..- _ .._ _—.. . -.. __.. .. �. , - �..,. -• . __. . . ...—_. _. . " ". __ � _. . .. �o.... .. - .. � '� .... . :ri x� i v .i� •��• .,� .... . ....,, — '—"— '_'__"_"_" __ �-"_"_—___•-_�... ..�'�"�+.q� i�'.A�"`�"r..'�.'�" �^- .-.�...._—'"_" ��rwma� , . _:," ,... ' . ,. �+ wr� � .�• _'" %� . . . ��� :612 I/ -� ��, ���� �. Mfl�� r4Y � . .. _. ...._._. St�f>Y' '� �.I�li�lii' �• � �� �-.J %i,^• �" ^ ....'- ..._. . .. . %T1+16`M �_ __ �fll k ^ �Ctl11R� ' � � o\ , a� � )Y X r � Y ��' 1 �� [la ` �L��� •` � \1\,��� �Y� �k 322r ' �� ;.,t u ; + . �, fxYN . A � - 1A ,.�.�" v iW�LM N � . 1� r�— . 3221 �- � ., ,al-m ' F y .. � - _ f-�'. , ' a`°°'�r.'nr ..»�..,.. � . .ia.c � _ ,�� . �, , , ,�,:-�m � m � �� f-�1 „f . , ,.. "„�.. , I � � m..K � , .�,.. � p ' ... � - �.. � i k� .,�,.� N ,..,,...., ? — -- .. �u,,, .,...aA. � L�,O , __ _„�— _. , . ""� i Y wwff•,� ' ., `,; n .,... � ; . .a 1 � ��4:.,Q � � : '_ j�, ��, � „ � �... , �, � y 1 . . . : _ � ' � , . �.. 9�� o , 'i��n ���,� `K;,�. . .�, , - 3 .. � '� � ^1 '` fF3 � `�$�. � � . _ 1�. � 'E_ �� � � ,, .�: � Y .� :. ..,, �' -;..�"' . - -- � . � . � ,, �� \s Y.�� q �.<. � PROPOSEDCON�OMINIUM �rµ `� �gb �R� � __ • , � � � . . . ._ y- Y � . , � e wM tl �'� ��.RK.� '�rtS. P I �� / ' ' ... � a 1 . , Q(A', .�. ..: � �. i. 1 � �� p� � . " JpkRRil � ... :nx.er. . .n . _ .. . i ., a , - " ' �,R j �er �.� � " ' � �.., _ �� < / ' � ' ' S 9rya ,. , . �y � :, `. _ _ .�,;��i. N�• �,.,... ��'.� �k � � �: :'r a�.�w+°Nic . '. ..-,n�•'^� . ' i .1 . - .-____ _ \ � i MNO�;iI ' � I I y 612 �.- ., . . .. . . � � � P '_ � ... �' ' '..'. '� �., , A � .. ; N �.,... 1 ,. . . v �. ... , _ . � . . r �m+ ! s22 ��'g - - . . _ •_ _ _ _- ` - - --- - _ _, o - — -- 322 =''� ;: ��� , ' -,' �,, o � �1 :.. . � - . .. - � + . n.aa. .... -x � —.,.� '-- -._"_"_ �' _"_ -- _"_ ___—__�...� i �r. —"'�'"�'" ' ' � ,.. '_ cr`:,r�;.o'v � S ' � .-,,.r— �_ �,:.�.,N� , _ , . , _ . , _. e03,• ",N'<" ' . . ..:.. ,..�- ' �.�.. -� -- .. . . .� ��.,.. r ..<. . � - . . ..+ , n,.� ._._,_ `- '_ . .' j._ .. __�_.__. . . �._ v,�. ... ._.___—____—— ... .___.._. : ....n._ .. ._. . ____. ._—_ ._ � --.. ,�'� .'„-� e 6�.. ..��i. +�w�cnn�mm ._ _ �. �x , � fF � w .m�iv��a,, y, t � �b �_ �..��� z�� � .io°�. ��++o�°«'��°iw $ 4 � k Kr»xiw!�n :Dr, 9F yy �� 1�� �� ,.4 'i ?- •Fk `%F j,s sa, a � " ' ' '': r.i ' �'�ii� � "r '.4 '•x': 4�:. . +Y n n R'. � rf SIIE DATA '�e<rc��+ri�F r,[�uaav<.matssevnu �. I nervcrvxs a,�u�.rw�:rasiuru '� I vra.sT�Fs ;,ve�Na�r:[r +r�¢�[s ���� I 4,1p:{g,F�F16T' 11JYS;ty,;.J,?LFi� . FF7VCiDJEMqry 21UItS:t7„U.Y,F�i ��.4k%EJ.DAG'�4GNi 10•.-^ Ff;7J�,:051'.�iWHEIGh� 10"�.' �LOir„^„Tq;{�Ei1T: '741§PIIL'.if 25.'3!SF'�h'� �, x5111fE1,'l�f.� 1J;1i1',I?�: TJ'0.LoiCPr[W,E SSaSF^.:�i �I IpMSC.iFED0�N5P�CFPE0C99 iY.vX � .IAN:SCAF.D7xNSi�CFR7Y:i0 +G'dOSF::.'J ��F,15N'.�CiR�i:IFF: �cP{�[c�2�A75VMT� '�Giirt'�'GF9�'A�F]I10i4', +6'�EXffR7{.�G:1+4"E� I FAiIC'Ci.'9pA9E;�IN1' 1D.'IEA095�/C:'2��:ACFACe: pilFY•`.'.fliY'C Cu�E'f ��.R7�D:J'F�SvM1tT4A 7CAE1 149:::°._�' ".PJ4� •••NOTES••• �n��cc s:::ittx-uvss�rec • -SITE PLAN PROVIDED BY BC ARCHITECTS AND CARLOS ZAPATA STUDIO BLOWING ROCKS SITE PLAN -SITE PLAN NOT TO SCALE TO PROVIDE CLARITY FIGURE 4 , « , ,�,. _ � ;� , n «: �...- ,� 'tn' u _� -"-,, � �',co,; _. y cnc� . � ' �''� . � � J"�`,,,� . � , p� ...... , � - ... '. � �[� I� � 11 . �-. L�}/�� . . A . . ...COL•. _______�y���...� _ .. .. . . - .__t_���r�——'„._ _. ... ._." .__ __ —. . CCL� . .. . /� . -� � ..�`-. „ •M•. i ._., I = .. . . . � C! =°� . ..�{�.... . . r11.J.r:�.� .. :.�^x�r- cr�� o , � . � w. '� �..a / ]RVYM! .,t, �15 � ��,. _ � �� � . . � , . cac� . -\ ,.:� .- �. ..-.. ',t '...}:.. . . • � . . 3� .� "�-...;i�� � . . � � � ,o ` . �.�`-�•ot' �. ''1 l � �� - _ '"' � ." _ p LU{ �� . fC ....C . - 'J . �. . . . _�„ • .- tf....aN�... W... 1:� � �. ' /'. � C0: . � ... ....` �Yii:aR .... �.., 1 , WJ \ ` .. .t .p.. .. � . . . . � -�c t . CU� � " ,QM1 ' . � , _..� � _ .-' ' )! . . . . _ . �' . ' '.' . Y`� .. _ o ..Kt �.� - +y�'..�' -_ �m:� ' �\ � i . _ ' -. T, . �- r ..� . `. ___. ._._ , � ' /... .� `". 4N. i� `. . . . �' • �.•_ � . �� `. ` , � w \ .- _-" �` . . A� M. �`J. . I �iG_-:'`� . . �• ' _ �` ..� T'�. ! _ �-.��.+ _r_..__�.w�__ . � _ `i�. ./-_.. _ 1^� ,. �1�.... V` . �+ -... . I'.,.. , '+\. -- ,�� -,c-,. . � .. ---c�, ' - � ie . a' ,nr � a.' ^ ttw ��' ... . . � . . . . . . .. � - •. �l •�' � • � ; �� �\� . � . . ti1:11.f::1�1[;'-1'J�" 4.� ��i % ,�� . .. BLOYYN6 R�KS G1�TID�y_,_AI�_yATA �� - � .-x-.�,. ' '� - _ . x.. t . �.4 � �So " `y.'.• - ^.'� `�.� .. . . .�. • A.M1�/,hv.�1C��• ',.R.g,� ����` - � ' � ,. � �,-. `' � ' �`,,y � ._._, .. •__� "'�1.��:.tu..!c�.fC.�^r..90..•. Co a".^:fl�'O'.{•^�a�'QJ^:q4�.VMY' ' . Ri.�C' °V� , /�''�( �' . �v �V'is`��i7'G�CCI;�M�"'A�Y� C2L^ ^liJi: . 4_^ JC_` ::.'Q4_ � /� � \ � ' _ " _ �� `L"5' -'!.• �.'l`i��. Il.w. . _. • _ti. --�. : . •a ' _,._'^�. '� .T... ��wc.r�e .,�....-. • ^•• • .C�s.+pts.iaC� 'eT'��:!:.qC v\; � , • . �u'�C'~�'�.Y^ yYt. �'lC•. ' ""�.+a�.. ,W�3: ' _" ]�S X � +__c. ^b '���C 6'L YCL`� 7C C�V C.C'IC0. ��. - . .�i.a� �a ` ` . �- .ro�n••T ......r. .`C +3+Ot ' _'" '+�1 g .�. /'�M i � ... .._ .-ti�..r�.-a ti . . � .;� u _ C'. `r'TS5 A"t ,'�A.�n _ .. . .+J.�. �n::G._t1 73 E�LL`: :G 3�t�5. •. .0 ..,C_ .�]A n-t^S :'�'. � � � .+..rt�.�::J� s._< I �� ' � +1 ��� .0 I. . �.liL \.^'y`C .���, GA"_'� :1r:t r�y' o�� ... . . ca; ��i^.v�x,� :e'aC' u,�.r a:'C� ^�.v ..�-v 1'�_^_ . / _....r���. o:.-'. . . �•` ��.�� ,��. ' � . '4 �� � fr4.E':lN1JC!l/RS^��?0� '.b'iRl.': :Tl<�i.w. ^S�l'l,V'.C�.9[: ,���' ...nt4 <r __ . _ �_.� � � Ik�'�—.0__' � . . .. � � . � �.. - .. '....., _ . . . ' \ • � �'�.�-'�' . ✓. . . _ '�����_��.�'��`� _ _._.�...�L-.......�.. __.�._""""__ "� .. _. ..._ _____ ••�NOTES��� BLOWING ROCKS PLANTING PLAN -PLANTING PLAN PROVIDED BY BC ARCHITECTS AND DS BOCA -PLANTING PLAN NOT TO SCALE TO PROVIIDE CLARITY FIGURE 5 APPENDIX A Soils Report 3 Soil Map—Palm Beach County Area,Florida 3 v e m � 26°57'46"N ��� �..�- � . � , � 26°57 46"N � :- �� �. . �� �.� -� .`� � �� . . . == :� ' `,�`. ' . � T��� � _ ,� � i � � � � T � - _ , � � . '� �i . . . _ . . � I �+� r :- , � ��• F � '�. :�. � � { ,�,. -R• r � �� " '-� . \ _� . ! �, _ .:�y= . w y� + •`� . ��: ; r ����� � t-�/ !i1♦ , . 4�,s � �{ ��i•� } � , 1 ` t '��vr [��i � . ��yy,,,,,, ""��pp�j,� GC/ t^ ��. �. 'A�� �, � ti1= f. i� I t,i``^S�, ,Y':�,`.��, i .y '��"+ ~,�lr:a .`�p ��a` f; e+ . . �i.�h M �y-,�' '3� .. �� . . . - . �. . ~ �} - � . �� "5.,.. .'. �� ' . � _ ,. - . q� '. . _ � . .. ,. . _._ � Soii Map m�;y n�t !�c v�iiid .it this se�le. .:i:� �� `,\ z.. 26°ST 3T N .. . w . �\\ . _ . . . .. . 26°57 3T N 3 3 a Map Scale:1:1,980 iF printed on A landscape(11"x 8.5")sheet � c ° Meters °' N 0 25 50 10D 150 °' � Feet 0 50 100 200 �00 Map projection:Web Merptor Comer coordinates:WGS84 USDA Natural Resources Web Soil Survey 5/25/2018 i Conservation Service National Cooperative Soil Survey Page 1 of 3 Soil Map—Palm Beach County Area,Florida MAP LEGEND MAP INFORMATION Area of Interest(AOI) Spoil Area The soil surveys that comprise your AOI were mapped at Area of Interest(AOI) 1:20,000. Stony Spot Soils very Stony Spot Warning:Soil Map may not be valid at this scale. Soil Map Unit Polygons •• wet spot Enlargement of maps beyond the scale of mapping can cause . • Soil Map Unit Lines misunderstanding of the detail of mapping and accuracy of soil otner line placement.The maps do not show the small areas of � Soil Map unit Points contrasting soils that could have been shown at a more detailed , Special Line Features Special Point Features SCale. �� Blowout Water Features Streams and Canals Please rely on the bar scale on each map sheet for map Borrow Pit measurements. � Transportation �n Clay Spot . . . Rails Source of Map: Natural Resources Conservation Service Closed Depression Web Soil Survey URL: ,... Interstate Hi9nways Coordinate System: Web Mercator(EPSG:3857) Gravel Pit US Routes Maps from the Web Soil Survey are based on the Web Mercator Gravelly Spot Major Roads projection,which preserves direction and shape but distorts distance and area.A projection that preserves area,such as the Landfill Locai Roads Albers equal-area conic projection,should be used if more Lava Flow accurate calculations of distance or area are required. Background ^ Marsh or swamp � Aerial Photograpny This product is generated from the USDA-NRCS certified data as of the version date(s)listed below. ' Mine or Quarry Soil Survey Area: Palm Beach County Area,Florida Miscellaneous Water Survey Area Data: Version 13,Oct 6,2017 Perennial Water Soil map units are labeled(as space allows)for map scales Rock outcrop 1:50,000 or larger. __ Saiine Spot Date(s)aerial images were photographed: Nov 13,2014—Dec 11,2014 Sandy Spot The orthophoto or other base map on which the soii lines were = Severely Eroded Spot compiled and digitized probably differs from the background Sinkhole imagery displayed on these maps.As a result,some minor shifting of map unit boundaries may be evident. Slide ar Slip oa Sodic Spot USDn Natural Resources Web Soil Survey 5/25/2018 � Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map—Palm Beach County Area,Florida Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 4 Arents-Urban land complex,0 5.3 30.7% to 5 percent slopes 9 Beaches 4.1 23.4% 27 Palm Beach-Urban land 2.8 16.2% complex,0 to 8 percent slopes 99 Water 4.7 27.0% 100 Waters of the Atlantic Ocean 0.5 2.8% Totals for Area of Interest 17.4 700.0°/a usDn Natural Resources Web Soil Survey 5/25/2018 � Conservation Service National Cooperative Soil Survey Page 3 of 3 APPENDIX B FNAI Biodiversity Matrix , 5/25/2018 FNAI Biodiversity Matrix � IOIN Thumasvillc Ruad �"`'�Z°°-`� Florida Nati�r•al Areas lnventory �r:,u;,o:�ss�e,ri,.iz:na �,,. � 850424-R207 h<<����-�,a���:,, Biodiversity Matrix Query Results � � ���������������� UNOFFICIAL REPORT ; ! Created 5/25/2018 �F 1 t�K I u A (Contact the FNAI Data Services Coordinator at 850.224.8207 or �'t�r�� �e�',� kbrinegar@fnai.fsu.edu for information on an official Standard Data Report) IN � LN I t� RY NOTE: The Biodiversity Matrix includes only rare species and natural communities tracked by FNAI. Report for 2 Matrix Units: 69107, 69108 . _ Descriptions �. ,� �� �;S � DOCUMENTED -There is a documented occurrence in the , FNAI database of the species or community within this Matrix Unit. . 1. y DOCUMENTED-HISTORIC-There is a documented � occurrence in the FNAI database of the species or community �I Ri i within this Matrix Unit; however the occurrence has not been � �/` �I I observed/reported within the last twenty years. ' � �� I LIKELY-The species or community is known to occur in this � vicinity, and is considered likely within this Matrix Unit � because: ; i��, i 1. documented occurrence overlaps this and adjacent i � = E ?;i_; J��ilei _ Matrix Units, but the documentation isn't precise enough to indicate which of those Units the species or community is actually located in; or � �; 2, there is a documented occurrence in the vicinity and � there is suitable habitat for that species or community ��`� � i within this Matrix Unit. I>. t_H�04 - ��, POTENTIAL-This Matrix Unit lies within the known or d ;.rp�<�, ; predicted range of the species or community based on expert a ,4;uye r;o;u,:,; � knowledge and environmental variables such as climate, ---- ------- "- °"^ � soils, topography, and landcover. Matrix Unit ID: 69107 6 Documented Elements Found Scientific and Common Names Global State Federal State Rank Rank Status Listing Asin�iin<, i��lia�ucv�� G1 S1 LE E Four-petal Pawpaw Beach dune G3 S2 N N Claclonia_N�ilt�i�.iiri G1 S1 LE E Perforate Reindeer Lichen Dermochelys coriacea G2 S2 LE FE Leatherback Sea Turtle Scrub G2 S2 N N Scrubby flatwoods G2 S2? N N 2 Documented-Historic Elements Found Scientific and Common Names Global State Federal State http://d ata.lab i ns.org/map ping/FNAI_Bio Matrix/Grid Sea rch.cfm?sel_id=69107,69108&extent=788171.76680000,333071.43290000,789781.10980000,333071.432900 5/25/2018 FNAI Biodiversity Matrix , Rank Rank Status Listing Ctenogobius stigmaturus G2 S2 N N Spottail Goby Okenia hypogaea G3? S2 N E Burrowing Four-o'clock 9 Likel Elements Found Scientific and Common Names Global State Federal State Rank Rank Status Listing Aphelocoma coerulescens G2 S2 LT FT Florida Scrub-Jay Caretta caretta G3 S3 T FT Loggerhead Sea Turtle Chelonia mydas G3 S2S3 LE FE Green Sea Turtle Geopsammodius fuscus G1 S1 N N Dark Tiny Sand-loving Scarab llalophila johnsonii G2 S2 LT E Johnson's Seagrass Jacquemontia reclinata G1 S1 LE E Beach Jacquemontia Melanoplus indicifer G1 S1 N N East Coast Scrub Grasshopper Mycte�ia an_iericana G4 S2 LT FT Wood Stork Trichechus manatus G2 S2 LE FE West Indian Manatee Matrix Unit ID: 69108 3 Documented Elements Found Scientific and Common Names Global State Federal State Rank Rank Status Listing Dennochelys coriacea G2 S2 LE FE Leatherback Sea Turtle Scrubby flatwoods G2 S2? N N Strymon martialis G3G5 S2S3 N N Martial Scrub-Hairstreak 0 Documented-Historic Elements Found 7 Likel Elements Found Scientific and Common Names Global State Federal State Rank Rank Status Listing Caretta caretta G3 S3 T FT Loggerhead Sea Turtle Chelonia mydas Green Sea Turtle G3 S2S3 LE FE Ctenogobius stigmaturus G2 S2 N N Spottail Goby lacquemontia redinata G1 S1 LE E Beach Jacquemontia Mycteria an�e�icana G4 S2 LT FT Wood Stork lephrosia angustissima vai_ curtissii G1T1 S1 N E Coastal Hoary-pea 1ri�hechus ntanatus G2 S2 LE FE West Indian Manatee http://data.labins.org/mapping/FNAI_BioMatrix/GridSearch.cfm?sel_id=69107,69108&extent=788171.76680000,333071.43290000,789781.10980000,333071.432900 , 5/25/2018 FNAI Biodiversity Matrix Matrix Unit IDs: 69107 , 69108 36 Potential Elements Common to An of the 2 Matrix Units Scientific and Common Names Global State Federal State Rank Rank Status Listing Acipenser oxyrinchus oxyrinchus G3T3 S1 LE FE Atlantic Sturgeon ii��he�locon�a coer�ilescens G2 S2 LT FT Florida Scrub-Jay Chamaesyce cumulicola G2 S2 N E Sand-dune Spurge Chaiadiius inel�du_s G3 S2 LT FT Piping Plover Cladonia.peiforat�i G1 S1 LE E Perforate Reindeer Lichen Coelorachis tuberculosa G3 S3 N T Piedmont Jointgrass Conradina grandiflora G3 S3 N T Large-flowered Rosemary Dicerandi�a im�paculaCa G1 S1 LE E Lakela's Mint Dry�narchoi�cc�u��eri G3 S3 LT FT Eastern Indigo Snake Elytraria caroliniensis var. angustifolia G4T2 S2 N N Narrow-leaved Carolina Scalystem t_ieUr�ucliely�i�nbric�t_a G3 S1 LE FE Flawksbill Sea Turtle Falco columbarius G5 S2 N N Merlin Falco peregrinus G4 S2 N N Peregrine Falcon Forestiera segregata var. pinetorum G4T2 S2 N N Florida Pinewood Privet Glaridularia rnaritima. G3 S3 N E Coastal Vervain Gopherus polyphemus G3 S3 C ST Gopher Tortoise Halophila johnsonii G2 S2 LT E ]ohnson's Seagrass Heterodon simcis G2 S2 N N Southern Hognose Snake Lechea cernua G3 S3 N T Nodding Pinweed Lechea divaricata G2 S2 N E Pine Pinweed Linuii� carteri,var. smallii G2T2 S2 N E Small's Flax Li(liobates capito G3 S3 N SSC Gopher Frog Manatee Aggregation Site GNR SNR N N Microphis brachyurus G4G5 S2 SC N Opossum Pipefish IVeiiias(yl�s,fluiicld�id G2 S2 N E Celestial Lily ;'crc;r;ysa�s polronotus r;;��i;;�nhis G5T1 S1 LT F7 Southeastern Beach Mouse l'�domys floridanus G3 S3 N SSC Florida Mouse l�ulygala smallii G1 S1 LE E Tiny Polygala Rallus longirostris scottii G5T3? S3? N N Florida Clapper Rail Rivulus marmoratus G4G5 S3 SC SSC Mangrove Rivulus Roystonea elata G2G3 S2 N E Florida Royal Palm http://data.labins.org/mapping/FNAI_BioMatrix/GridSearch.cfm?sel_id=69107,69108&extent=788171.76680000,333071.43290000,789781.10980000,333071.432900 5/25/2018 FNAI Biodiversity Matrix . Scelopoi us woodi G2G3 S2S3 N N Florida Scrub Lizard Schiz�chyr�iu�p niveum. G1G2 5152 N E Scrub Bluestem Setophaga discolor paludicola G5T3 S3 N N Florida Prairie Warbler Tolumnia bahamensis G3 S1 N E Dancing-lady Orchid Trichomanes punctatum ssp. floridanum G4G5T1 S1 E E Florida Filmy Fern Disclaimer The data maintained by the Florida Natural Areas Inventory represent the single most comprehensive source of information available on the locations of rare species and other significant ecological resources statewide. However, the data are not always based on comprehensive or site-specific field surveys, Therefore, this information should not be regarded as a final statement on the biological resources of the site being considered, nor should it be substituted for on-site surveys. FNAI shall not be held liable for the accuracy and completeness of these data, or opinions or conclusions drawn from these data. FNAI is not inviting reliance on these data. Inventory data are designed for the purposes of conservation planning and scientific research and are not intended for use as the primary criteria for regulatory decisions. Unofficial Report These results are considered unofficial. FNAI offers a Standard Data Request option for those needing certifiable data. http://data.labins.org/mapping/FNAI_BioMatrix/GridSearch.cfm?sel_id=69107,69108&e�ent=788171.76680000,333071.43290000,789781.10980000,333071.432900 APPENDIX C Drainage Report �� KI�:SHA��AIt! -�G�/` A�SSOCIA I`LS Drainage Statement for: Blowing Rocks Project No. 17-1179 Locatiou 'I'he 1.78 acre project site is located between the Atlantic Ocean and the Intracoastal Waterway immediately south of Coral Cove Park. Beach Road bisects the project site with the majority of the project site located east of Beach Road. The project site is bounded on the nocth by Coral Cove Park, on the east by the Atlantic Ocean, on the south by undeveloped lands owned by the State of Florida Trustees of thc Intcrnal Improvement Trust Fund (TI ITF) and on the west by the Intracoastal Water���ay. 'l�he projec� site is located within the Intracoastal basin of the South Florida Water Management District(SFWMD). FEMA Flood llata '1'he western portion of tlle project site behind the dune line is locatcd ���ithin flood zone AE, elevation 7.0' NAVll based upon the Letter of Map Revision {LOMR) effective July 2, 2018 for the FLMA Flood Insucance Rate Map (FIRM) panel number 12099C0179F, e1'fective Octobei• I 5, 20 I 7. Existin�Conditions "I'hc site is currently developed and in use as a residential multi-family development on the south side and a single building (church parcel) on the north side. ']'here are minimal stormwater management facilities located onsite consisting of a drainage system within thc pool area of the multi-fa►nily developmetit. Currenlly, stormwater runofif generated onsite sheet (lo�vs directly offsite primarily to the �vest to Beach Road, as ���ell as to Coral Cove Park (noi�th), the Atlantic Ocean (east) and the undcveloped pa�•cel (south). Beach Road does not have a formal sto�mwater conveyance or stormwatcc management system. Stormwater runoi'f from Beach Road sheet filows off the roadway onto the adjacent properties. 1'here is a culvert system along the east side of[3each Road along the pcoject fi•ontage and this system allows surface �vater runoff north of the project site along Beach Road and stormwater runoff from this site to discharge south into the undeveloped state-owned land south of the �roject site. There are no existing��,atcr quality treatment facilities locatcd on-site. �I 1 :\ I)ixi�•lii:;h�c:��.tiuitc°01 • ��'c,l Palm 13���u li. I�L 33101 • Shl-bt19-8b0(1•�c�c��.kesha�arr.coni Pronosed Imnrovements 7'he proposed project consists of the redevelopment of the site for a mulli-story COIICIOIIIIt]lUill. T'hc finished flooi• elevation ���ill be raised to meet the current building department finishcd floor eleva�ions associated with cui•rent }�CMA elevation (listed above). The proposed minimu�n finished tloor elevation is 1.5' above the FF,MA elevation or elcvation 8.50' NAVD. The propo5ed stormwater management syslem will be constructed to meet thc standards of the South l�lorida Water Management District. Stormwater runoff will be reduced from the pre- development coiiditions. Wate►• quality treatment facilities will bc designed to treat stormwater runoff pi•ior io discllarge. Legal positive outfal I ���ill occur west onto Beach Road aiid ultimately, to the u��developed property to the south via bubble up stri�ctures or a hard pipe connection io the drainagc system on Beach Road. It should bc noted lhat the Village of 'I'equesta typically requires new development and redevelopment to retain 95% 01' the runoff from a 25 yeac — 1 day storm event. Due lo the geographic location of' �he prc�jecl site being localed on the Barrier Island and elevated significant(y highe�� than the adjacent properties, this regulation should not apply to this sitc as there will be no adverse impacts to any Village stormwater management syslem or any off-site properlies, The proposeci slormwatei• management system �vill be an overall improvemenl to water quality trcannent and stormwater runoff from this sile. Preliminary Surface Water Mana�ement Svstem Calculations The drainage area associated with the redevelopment of the site is 1.32 acres which is the area east of Beach Road aiid west ol'the existing dune line. 'I'he cxisting site is currenlly developed �vith 0.96 acres of impervious area genei•aiing 1.23 acre-feet of runoff during the 25 year — 72 hour design evcnt (13.5 inches oi' rainfall). The proposed sitc plan contains 1.1 I acres of impervious area that would generate 1.33 acre-feet of runoff during the 25 year— 72 hour storm event. The proposed drainagc system ��ill be designed to provide 0.23 acre-feet of�vater quality treatment which �vill be retained within a proposed exfiliration trench system. Therefore, there will be an overall reduction in runoff generated from the 25 year-- 72 hour dcsi�n cvenl. Existing Site Runoff'(ac-('t) �,?3 Proposed Site R�mof'C(ac-ft) 1.33 Pi•oposed Watec Quality TreaUnent(ac-1t) 0.23 Net Runoff(ac-ft) (-)0.13 Randy Wertepny, P.E. (1=lorida I.icense No. 72504) � 1�9arch 14'�, 201$ Keshavarz& Associatzs, Inc. Certiiicate af Authorization No. 4897 i11i;\,Dj�ic Uit;h�c,t�. tiuil�•?I11 • \\rsl P.�lut li�•:u•h. I'L 33dU1 • .ihl-(iJ0-86UU� ���cw.l.eslici��u2.coui �� �. , �Y • �����1��� � , .� ��� � � �� �� . ����� � � ������e������ � �����a�����.��.�.�P�� . �����#: �-� ��: 6 �6 � �§���tox: !✓����=� , R,oca.i�on: �A ����rl C'�,� T�- , �ta�ic�'x�ssure:��' '�Y���D�eh��'s d(cir�}: '/i' 4" JPftot(��'low�)Re�..di�a�: d� Jl�esidfu�l�'xessure: 4��1�: �� ' � � SSIFA�L REPAIlLS NEEDLD . A) Height ' � . 2"he een�`e�of a I�ose ou2`let rnus�`X�e cr�Zeast I8"above frr�al gt�at,�e, B) Paint �) Caps � ' . D) Chai�s E) Cleazance � . AZl vegetation, and other obstrzcetior�s ar�e at lecrst 3'away,fwoni h,ydrant. F) Operafiau N'ut G) Reflector C�mments: Ge�zeral gnzdelines: - Prior to conducting hyd�rant flow#es�;notify the Water Dept. (575-623�}. �Th�test h�draart is the Jiydrant tbat the,static and residual aze taken at. There must be at least a IO% drop in the sta�ic�aressvte after opening tbe fla�vv hydrant. � -�rom a.n.accuxacy stand�outt it i.s prefetable to use tb.e 2�/z'Qut�et rather t.�an the s�eamer outlet. -To detez�min.e gpm discharge from a hydran�use the fornaula: • 29.7xD�.�Px.9 • . � r' Hydrant Information Sheet Hydrant Number 1-030 Hydrant Location "Across from Coral Cove Park" (1600 S Beach Rd.) Nozzle Coefficient 0.90 Noule I.D., inches 2.50 Pitot Pressure 36 Residual Pressure 55 Static Pressure 70 Flow, gpm = 1013 Flow, gpm at 20 psi= 1940 Hydrant Flow so 70 60 L 50 1013 N 40 a 30 20 10 0 0 500 1000 1500 2000 2500 GPM r &�Q��s�� * � * ' . � ` �������� '�f:qUl�Std.�8�P�Cli� �x��ydran4 Inspe��.on�.tepart . . Hy�'ant#: Date: � � li Ynspector: /�l����� s�' d�' ���� ��� � �,�lC�.fI.O]n' r � . Stiatie�'�esswre:�t�� ���ch�e�Tsed(cn cle one 2'/2" 4" Pi.tot(I{'low)ReadYn�: Residual Presswre: G]PM: I� ' � ��� �TEM�� PASS/FAtL REPA]RS NEEDED � A) Height • The center of a hose outlet must be at least 18"above final grade. B) Paan.t ' C) Caps • D} Ch&],TLS ��� CLP��TiCO ' All vegetaiion, and other obstrucfians are at lea�t 3'away from hydrant. � Operation Nut G) Reflector Co�nen#s: • � Gen�ra�gu�idelines: - Prior to conducting hydrant flow tast;not9�y the Watex Dept.(575-6234). -The test hydrant is fihe hydrant that fihe pitot(flow)pressure is taken at. There must be at least a 10°/a cirap.in the static pressure aftex openi.�.g�1a.e flow hydrant. , -From an accuracy s�an�.point it is prefexable fo use the 2'/a"outlet xather f.han fihe s�eamer ou�let. -To detemzi.ne gpm clischarge from a hqdrant use the foxmula: 29.7xD��Px.9 . r Hydrant I nformation Sheet Hydrant Number Blank Hydrant Location "S. of 1550 Beach Rd." Nozzle Coefficient 0.90 Nozzle I.D., inches 2.50 Pitot Pressure 38 Residual Pressure 58 Static Pressure 70 Flow, gpm = 1040 Flow, gpm at 20 psi= 2248 Hydrant Flow so 70 60 � 50 N 40 a 30 20 10 0 0 500 1000 1500 2000 2500 GPM Blowing Rocks Condominiums Tequesta, Florida ,� �� -�. ,� . t :� �.'- „,�� + � '�. "i• :N ��,. •- t ' �� I ` , , . �'•� ��. ,�+,i. 't• }y, '� . '" . , ' ',r,, 4 ~,�, ,�� . -' - 1 `� • � •� t � ,- — � _-�� I�. YA �4 � '�• 4' �) � ` • ,� ; ��.� ' � ..�"" � �' � - �r .' !d y±f ?-: ��1 � -�� t + - .�'� � _ � �r'� `�s� ' ' er .�. 'O , � � • , \ �.. { y�J' �� �`-� � �, . k �� r , r � � �__� '! �� , r• i �� � • � � .��r �. � , � _/ ^�`+� �: a. �f 1' J�J _ � • Y .;1'�"�, �_"� o �" �� ...,<•i/JI� � ` �� � �, �- . �� -�y. '`�' '� ' , � � �.'f' ..,,a�'-.r,c -� ' �' •.., � ile 4 , „ . A�� � �. '�����i .' � _ ��. op , �. i{ � � • . , , _�T�, i�=�j 1'' .t � �.� `Yi�� +.!'t • `^,f�"� � � .��,j.- . '�.'�._ .�'".—.el:.��s'�" — l�L,'�� �`�'.' ; �' .� �;: ��,.,,���°^+}, - ;� ��,-":'� �. „ ;,� ��Y � .�s �. .�� ;�� �4�j .;,r�: � �% ',�. .. , . . . Aerial Location Map �1, � � 3.13.18 � � , ���1 AT&T Florida T:561.540-9262 � L 120 N K Street Lake Worth, FI 33460 May 22nd, 2018 Keshavarz Associates Joan Sopczak 711 N. Dixie Highway, Suite 201 West Palm Beach, FL 33401 RE: Blowing Rocks, 1500 and 1550 Beach Road, Tequesta, Florida Dear Ms. Joan Sopczak This letter is in response to your request for information regarding availability of service at Blowing Rocks, 1500 and 1550 Beach Road, Tequesta, Florida This letter acknowledges that the above-referenced development is located in an area served by AT&T. Any service arrangements for this development will be subject to later discussions and agreements between the developer and AT&T. Please be advised that this letter is not a commitment by AT&T to provide service to the above-referenced project. The projected land use does not appear to encroach into any AT&T easements nor does it appear that it will interfere with the provisioning of services. However, should any of the adjacent aerial/buried/inside communication facilities need to be relocated/adjusted those expenses incurred by ATT Florida to accommodate the improvements will be the financial responsibility of the property owner. Please contact me with any comments regarding this response. Thank you for contacting AT&T. Sincerely, �� �/l; ,/�,��, Eddie Herron MGR OSP PLNG & ENGRG DESIGN A Gmutl Sponso�ot the u 5 Olymv��Team , I lorida Powei &Li,yld Coin�iany , � , FPI_ i��ay z3, 20��� J�»ii :�o���;z��l� / i'I i�J I�ixi� I Ivvy, ;�ufie 2U�1 V1Ji�:;i I-'�ilrri 13�:�ich, f-I 334(��I I?�+: `;ni�il�;�-� !��/ttll�ii�lliiy iui I�ilrn,nllli�) I:tx::k:� (�15!i(1 t��. �IhUU lic�icii I��r_ul) Ueai ,loan: I F�is is to con(irn�i tliat, at fhe prese,ril tii7�e, FPL I�as sufficic:r�i r,apacily to provide elec;tric service to the above capiioned �roperty. l his service will be furnished in �ccordance with applicabic� rates, rules and regulations. Preliminary analysis of youi reqiiest has iiidicated th�i a lii�e exiensicm will be ieq�-iired and will most litcely r�yuire a ConiribuYion in Aicl of Ce�nstruction to be paid in order lo provicl� serviee. r�i��se E�ro��a� rn� r��,�i S�i� r�i��,, site survey and eleciiic��l load data as soon as possible so the necessary engineering can l�egin. �.�rly contact with FPL is essential so that resources may be schedulecJ to facilitate availability of service when required. Sincerely, � � Miclrael t3aldwin Associate Engineer a NEXTera ENERGY Company �—�-_ � WASTE MANAGEMENT JEFF SABIN GOVERNMENT AFFAIRS WASTE MANAGEMENT INC.OF FLORIDA 7700 SE BRIOGE RD HoBE SouNo,FL 33455 PH:(772)545-1327 Mosi�e:(772)263-0017 May 29, 2018 Mr. Alec Dickerson Gentile, Glas, Holloway, O'Mahoney & Associates, Inc. 1907 Commerce Lane, Suite 101 Jupiter, FL 33458 Re: Blowing Rocks (1500 Beach Road, Tequesta, Florida) Dear Mr. Dickerson: In response to your request for confirmation of service availability for the above development, Waste Management of Martin County can adequately accommodate the prescribed services as provided for in our Solid Waste and Recyclable Materials Collection Services Agreement with Martin County. Arrangements will need to be made by the owner to have equipment rolled out, allowing our trucks to have access from the frontage road on service days. We appreciate the opportunity to service the new community and look forward to working with the developers and builders in making it an environmentally friendly project. Please contact our Sales Specialist as your project proceeds, her contact information is below, or myself. Sales Specialist: Amanda Mindell- 561-351-8658 If you have any questions or concerns, please contact us. Sincerely, � JEFF SABIN Government Affairs Cc: Amanda Mindell Loxahatchee River Distrir� ,���NV�RONINE�,rq�� � �:•�`- �y Water Reclamation � Environmental Education � River Restorati:� w_ - � 25001upiter Park Drive,Jupiter, Florida 33458 Y '" '`� � ; o Telephone (561)747-5700 •Fax(561) 747-9��� � zA+l,=,��,J�,r.ahatrt�r�� . y� �'�3��, �tiy o� y�� ! (r;,: �' ?',I li��i;�l�i��� �'�;.I� , i :E�� !ii v;� I 1971 1 `li:'� i�,i March 14,2018 Gentile Glas Hollaway 0'Mahoney&Assoc.,Inc. 1907 Commerce Lane,Suite 101 Jupiter,FL 33458 Attn:Alec Dickerson Re: BLOWING ROCKS CONDOMINIUMS 1500 and 1550 Beach Road,Tequesta SANtTARY SEWERAVAILABIbITY Dear Mr.Dickerson: This letter is_provided in response to your recent inquiry concerning sanitary sewer service availability for the subject properry. Please be advised that,as of this date,sanitary sewer service can be made available to the subject property upon payment of certain costs in accordance with the District Rules. Copies of District Rules Chapter 31-10 are available for your review on our web site at Consistent with District policy,the developer will be responsible for all costs associated with connecting to the existing wastewater system of the District. As discussed with the project engineers the nearest available sewer main is located in the Beach Road (SR A1A) right of way. Should you require additional information on this matter,please contact our Engineering Department at(561)747-5700 Linda at xt 110,or Diane at�. 123. SinS:er�ly, �-- '-� ��'-r��--" C ����� . P� Clinton R.Yerke�' y Depury Bxecut4ve Director v:\dev�proj\blowing rocks condos\Avail ltr.dce ,�� � �. ; �i ,. :, i� �� � � �,�, ,;.�,. � ,�r,��_., ,� � � � ,.. t3oard Niember t3e�ard Member t�hairci�an t3oaid Me��ibei 13onrd Member 81'SO'OI „O-,1=���b/C ���1b'�5 (������� ������ — ���I��� �����Y� ���� ����> I`I� ���/ \��� I�l� �� ��I���-1-I�1� ��i'dM Ol Q3NNId 9N11N'�1c# NOIl'�fQNflO� SZl�11�1 Zl3c�d0� N91 S Q�z!I�t��z! Q�S I'v`z! '1H „� '1� 't�5 O� 39 01 SNOISN�W I� N915 Wf1W IX'�W � � � t � _., . , .1 , � - �'�0; )1\;��(IJ�;iZ-i ;►�,�I;1%��1Zi<�i `w cp w � �►� _ �r ' !� �► ��v �� � � �� ..� � J �.;► I .�I . I ,f1�� . ,� � .� � . �J . � �� _ ��o� „�-�� ��o� „O-,b � �oil�Niwm-ti __ ZlO� 1 I�>I�'�9 - ��'�M Ol CI�NN Id s��li�� ��ddo� a�s i�� �1+� ,�o i r � � ; ! §n. i11'�J�Y{`�J�.`lL� f . �.:5. �` �t . .,4= �A����`—_ � � Drainage Statement for: ; Blowing Rocks ' Project No. 17-1179 Locatian ' The 1.78 acre project site is located between the Atlantic Ocean and the Intracoastal Waterway ; iminediately south of Coral Cove Park. Beach Road bisects the project site with the majority of the project site located east of Beach Road. The project site is bounded on the north by Coral Cove Park, on tlie east by the Atlantic Ocean, on the south by undeveloped lands owned by the State of Florida Trustees of the Internal Improvement Trust Fund (TIITF) and on the west by the Intracoastal Waterway, The project site is located within the Intracoastal basin of the Sauth Florida Water Manageinent District/Florida Department of Environmental Protection. FEMA Flood Data The westeni portion of the project site behind the dune line is located within flood zone AE, elevation 7.0' NAVD based upon the Letter of Map Revision(LOMR) effective July 2, 201 S for the FEMA Flood Insurance Rate 1VIap (FIRM) panel number 12099C0179F, effective October 15,2017. Existing Conditions The site is currently developed and in use as a residential multi-family development on the sauth side and a single building (church parcel) on the north side. There are minimal stormwater management facilities located onsite consisting of a drainage system within the pool area of the inulti-family development. Currently, stonnwater runoff generated onsite sheet flows directly offsite priinarily to the west to Beach Road, as well as to Coral Cove Park (north), the Atlantic Ocean(east) and the undeveloped parcel (south). Beach Road does not have a fonnal stormwater conveyance or stormwater management system. Stormwater runoff from Beach Road sheet flows off the roadway onto the adjacent properties. There is a culvert system along the east side of Beach Road along the project frontage and this system allows surface water runoff north of the project site along Beach Road and stormwater runoff frain this site to discharge south into the undeveloped state-owned land south of the project site. There are no existing water quality treahnent faciiities located on-site. � 711 N Di�ie I3ighwa3f,Suitc 201•�CTest Palm Beach.I+L 33401 • 561-689-8600•wK�,�.keshavarz.com , i ! i , � ti i � Proposed Improvements , � I The proposed project cansists of the redevelopment of the site for a multi-story condominium. � The finished floor elevation will be raised to meet the current building department finished floor ! I elevations associated with current FEMA elevation (listed above). The proposed minimum finished floor elevation is 1.5' above the FEMA elevation or elevation 8.50'NAVD. � i The proposed stormwater management system will be constructed to meet the standards of the i South Florida Water Management District. Stormwater runoff will be reduced from the pre- development conditions. Water quality treat�nent facilities will be designed to treat stormwater runoff prior to discharge by way of depressed swale areas and 100 linear feet of proposed exfiltration trench (please see exfiltration trench calculations on the next page). Legal positive � � outfall will occur west onto Beach Road and ultimately,to the undeveloped property to the south via bubble up structures or a hard pipe connection to the drainage system on Beach Road. ' It should be noted that the Village of Tequesta typically requires new develop�nent and redevelopment to retain 95°fo af the runoff from a 25 year — 1 day storm event. Due to the . geographic location of the project site being located on the Barrier Island and elevated significantly higher than the adjacent properties, this regulation should not apply to this site as there will be no adverse impacts to any Village stormwater management system or any aff-site properties. The proposed stonnwater management system will be an overall improvement to water qua2ity treatment and stonnwater runoff from this site. Preliminary Surface Water Management Svstem Calculations The drainage area associated with the redevelopment o�the site is 1.32 acres which is the area ; east of Beach Road and west of the existing dune line. The existing site is currently developed with 0.96 acres of impervious area generating 1.23 acre-feet of runoff during the 25 year — 72 hour design event (13.5 inches of rainfall), The proposed site plan contains 2.00 acre of impervious area that would generate 1.26 acre-feet of runoff during the 25 year—72 hour storm event. The proposed drainage system will be designed to provide 0.21 acr�feet of water quality treatment which will be retained within a proposed exfiltration trench system. Therefore, there will be an overall reduction in runoff generated from the 25 year—72 hour design event. Existing Site Runoff(ac-ftj 1.23 ; Proposed Site Runoff(ac-ft) 1.26 Proposed Water Quality Treatment(ac-ft) 0.21 Net Runoff(ac-ft} (-)0.18 ; 7I1 N Dixie Highway,Suite 20I•�K�est Palm Beach,FL 33401• 561-689-860Q•wN�w.kesha��arz.com i ri � � i i KESHA t�ARZ&ASSOCIATES,INC. ; 711 North Dixie Highway,Suite 200 , West Palm Beach,Florida 33401 ` �I���� phone:(561)689-8600 A Project Name:Blowing Rocks Condominium � Project Number:17-1179 EXFILTRATION TRENCH DESIGN CALCULATIONS TRENCH CROSS SECTION OVERFLOW EL= 6.D0 FT �_ TOP OF TRENCH= 4.00 FT P1PE SIZE= 18"PERF, HDPE H2= ' 5.00 PIPE ' � INVERT= 1.00 FT BOTTOM OF '� TRENCH= -1.04 FT TRENCH WIDTH{FT)_ � 8.0 � �- WATER TABLE ELEVATION= 1.00 FT � DESIGN CHARACTERISTICS 1. Exfiltration Trench Depth {FTj 5.00 2.Saturated Trench Depth,Ds (Fl) 2.d0 3.Un-Saturated Trench Depth, Du (FT) 3.00 4. Exfiltration Trench Width,W {FT) 8.0 5. Head ac#ing on Trench,H2 (FT) 5.00 B. Factor of Safety 2.00 7.Hyd.Conductivity, K (CFS/FT.SQ:FT. HEAD) 2.84E-04 Vwq= REQUIREQ WATER QUALITY VOL.(AC-IN) 2.520 Vadd= ADDITIONAL STORAGE VOL.(AC-IN) 0.000 %WQ= 50% L= REQUIRED�ENGTH 4F TRENCN{FT): 95.82 PROPOSED LENGTH OF TRENCH(FT): _100 PROPOSED VOL.TO BE TREATED(AGFl): 0.219 PERCENT OF REQUIRED PROVIDED: 904.4°l0 L=(F.S.*{(%WQ*Vwq)+Vadd))/{K*(H2*W+2"H2*Du)-(Du"2)+(2*H2*Ds)+(,4Q0139*W"Du)) COMMENTS: " THIS IS CONSIDERED DRY PRETREATMENT * REFERENCE: Environmental Resource Permit Information Manual Ver.2014 ; � rl `, ����uii�or ,e�a��GpT7 WF�s��� i :���'�5'�Gfc N S��'r�`�o�'. 0 ��, _ , . � 72504 .2�: ��,•' No ' � � :�r r �c� * ��� �-p� 0 %W- . �•, - . + . � �� '�=�e Ra y ���,,' � .�,��tiida License No. 72504) �ltltfti4�� July 11�',2018 Keshavarz&Associates, Inc. Certificate of Authorization No.4897 i i � � I I � � 1 1 ': i i � i . ; � I 711 N Disie Iiighway,Suite 201•West Palm Beach,FL 33401• 561-689-8600•www.keshavarz.com r �TC ; Transportation Consultants i • `�� • r'� • _ i ��' � �" • . ! � • . . • • . a �`� • . • • . � � �°_ � =t� • -.: � t_�'� i i 2005 Vista Parkway,Suite 111 West Palm Beach,FL 33411-6700 {561)296-9698 Fax(561)684-6336 ; Certificate of Authorization Number: 7989 March 13, 2018 Mr. Quazi Bari, P.E. Palm Beach County Traffic Division 2300 North Jog Road, 3`d Floor West Palm Beach, FL 33411-3745 Re: Blowing Rocks Condos-#PTC17-068 Concurrency Statement Dear Mr. Bari: The purpose of khis letter is to provide a traffic statement for the above referenced project to determine if the proposed development meets the requirements of Article 12, Traffic Performance Standards, of the Palm Beach County (PBC) Unified Land Development Code (ULDC). The site is located on the east side of SR A1A (Beach Road), in the Village of Tequesta. It is proposed to devefop 21 multi-family condominium units. The site is currentiy vested with one single family home and 10 rnulti-family condo units. The proposed project will utilize one driveway with full access to SR A1A (Beach Road) for the residential units. There is one proposed driveway with access to SR A1A for the service entrance. The Property Control Numbers are provided on Attachment 1. Buildout of this project is estimated to be 2020. Attachment 2 provides the Daily and Peak Hour trip generation for the existing and proposed uses. Since the proposed project has a net trip generation of fewer than 20 peak hour trips, a traffic study is not required. The project has an insignificant impact on area roadways. Therefore the praposed project is in compliance with Palm Seach County Traffic Performance Standards. Please contact me if you have any questions. Sincerely, � � Lind�,jit��c#�le ,����i,�� .. � Flo��t���►"�r�Qb'.�,9 •' �•.�, �i : . JQ��' t�t�C}�me� � � �.TI ; Y � * �. � �1 j�'� ��ti STATE OF �:��4• ,�`�':'o( 1p1;r`�'••` y���s,`�;��N A�ti�C���• lili11 LetterBari 17-068 92-13-�� Pind¢r Troutman tvnwlting, Inc. � AITACHMENT 1 PARCEL CONTROL NUMBERS 60-43-40-30-21-001-0000 60-43-40-30-21-000-0010 60-43-40-30-13-000-10i 0 60-43-40-30-13-000-1020 60-43-40-30-13-000-1030 60-43-4Q-30-13-OUO-1 Q40 60-43-40-30-13-000-1050 60-43-40-30-13-000-2010 60-43-40-30-13-U00-2020 60-43-40-30-13-000-2030 b0-43-40-30-13-000-2040 60-43-4Q-3Q-i 3-OOQ-2050 Letter Bari 7T-068 11-13-17 3/13/2018 Tripgen 17-068 12-7-17 Attachment 2 Blowing Rocks Condos Trip Generation Daily Existin ITE New Land Use Code Intensi Trip Generation Rate(1) Tri s Sin le Famil Residen6al 210 1 DU 10/DU 10 Residential Condos 230 10 DUs 6.65/DU 67 TOTALS 77 Pro osed ITE New Land Use Code Intensi Tri Generation Rate(1) Tri s Residential Condos 230 21 DUs 6.65 /DU 740 TOTALS 140 Net Tri s b3 AM Peak Hour Existin ITE New Tri s Land Use Code Intensi Tri Generation Rate(1) In Out Tri s Sin (e Famil Residential 210 1 DU 0.75 /DU(25/75) - 1 1 Residential Condos 230 10 DUs Ln(T) =0.80Ln(�+0.26(17/83) 1 7 8 TOTALS 1 8 9 Pro osed ITE New Tri s Land Use Code tntensi Tri Generation Rate(1) In Out Tri s Residential Condos 230 21 DUs Ln(T) =0.80Ln tX)+0.26 t77/83) 3 72 15 TOTALS 3 12 15 Net Tri s 2 4 6 PM Peak Hour Existin ITE New Tri s Land Use Code Intensi Tri Generation Rate(1) In Out Tri s Sin le Famil Residential 210 1 DU Ln(�=0.90Ln(X)+0.51 (63/37) 1 1 2 Residential Condos 230 10 DUs Ln(� =0,821n{?�+0.32(67/33) 6 3 9 TOTALS 7 4 11 Pro osed ITE New Tri s Land Use Code Intensi Tri Generation Rate(9) In Out Tri s Residential Condos 230 21 DUs Ln(1) =0.82Ln(�+0.32 ib7/33) 11 6 17 TOTALS 11 6 17 Net Tri s 4 2 6 t1)Source:Palm Beach County and Institute of Transportation Engineers(ITE),Trip Generation,9th Edition