Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 06E_02/14/2002 • ' 1Vlemorandum To: Michael R. Couzzo,Village M From: James M.Weinand, Fire Chi Date: February 5, 2002 SubJect: Contract Amendment for r ating the Public Safety Training Tower On October 11, 2001, the Village Council awarded the construction contract for the Public Safety Facility to David Brook's Enterprises of Palm Beach Gardens, Inc., for $3,601,366.00. This price included a training tower for$125,000.00. After careful examination of the 357 Tequesta Drive site, we realized there were several limitations to having the training tower at this location. We also realized that the noise and water runoff was not conducive to the neighborhood setting. Therefore, Police and Fire-Rescue personnel have examined finro different locations for their training needs; Public Works Facility on Bridge Road and the Water Utilities Plant on Old Dixie Highway. The best site for this facility was determined to be behind the Water Utilities Plant (somewhere near the Sprint Cellular Tower). Our contract with Gee & Jenson included the design and engineering of the training tower on the 357 Tequesta Drive site. Since we anticipate moving the location of this facility to the Water Utilities Plant, a contract modification is needed. Attached you will find the contra�t amendment to bring about this move. The change order amount of $4,800.00 does not require Village Council approval, but the stafF feels that they should be made aware of this change. Therefore, if you see fit please place this item on the next Village Council agenda. M:�,4dministration DocumentslVillage Manager\Training Tower Design Award 02042002.doc �ee � enso� J -:-�. _ _ _ -�s��_ _ _. . Celebruting SO Yars of Design Excellence November 13, 2001 Village of Tequesta 25D, Tequesta Dr. Suite 300 Teyuesta, Florida 33469-0273 Attn: Mr. Michael R. Couzzo Jr.,Village Manager Dear Mr. Couzzo: Following our pre-construction meeting discussion,please find attached an Amendment . _ to the Agreement between the ViIlage of Tequesta and Gee& Jenson for the design of Public Safety Facility(dated February 13, 2001). The Amendment is for requested additional services for relocating the Fire Training Tower from 357, Tequesta Drive(Tequesta Public Safety Facility site)to Old Dixie Highway(Tequesta Water Treatment Plant site). If you have any questions,please don't hesitate to call. Very truly yours, o ���-. Brian Tavares Project Manager � /bt i)ne Harvarri Circie, We§t Palm Beach, �L 33409-1923 �'�761) �1�.65�0 F(561)5�5.b5a1 ENGINEERING fE80002934 ARCHIlEGTUAE dAA C000656 LANOSCAPE AHGHITECTURE iLG C0�0050 LAND SURVPlIN6 YLB 0002934 INTEaIOfl DESIGN fIB OOO1t720 AMENDMENT#1 November 13, 2001 'T'his Amendment#1 dated November 13, 2001 is in accordance with our Agreement dated February 13, 2001 and in our ongoing Services Agreement between the Village of Tequesta and Gee & Jenson dated of October 31, 1989. Arnendment# 1 is for"Additional Services"as per Article 8b. The Village of Tequesta has decided to build the Fire Training Tower off the Tequesta Public Safety Facility site. The new location shall be in Tequesta Water Treatment Plant site located at Old Dixie Highway, Tequesta,Florida. Gee&Jenson has been requested to adjust construction documents for Old Dixie Highway site for which the Scope of Services is as follows: 1. Review existing Site conditions 2. Provide contract document to include Site Plan, Civil and Utilities drawings. 3. Review General Contractor's quote. 4. Adjust plan review of"as built drawings". The Consultant shall be paid a lump sum fee of Four Thousand and Eight Hundred Dollars. Added to the above stipulated labor sum are any reimnursable expenses as per - � the original agreement. Plans shall be completed within 30 calendar days after"Notice to Proceed"is received from Village of Tequesta. Acceptance Acceptance of this amendment may be indicated by the signature of a duly authorized official of the Owner in the space provided below. One signed copy of this amendment returned to the Consultant will serve as an Agreement between the two parties and as Notice to Proceed. This contract amendment will be binding on the two parties hereto and parties' successors and assigns. Should this proposal not be accepted within a period of thirty (30) calendar days from the above date, it shall become null and void. Yours trulY, BY� �J E�C.�� //S� ( ovuo. 1�`• Gee &Jenson E-A-P Inc. Print ame and title � %� � t �a, � � - � Thomas Orlowski, AIA,NCARB Senior Vice President Date: to�_ - a !bt W:�200Q�,0�1Admin\Contract\Amendment Fire Tower I 1-13-Ol.doc / ane Hacv�rd Cirele, W�st Palm 8each, FL 33409-1923 T(563) 51j.550� F(yGl) 515.b502 .=�� ��/YEqAs}� E�dGINEEHING rEB OGOe93a ARCHlTECTUFlE rAA CQOOE56 LANDSCAPE ARCFlTEGTURE�lC rp0405�1 LANO SURVEYIB,6L8 9002934 INT�RtOR�ESIGY x18 660Lry20