HomeMy WebLinkAboutDocumentation_Planning and Zoning_Tab 2_12/20/2018_Site Plan Review _ Zoning -r�.- -
����
`�� Landscape Architects Pianners Environmental Consulfanis
G�NTILE GLAS HOLLOWAY O'MAHONEY&a��K����,inr. GeorgeG.Gendlet�SV,
M.Troy Hulloway Acu
kmiiv M.O'Mabonev iUtA
D«li Buclunaster Glas Ai�_P
November 1, 2018
Nilsa Zacarias
Village of Tequesta
345 Tequesta Drive
Tequesta, FL 33469
RE: Pelican Square
Dear Ms. Zacarias:
Pursuant to comments received from staff on October 17, 2018 based on our resubmittal of
September 26, 2018 please accept this letter as our written response. Also, included with
this letter are the revised plans, which address the comments where applicable. Please note,
this response letter only contains the OUTSTANDING comments made by the Village of
Tequesta. For your convenience we have prepared our responses in bold ifalics.
Site Plan Review—Zoninq
General Comments
• Provide response to 818/18 e-mail about R-O-W coordination with Palm Beach County (see
attached e-mail)
Response: P/ease note, on 70/19/18, the applicant provided the Community
Deve/opment Director an emai!from PBC Land Development Division which states
that there is no objecfion to the driveways as shown. A copy of fhat email has a/so
been provided with this submittal.
• Label compact parking spaces on Sheet SP-1
Response: The sjte p/an contains six 9'x18' parking spaces, which have been
indicated on the sife plan and within the Site Data.
• Revise Building Lot Coverage to state Professi�nal Office rather than Commercial Use
Response: The building Ivf coverage fab/e has been revised, as requested.
5. Provide color chips and sample material of all exterior finishes including buildings and hardscape,
including covered pavilion. Provide color board for covered pavilion. Color board provided is for
the main structure(s). F'��>vi�iF f��mG,le rn��terial �f �xteriar Firiishes {Pav�:rs, etc.)
Response: As discussed, paver samples in addifion to a roof sample have been
provided with this submittal.
1907 Commerce Lane, Suite 101 )upiter, �lorida 33458 561-575-9557 Sht-S75-5260 Fax www.2ghc>.cnm
Pelican Square Response Letter
November 9, 2098
Page 2 of 6 '
�0. Provide elevation, floor plan, material and finishes for covered pavilion. Provide color baard for
covered pavilion. Color board provided is for the main structure(s). ` �� ,�i � � � �: i �
;: , �i : ;
Response: As discussed, paver samples, in addifion fo a roof sampte have been
provided wifh this submfttal.
18. Continue communication with surrounding neighbors. ` ��; � !������ � �
Response.• On September 27, 2018, the applicanf inet wifh 8obbie and Dennis Pilia
(3463 lnlet Court) and Tony and Leslie Hawker (3480 Cana! Court) to discuss the
project details, to which they showed no opposition the proposed project. The
applicanf has given the neighbors his contact informatian, and has repeatedly
sfated that he is availab/e to address any concerns the residents may have.
Site Plan Review- Division 2 Comments
Sec. 7&331. - Required; development standards; required facilities and infrastructure.
By the terms of this chapter, all permitted uses in all zoning districts except R-IA and R-1, all special
exception uses as approved by the village council, all planned residential development (PRO),
planned commercial development (PCD), and planned mixed-use development (PMUD), al(
miscellaneous development and redevelopment, all subdivisions, and all uses or construcfion lying
partially or entirely in special flood hazard areas shall comply with the following:
a) Site plan review is required. SPR APPLICATION UNDER REVIEW
b) Conceptual review of the overall development, if phased, is required.
Response: The project is not�infended to be phased.
c) The development shall conform to all minimum requirements of this chapter and any other
applicable laws and regulations. SPR APPLICATION UNDER REVIEW
d} The development shall be compatible with the intent of the zoning district wherein it is
proposed to be located and compatible with adjacent land uses.
Response: This proposal also includes a rezoning map amendment fo the
Mixed Use zoning district. The development has been designed fo meet a1!
sfandards of the Mixed Use district.
e) No building permit shall be issued for the purpose of erecting any structure or building, or for
structural alterations in any existing structure or building, until after the planning and zoning
advisory board has reviewed and made recommendations to the village council, and the
village council shall have finally approved the site plan in accordance with this section.
However, for the items specified in section 22-53(b), the planning and zoning advisory board
has final approval authority, and those items do not require further approval by the village
council. SPR APPLICATION IS CURRENTLY UNDER REVIEW. NO BUILDING PERMITS WILL BE
ISSUED UNTIL VILLAGE COUNCIL APPROVAL IS OBTAINED.
Response: The above provision is acknow/edged.
O:\Pelican SquarelApplicationslSite PIanlAgency CorrespondencelPelican Square Response Letter 11.1.18.docx
�
Pelican Square Response Letter
November 1, 2018
Page 3 of 6
f) No building permits or development orders shall be issued unless public facilities and services
which meet or exceed the adopted level of service standards are available concurrent with the
development impacts. Compliance with this requirement may be accomplished through one
or more or a combination of the follawing processes:
1) Installation of all required public facilities/infrastructure/services prior to or concurrent with
the development impacts. SITE IS LOCATED WITHIN URBAN SERVICE AREA OF VILLAGE
&HAS ALL MUNICIPAL SERVICES AVAILABLE
2) Phasing of all required public facilitieslinfrastructure/services: PROVIDE STATEMENT
a) By local government (capital improvements element).
b) By the developer(development agreements).
Response: As stated above, fhe sife is located within the urban service area
of the Village and has all municipal services available.
3) Phasing of the development. PROVIDE STATEMENT.
Response: The proposed development will not be phased.
g) All proposed development and or redevelopment shall be coordinated with andlor obtain
approvals and/or permits from the following agencies:
1) Palm Beach County Health Department. PROVIDE LETTER
Response:A letter or permit will be provided when the design for this project
has been completed, and the permif applicafion has been approved. The
Owner would like to have assurance with the Site Plan layouf prior fo
proceeding with complete Construction Plans
2} Tequesta Fire-Rescue Department (Fire Marshal). PROVIDE LETTER
Response:A /efter or permif wil!be provided when the design for this project
h�s been complefed, and the permif application has been approved. The
Owner would like to have assurance wifh the Site Plan layout prior to
proceeding wifh comp/efe Construcfion Plans
4) Department of Environmental Resources Management (DERM). Applicant: PROVIDE
LETTER OR STATEMENT
Response: This proper�y has NO environmentatly sensitive lands or
vegetation, as it has been previously developed and is mowed& maintained
on a regular basis.
5) South Florida Water Management District (SFWMD). PROVIDE LETTER
Respanse:A letter or permit wil!be pr�vided when the design for this project
has been complefed, and fhe permif application has been approved. The
Owner would like to have assurance with the Site Plan layout prior to
proceedfng with complefe Construction Plans
6) Florida Department of Transportation (FDOT). PROVIDE LETTER
Response:A letter or permif will be provided when the design for fhis project
has been complefed, and the permit application has been approved. The
Owner would like to have assurance wifh the Site Plan layout prior fo
proceeding with complefe Construction Plans
0:1Pelican SquarelApplicationslSite PIanlAgency CorrespondencelPelican Square Response Letter 11.1.18.docx
Pelican Square Response Letfer
November 9, 2098
Page 4 of 6
15)Tequesta Water Department. PROVIDE LETTER
Response:A letter or permit will be provided when the design for this projecf
has been completed, and fhe permit application has been approved. The
Owner would like to have assurance with the Site P/an layouf prior to
proceeding wifh complete Construction Plans
h) All new development and/or redevelopment must provide the necessary infrastructure to meet
the following level of service standards. Each appfication submitted pursuant to this section
shall be required to provide a certification from a licensed engineer in the state that the
proposed development and/or redevelopment meets or exceeds the level of service standards
for the listed infrastructure as follows:
1) Traffic (roads and righfs-of-way). TRANSPORTATION CONSULTANT TRAFFIC
STATEMENT
Roadway Type LOS Standard (LOS� Peak
Coliector� C D, *Except Country Club Drive and
Seabrook Road which are C
-- - -- --_ --
Urban minor arteria(s C D
-
Princi al arterials C D
----� ----- --- _ - __
2} Sanitary Sewer. A central wastewater level of service standard of 108 gallons per capita
per day is hereby adopted, and shall be used as the basis of estimating the availability of
capacity and demand generated by a proposed development project. PROVIDE
STATEMENT
Response: See attached Concurrency Analysis
3) Drainage. A public drainage facilities level of service standard of a 25-year frequency, 24-
hour duration storm event is hereby adopted, and shall be used as the basis of estimating
the availability of capacity and demand generated by a proposed develapment project.As
a general drainage requirement, each proposed project and/or site must maintain 95
percent of all stormwater runoff on-site. PROVIDE STATEMENT
Response: See aitached Drainage Statement
4) Potable water. The following potable water level of service standards are hereby adopted
and shall be used as the basis for estimating the availability of facifity capacity and demand
generated by a proposed development project: PROVIDE STATEMENT
a. Average day wafer consumption rate:
Residential: 175 gallans/capita/day
b. Maximum day water consumption (including irrigation):
Residential: 180 gallons/capita/day
Nonresidential*: 3,030 gallonslacre/day
Response: See aftached Concurrency Analysis
5) Recreafion level af service standards fable. PROVIDE STATEMENT.
— — - -- _-_ _-- ---
Area/activity_(unit/po�aulation�__;_ Classification standard _
� Nei�hborhood parks I 2 acres/1,OOQ
; - --- --- -
� Communit� park 1 _ 2 acres11,000
Beaches � 1 mile/31,250
-- -- —_ --- - -- ---
Golf courses ! 9 holes/30,000
0:1Pelican SquarelApplicationslSite PIanlAgency Correspondence\Pelican Square Response Letter 11.1.18.docx
Pelic�n Square Response Letter
November 1, 2018
Page 5 of 6
Tennis 1 court/2,500
_ _ _ ---- -- ----— --
Basketball 1 court/2,500
Baseball/softball 1 field/7,200
____ _ _ — — -- -- —
Football/soccer 1 field/4,800
-- --__ - ----
Playground areas I____ 1 acre/3,60Q
Beach access easements ' 1 per%2 mile of developed or !
� � redeveloped beach frontage _�
Response: As stated in the accompanying justification statement, the
applicant will be providing an 890 s.f. community recreafion room in building
A along with a community gathering Open Space area with a 12'x 14'covered
pavilion. There will be /VO BBQ grills provided on site.
6) Fire flow requirements. All development andlor major redevelopment must provide the
necessary infrastructure improvements for fire suppression, including adequate fire
hydrant placement, to meet the development's fire flow requirements in accordance with
NFPA#1, Uniform Fire Code, Florida edition. PROVIDE STATEMENT
Response: Du1y Noted. AI! applicable frre flow infrastructure will be
improved to meef NFPA#9.
j} The development shall project for the reservation and preservation of existing and future
rights-of- way as may be determined by the village and in conformance with the county
and village right-of-way protection plan. PROVIDE STATEMENT
Response: Comment nofed.
Building Department Review
Mr. Jose Rodriguez, Village of Tequesta Building Official, has no comments at this time
Traffic Engineerinca Review Comments - William Grieve, P.E. from McMahon
Associates, Inc.
Traffic Statemenf
No traffic comments.
Sewer, Drainage, and Water Review Comments —
Spencer M. Schroeder, P.E. from Mock Roos & Associates
General
Most of our previous comments have satisfied with the re-subrnittal. The ApplicanYs respanses
appear to demonstrate the feasibility of these areas of the proposed design. Our remaining
comments are below.
Utilities
2. Show the proposed watermain connectians on either side of the develapment to be connected to
the existing watermain along US1 and not the existing mains within Canal Ct. and Inlet Ct.
Connection to these mains would cause an unacceptable disruption of service for the residents
on these streets. Also, since the watermain along US1 is larger and the connections would no
longer be "size on size", tapping sleeves and valves may be used for these connections.
O:1Pelican SquarelApplicationsl5ite PIanlAgency GorrespondencelPelican Square Response Letter 11.1.18.docx
Pefican Square Response Letfer
Novernber 1, 2018
Page 6 of 6
Response: "Per an agreement with Jay Wickham, the proposed water/fire line
connections and locations will be designed per VOT standards for permitting
during the Construction plan phase."
5. Original comment 5: "The submitted 'Concurrency Analysis' satisfies the level of service
requirements for sanitary and potable water. However the Analysis does not address fire flow
demand. Please provide#ire flow demand as calculated per NFPA#1, Uniform Fire Code, Florida
Edition. Also, please provide documentation—through flow test or other means—that the potable
water distribution system is capable of ineeting the calculated fire flow and pressure demands."
The Applicant's response and submitted flow test only addresses part of the comment. While the
submitted "Hydrant Report" confirms the available system flow and pressure, no proposed fire
flow demand calculations are included with the resubmifted materials. Please provide proposed
fire flow demands as calculated per NFPA #1. Also, please note, some of the preliminary
information included in the Hydrant Test application does not appear to be consistent with the
other submitted design information.
Response: P/ease see the included sfatement which addresses �re flow demand
for the proposed project.
Law Enforcement Review Comments
Mr. James McGrew, Village of Tequesta Assistant Police Chief, has no additionaf comments.
Fire Safetv Review Comments
Fire Dept. is satisfied with the applicant's response dated 8/13/2018 regarding Fire Hydrants,
Sprinkler System, and Elevator.
Landscape Review Comments- Stephen Parker, RLA, consulting landscape architect
Perimeter Landscapinq
Per the October 15, 2018 memo from Mr. Parker, the landscape plans have an updated
revision date to be consistent with the other plans.
Should you have any questions regarding the resubmittal please do not hesitate to contact
me at 561-575-9557 or email me at ���.
RespectFully,
Gentile Glas Holloway O'Mahoney 8 Associates, lnc.
��
�\; .
M. Troy Holloway, PLA, ASLA, LEEDUAP, BD&C
Partner
O:1Pelican SquarelApplicationslSite PIanlAgency Correspondence\Pelican Square Response Letter 11.1.18.docx