HomeMy WebLinkAboutAgreement_General_6/13/2019_Kimley-HornVILLAGE OF TEQUESTA ENGINEERING SERVICES WORK AUTHORIZATION WA TER TREA TMENT PLANT AND DISTRIBUTION SYS TEM FACILITY ASSESSMENT PLAN UPDATE This Work Authorization authorizes Kimley-Horn and Associates, Inc. to perform work set forth herein and is issued pursuant to The Professional Engineering Services Agreement, between the Village of Tequesta ("Client" or "Village") and Kimley-Horn and Associates, Inc. ("Kimley- Horn" or "Consultant"), dated May 12, 2016 ("Agreement"). All terms and conditions of said Agreement are hereby incorporated and made part of this Work Authorization. PROJECT UNDERSTANDING The Village desires to have the Consultant perform an update of their "Water Treatment Plant and Distribution System Facility Assessment Plan" that. was prepared in late 2011. The purpose of this update is to identify work that has been completed since the initial Assessment was performed, identify other upgrades/improvements that are now required or are appropriate and prepare an update of the costs to perform the recommended replacementirehabilitation for use in the Village's ten-year capital improvement plan for the Filter Plant, Reverse Osmosis Plant, Water Storage Tanks, Surficial Wells, Floridan Wells and Water Distribution System. The Consultant will update the useful remaining life table within the Facility Assessment Report for, the existing equipment/existing infrastructure in the system. SCOPE Kimley-Hom will perform the following services: Task I — Filter Plant: The Consultant will make field observations and update our findings and recommendations for replacement/rehabilitation for the following associated components; Filters, Surge Tank, Ammonia Tank, Transfer Pumps, High Service Pumps, Air Scour System, Building, Standby Power, Electrical, Instrumentation/Control and site civil. The replacement/rehabilitation costs for these components will be updated and will be reflected in an updated ten-year capital improvement plan. Task 2 — Reverse Osmosis Plant- The Consultant will make field observations and update our findings and recommendations for replacement/rehabilitation for the following associated components; Cartridge Filters, High Pressure Pumps, RO Trains, Degasifier, Scrubber, Transfer Pumps, Clearwell, RO Building, Sulfuric Acid System, Sodium Hypochlorite System, Sodium Hydroxide System, High Service Pumps, Standby Power, Electrical, Instrumentation/Control and site/civil. The Consultant will also evaluate operational data to determine whether and when RO membranes should be replaced. The Cons6itant will perform an electrical evaluation to determine whether it is viable to convert the exi s!ting membrane feed pumps to VFD's to realize energy cost savings. The replacement/rehabilitation costs for these components will be updated and will be reflected in an updated ten-year capital improvement plan. Task 3 — Water Storaae Tanks; The Consultant will - make field observations and update our findings and recommendations for replacementirehabilitation of the 2.OMG and 0.75MG Ground Storage Tank. The replacement/rehabilitation costs for the tanks will be updated and V411 be reflected in an updated ten-year capital improvement plan. Task 4 — Surficial Wells; Task 2 — The Consultant will make field -observations and update our findings and recommendations for replacementirehabilitation for the following associated components; Wells 7, 8, 18, 19, 20, 23, 24, 25, 26 and 27. The replacementfrehabilitation costs for the wells will be updated and will be reflected in an updated ten-year capital improvement plan. Task 5 — Floridan Wells; The Consultant will make field -observations and update our findings and recommendations for replacement/rehabilitation for the following associated components; Well RO 1,, 2, 3,and 4. components; The replacementirehabilitation costs for the wells will be updated and will be reflected in an updated ten-year capital improvement plan. Task 6 — Water Distribution System; The Consultant will -make field observations and update the findings and recommendations for replacement/rehabilitation for the following associated components; the Water Distribution System and associated appurtenances. The replacernerittrehabilitation costs for the tanks will be updated and will be reflected in an updated ten-year capital improvement plan. Task 7 — Report Preparation; The Consultant will prepare an update the Facility Assessment report that will define our findings from the above within Tasks 1 thru 6 above, along with updated costs for the replacement/rehabilitation outlined in a ten-year capital improvement plan. ADDITIONAL SERVICES Any services not specifically provided for in the above scope, as well as any changes in the scope requested by the Village, will be considered additional services to this Work Authorization and will be performed based on subsequent Work Authorizations approved prior to performance of the additional services. INFORMATION AND SERVICES PROVIDED BY THE VILLAGE Kimley-Horn assumes that all information provided by the Village can be relied upon in the performance of professional services. The following information shall be provided to Kimley- Horn and/or the following services will be performed by the Village. • Access to the water treatment plant and well sites • Staff assistance at well sites • Staff assistance within the water distribution system • Fire Department fire flow test data performed within the last 12 -months ASSUMPTIONS AND CLARIFICATIONS The scope of work and fees stated in this Work Authorization are based on the following assumptions and clarifications: Our findings on the well reviews (Surficial and Floridan) associated recommendations will be based on physical facility observations and review of operational recorded data and well performance based on drawdowns. SCHEDULE Kimley-Horn will complete the work set forth herein within 90 days after receipt of an executed Work Authorization and Purchase Order, exclusive of delays beyond the control of the Consultant. COMPENSATION Kimley-Horn will perform the services described in the Scope of Services (Tasks 1 thru 7 above) on a lump sum basis fee in the amount of forty-four thousand and two hundred and fifty dollars ($44,250.00). (WATER TREATMENT PLANT AND DISTRIBUTION SYSTEM FACILITY ASSESSMENT PLAN UPDATE) Accepted by: Village of Tequesta Date: le - /7 `,tet 7 r Kimley-Horn and Associates, Inc. Christophi W. Heggen,'P.if�ice President Date: 3 3 V NlleF ZZ1 1