HomeMy WebLinkAboutResolution_36-19_8/8/2019RESOLUTION NO. 36-19
A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF
TEQUESTA, FLORIDA, ADOPTING A REVISED BUILDING DEPARTMENT
FEE SCHEDULE AS PROVIDED BY CHAPTER 14, ARTICLE VI OF THE
VILLAGE CODE OF ORDINANCES; PROVIDING THAT THIS SCHEDULE OF
FEES AND CHARGES SHALL BE AVAILABLE FOR INSPECTION AT ALL
TIMES AT THE VILLAGE HALL DURING REGULAR BUSINESS HOURS;
PROVIDING FOR PUBLICATION OF THIS SCHEDULE OF FEES AND
CHARGES IN APPENDIX C. OF THE VILLAGE'S CODE OF ORDINANCES;
PROVIDING AN EFFECTIVE DATE; AND FOR OTHER PURPOSES.
WHEREAS, the Village Council of the Village of Tequesta, Florida, desires to adopt by
resolution a revised building department fee schedule for all building activities in the Village for the
citizens of the Village of Tequesta and for other members of the public; and
WHEREAS, the Village Council desires to incorporate all such fees and charges adopted
under the authority of Chapter 14, Article VI of the Code of Ordinances into one comprehensive fee
schedule; and
WHEREAS, the Village Council desires to make certain the schedule of fees and charges is
available for inspection such that any member of the public may be aware of the cost of land
development activity within the Village.
NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE
VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AS FOLLOWS:
Section 1: The Village Council of the Village of Tequesta, Florida, hereby adopts the
revised Schedule of Fees and Charges attached hereto as Exhibit A and made part hereof as if fully
set forth herein.
Section 2: This duly adopted Schedule of Fees and Charges shall be available at the
Village Hall for inspection by the public during normal business hours, and shall ftirther be published
in Appendix C of the Village's Code of Ordinances.
Section 3: This Resolution shall take effect immediately upon adoption.
Exhibit A
APPENDIX C – PERMIT FEES
(A) BUILDING PERMIT FEES:
1. Application fee: ..... $75.00
The application fee is nonrefundable and added to the permit fee.
A state surcharge of 2.5% shall be assessed for each permit issued; minimum $2.00 per F.S.
§ 553.721. In addition, a state surcharge of 1.5% shall also be assessed for each permit
issued; minimum $2.00 per F.S. § 468.63 1; for a total minimum assessment of $4.00.
2. Building permit applicants for new or replacement commercial buildings, new or
replacement multi -family buildings and new or replacement duplexes shall pay a
nonrefundable $3,000.00 fee at the time of filing for a building permit.
Building permit applicants for new or replacement conventional single-family residence shall
pay a non-refundable $1,500.00 fee at the time of filing for a building permit.
Building permit applicants for new or replacement modular homes shall pay a non-
refundable $750.00 fee at the time of filing for a building permit.
Modular Office/Conimercial—$1,500.00 (non-refundable) minimum application fee.
3. Building Maste permit fees shall be 12-% of the construction valuation. Permit fees for
finish work including mechanical, electrical, plumbing, heating, air conditioning and any
other permanently installed equipment shall be 2% of the work valuation. "Valuation" shall
be as determined by the Florida Building Code Section 109.3.
4. Permit fees based upon valuation shall be collected to construct, enlarge, alter, repair, move,
demolish, or change the occupancy of a building or structure, or to erect, install, enlarge,
alter, repair, remove, convert or replace any required impact -resistant coverings, electrical,
gas, mechanical, plumbing system, fire protection system, accessible, or flood resistant site
element, the installation of which is regulated by the Florida Building Code and Florida Fire
Prevention Code, or to cause any such work to be done, shall first make application to the
building official and obtain the required permit.
Work requiring such a permit includes, but is not be limited to, the following examples.
Seawalls/dune walk -
New structures
Air conditioners
overs
Renovation and demolition
Docks/boat lifts/davits
Heat pumps/pool heaters
Fire protection systems and
Additions and sunrooms
Land filing and grading
alarms
Accessory structures
Land clearing and tree
Refrigeration systems
(gazebos/sheds)
removal
Gas equipment, tanks, and
Moving buildings
Signs, new or modified
piping
Flatwork and decks on grade
Repair of existing signs
Gutter or downspouts
Landscap ing and
Seal coating of parking lot
French drains, pipe drains
lighting
Re -striping of parking lot and ADA
Lawn irrigation systems
Awnings or canopies, tents
access
Commercial exhaust vents and
miscellaneous construction
Plumbing installations
hoods
Solar water heaters and pool
State approved modular units setup
Plumbing repairs
heaters
i Foundations for modular units
Sewer/drainage and taps
Electrical installations and
5. Plan reviews.
Non-refimdable plan review fee and shop drawing fee to be added with the total permit fee;
$0.00125 times the valuation.
- Pre -submittal plan review—$150.00 (non-refLmdable) minimum fee plus $50.00 per hour
or portion thereof.
- Stamp extra "job copy"—$25.00 (non-refimdable).
repairs
Driveways, patios, and sidewalks
Storm drainage lines
Service Panel changes
Fences and walls; flagpoles over 20
Water heaters and
Interior and exterior lighting and
feet
boilers
poles
Water mains and
Roofing (repairs and new roofs)
Generators and transfer switches
protection
Swimming pools and
Transformers and vehicle
Hurricane protection and shutters
Barriers
protection
Flood -proofing panels and flood
Fountains, spa and hot
Fire sprinkler and alarm system
vents
tubs
Retaining or rip rap walls
Screen enclosures/lanais
Elevators and platform lifts
Window/door removal and
Water features and
Dumbwaiters, chairlifts
replacement
fountains
Utility work and public right -of -
Waterproofing of areas
Tanks (all types)
way
5. Plan reviews.
Non-refimdable plan review fee and shop drawing fee to be added with the total permit fee;
$0.00125 times the valuation.
- Pre -submittal plan review—$150.00 (non-refLmdable) minimum fee plus $50.00 per hour
or portion thereof.
- Stamp extra "job copy"—$25.00 (non-refimdable).
A $50.00 minimum application fee shall be due upon submittal. Each subsequent plan review
after the third plan review rejected for a previously noted violation shall be charged at four
times the normal fee per F.S. § 553.80 (2)(b). Plans drawn by a licensed subcontractor, when
not required to be drawn by a licensed architect or engineer, shall include the contractor's
name, company name, business address, and license number per F.S. § 553.70.
6. Fixed fees.
Valuation system shall not be used if a fixed fee is set below.
Certificate of occupancy—Certificate of completion (included in permit price)
Temporary CO residential\$50.00
Temporary CO or COC commercial and multi-family\$150.00
Stocking Permit (no employee hiring or training activities allowed without temporary
CO)\$200.00
Temporary electrical service or power pole\$125.00
Temporary construction trailer\$200.00
Temporary sales trailer removal required before certificate of occupancy will be issued,
annual fee\$200.00
Change of contractor\$75.00
Tents/canopies/membrane structures (temporary only—Three-day maximum)\$50.00
FENM trailers (during a declared disaster only), each\$150.00
Plans revision fee (for substantially revised plans): Flat fee\$75.00
Plans revision fee (for minor revisions to plans): Flat fee\$45.00
Lost permit card or lost plans fee\$40.00
Additional sign fees—First electrical connection\$60.00
Each additional connection (Sec. 78-736)\$30.00
7. Private Providers.
The Village shall calculate a reduced fee for permits when the owner or contractor uses a
private provider to perform plan review and inspections. Use of a private provider, and
calculations for fee reduction shall comply and shall be in accordance with all requirements
of Sec. 553.791, F.S."
8. Work without permit.
After the fact permit fees for work done without benefit of a permit. Price for after the fact
permits will be assessed to each category, building, plumbing, electrical, mechanical, gas,
and roofing at triple the regular permit fee.
9. Permit extensions (active permits only).
Extension of a permit if no new codes are in effect\$75.00
Extension of a permit if new codes are in effect\One percent of valuation.
- Permit extensions shall not exceed 90 days each maximum.
- Demolition permits may be extended only once, and for a period not to exceed 3 0 days.
Extensions shall be requested in writing by the permit applicant and demonstrate justifiable
cause.
Archived plan retrieval fee $25.00 per request, copies priced per F. S. § 1 19.07(l)(a).
If a permit expires, renewal of the expired permit shall require the payment of the full permit
fee in effect at the time of renewal. Subject to the approval of the building official, one or
i
more, not to exceed four, requests for permit extensions can be made prior to the expiration
of a permit. However, in no event shall extensions be granted by the building official on
projects which have received variances, special exceptions, and site plan reviews which have
otherwise lapsed pursuant to Chapter 78.
10. Inspections.
Re -inspection fees for rejection of work due to faulty construction, work not ready, failure to
call for inspection, work covered up, work not per plans, and/or no access (lifts/ladders) to
jobsite:
- Flat fee\$ 100.00
- Required inspections are included within regular building permit fees.
0 Partial inspections, each; must be paid prior to any ftirther inspections being
scheduled\$ 5 0. 00
- Special (courtesy) inspections where no permit fee has been generated\$ 5 0. 00
- After hour inspections, per hour; two-hour minimum\$75.00
- After an initial inspection and one subsequent re -inspection for the same code violation
specifically and continuously noted in each rejection, each subsequent re -inspection shall
be $400.00 each per F.S. § 553.80(2)(c).
11. Refund policy.
Requests for refunds of permit fees paid must be submitted within 30 days of the date of
issuance of the permit. There shall be no refunds of the plan submittal and review fee paid at
the time of application for permit. There shall be no refunds once work has commenced.
Eligible amounts will be refunded at 50%.
12. Emergency work.
Where equipment replacements and repairs must be perfonned in an emergency situation, the
permit application shall be submitted within the next working business day to the building
official, without triple fee.
13. Fee reduction for certain not-for:pLQfit entities.
Fees for propei1y owners that are 501(c)(3) entities shall be reduced by 50%.
(B) FLOODPLAIN DEVELOPMENT FEES:
A floodplain development permit (FDP) is required for all development projects proposed
within the limits of the floodplain. Development activities determined not to be in a floodplain
are not assessed a fee. A completed floodplain application form should be submitted, along
with all applicable supporting documentation, to the building department at village hall. Please
check with the floodplain manager for a determination if a proposed development is within the
community flood fringe. In order for a permit application to be initially accepted for review the
appropriate fees must first be submitted. Checks are to be made payable to Village of
Tequesta. Once the permit submittal is determined to be in compliance with the provisions of
the flood damage prevention ordinance of the Village of Tequesta, the application is approved
for permitting. Phased projects shall be charged separate fees for each phase requiring separate
reviews. Fees collected are non-refundable.
1. Determination fees:
• Initial flood zone determination\(no fee).
• Letter of floodplain map determination for insurance purposes\$ 5 0. 00.
• Floodplain determination requiring site visit\$125.00.
• Flood elevation certificate and review\$1 00.00.
2. Residential permits:
- New habitable structures—single family detached dwellings, room additions, pools, flat
fee\$250.00.
Accessory structures permit—Non-habitable sheds, garages, decks, pool houses, outdoor
kitchens, fences, flat fee\$75.00.
- Substantial improvement, or substantial repair, flat fee\$250.00.
The floodplain manager will use the market value of the building, less land, as determined
by the tax office. Should the applicant disagree with this value, a certified appraisal that
uses the cost approach method to determine the building's current value may be submitted.
If the value of improvement is greater than 50 percent of market value the project is a
substantial improvement by definition; requiring the structure be elevated to the design
flood elevation.
3. Non-residential (commercial) permits:
- New Commercial structures\$' ) 5 0.00;
- plus $75.00 per hour or portion thereof.
- Substantial improvement, or substantial repair\$350.00;
- plus $75.00 per hour or portion thereof.
The floodplain manager will use the market value of the building, less land, as deten-nined
by the tax office. Should the applicant disagree with this value, a eel tified appraisal that
uses the cost approach method to deterinine the building's current value may be submitted.
.If the value of improvement is greater than 50 percent of market value the project is a
substantial improvement by definition; requiring the structure be elevated to the design
flood elevation.
4. Small-scale development permits—residential single parcel landscaping, small ponds,
minor fill/grading, retaining walls, utility crossings, culverts, sewer, debris removal, flat
fee ..... $125.00.
Large-scale development permits—Floodplain studies; floodway encroachments; new or
expanded subdivisions; watercourse alterations; bridges; flood control structures; multi-
unit dwellings, other projects as determined by the floodplain manager\$650.00.
5. Inspections:
-1
Floodplain site inspections 0):
- initial inspection\$ 12 5. 00.
- each additional\$ 7 5. 0 0.
- Flood -proofed structure inspection/certification (commercial only)\$175.00.
6. Revisions:
Minor revision—Previously reviewed or approved floodplain permit/application\$15 0.00.
- Major revision—Previously reviewed or approved floodplain permit/application requires
applicant to reapply and pay new fees.
- Floodplain map revision (LOMR) application\$1,200.00.
- Variance application (plus required advertising at cost)\$1,500.00.
7. Extensions: (90 days max.) ..... $150.00
- Must be requested in writing prior to expiration and demonstrating justifiable cause.
Expired applications and pen -nits shall require a new application and new fees shall
apply.
- Applications submitted after development activities have commenced shall be assessed a
$250.00 fine and permit fees shall be tripled de4bled. Violations may be fined up to
$250.00 each day the violation remains.
- The floodplain manager may assess additional fees or require third party review, at cost,
by a qualified professional of the village's choosing at the applicant's expense. Projects
specifically owned and funded by the Village of Tequesta are exempt from fee charges.
RESOLUTION
36-19
Date
08/08/2019
Motion
Vice -Mayor Kristi Johnson
Second
Council Member Kyle Stone
VOTE
FOR ADOPTION AGAINST ADOPTION
ABSENT
Mayor Abigail Brennan
✓❑
❑
❑
Vice -Mayor Kristi Johnson
✓❑
❑
❑
Council Member Vince Arena
❑
❑
✓❑
Council Member Laurie Brandon
✓❑
❑
❑
Council Member Kyle Stone
❑
❑
✓❑
The Mayor thereupon declared the Resolution duly passed. and adopted.
MAYOR OF TEQUESTA
_... v
ATTES�• SEAL
INCORPORATED;
Lori McWilliams, MMC
Village Clerk