Loading...
HomeMy WebLinkAboutResolution_20-00/01_02/08/2001RESOLUTION NO. 20-00/Ol • • A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AWARDING A PROPOSAL TO WILLIAM H. MURPHY GENERAL CONTRACTOR, INC., OF HOBE SOUND, FLORIDA, IN THE AMOUNT OF $28,803, FOR RENOVATIONS TO THE TEQUESTA RECREATION CENTER, HAVING A FY 2000/2001 CAPITAL IMPROVEMENT PROPOSED INTRA FUND TRANSFER OF $35,000, AND AUTHORIZING THE VILLAGE MANAGER TO EXECUTE THE APPLICABLE CONTRACT ON BEHALF OF THE VILLAGE. NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AS FOLLOWS: Section 1. Consideration to award a proposal to William H. Murphy General Contractor, Inc., of Hobe Sound, Florida, in the amount of $28,803, having a FY 2000/2001 Capital Improvement Proposed Intra Fund Transfer of $35,000, for renovations to the Tequesta Recreation Center, attached hereto as Exhibit "A" and incorporated by reference as a part of this Resolution is hereby approved and the Village Manager of the Village of Tequesta is authorized to execute the same on behalf of the Village. Councilmember ~,,,.,, an upon eing put to a vote, the vote was as follows: THE FOREGOING RESOLUTION WAS OFFERED by Councilmember Schauer who moved its adoption. The motion was seconded by d b FOR ADOPTION AGAINST ADOPTION Joseph N. Capxetta Elizabeth A. Schauer Basil E. Dalack Geraldine A. Genco • Sharon D. Walker • The Mayor thereupon declared the Resolution duly passed and adopted this 8th day of February, A.D, 2001. MAYOR OF TEQUESTA • i' . •.=; ,-' ~~ __._• 4 b Joseph N. Capr tta ATTEST: ^~---~ oann Mangan' llo Village Clerk Resolution\Wm. H. Murphy .7 • EXHIBIT "A" PROPOSAL WILLIAM H. MURPHY GEN. CONTR. INC 8840 SE ROBWYN ST HOBE SOUND, FL 33455 TEL~FAX 561 546-9940 FL. LIC CGC018323 VILLAGE OF TEQUESTA -JAN 20,2001 250 TEQUESTA DR. TEQUESTA, FL 33458 PROJECT: VILLAGE OF TEQUESTA RECREATION CENTER. $ 28,803.00 STAFF TOILET FACILITY/WINDOW REPLACEMENT. Bid is based on information obtained from plans drawn by INTER-PLAN INC. titled; Village of Tequesta Recreation Center, Drawn by Hansen, Dated 23 October 2000. Labor and material to include: • Building permit • Replacement of front window glass with with aluminum store front material(bronze) and impact glass. • Remaining space below the windows will be famed out and finished to match existing finishes both inside and out. • Frame out and install a Dutch door in kitchen to match existing door in adjacent office. • Frame out a 3' X 7' and a 6' X 7' area in the north end of the existing storage room for a Utility closet and a New Staff Toilet. • An opening will be cut into the east wall of the existing classroom to allow access to the new bathroom. • Both water and waste will be tied into existing supplies on the north side of the building. • All fixtures, doors and hardware will match the existing fixtures. • Tile will be installed as per plans using the same the that is in existing baths • Remaining surfaces that are not tiled will be painted, matching existing colors. • All debris will be removed from site prior to final inspection. Thank you for the opportunity to bid your project. i by i. INTER•PLAN iivc January 27, 2001 Mr. Gary Preston, Director of Public Works and Recreation ARCHITECTURE Village of Tequesta PO Box 3273 PLANNING Tequesta, Florida 33469 INTERIOR DESIGN RE: Tequesta Recreational Center COMPUTER Toilet and Utility Closet/Front Window Replacement MODELING 399 Seabrook Road AND DESIGN RESEARCH Dear Mr. Preston: CONTRACT I have reviewed the proposal submitted by William H. Murphy General ADMINISTRATION Contractor, Inc. regarding the above referenced project. The proposal appears ACCESSIBILITY to cover the scope of work as designed in the drawings prepared by our CONSULTANT OfflCe. • AAC 390 The proposed bid of $28,603.00 is a reasonable bid for the proposed work. 399 North Cypress Drive Tequesta, Florida 33469 Phone: 561 744 0445 Fax: 561 744 7219 As I indicated to you, I had contacted several contractors, all of which indicated they were too busy at this time to bid this project. Unfortunately, as you know, construction activity has been very high for the past few years and trying to find contractors who are willing to bid smaller projects has been difFicult. Thank you for the opportunity to work with you on this project. If you should have any questions or concerns please feel free to contact me at any time. Sincerely, Inte~Plan Irrc President Email: architect *terplanarchitects.com