HomeMy WebLinkAboutResolution_20-00/01_02/08/2001RESOLUTION NO. 20-00/Ol
•
•
A RESOLUTION OF THE VILLAGE COUNCIL OF THE
VILLAGE OF TEQUESTA, PALM BEACH COUNTY,
FLORIDA, AWARDING A PROPOSAL TO WILLIAM H.
MURPHY GENERAL CONTRACTOR, INC., OF HOBE
SOUND, FLORIDA, IN THE AMOUNT OF $28,803, FOR
RENOVATIONS TO THE TEQUESTA RECREATION CENTER,
HAVING A FY 2000/2001 CAPITAL IMPROVEMENT
PROPOSED INTRA FUND TRANSFER OF $35,000, AND
AUTHORIZING THE VILLAGE MANAGER TO EXECUTE THE
APPLICABLE CONTRACT ON BEHALF OF THE VILLAGE.
NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE
COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH
COUNTY, FLORIDA, AS FOLLOWS:
Section 1. Consideration to award a proposal to
William H. Murphy General Contractor, Inc., of
Hobe Sound, Florida, in the amount of $28,803,
having a FY 2000/2001 Capital Improvement Proposed
Intra Fund Transfer of $35,000, for renovations to
the Tequesta Recreation Center, attached hereto
as Exhibit "A" and incorporated by reference as a
part of this Resolution is hereby approved and the
Village Manager of the Village of Tequesta is
authorized to execute the same on behalf of the
Village.
Councilmember ~,,,.,, an upon eing
put to a vote, the vote was as follows:
THE FOREGOING RESOLUTION WAS OFFERED by
Councilmember Schauer who moved its
adoption. The motion was seconded by
d b
FOR ADOPTION
AGAINST ADOPTION
Joseph N. Capxetta
Elizabeth A. Schauer
Basil E. Dalack
Geraldine A. Genco
•
Sharon D. Walker
• The Mayor thereupon declared the Resolution duly
passed and adopted this 8th day of February, A.D,
2001.
MAYOR OF TEQUESTA
•
i'
. •.=; ,-'
~~ __._•
4 b
Joseph N. Capr tta
ATTEST:
^~---~
oann Mangan' llo
Village Clerk
Resolution\Wm. H. Murphy
.7
•
EXHIBIT "A"
PROPOSAL
WILLIAM H. MURPHY GEN. CONTR. INC
8840 SE ROBWYN ST
HOBE SOUND, FL 33455
TEL~FAX 561 546-9940 FL. LIC CGC018323
VILLAGE OF TEQUESTA -JAN 20,2001
250 TEQUESTA DR.
TEQUESTA, FL 33458
PROJECT: VILLAGE OF TEQUESTA RECREATION CENTER. $ 28,803.00
STAFF TOILET FACILITY/WINDOW REPLACEMENT.
Bid is based on information obtained from plans drawn by INTER-PLAN INC. titled; Village of
Tequesta Recreation Center, Drawn by Hansen, Dated 23 October 2000.
Labor and material to include:
• Building permit
• Replacement of front window glass with with aluminum store front material(bronze) and
impact glass.
• Remaining space below the windows will be famed out and finished to match existing
finishes both inside and out.
• Frame out and install a Dutch door in kitchen to match existing door in adjacent office.
• Frame out a 3' X 7' and a 6' X 7' area in the north end of the existing storage room for a
Utility closet and a New Staff Toilet.
• An opening will be cut into the east wall of the existing classroom to allow access to the new
bathroom.
• Both water and waste will be tied into existing supplies on the north side of the building.
• All fixtures, doors and hardware will match the existing fixtures.
• Tile will be installed as per plans using the same the that is in existing baths
• Remaining surfaces that are not tiled will be painted, matching existing colors.
• All debris will be removed from site prior to final inspection.
Thank you for the opportunity to bid your project.
i by
i.
INTER•PLAN iivc
January 27, 2001
Mr. Gary Preston, Director of Public Works and Recreation
ARCHITECTURE Village of Tequesta
PO Box 3273
PLANNING Tequesta, Florida 33469
INTERIOR DESIGN
RE: Tequesta Recreational Center
COMPUTER Toilet and Utility Closet/Front Window Replacement
MODELING 399 Seabrook Road
AND DESIGN
RESEARCH Dear Mr. Preston:
CONTRACT I have reviewed the proposal submitted by William H. Murphy General
ADMINISTRATION Contractor, Inc. regarding the above referenced project. The proposal appears
ACCESSIBILITY to cover the scope of work as designed in the drawings prepared by our
CONSULTANT OfflCe.
•
AAC 390 The proposed bid of $28,603.00 is a reasonable bid for the proposed work.
399 North Cypress Drive
Tequesta, Florida 33469
Phone: 561 744 0445
Fax: 561 744 7219
As I indicated to you, I had contacted several contractors, all of which
indicated they were too busy at this time to bid this project. Unfortunately, as
you know, construction activity has been very high for the past few years and
trying to find contractors who are willing to bid smaller projects has been
difFicult.
Thank you for the opportunity to work with you on this project. If you should
have any questions or concerns please feel free to contact me at any time.
Sincerely,
Inte~Plan Irrc
President
Email: architect
*terplanarchitects.com