Loading...
HomeMy WebLinkAboutResolution_56-01/02_07/11/2002RESOLUTION NO. 56-01/02 • • A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, APPROVING A PROPOSAL FROM DAVID BROOKS ENTERPRISES, PALM BEACH GARDENS, FLORIDA, FOR THE RELOCATION OF THE ELECTRICAL SERVICE TO WELL #7; SERVICE TO THE FOUNTAIN OF VILLAGE GREEN PARK, AND THE DEMOLITION OF THE EXISTING PUMP CONTROL STRUCTURE, IN THE AMOUNT OF $70,324.00, WITH FUNDS BEING APPROPRIATED FROM WATER UTILITIES, AND AUTHORIZING THE VILLAGE MANAGER TO EXECUTE THE APPLICABLE CONTRACT ON BEHALF OF THE VILLAGE. NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AS FOLLOWS: Section 1: The proposal from David Brooks Enterprises, Palm Beach Gardens, Florida, for relocation of the electrical service to well #7 and the demolition of the existing pump control structure, in the amount of $70,324.00, is attached hereto as Exhibit "A" and incorporated by reference as part of this Resolution, is hereby approved, and the Village Manager of the Village of Tequesta is authorized to execute the same on behalf of the Village of Tequesta. THE FOREGOING RESOLUTION WAS OFFERED by Councilmember Resnik, who moved its adoption. The motion was seconded by Councilmember von Frank, and upon being put to vote, the vote was as follows: FOR ADOPTION AGAINST ADOPTION Geraldine A. Genco Joseph N. Capretta Basil E. Dalack Edward D. Resnik Russell J. von Frank The Mayor thereupon declared the Resolution duly passed and adopted this 11th day of July, 2002. ~,t~der.~e.~ ayor Geraldine A. enco • ATTEST s~ ,~-/ Village Clerk Ma Wolcott Q 0 ('l>u~te-~-~ Wl~~-c~ J ~~. ~ DOlV7 E N T E R P R I S E S 9000 Burma Road, Suite 101 Palm Beach Gardens, FL 33403 561.863.1200 Fax: 561.863.1264 June 7, 2002 Mr. Mike Flattery Gee & Jenson Architects One Harvard Circle West Palm Beach, FL 33409 Re: Tequesta Public Safety Building Power 8 Control Revisions Pending Change No. 43 Dear Mike: We offer to perform the work associated with the power and control work outlined in drawings E-1, E-2 and E-3 by Reese, Macon & Associates dated 11/27/01. The price for this work is Seventy Thousand Three Hundred Twenty Four Dollars ($70,324.00). We further request that the contract time be increased by three (3) days. • Attached please find a cost break down for this work. Please review and let me know if you have questions or require further information. Sincerely, David Brooks Enterprises, Inc. ~~~ ~ David Brooks President Accepted: Village of Tequesta Cc Chief Jim Weinand, VOT Rick Wilhelm, DBE File C:Vv1SWORD\Tequesta\P.C.# 43.doc • L~~ y~r~ General Contractors Construction Management ESTIMATG~ ~Z~CORD Date: 11 1 avid Brooks Enterprises, Inc. Project: TepU@°~'°:~ #~UbIIC Safeiv Bldg Page: 1 or 1 D . ,... _ ......_. _., ., ... .. P.C. ~ 43 -Power & Control Relocation P br: OB Labor Total - ---- Urrit Labor Subcontract Total --- - -- - -- ------- -- - Total Cost Supervise and Coordinate LS 1.00 250.00 $250 $0 $0 $250 Survey /Lay Out HR 8.00 $0 $0 85.00 $680 $680 AS-Built Drawings HR 8.00 $0 $0 85.00 $680 $680 Contxete Mounting Pads SF 60.00 3.00 $180 3.00 $180 $0 $360 Misc. L'Scape /Irrigation /Grading LS 1.00 200.00 $200 300.00 $300 $0 $500 Building Demolition 8 Removal LS 1.00 $0 $0 2500.00 $2,500 $2,500 Electrical Subcontract Work LS 1.00 $0 $0 60555.00 $60,555 $60,555 Not es: 1. Excludes FPL fees $630 $480 64,415 65,525 State Sales Tax - % 0.06 $29 29 $630 $509 64,415 65,554 udion Fee I Insurance % 115/5°/ % 0.020 3,221 I I 3,392 1,379 • ~' ~ May ]0, 2002 David Brooks Enterprises, Inc. 3866 Prospect Ave. Suite #9 West Palm Beach, F133404 Attn~ David Brooks Re: Village Of Tequesta Well #7 Subject: Scope Letter P~~#~~ E LCO r-- 1~ECEIVED Mai 1 a zoaz CAI. CONTRACTORS Gerelco Electrical Contractors Inc. includes all labor and materials necessary to provide a complete and fully operating electrical system for the above referenced project. The following items are included; 1) New Service Fur Well 87 and Fountain. 2) Furnish and Install new power and control pane! for the existing Fountain. 3) New Conduit and wire for new Fountain panel and Well #7. 4) All Equipment, Conduit and wire per plans azrd specified notes. 5) Demolition of existing service as per plans. 6) Pemnit fees are included. • nab iu uc uc: uoF+ Excluded rrom Uur Bid: I) Temporary Power. 2) All concrete work inclusive of cutting, patching, and or pouring pads. 3) Service beyond FPL Hand Hole listed on plans. Total cost of scope of work: $ 60,555.00 The above estimate is based on drawings E1 thru E3 dated on Apri118, 2002 as prepared by JHHAM Engineering and Reese, Macon and Associates, lne. If there are any questions or conmrents please contact me at t-772-340-7474. Si~erely, ' ~~ J Trevor Palmer Project Estimator • 521 N.W. Enterprise Drive, Port St. Lucie, Florida 34986 (561) 340-7474 • Fax (561) 34fl-7475 E-entail: email@gerelco.com - Web Page: www.gerelco.corn nDD av vr. v-T. .,-=r 05/10lD2 1 b :23 • -- Job Number 22075 Bid Oate 05/09/02 Bid Ti®e 14:00 Estiaator Trevor Palmer Square footage 0. Division O1 Raceway, Ftgs, & Boxes Q2 4iire !r Cable 06 Underground/Site 07 Misc 10 Grounding Total 02 Distributia~ gear (GRAYBAR) 3a Quote 30 (pull boxes) Total Sales Tax (6~) • Total Material Oi ~i~.sn 01 Raceway, Ftgs, & Boxes 02 Yire & Cable 06 Underground/Site O7 Misc 10 Grounding Total Cateaorv of T Electrician/mech. 100.0 Total 100.0 • Non- T~.aL Quoted Material Fac .ot r 475.11 25.0 $ 1,421.28 25.0 ~ 1.332.19 25.0 ~ 2.200.00 25.0 ~ 32.31 25.0 ~ 5,460.89 Ol~t~ateri a I Labor Hours IQ#~1 Factor_ 28.31 0.00 ~ 28.31 58.78 0.00 ~ 58.78 340.32 0.00 ~ 340.32 160.30 0.00 $ 160.30 1.b8 0.00 ~ 1.68 589.39 589.39 labor Rates Hours Base Rate Burden ~~ 589.39 42.00 0.00 0.00 589.39 X 42.00 (AVG LAB RATE W/BURDEN) _ Non Productive Labor nin $ 593.89 $ 1,77b.60 $ 1,665.24 $ 2,750.00 $ 40.39 $ 6,826.12 $ 12,346.00 $ 3,188.00 $ 15,534.00 $ 1,341.b1 S 23,101.73 xtension 24,754.38 $ 24,154.38 Ila `~J' a u uc v'7 a ar .iM 05/10/0 • 11ssc~i otign deco/pump relaocation layout/schematics Total ~ NAME• Villane of Tertr~t NeII i7 All BreakdoMns (Alll ~ Bdl~ Factor ~~ Des~rioti~ STORAGE EQRT RENrat - coMPACTOR EQRT RENTAL - BACKHOE Permit fees Total Job Subtotal (Prime Cost) Overhead (10~) Profit (S~) Job Total Actual Bid Price Material to labor ratio: 0.49 Cost per square foot Selling price per square foot r-- Extension $ 2,500.00 $ 750.00 $ 3,250.00 I~il $ 500.00 $ 35o.ao $ 750.00 S 575.00 $ 2,175.00 5 53,881.11 S 5,388.11 $ 2,963.46 $ 62,232.b8 E 60,555.00 $ 0.00 0.00 i • ..or -.. ..~ .. ......~- OS/10/02 16.23 Yiilar_~o o_ f Teauesta Yell it ~~ EXTENSIOA BY ~cc Item N Description Price U Ext Price taMr 1 Frh lalv,r -'- Ol Raceway, Ftgs, & loxes --- ' 1591 1592 2 La:knut 2-1/2" Lockout 20.00 44.86 C 8.97 0.21E 5.40 1603 2" Plastic Bushing 16.00 110.19 C 17.63 0.33E 5.28 1604 2-1/2" Plastic Bushing 4.00 50.06 C 2.00 0.30E 1.20 1989 2" A k~ Rigid Coupling 7.OD 83.95 C 5.86 0.35E 2.45 1990 2-1/2" Alwo Rigid Coupling 8.00 2 472.48 C 37.84 0.00E 0.00 2013 2'x12 Alum Nipple .00 1,065.28 C 21.31 0.00E 0.00 2(114 2-1/2"x12" Alum Nipple 12.00 1,813.10 C 217.57 O.bO E 7.20 6485 i2x12x6' Screw Cover Pull Box-Nema 3 6.00 1 00 2,731.11 C 163.91 0.75E 4.50 . -- O1 Raceway, Ftgs, & Boxes Total -- QUOTE ~ 0.00 475 it 2.28E 2.28 28 31 --02Yire&C~le--- 2796 f2 THNN CU Stranded Mire 2,764,00 394.03 M 1 069.10 17 50 M 48 38 2800 l!3/0 TNNN CU Stranded Yire 20.E 904.36 M , 18.09 . 29 75 M . 0 60 2801 If4/0 T!UIN CU Stranded Yire 280.1m 1,121.75 M 314.Q9 . 35.00 M . 9 80 -- 02 Yire & Cable Total -- 1,421.28 . 58.78 --- 06 Underground/Site - 2065 2" PVC Male Adaptor 12.00 8(1.11 C 9.61 0 30E 3 60 2066 2-1 /2" PYC Male Adaptor " 2.00 130.12 C 2.~ . 0.40E . 0 ~ 2119 2 PYC Coupling 72.00 56.12 C 6 73 0 12E . 1 44 2120 2-Il2" PVC Coupling 2.00 99.12 C . 1.98 . 0 14E . 0 28 2131 2132 2" PVC Elbow 2-l/2" PVC Elbow 12.00 194.70 C 23.36 . 0.65E . 7.80 • 7014 18"Yx36"D Trench-Back Hoe 2.00 ~.~ 339.90 C 0,00E 6.80 0.00 0.80E 10.00 C 1.60 80 80 7104 4'x4'x4' Manhole Excavate/8ackfill/C 4.00 0.00E 0.00 4.00E . 16 00 7118 18"Yx36"0 Backfill & Compaction 900.OD 0.00E 0.00 9 OD C . 81 00 8175 2" PVC (Sd>edule-80) 900.00 131.20 C 1 180.80 . 12 00 C . 106 00 8i 76 2-1 /2" PYC (Schedule-80) 50.00 200.62 C , 1.31 . 14 E C . 7 OD 8260 J ~X FUSH Y/GRADE Y/TRAFFIC COVER 4.00 (pWli: 30 0.00 . 8.00E . 32 00 '- 06 Underground/Site Total -- 1,332.19 . 340.32 'O7Misc- 6928 Extract,Cap, Cover Existing Feeders 1.00 O.DO E 0.00 15.00E 15 00 6929 Racks for equipment 2.00 350.00E 700.00 6.00E . 12 00 6930 One lot Of Gear labor ' T.00 QUOTE 2 0.00 73.30E . 73 30 6931 Recomrect Existing Circuits 1.00 0.00E 0.~ 20-.ODE . 20 00 6932 Offload/handle/stage manholes 1.00 1,500.00E 1,500.00 40.00E . 40.00 --- 07 Misc Total - 2,200.00 160.30 - 10 Grounding -- 6b71 5/8"x10' Copper Ground Rod 2.00 1,505.02 C 30.10 0.58E 1 16 6615 5/8" Ground Rod Clamp 2.00 110.58 C 2.21 0.26E . 0.52 --- 10 Grounding Total -- 32.31 1.68 Job Total 5,460.89 589.39 r - ' • OUOTAT1oN e q ASPHALT B BLOCK C CONCRETE CUTTING CONTRACTORS, INC. SERVING SOUTH FLORIDA SINCE 1971 2001 NORTH ANDREWS AVENUE POMPANO BEACH, FLORIDA 33069 COMPANY NAME ~~~~ (~~yt7k-S STREET ADDRESS CITY, STATE, ZIP PERSON REQUESTING BID ~' ~~ OFFICE PHONE DATE`SQ, UOTEDYQ ~ OUO~ ~ I J ~ FAX COST. NO. P.O. f `~ o Muw AREA {aoe- aa-0ee, o wrsr vALM AREA lee,) 7~a>as a Fr. LAUOeIOAIF AREA ~- sas+w o Fr. AREl1 lee,) ~aeasse o vaMnANO AREA loep aesee~ a FAIL (ae41 aroaseri o INTERNET. o EMAIL eem~erq~na..aan T~~u ~ ~~~~ ~ r cl-~ k ~~rl-t-z~~. mom. ~ 5- it ~x 9 x ,~ , ~,,5 ~Z ~v~cA~ D ~o hi1c~ v-~ ~~~ ~i rI- J~ ~`' 1 C3r~s /J~u ~ ~ ~ ~ s~~ ~ ~D (~/ /'l~ Lu~Y' V X /Z ` 13Li~ ~ -- ~~ ~ ~~~ ~ ~ !~~ ~~ PRICES SUO CHANGE~llllRlO~N JOB GUOTATIO . ~ G } WE ASSUME NO RESPONS181LITY FOR LAYOUT OR UTILITIES BURIE . NOTICE: THIS QUOTATION IS VALID FOR 75 DAYS UNLESS O ~ . eR AVAILABLE ^ ~ ~' DNfanoe MISIDE WORK ^ AYVER AVAILABLE ~• ^ Dietar~cs OVERTIME NECESSARY ^ OUR SCAFFOLDING ^ Hef(~lt VACUUM REQUIRED ^ HEIGHT OF WORK ^ Feel PLASTIC i TAPE ^ TRUCK TO WORK AREA ^ ^ _ In DMencs EXTRA MAN REQUIRED ^ STAND - BY TIME WILL BE CHARGED AT 685.00 PER HOUR pEp'IIAAN. cusTOMER COPY 86`~Gd y3 ACCESSIBILITY BUCK ^ STAIRS ^ SCAFFOLD ^ LADDER ^ HOIST ^ ELEI/. ^ PLANKS SPECIAL EQUIPMENT REQUIRED