HomeMy WebLinkAboutResolution_82-99/00_09/14/2000RESOLUTION NO. 82-99/00
:~
•
A RESOLUTION OF THE VILLAGE COUNCIL OF THE
VILLAGE OF TEQUESTA, PALM BEACH COUNTY,
FLORIDA, APPROVING THE BID AWARD FOR WELL
REHABILITATION FOR A 12-MONTH CONTRACT
(OCTOBER 1, 2000 THROUGH SEPTEMBER 2001), TO
AQUIFER MAINTENANCE PERFORMANCE (AMPS) OF
DAVIE, FLORIDA, IN THE AMOUNT OF $94,350, WITH
FUNDS FOR FY 2000/2001 BEING APPROPRIATED FROM
THE WATER ENTERPRISE FUND, HAVING A FY
2000/2001 BUDGET ALLOCATION OF $20,000, AND
SUBJECT TO FUNDS BEING APPROPRIATED AND
APPROVED BY THE VILLAGE COUNCIL FOR FY
2000/2001, AND AUTHORIZING THE ACTING VILLAGE
MANAGER TO EXECUTE THE APPLICABLE CONTRACT ON
BEHALF OF THE VILLAGE.
NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE
COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH
COUNTY, FLORIDA, AS FOLLOWS:
Section 1. The Contract for Well Rehabilitation
with Aquifer Maintenance Performance (AMPS)
of Davie, Florida, in the amount of $94,350,
attached hereto as Exhibit "A" and incorporated by
reference as part of this Resolution is hereby
approved subject to funds being appropriated and
approved by the Village Council for FY 2000/2001,
and the Acting Village Manager is authorized to
execute the same on behalf of the Village.
RESOLUTION WAS
Genco ,
The motion was
OFFERED by
who moved its
seconded by
Councilmember Schauer and upon being
put to a vote, the vote was as follows:
THE FOREGOING
Councilmember _
adoption.
FOR ADOPTION
Joseph ~I. Capretta
Basil E. Dalack
Geraldine A. Genco
Elizabeth A. Schauer
Sharon D. Walker
AGAINST ADOPTION
The Mayor thereupon declared the Resolution duly
passed and adopted this 14th day of September, A.D,
2000.
MAYOR OF TEQUESTA
G
~.
oseph N. Cap tta
- ATTEST:
~.d~
oann Mangan' llo
Village Clerk
Resolution\wellRehab
•
•
E XN/d!T "f~ "'
PROPOSAL,
T0: VILLAGE OF TEQUESTA
P.O. BOX 3273
357 TEQUESTA DRIVE
TEQUESTA, FLORIDA 33469
FROM:
3
A~nari~e( ~Ir1~;v~aiup X ~C~f~~puup ~~~~ ~(~ lru..~
~i ~~ Fl~~~
(Herein~.fter referred to as Firm)
Gentlemen:
The undersigned proposes to furnish all labor, materials,
equipment, services, and incidentals necessary to perform all work
in accordance with the Contract Documents. entitled: Village of
Tequesta, Well Rehabilitation - Annual Contract.
The Firm now submits the following and hereby agrees:
• 1. The only person(s)
as principal are
without connection
. making a proposal;
good f aith witho~
practices.
interested in this proposal, or Agreement,
named herein; that the proposal is made
with any other person, company, or parties
and that it is in all respects fair and in
.zt collusion or fraud, or other illegal
2. To hold Proposal open until an Agreement has been executed
between the Village and the accepted Firm, or until sixty (60)
calendar days after the bid opening date, whichever is
shorter.
3. To enter into and execute an Agreement on the basis of this
Proposal, within fifteen (15) calendar days after the award of
the Contract.
4. To start work within ten (10) calendar days of the Date of
written authorization for a selected well to be rehabilitated,
from the Village/Engineer. Work shall be completed within the
number of calendar days specified in Article 3 of the
Agreement.
5. In the event of multiplication, addition, or clerical errors
on the Proposal Forms, the Village may correct these errors to
clarify the Proposals. The information which results in the
lowest cost to the Village will be considered correct, and
therefore utilized.
P-1 00-106we1
BASE PROPOSAL FORM
ESTIMATED
ITEM QUANTITY DESCRIPTION ~ LUMP SUM
A. WELL REHABILITATION, WELL 7
1.0 Pump Removal/Inspection
For providing the complete mobilization of
all equipment, materials and labor necessary
to perform the pump removal/inspection
outlined within Section 11202, Well
Rehabilitation,. Item A, Pump
Removal/Inspection.
UNIT PRICE PER PUMP REMOVAL/INSPECTION $ , 2~ ~ /pump
Rem./Inspect.
•
2.0 Mechanical and Acid Treatment Process
2.1 Mechanical Agitation Process
For providing all equipment, materials and
labor necessary to perform the mechanical
agitation process as outlined within Section
11202, Well Rehabilitation, Item B.l.,
Mechanical Agitation.
UNIT PP.ICE PER MECHANICAL AGITATION PROCESS $ ~~'/Mech
Agitation
2.2 Acid Treatment Process
For providing all equipment, materials and
labor necessary to perform the acid treatment
process as outlined within Section 11202,
Well Rehabilitation, Item B.2.i, Acid
Treatment.
UNIT PRICE PER ACID TREATMENT PROCESS
P-2
$ 2 ~~~ /Acid
Treatment
00-106we1
•
•
•
ESTIMATED '
ITEM QUANTITY DESCRIPTION LUMP SUM
2.3 Prechlorination Treatment
For providing all equipment, materials and
labor necessary to perform the
prechlorination treatment as outlined within
Section 11202, Well Rehabilitation, Item
B.2.ii, Prechlorination Treatment.
UNIT PRICE PER PRECHLORINATION TREATMENT $ Z,~~~ /Pre-
chlor. Treatmt
3.0 Assembly/Re-installation of Pump
For providing all equipment, materials and
labor necessary to perform the complete
demobilization, clean-up/ restoration from
the site, assembly/reinstallation of pump as
outlined within Section 11202, Well
Rehabilitation, Item C,
Assembly/Reinstallation of Pump.
UNIT PRICE PER ASSEMBLY/REINSTALLATION OF PUMP $ ~~2~~ /Asmb
& Reinstall.
SUBTOTAL, WELL REHABILITATION, WELL 7 $ LJ, "1 1~
P-3 00-106we1
•
BASE PROPOSAL FORM
ESTIMATED
ITEM QUANTITY DESCRIPTION LUMP SUM
B. WELL REHABILITATION, WELL 8
1.0 Pump Removal/Inspection
For providing the complete mobilization of
all equipment, materials and labor necessary
to perform the pump removal/inspection
outlined within Section 11202, Well
Rehabilitation, Item A, Pump
Removal/Inspection.
UNIT PRICE PER PUMP REMOVAL/INSPECTION $ ~`~= /Pump
Rem./Inspect.
C]
•
2.0 Mechanical and Acid Treatment Process
2.1 Mechanical Agitation Process
For providing all equipment, materials and
labor necessary to perform the mechanical
agitation process as outlined within Section
11202, Well Rehabilitation, Item B.l.,
Mechanical Agitation.
UNIT PRICE PER MECHANICAL AGITATION PROCESS $ (~`~~J~ /Mech
Agitation
2.2 Acid Treatment Process
For providing all equipment, materials and
labor necessary to perform the acid treatment
process as outlined within Section 11202,
Well Rehabilitation, Item B.2.i, Acid
Treatment.
UNIT PRICE PER ACID TREATMENT PROCESS
P-4
$ r /Acid
Treatment
00-106we1
ESTIMATED
ITEM QUANTITY DESCRIPTION LUMP SUM
2.3 Prechlorination Treatment
For providing all equipment, materials and
labor necessary to perform the
prechlorination treatment as outlined within
Section 11202, Well Rehabilitation, Item
B.2.ii, Prechlorination Treatment.
UNIT PRICE PER PRECHLORINATION TREATMENT $~,~j~`~ /Pre-
chlor. Treatmt
3.0 Assembly/Re-installation of Pump
For providing all equipment, matterials and
labor necessary to perform the complete
demobilization, clean-up/ restoration from
the site, assembly/reinstallation of pump as
outlined within Section 11202, Well
Rehabilitation, Item C,
Assembly/Reinstallation of Pump.
• UNIT PRICE PER ASSEMBLY/REINSTALLATION OF PUMP $ ~-~Z~W`' /Asmb
& Reinstall.
SUBTOTAL, WELL REHABILITATION, WELL 8 $ ~`j
P-5 00-106we1
•
BASE PROPOSAL FORM
•
•
ESTIMATED
ITEM QUANTITY DESCRIPTION ~ LUMP SUM
C. WELL REHABILITATION, WELL 18
1.0 Pump Removal/Inspection
For providing the complete mobilization of
all equipment, materials-and labor necessary
to perform the pump removal/inspection
outlined within Section 11202, Well
Rehabilitation, Item A, Pump
Removal/Inspection.
UNIT PRICE PER PUMP REMOVAL/INSPECTION $ ~ Z { /Pump,
Rem./Inspect.
2.0 Mechanical and Acid Treatment Process
2.1 Mechanical Agitation Process
For providing all equipment, materials and
labor necessary to perform the mechanical
agitation process as outlined within Section
11202, Well Rehabilitation, Item B.1.,
Mechanical Agitation.
UNIT PRICE PER MECHANICAL AGITATION PROCESS $ 1~~1Sz /Mech
• Agitation
2.2 Acid Treatment Process
For providing all equipment, materials and
labor necessary to perform the acid treatment
process as outlined within Section 11202, .
Well Rehabilitation, Item B.2.i, Acid
Treatment.
UNIT PRICE PER ACID TREATMENT PROCESS $ Z,IGC~J`' /Acid
Treatment
P- 6 00-106we1
ESTIMATED
ITEM QUANTITY DESCRIPTION LUMP SUM
2.3 Prechlorination Treatment
For providing all equipment, materials and
labor necessary to perform the
prechlorination treatment as outlined within
Section 11202, Well Rehabilitation, Item
B.2.ii, Prechlorination Treatment.
UNIT PRICE PER PRECHLORINATION TREATMENT $ Z,S~~ /Pre-
chlor. Treatmt
3.0 Assembly/Re-installation of Pump
For providing all equipment,. materials and
labor necessary to perform the complete
demobilization, clean-up/ restoration from
the site, assembly/reinstallation of pump as
outlined within Section 11202, Well
Rehabilitation, Item C,
Assembly/Reinstallation of Pump.
• UNIT PRICE PER ASSEMBLY/REINSTALLATION OF PUMP $ j Z~S`'-' /Asmb
& Reinstall.
SUBTOTAL, WELL REHABILITATION, WELL 18 $ ~,Z~ ~
r 1
LJ
P- ~ 00-106we1
•
•
BASE PROPOSAL FORM
ESTIMATED .
ITEM QUANTITY DESCRIPTION LUMP SUM
D. WELL REHABILITATION, WELL 19
1.0 Pump Removal/Inspection
For providing the complete mobilization of
all equipment, materials and labor necessary
to perform the pump removal/inspection
outlined within Section 11202, Well
Rehabilitation, Item A, Pump
Removal/Inspection.
UNIT PRICE PER PUMP REMOVAL/INSPECTION $ ~~2,j(~"~ /Pump
Rem./Inspect.
2.0 Mechanical and Acid Treatment Process
2.1 Mechanical Agitation Process
For providing all equipment, materials and
labor necessary to perform the mechanical
agitation process as outlined within Section
11202, Well Rehabilitation, Item B.1.,
Mechanical Agitation.
UNIT PRICE PER MECHANICAL AGITATION PROCESS $ ~-,'S~j~ /Meth
Agitation
•
2.2 Acid Treatment Process
For providing all equipment, materials-and
labor necessary to perform the acid treatment
process as outlined within Section 11202,
Well Rehabilitation, Item B.2.i, Acid
Treatment.
UNIT PRICE PER ACID TREATMENT PROCESS
P-8
$ Z,~~`~ /Acid
Treatment
00-106we1
• ESTIMATED
ITEM QUANTITY DESCRIPTION LUMP SUM
2.3 Prechlorination Treatment
For providing all equipment, materials and
labor necessary to perform the
prechlorination treatment as outlined within
Section 11202, Well Rehabilitation, Item
B.2.ii, Prechlorination Treatment.
UNIT PRICE PER PRECHLORINATION TREATMENT $ Z,~j~ /Pre-
chlor. Treatmt
3.0 Assembly/Re-installation of Pump
For providing all equipment,. materials and
labor necessary to perform the complete
demobilization, clean-up/ restoration from
the site, assembly/reinstallation of pump as
outlined within Section 11202, Well
Rehabilitation, Item C,
Assembly/Reinstallation of Pump.
• UNIT PRICE PER ASSEMBLY/REINSTALLATION OF PUMP $ ~'' /Asmb
& Reinstall.
c ,~ ~'
SUBTOTAL, WELL REHABILITATION, WELL 19 $ ~2.,~-s
•
P- 9 00-106we1
•
BASE PROPOSAL FORM
ESTIMATED
ITEM QUANTITY DESCRIPTION LUMP SUM
E. WELL REHABILITATION, WELL 20
1.0 Pump Removal/Inspection
For providing the complete mobilization of
all equipment, materials and labor necessary
to perform the pump removal/inspection
outlined within Section 11202, Well
Rehabilitation, Item A, Pump
Removal/Inspection.
UNIT PRICE PER PUMP REMOVAL/INSPECTION $ "~ /Pump
.Rem./Inspect.
•
•
2.0 Mechanical and Acid Treatment Process
2.1 Mechanical Agitation Process
For providing all equipment, materials and
labor necessary to perform the mechanical
agitation process as outlined within Section
11202, Well Rehabilitation, Item B.1.,
Mechanical Agitation.
UNIT PRICE PER MECHANICAL AGITATION PROCESS $~~~~5 i /Mech
Agitation
2.2 Acid Treatment Process
For providing all equipment, materials and
labor necessary to perform the acid treatment
process as outlined within Section 11202,
Well Rehabilitation, Item B.2.i, Acid
Treatment.
UNIT PRICE PER ACID TREATMENT PROCESS
P-10
$ ~, ~_ /Acid
Treatment
00-106we1
• ESTIMATED
ITEM QUANTITY DESCRIPTION LUMP SUM
2.3 Prechlorination Treatment
For providing all equipment, materials and
labor necessary to perform the
prechlorination treatment as outlined within
Section 11202, Well Rehabilitation, Item
B.2.ii, Prechlorination Treatment.
UNIT PRICE PER PRECHLORINATION TREATMENT $ 2,S~S°' /Pre-
chlor. Treatmt
3.0 Assembly/Re-installation of Pump
For providing all equipment, materials and
labor necessary to perform the complete
demobilization, clean-up/ restoration from
the site, assembly/reinstallation of pump as
outlined within Section 11202, Well
Rehabilitation, Item C,
Assembly/Reinstallation of Pump.
• ' UNIT PRICE PER ASSEMBLY/REINSTALLATION OF PUMP $ Z''t5~' /Asmb
& Reinstall.
SUBTOTAL, WELL REHABILITATION, WELL 20 $ ~l~Z`l~`~
r:
P-11 00-106we1
•
BASE PROPOSAL FORM
ESTIMATED
ITEM QUANTITY DESCRIPTION LUMP SUM
F. WELL REHABILITATION, WELL 23
1.0 Pump Removal/Inspection
For providing the complete mobilization of
all equipment, materials and labor necessary
to perform the pump removal/inspection
outlined within Section 11202, Well
Rehabilitation, Item A, Pump
Removal/Inspection.
UNIT PRICE PER PUMP REMOVAL/INSPECTION $ ~ ~~"~ /per
~ P
Rem./Inspect.
•
•
2.0 Mechanical and Acid Treatment Process
2.1 Mechanical Agitation Process
For providing all equipment,' materials and
labor necessary to perform the mechanical
agitation process as outlined within Section
11202, Well Rehabilitation, Item B.1.,
Mechanical Agitation.
UNIT PRICE PER MECHANICAL AGITATION PROCESS "'`'
Agitation
2.2 Acid Treatment Process
For providing all equipment, materials and
labor necessary to perform the acid treatment
process as outlined within Section 11202,
Well Rehabilitation, Item B.2.i, Acid ,
Treatment.
UNIT PRICE PER ACID TREATMENT PROCESS
P-12
$ Z ~ z /Acid
Treatment
00-106we1
• ESTIMATED
ITEM QUANTITY DESCRIPTION LUMP SUM
2.3 Prechlorination Treatment
For providing all equipment, materials and
labor necessary to perform the
prechlorination treatment as outlined within
Section 11202, Well Rehabilitation, Item
B.2.ii, Prechlorination Treatment.
UNIT PRICE PER PRECHLORINATION TREATMENT $ ~,5~`~'" /Pre-
- chlor. Treatmt
3.0 Assembly/Re-installation of-Pump
For providing all equipment, materials and
labor necessary to perform the complete
demobilization, clean-up/ restoration from
the site, assembly/reinstallation of pump as
outlined within Section 11202, Well
Rehabilitation, Item C,
Assembly/Reinstallation of Pump.
UNIT PRICE PER ASSEMBLY/REINSTALLATION OF PUMP $ 1,Z~`~ /Asmb
& Reinstall.
SUBTOTAL, WELL REHABILITATION, WELL 23 $ ~~`jJ'
•
P-13 00-106we1
BASE PROPOSAL FORM
ESTIMATED
r ITEM QUANTITY DESCRIPTION LUMP SUM
G. WELL REHABILITATION, WELL 24
1.0 Pump Removal/Inspection
For providing the complete mobilization of
all equipment, materials and labor necessary
to perform the pump removal/inspection
outlined within Section 11202, Well
Rehabilitation, Item A, Pump
Removal/Inspection.
UNIT PRICE PER PUMP REMOVAL/INSPECTION $ ~~~ /pump
Rem./Inspect.
•
•
2.0 Mechanical and Acid Treatment Process
2.l Mechanical Agitation Process
For providing all equipment, materials and
labor necessary to perform the mechanical
agitation process as outlined within Section
11202, Well Rehabilitation, Item B.1.,
Mechanical Agitation.
UNIT PRICE PER MECHANICAL AGITATION PROCESS $ ~-,S~S w /Mech
Agitation
2.2 Acid Treatment Process
For providing all equipment, materials and
labor necessary to perform the acid treatment
process as outlined within Section 11202,
Well Rehabilitation, Item B.2.i, Acid
Treatment.
UNIT PRICE PER ACID TREATMENT PROCESS
P-14
$ Z,$~`~ /Acid
Treatment
00-106we1
• ESTIMATED
ITEM QUANTITY DESCRIPTION LUMP SUM
2.3 Prechlorination Treatment
For providing all equipment, materials and
labor necessary to perform the
prechlorination treatment as outlined within
Section 11202, Well Rehabilitation, Item
B.2.ii, Prechlorination Treatment.
-UNIT PRICE PER PRECHLORINATION TREATMENT $ ~~5~= /Pre-
chlor. Treatmt
3.0 Assembly/Re-installation of Pump
For providing all equipment, materials and
labor necessary to perform the complete
demobilization, clean-up/ restoration from
the site, assembly/reinstallation of pump as
outlined within Section 11202, Well
Rehabilitation, Item C,
Assembly/Reinstallation of Pump.
• -~
UNIT PRICE PER ASSEMBLY/REINSTALLATION OF PUMP $ ~-~~~'J~- /Asmb
& Reinstall.
SUBTOTAL, WELL REHABILITATION, WELL 24 $ ~,~~`j'"-
•
P-15 00-106we1
•
BASE PROPOSAL FORM
ESTIMATED
ITEM QUANTITY DESCRIPTION LUMP SUM
H. WELL REHABILITATION, WELL 25
1.0 Pump Removal/Inspection
For providing the complete mobilization of
all equipment,' materials and labor necessary
to perform the pump removal/inspection
outlined within Section 11202,_Well
Rehabilitation, Item A, Pump
Removal/Inspection.
UNIT PRICE PER PUMP REMOVAL/INSPECTION $ I~~S(~`''- /pip
Rem./Inspect.
•
•
2.0 Mechanical and Acid Treatment Process
2.1 Mechanical Agitation Process
For providing all equipment, materials and
labor necessary to perform the mechanical
agitation process as outlined within Section
11202, Well Rehabilitation, Item B.1.,
Mechanical Agitation.
UNIT PRICE PER MECHANICAL AGITATION PROCESS $ I,S~~`''- /Meth
Agitation
2.2 Acid Treatment Process
Foz providing all equipment, materials and
labor necessary to perform the acid treatment
process as outlined within Section 11202,
Well Rehabilitation, Item B.2.i, Acid
Treatment.
UNIT PRICE PER ACID TREATMENT PROCESS
P-16
$ ~(~`~ /Acid
Treatment
00-106we1
• ESTIMATED
ITEM QUANTITY DESCRIPTION LUMP SUM
2.3 Prechlorination Treatment
For providing all equipment,, materials and
labor necessary to perform the
prechlorination treatment as outlined within
Section 11202, Well Rehabilitation, Item
B.2.ii, Prechlorination Treatment.
UNIT PRICE PER PRECHLORINATION TREATMENT $ Z~J~`T /pre-
chlor. Treatmt
3.0 Assembly/Re-installation of Pump
For providing all equipment, materials and
labor necessary to perform the complete
demobilization, clean-up/ restoration from
the site, assembly/reinstallation of pump as
outlined within Section 11202, Well
Rehabilitation, Item C,
Assembly/Reinstallation of Pump.
r~
LJ
UNIT PRICE PER ASSEMBLY/REINSTALLATION OF PUMP $ ~ Z~S"- /Asmb
& einstall._
SUBTOTAL, WELL REHABILITATION, WELL 25 $ ~;t}~5
•
P-17 00-106we1
•
•
BASE PROPOSAL FORM
ESTIMATED
..ITEM QUANTITY DESCRIPTION LUMP SUM
I. WELL REHABILITATION, WELL 26
1.0 Pump Removal/Inspection
For providing the complete mobilization of
all equipment, materials and labor necessary
to perform the pump removal/inspection
outlined within Section 11202, Well
Rehabilitation, Item A, Pump
Removal/Inspection.
UNIT PRICE PER PUMP REMOVAL/INSPECTION $ Z~p~~ /Pump
Rem./Inspect.
2.0 Mechanical and Acid Treatment Process
2.1 Mechanical Agitation Process
-For providing all equipment, .materials and
labor necessary to perform the mechanical
agitation process as outlined within Section
11202, Well Rehabilitation, Item B.1.,
Mechanical Agitation.
UNIT PRICE PER MECHANICAL AGITATION PROCESS $ `SSW /Mech
Agitation
2.2 Acid Treatment Process
For providing all equipment, materials and
labor necessary to perform the acid treatment
process as outlined within Section 11202,
Well Rehabilitation, Item B.2.i, Acid
Treatment.
UNIT PRICE PER ACID TREATMENT PROCESS
P-18
$ Z ~~ /Acid
Treatment
00-106we1
,]
•
•
ESTIMATED
ITEM QUANTITY DESCRIPTION LUMP SUM
2.3 Prechlorination Treatment
For providing all equipment,' materials and
labor necessary to perform the
prechlorination treatment as outlined within
Section 11202, Well Rehabilitation, Item
B.2.ii, Prechlorination Treatment.
UNIT PRICE PER PRECHLORINATION TREATMENT $ Z,S~j'= /Pre-
chlor. Treatmt
3.0 Assembly/Re-installation of Pump
For providing all equipment, materials and
labor necessary to perform the complet e
demobilization, clean-up/ restoration from
the site, assembly/reinstallation of pump as
outlined within Section 11202, Well
Rehabilitation, Item C,
Assembly/Reinstallation of Pump.
UNIT-PRICE PER ASSEMBLY/REINSTALLATION OF PUMP $ 1~2~`~ /Asmb
& Reinstall.
SUBTOTAL, WELL REHABILITATION, WELL 26
P-19
$ ~,y ~S~L
00-106we1
•
SASE PROPOSAL FORM
ESTIMATED
ITEM QUANTITY DESCRIPTION LUMP SUM
J. WELL REHABILITATION, WELL 27
1.0 Pump Removal/Inspection
For providing the complete mobilization of
all equipment, materials and labor necessary
to perform the pump removal/inspection
outlined within Section 11202, Well
Rehabilitation, Item A, Pump
Removal/Inspection.
UNIT PRICE PER PUMP REMOVAL/INSPECTION $ ~-~2'~`l /pump
Rem./Inspect.
•
2.0 Mechanical and Acid Treatment Process
2.1 Mechanical Agitation Process
For providing all equipment, materials and
labor necessary to perform the mechanical
agitation process as outlined within Section
11202, Well Rehabilitation, Item B.1.,
Mechanical Agitation.
UNIT PRICE PER MECHANICAL AGITATION PROCESS $ ~~5~~ ~ /Mech
Agitation
2.2 Acid Treatment Process
For providing all equipment, materials and
labor necessary to perform the acid treatment
process as outlined within Section 11202,
Well Rehabilitation, Item B.2.i, Acid
Treatment.
UNIT PRICE PER ACID TREATMENT PROCESS
P-20
$ Z `(~ ~ /Acid
Treatment
00-106we1
•
ESTIMATED
ITEM QUANTITY DESCRIPTION LUMP SUM
2:3 Prechlorination Treatment
For providing all equipment, materials and
labor necessary to perform the
prechlorination treatment as .outlined within
Section 11202, Well Rehabilitation, Item
B.2.ii, Prechlorination Treatment.
UNIT PRICE PER PRECHLORINATION TREATMENT $ ~ S~tS"- /Pre-
chlor. Treatmt
3.0 Assembly/Re-installation of Pump
For providing all equipment, materials and
labor necessary to perform the complete
demobilization, clean-up/ restoration from
the site, assembly/reinstallation of-pump as
outlined within Section 11202, Well
Rehabilitation, Item C,
Assembly/Reinstallation of Pump.
UNIT PRICE PER ASSEMBLY/REINSTALLATION OF-PUMP $ ~-,"'Z~j`"-' /Asmb
& Reinstall.
SUBTOTAL, WELL REHABILITATION, WELL 27 $ ~,'-{`->>"~
TOTAL, WELL REHABILITATION $ 'J']Q"i
(Wells 7,8,18,19,20,23,24,25,26,27)
•
ADDITIVE ALTERNATE~ADJUSTMENTS:
4.0 For providing a video on the specific
rehabilitated as requested by the Own
PER VIDEO PRICE OF
5.0 For providing more or less than eight
mechanical agitation.
PER HOUR COST OF
P-21
well being
er/Engineer.
s ~~r
(8) hours of
s ~~~
00-106we1
The following is a complete list of the subcontrac
if the undersigned is awarded the Contract for thisoprojecte Thed
subcontractors for the electrical and instrumentation must be
included as well as any subcontractor performing more than $5,000
work (equipment and labor) on the project. If the General
Contractor will be performing any of the electrical or
instrumentation work with their own forces, indicate below.
Subcontractors named below may not be changed by the Contractor.
The Owner may request a change under the terms of applicable
sections of the General Conditions.
Type of Work Name and Address of Subcontractor
~ l~-
•
•
P-22 00-106we1