HomeMy WebLinkAboutResolution_70-99/00_07/20/2000RESOLUTION NO. 70-99/00
•
•
•
A RESOLUTION OF THE VILLAGE COUNCIL OF THE
VILLAGE OF TEQUESTA, PALM BEACH COUNTY,
FLORIDA, APPROVING A PROPOSAL WITH REESE,
MACON & ASSOCIATES, INC., OF LAKEWORTH,
FLORIDA, FOR ENGINEERING/SURVEY SERVICES IN
CONNECTION WITH TEQUESTA COUNTRY CLUB DRAINAGE
EASEMENTS, PHASE II, IN THE AMOUNT OF
$6,650.00, HAVING AN FY 1999/2000 BUDGET
ALLOCATION OF $500,000 WITH FUNDS BEING
APPROPRIATED FROM THE TEQUESTA PENINSULA
CAPITAL PROJECT FUND AND AUTHORIZING THE
VILLAGE MANAGER TO EXECUTE THE APPLICABLE
PROPOSAL ON BEHALF OF THE VILLAGE.
NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE
COUNCIL OF THE VILLAGE OF TEQUESTA, PALM- BEACH
COUNTY, FLORIDA, AS FOLLOWS:
Section 1. The Engineering/Survey Services- in
connection with Tequesta Country Club Drainage
Easements, Phase II, with Reese, Macon &
Associates, Inc., of Lake Worth, Florida, attached
hereto as Exhibit "A" and incorporated by
reference as a part of this Resolution is hereby
approved and the Acting Village Manager of the
Village of Tequesta is authorized to execute the
same on behalf of the Village of Tequesta.
THE FOREGOING RESOLUTION WAS OFFERED by
Councilmember Schauer who moved its
adoption. The motion was seconded by
Councilmember Genco and upon being
put to a vote, the vote was as follows:
FOR ADOPTION
AGAINST ADOPTION
Basil E. Dalack
Geraldine A. Genco
Elizabeth A. Schauer
Sharon D. Walker
• The Mayor thereupon declared the Resolution duly
passed and adopted this 20thh day of July, A.D,
,, 2000
MAYOR OF TEQUESTA
'~~
~.
-;
• Y# ''
n~.
.J
4 i~ („~
oseph N.Capretta
ATTEST:
oann Mangan ello
Village Clerk
Resolution\RMAPhaseII
RMA
• Reese, Macon and Associates, Inc.
June 26, 2000
Village of Tequesta
136 Bridge Road
Tequesta, FL 33469
Attn: Josef Grusauskas, Utilities Director
Re: Tequesta Country Club
Drainage Easement Descriptions
Gentlemen:
EXHIBIT "A"
• We are pleased to submit this proposal for Engineering/ Survey Services in connection with providing
land descriptions of the drainage pipes within the Tequesta Golf Course boundaries. Reese, Macon
and Associates, Inc., hereinafter referred to as the Engineer, shall perform the services as documented
below for the Village of Tequesta, hereinafter referred to as the Client.
SCOPE
The following specific tasks will be performed by the Engineer:
Perform the necessary field work (survey) to define the locations of the pipe outfalls into the
golf course ponds and the interconnecting pipes between the ponds.
2. Prepare eleven (11) land descriptions/sketches of the drainage pipes within the golf course.
3. Provide three (3) sets of land descriptions/sketches for the Village's use in having their legal
counsel review and prepare the documents for recording within the County.
The above scope is predicated on the assumption that the Client shall furnish, at no cost to the
Engineer, utility personnel to assist in locating/exposing drainage structures and pipe, all available
pertinent information including previous reports, plans, specifications, permits, plats, existing survey
information and other data relevant to the performance of the above services for the project. In
•
6415 Lake Worth Road Suite 307 Lake Worth, FL 33463-2907
Telephone (561) 433-3226 Facsimile (561) 433-8011
e-mail: reemac@gate.net
• addition, the Client shall designate, in writing, a person to act as the representative for services
performed under this agreement.
TIME OF PERFORMANCE
The Engineer will commence work within ten (10) days of receipt of an executed authorization.
FEE5
For Scope Items 1 through 3, the Engineer shall be paid according to the following schedule on the
basis of actual time spent plus any applicable sales tax and reimbursement for non-salary expenses
including, but not limited to, automobile travel at $.30/mile, reproduction and long distance
telephone. We estimate the total cost for the services provided under the Scope Items will not exceed
Six Thousand, Six Hundred and Fifty Dollars ($6,650). This amount shall not be exceeded without
prior written approval by the Client.
Project Manager $70.00/HR.
Senior Engineer $65.00/HR.
Engineer/Sr. Technician $55.00/HR.
Designer $SO.OO.HR.
Draftsman $40.00/HIZ.
Technician $37.50/HR.
•
Secretary $25.00/HR.
If services are required in the performance of the above scope, beyond those normally provided by
the Engineer, which must be sublet, the Engineer shall order the work after obtaining the written
authorization of the Client. The subcontractor shall bill the work directly to the Client. If the
Engineer is requested to subcontract the work directly, a 10% handling charge will be added to the
subcontractor's invoice.
Invoices for services rendered are issued on a monthly basis and are due within thirty (30) days of the
invoice date. Interest at a compound rate of one and one-half percent per month shall be charged to
any past due statements. Interest shall be computed on past due statements from the date of the
invoice.
TERMINATION
This agreement may be terminated by either party by giving thirty (30) days written notice. The
Engineer shall be paid for all services rendered prior to the termination date.
• 2
ACCEPTANCE
• Acceptance of this proposal may be indicated by executing this document in the space provided
below. This contract shall be considered void if not executed within thirty (30) days from the above
date. Upon execution of this agreement, the Client shall return one copy to the Engineer.
Accepted By:
VILLAGE OF TEQUESTA
~~~
• By: Joann Manganiell ,
Acting Village Manager
Date: 02 ~, a oo a
tcj0097/99-001
Very truly yours,
REESE, MACON and ASSOCIATES, INC.
-~~~~---
James T. Macon, P.E.
Vice President
• 3
v'' •/ I o- \' I L L H V L U( 1 (_ l„I V [= J I /y
~j.. Opp O <00 E00 FCET
~ `I W
t1
•
,,
•
•
• COUNTRY CLUB COr/11~lUNITY
E;AR SCALE =o
COUNTRY CLU9 DRIVE o I DRAINAGE IMPROVEf/IENTS
RESURFACING ~ ~ JU:vE 1979 p~
• lllllllllllllllllllllllllllllllllllll ll11111111111 I1111111IIIIIII:~1 3111-J 2 4
1'.~~ J'7 .JJ /~J~/~•~"+•/. ~! 1/J ;/!• !w'!/: J((1I'J-•:101 / \~C
-.C.i. ' ~ t . : ~;.:'J~y t~t'.l_v .l.r' GG'~(iT.3 : (. ~ %J~: 1:,.•l.~.T I .%
~ _'~~f COUNTRY ~ i .t ~ 2 J
~ r ~ '' ~ \' 30 21 r. CLUB / / '(J= 7EOUEST:.
/~~. CI n ~ /tar ..
''/~„ ~ ~ i ~ ~ ~ ~ ~ ~ h = I ~ ' '• = ~ I ~ ~ °: '` _ i y.d CIRCLE ,~~
• l~ J1~ ~ I /,: I ; i ~ j ' ~ 1 ~ '; I ~ I ~ ~ Y ^ I `• I ,~ r . '.cY, 1 J~' t `• ...~
•/ .n f:.~P,'h~aY 4 O~..1~~ TH .rSL ! /' I llllJf//~
~ ~~ r1 ~ ~ -~ .~_ rte; rrs ~ ~)I 7 JJ ~~ •.- \~ l~
(In Inlet) wit •,J r.,J ! ~~~~~~~ s. .l: ;t' '/~ ::, ~~~''/ .~ \,
z 1rr ~,- " o~ POND t' S ~ r,r r'' :,s ~ ~ .~' \\\%,-'••~
O _ rte. ~7/.7i' y~ ,Ir ^^`; JJ 'f J~J~'••y. ~•~}~~O~t j \~\~ E):I$i
m ~1 -~,\j3, t \l .1~ i _•1r0 ~n~\T;J fJ '~~- 1•
C
r -'1 rLn J rr IJ,
•J° ,13 'r 7•o r~ (F. G. Inlnlet) ~
.,- ' ~,,~ ~ ,, ..3 ,15... , _L T E Q U E S T Ate'' -~I . f--~---
STRUCTURE r ' j~• ~42~Y~C F ~- ~ l1 '~,~4_ ~ ,
~7~ •:.~:
-C r ~` Cam'-~-~~~ STRUCTURE ~1~'
' '~ ~ }
.~
' ,~ -
''-•~~~ t, ~r - ~ P~. z COUNTRY PorJD~l er,~ •,f , , ~,: ,
.,
~ " 1 a1 Es,ist.2 ~ I
~~ 42"x 29" ` nr '~.- POND°16 -_. _~:. ~ .~,
~ (F. G. In Inlet),. ~`I ( .. `' •. 1 •~J
/ l.. _ --
~ / /9J ~J JJ ~ ~ /J:
/Qe ,J> J \
' O /JJ cr J~ ~ ,Jf rJ /15 ri' f I' J.
~_ x ~ ~ CLUB ''' ,;o POND ;J ~ -B
C ~ .p, JJD rJJJ (:7 rfJ its (:J 17 /J
T J
~ ~ cJ ~_ ill /T/ r:1 y\G' r ~ !'O
42"x29" ~ n1 isi /,( p~ I 'H -~\rr' R rJ 8 .,~ ~ I
,_ m F. G. l s~ A- /~ 1 ri r" ,ri /A '- !'s o -
(In Inlet)!( rf4 „! 4 ~ nj J a by
la ~ j o 0
_ _ .:, s / .~ I t GOLF o ,o, W f-.\r- ~
~,~, ' ~~ 1, r3 rot ti" a a ~.1R' v -
!/i Its t COURSE ,~ ^% rot ,J ~ c co ~
__ it c'';3: IT'r5 ~o1v ~\\ P' ~ LItdITS s +" ~r ~ es ~; ~ >
= '7J J ` ~'r r J11/fit//r JA, o..'. t' a. ~ of 9 d(1 P~ o
/ j~l ~J ~I0/ 1 L~H. - ~L/ 33 ~r s 1 F1 ~.K ~
- m . _. A/,^ ~ ~ ~c^ ~' POND r. `" N :s ~`'-~,~ ~
_ F. G. (In Inlet) e~ ~ ~ ~,~ ? ,r '- ,; " ~ ,,;
7~ CONTROL STRUCTURE ~'.. f\'! '. ~ S'/• •o, "-' L+ '' Jlce
• I fr llLll
LEGEND ~~ ~ ,~/ •'~ m ,~ cs cJIcJ ~
Exist. 24" mss' i•/,
•11----- EXISTING INLET- 6 PIPc 42-x 9 - ~;~ a /ti'•~^ s` ~s ss co s:
w PROPOSED INLET & PIPE ~ ~ `'• a/r' Y/ 3 s( ss °' SLI ss'
A ~ F~ > ST s/ SS S'
~ PROPOSED h1ANHOLE 8 PIPE "~- _ y~ C
~__ - PROPOSED DRAINAGE EASPlt'T. 7~j~ ^ y ~ y3 -~
~~~~ .a ~~6 25
FG. FLAP GATE ~~ J ~ I
1~- ____ ` EXISTING POND ;~~ 36
/ ~/ ~;7
~ (, ~ OND ENLARGEMENT /~~~' -- Y
G/ ./
_('J,JJ %~ SY/ACED AREAS ~~i --=
=liY~/' '
/ ,''','l//'/~~~i. GEE G' JENSOE,T PALNt BEACH'IFLO IDA~~`,F
R 4 ^ E ~ - --._-- --