Loading...
HomeMy WebLinkAboutHandouts_Planning and Zoning_Tab 01_10/17/2019 (2) ��ACN C , 2 October 17,2019 Linda Riccardi,P.E. • 4t'LOR19 Pinder Troutman Consulting,Inc. 2005 Vista Parkway, Suite 111 West Palm Beach,Florida 33411 Department of Engineering and Public Works RE: Lighthouse ArtCenter at Gallery Square North P.O.Box 21229 Project#: 191004 West Palm Beach,FL 33416-1229 Traffic Performance Standards Review (561)684-4000 FAX:(561)684-4050 Dear Ms. Riccardi: www.pbcgov.com The Palm Beach County Traffic Division has reviewed the Lighthouse ArtCenter at Gallery Square North Traffic Impact Statement, revised September 25, 2019, pursuant to the Traffic Performance Standards in Article 12 • of the Palm Beach County Unified Land Development Code(ULDC).The project is summarized as follows: Palm Beach County Board of County Municipality: Tequesta Commissioners Location: NEC of Tequesta Drive and Seabrook Road PCN: 60-42-40-25-10-002-0030 Mack Bernard,Mayor Access: One full access driveway connection onto Tequesta Drive Dave Kerner,Vice Mayor (As used in the study and is NOT an approval by the Hal R.Valeche County through this letter) Gregg K.Weiss Existing Uses: General Commercial=38,647 SF Proposed Uses: Adding 7,645 SF of General Commercial (total of Robert S.Weinroth 46,292 SF) Mary Lou Berger New Daily Trips: 270 New Peak Hour Trips: 5(3/2)AM; 24(11/13)PM Melissa McKinlay Build-out: December 31,2022 Based on the review, the Traffic Division has determined that the proposed development meets the Traffic Performance Standards of Palm Beach County. County Administrator The proposed development does not have significant peak hour traffic impact (as defined in PBC TPS)on the roadway network. Verdenia C.Baker Please note the receipt of a Traffic Performance Standards (TPS) approval letter does not constitute the review and issuance of a Palm Beach County Right-of- Way (R/W) Construction Permit nor does it eliminate any requirements that may be deemed as site related. For work within Palm Beach County R/W, a detailed review of the project will be provided upon submittal for a R/W permit application. The project is required to comply with all Palm Beach County standards and may include R/W dedication. "An Equal Opportunity Affirmative Action Employer" *•p printed on sustainable � and recycled paper Linda Riccardi,P.E. October 17,2019 1� Page 2 • �LOR19P No building permits are to be issued by the Village after the build-out date specified above. The County traffic concurrency approval is subject to the Project Aggregation Rules set forth in the Traffic Performance Standards Ordinance. The approval letter shall be valid no longer than one year from date of issuance. unless an application for a Site Specific DevelopmentOrder has been approved. an application for a Site Specific Development Order has been submitted, or the approval letter has been superseded by another approval letter for the same property. if you have any questions regarding this determination, please contact me at 561- 684-4030 or email QBari@pbcgov.org. Sincerely, Quazi Bari,P.E. Manager—Growth Management Traffic Division QB:HA:rb ec: Ms.Nilsa Zacarias,Village Planner,Village of Tequesta Hanane Akif,E.I.,Project Coordinator II,Traffic Division Steve Bohovsky,Technical Assistant III,Traffic Division File: General-TPS-Mun-Traffic Study Review F:\TRAFFIC\HA\MUNICIPALITIES\APPROVALS120191191004 -LIGHTHOUSE ARTCENTER AT GALLERY SQUARE NORTH.DOCX