Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 12_12/12/2019 Agenda Item #12. Regular Council STAFF MEMO Meeting: Regular Council - Dec 12 2019 Staff Contact: Jeremy Allen, Village Manager Department: Manager TITLE Authorize Contract with REG Architects, Inc. for Architecture and Engineering Services for the Construction of a New Community Center SUMMARY: Architectural and Engineering Services The scope of work for this task includes an approximately 13,500 GSF, one-story Community Center consisting of: Lobby, Wait Area, Fitness Room, Multi-purpose space, Activity Room, Game Room, Offices, Break/Copy Room, Restrooms, Storage and Mechanical/Electrical Room. Limited work at existing park to include the redesign of exterior basketball court and modifications/upgrades to existing exterior park pathways. All tasks will be broken up into typical phases as follows: A.Schematic Design & Site Plan Approval (SD): A complete boundary and topographic/location survey will be conducted. Based on approved Conceptual Design Documents, (see Exhibit B) and any adjustments authorized by the Client, REG shall prepare Schematic Design Documents consisting of site plan and traffic study, preliminary floor plans, elevations, sections and refined computer models (if appropriate) to translate concept drawings to digital format. REG will also prepare, with assistance from client consultant, a set of documents to be submitted to the local municipality for site plan approval. B.Design Development (DD): Based on approved Schematic Design Documents and any adjustments authorized by the Client in the program, REG shall prepare Design Development Documents consisting of drawings and other documents to fix and describe the size and character of the Project as to architectural, structural, mechanical, electrical, plumbing, fire protection, civil, landscape; including obtaining input from REG Consultants, Client, Client's Representative and Client's Consultants. C.Construction Documents (CD): Based on approved Design Development Documents and any other adjustments to the scope approved/authorized by the Client, REG shall prepare, for approval by the Client, Construction Documents consisting of drawings and note form specifications setting forth in detail the requirements for construction of the project including obtaining input from REG Consultants, Client's Representative and Client's Consultants. Three copies of the completed plans as well as electronic versions will be distributed. D.Bidding and Permitting (BP): For the Bidding and Permitting phase of the project, REG shall assist the Client and Client's Representative in obtaining bids or negotiated proposals. The architect shall provide (3) full sets of Construction Documents necessary for permitting to the Client, Client Representative, or selected General Contractor for issuance to the local building department for review. The Architect shall not be responsible for any permitting / review applications or fees. E. Construction Administration (CA): Page 185 of 294 Agenda Item #12. The Construction Administration Phase shall consist of regularly scheduled monthly site visits for job site meetings, site observations, and shop drawing review. Monthly field reports shall be provided based on-site observations. Please note, construction Administration does not include any site inspections, field testing, special inspections, or changes to the project scope or plans; however, threshold inspections are included. Proposed Fees: It is our intent and suggestion to continue with each of the tasks of the project consecutively in order to meet the project's schedule. Outstanding deposits/balances must be paid prior to the start of work for the next phase. The following fees are reflective of a standard design-bid-build method of project delivery and are subject to change if another project delivery method is used. Architectural & Engineering Services FEES A.Survey, Schematic Design & Site Plan Approval Phase $59,950.00 B.Design Development $84,660.00 C.Construction Document Phase $134,000.00 D.Bidding & Permitting Assistance Phase $17,600.00 E.Construction Administration & Special Inspection $56,450.00 Total for Task I. (A.-E.) $352,660.00 In addition to these task fees, please allow an additional five percent per task for reimbursable expenses. Exclusions: Programming, MultiplePreliminaryDesigns, MarketingMaterial, ExistingFacility As-Builts, Environmental Reports, NOA Submittals, Building Information Modeling (BIM), Energy Modeling, Historic Preservation, Low Voltage System Design (Audio/Visual, Telecommunications/Data), Lighting Design, Acoustical Design, Security Design, Food Service Design, Pool/Fountain Design, Interior Design/Decorating, As-Constructed Record Drawings, Detailed Cost Estimating, LEED Certification, On-Site Project Representation (above what is stipulated in scope of work), System Commissioning, Field Testing, and Special Inspections. POTENTIAL MOTION / DIRECTION REQUESTED: Authorize Contract with REG Architects, Inc. for Architecture and Engineering services for the construction of a community center. ATTACHMENTS: REG Proposal Page 186 of 294 Agenda Item #12. Page 187 of 294 Agenda Item #12. Page 188 of 294 Agenda Item #12. Page 189 of 294 Agenda Item #12. Page 190 of 294 Agenda Item #12. Page 191 of 294 Agenda Item #12. Page 192 of 294