Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 25_8/13/2020Agenda Item #25. Regular Council STAFF MEMO Meeting: Regular Council -Aug 13 2020 Staff Contact: Matthew Hammond, Utilities Director Department: Utilities RESOLUTION 23-20, A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, FLORIDA, AMENDING AND INCREASING THE 2019/2020 STORM WATER UTILITY FUND #403 BUDGET BY APPROPRIATING FUND BALANCE IN THE AMOUNT OF $3751000.00 TO FUND EMERGENCY STORM WATER PIPE REPAIRS Amending and increasing the 2019/2020 Storm Water Utility Fund #403 Budget o fund emergency storm water pipe repairs. POTENTIAL MOTION- • - • Approve amending and increasing the 2019/2020 Storm Water Utility Fund #403 Budget o fund emergency storm water pipe repairs. 20200813-EMERGENCY STORMWATER PIP REPAIRS -RESOLUTION 23-20.ADA 20200813-EMERGENCY STORMWATER PIP REPAIRS-CIPD SHEET.ADA Page 419 of 451 Agenda Item #25. RESOLUTION 23-20 A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, FLORIDA, AMENDING AND INCREASING THE 2019/2020 STORM WATER UTILITY FUND #403 BUDGET BY APPROPRIATING FUND BALANCE IN THE AMOUNT OF $375,000.00 TO FUND EMERGENCY STORM WATER PIPE REPAIRS; PROVIDING AN EFFECTIVE DATE; AND FOR OTHER PURPOSES. WHEREAS, between May 22, 2020 and June 7, 2020 the Village received over twenty inches of rainfall; and, WHEREAS, the extremely high quantity and intensity of rainfall over this period overwhelmed several storm water systems causing closures of roadways and pathways and creating depressions within both Village right-of-ways and on private property; and, WHEREAS, to address these issues, Village Council authorized the replacement and/or lining of sixteen segments of failed storm water piping throughout the Village; and, WHEREAS, the following accounts will be increased to fund the repairs: Revenues Appropriate Fund Balance, 403-990-399.999, $375,000-00 Expenditures Drainage Improvements, 403-411-663.663, $375,000-00; and, NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AS FOLLOWS: Section 1: Resolution 23-20 amending and increasing the 2019/2020 Storm Water Utility Fund #403 Budget by appropriating fund balance in the amount of $375,000.00 to fund emergency storm water pipe repairs is hereby approved; Section 2: This Resolution shall become effective immediately upon passage. Page 420 of 451 Agenda Item #25. F 7'-Vo? +r cold CAPITAL IMPROVEMENT PROJECT DETAIL PROJECT Project Name: Emergency Stormwater Repairs Project Manager: D Tinoco Department: Utilities Original Plan Date: FY20 Location: Stormwater Collection System Between May 22, 2020 and June 7, 2020 the Village received over 20 inches of - w, rainfall. The extremely high quantity and intensity of rainfall over this period IVY overwhelmed several stormwater systems throughout the Village. The tremendous amount of precipitation over a short period of time saturated local soils and mobilized' the sandy soils surrounding failing stormwater pipes creating voids that resulted in the ` closure of roadways and sidewalks as well and depressions within Village right -of ways and on private property. To address these failures two emergency authorizations to replace or line sixteen (16) segments of failed stormwater piping were approved at a June 15, 2020 Special Council Meeting.AR _ =. t s ~ xY h'*3� _ A �iC�j{y& C� L _t +�� • fk — � 4 k OR r n t} "Y � 3 g,'Aw ;W ,- JSi,?.kn.e....W.S...nRi w.."...sr,.,..1.,e..'YY..+. i:•__,. J.. _ " - ' - .?_..... .. _::'.+S PROJECT EXPENDITURES FUNDING SOURCES: PROJECT COSTS: FY20 FY21 FY22 FY23 FY24 FY25 Land/Easement Acquisition Engineering & Planning Construction 375,000 Equipment TOTAL PROJECT COSTS 3753000 - - - - SOURCES OF FUNDS: FY20 FY21 FY22 FY23 FY24 FY25 General Fund - Dept Name (001) Water Enterprise Fund (401) Stormwater Enterprise Fund (403) 375,000 Unfunded TOTAL PROJECT REVENUE 375,000 - - - - Note: A reduction in repair and maintenance costs is anticipated as a result of this project. OPERATIONAL IMPACT FY20 FY21 FY22 FY23 FY24 FY25 Additional Revenues/Savings Charges for Services Other Revenues Less Additional Expenditures New Personnel Maintenance and Other Operating Contracts & Leases