Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 14_11/12/2020 Agenda Item #14. Regular Council STAFF MEMO � Meeting: Regular Council - Nov 12 2020 Staff Contact: Matthew Hammond, Utilities Department: Utilities Director A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, FLORIDA, ADOPTING A REVISED SCHEDULE OF FEES AND CHARGES FOR THE PROVISION OF WATER SERVICES RENDERED BY THE VILLAGE OF TEQUESTA FOR ITS CITIZENS AND OTHER MEMBERS OF THE PUBLIC; PROVIDING THAT THIS REVISED SCHEDULE OF FEES AND CHARGES SHALL BE AVAILABLE FOR INSPECTION AT ALL TIMES AT THE VILLAGE HALL DURING REGULAR BUSINESS HOURS; PROVIDING AN EFFECTIVE DATE; AND FOR OTHER PURPOSES. At the August 13, 2020 Regular Council Meeting the Village Council approved a Purchase Sale Agreement with Wesley Oldham for the purchase of the potable water main on Harbor Road N constructed by Mr. Oldham during 1980's at a pro-rated cost of the remaining life of the asset. This agreement has been fully executed and effectuated. Proposed Resolution 42-20 formally adopts a revised schedule of fees and charges relating to the provision of water services rendered by the Village of Tequesta by incorporating a Special Distribution Line Charge for the remaining unconnected properties/structures on Harbor Road N not specifically excluded in the Purchase Sale Agreement. The proposed Special Distribution Line Charge of $2,462.27 is a substantial savings to the affected properties from the charges required under the previous arrangement. The monies collected from this Special Distribution Line Charge, which is in addition to any other new service charges required, will reimburse the Water Enterprise Fund for the purchase price of the water main. POTENTIAL MOTION DIRE ON REQUESTED: Approval of Resolution No. 42-20 ATTACHMENTS: 0111r� Utility Fee Schedule Adopting Resolution Exhibit A Water Rate Revisions Page 327 of 478 Agenda Item #14. RESOLUTION NO. 42-20 A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, FLORIDA, ADOPTING A REVISED SCHEDULE OF FEES AND CHARGES FOR THE PROVISION OF WATER SERVICES RENDERED BY THE VILLAGE OF TEQUESTA FOR ITS CITIZENS AND OTHER MEMBERS OF THE PUBLIC; PROVIDING THAT THIS REVISED SCHEDULE OF FEES AND CHARGES SHALL BE AVAILABLE FOR INSPECTION AT ALL TIMES AT THE VILLAGE HALL DURING REGULAR BUSINESS HOURS; PROVIDING AN EFFECTIVE DATE; AND FOR OTHER PURPOSES. WHEREAS, the Village Council of the Village of Tequesta, Florida, desires to adopt a revised schedule of fees and charges relating to the provision of water services rendered by the Village of Tequesta for the citizens of the Village of Tequesta, Unincorporated Martin County, Unincorporated Palm Beach County, and the Town of Jupiter Inlet Colony and for other members of the public; and WHEREAS, the Village Council desires to incorporate all such fees and charges assessed in accordance with Section 74-61 of the Code of Ordinances into one comprehensive fee schedule; and WHEREAS, the Village Council desires to make certain the schedule of fees and charges are available for inspection such that any member of the public may be aware of the cost of each and every service provided by the Village of Tequesta's Utility Department. NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA,AS FOLLOWS: Section 1: The Village Council of the Village of Tequesta, Florida, hereby officially adopts the Schedule of Fees and Charges attached hereto as "Exhibit A" which is hereby made part hereof as if fully set forth herein. The revisions adopted herein create a new special charge category for new service connections on Harbor Road North in unincorporated Palm Beach County. Section 2: This duly adopted Schedule of Fees and Charges shall be available at the Village Hall for inspection by the public during normal business hours. Section 3: This Resolution shall take effect immediately upon adoption. Page 328 of 478 Agenda Item #14. Exhibit "A" Village of Tea uesta Water Utilities Fees andCharges 1. Monthly Water Service Charges e � A. Residential and Non-Residential Rate Schedule-Base Facilities Charges - The Base Facilities Charge is the minimum monthly charge and is based on meter size and monthly billing period as follows: Base Facilities Charge Table Meter Size: Amount 5/8" or 3/4" $19.67 1" $49.11 1.5" $98.46 2" $157.21 3" $294.77 4" $491.23 6" $982.50 B. Metering of Multi-family Buildin (M.F.j - Where a single meter is installed in a water connection serving a multi-family structure, the minimum monthly service charge shall be the greater of i) an amount equal to the number of dwelling units multiplied by the minimum charge for a 5/8 inch meter, or ii) the base facilities charge for the installed meter size. In the event there is a single meter measuring quantities of water for two (2) or more residential units, the gallons measured and charged pursuant to the terms of this section shall be prorated by dividing the total number of gallons metered by the number of units included on the single meter. C. Metering of Multi-Unit Buildings - Non-Residential - In the case of any non- residential multi-unit building housing more than one (1) business or entity, each business or entity therein shall be metered individually. Monthly minimum service charges shall be based on the established charge by meter size. Where an existing single meter is installed in a water connection serving two (2) or more businesses or entities, the minimum monthly service charge shall also be based on the established charge by meter size. Fire protection charges for fire lines shall be separately included; see paragraph number 2 herein below. Page 329 of 478 Agenda Item #14. D. Quantit3: Rate Charges for Residential and Non-Residential Rate Schedule - Applicable to all quantities of water shown by meter readings to have been delivered as follows: Quantity Step Rate Table Per 1,000 gallons or fraction Amount thereof Step 1 $3.12 Step 2 $5.25 Step 3 $7.13 Step 4 $9.14 Gallonage Allowance per Quantity Step Rate Table Meter Size Step 1 Step 2 Step 3 Step 4 3/4" 1 - 12,000 1201 -2500 251001 -401000 Above 40,000 1" 1 - 3000 3001 - 621000 6201 - 1009000 Above 100,000 1.5" 1 - 6000 60,001 - 12500 125,001 -20000 Above 200,000 2" 1 -9600 9601 -2001000 20001 - 32000 Above 320,000 3" 1 - 18000 1805001-3751000 37501 - 60000 Above 600,000 4" 1 - 30000 30001 - 62500 6251001 - 1100000 Above I MKI000 6" 1 - 60000 60001 - 112501000 112501001 -2100000 Above 2,000,000 2. Fire Protection Charge A. Monthly Charge- See Section 74.63,Village Code of Ordinances Within the Village.............................................$1.3 0 monthly Outside the Village............................................$1.3 0 monthly B. Private Fire Connections - * The following monthly service charges shall apply to private fire lines for sprinkling systems or other fire protection systems: Meter Size Amount 2" $12.49 3" $28.54 4" $51.73 6" $124.89 8" $214.05 10" $279.07 * No taps will be allowed which may be used for other than fire protection purposes; and there shall be no connection with any other source of water. Page 330 of 478 Agenda Item #14. 3. Meter Installation Charge - All water meters shall be installed by the Village of Tequesta, and the charge for making such meter installations or replacement of a meter of a different size upon request of the customer shall be as follows (all meters installed remain the property of the Village): A. Meter Installation Only Meter Size Amount 3/4" $281.57 1" $316.79 1.5" $633.54 2" $967.91 Above 2" Actual Cost Plus 10% B. Meter Installation with Water Main Tap (includes service line- maximum 100 LF) Meter Size Amount 3/4" $844.74 1 If $1 M03.12 1.5" $11337.49 2" $206.19 Above 2" Actual Cost Plus 10% 4. Interrupted Service Charges A. Meter Turn-On/Account Service Fee - (New Accounts).$44.10 B. Meter Turn-On or Turn-Off; Customer Request- (vacation or close-out of account) During business hours......................................... $26.3 8 Non-business hours.....................................................$56.53 C. Meter Turn-Off; for Non-Payment- 4x min. monthly service charge for the specific meter D. Transfer of Service............................................................. $17.59 5. Capital Connection &Special Charges SA. Capital Connection Charge Meter Size Water 3/4" $31470.86 ill $81677.06 1.5" $171354.14 2" $271766.59 3" $521062.90 4" $861771.48 6" $1731542.97 Page 331 of 478 Agenda Item #14. B. Special Distribution Line Charge—Harbor Road North New service connections on Harbor Road North in unincorporated Palm Beach County shall be required to pay a Special Distribution Line Charge of$2,462.27 per connection. This special charge shall be in addition to any other new services charges required. 6. Security Deposits Meter Size Amount 3/4" (adjust per index) $114.38 P (3x month Service Charge) $147.33 1.5" (3x month Service Charge) $295.37 2" (3x month Service Charge) $471.63 3" (3x month Service Charge) $884.30 4" (3x month Service Charge) $11473.68 6" (3x month Service Charge) $2,947.49 7. Interest on Deposits.- See Section 74-68.,Village Code of Ordinances. 8. Meter or Hydrant Re-location for Customer's Convenience- Actual cost plus 10% of all related charges. See Section 74-69., Village Code of Ordinances. 9. Emergency Bulk Water Service Rate,per 1,000 gallons.... o s*o o o s see o so o so **.$2.55 10. Capacity Reservation Fee(monthly per ERU1... ... .. ... .. ........... ..... ...... .......$11.92 11. Water Restriction Surcharge Adjustment.- See Section 74-74., Village Code of Ordinances. 12. Excessive Variance Step Adjustment - The Utility Director may approve an excessive usage credit (EUC) to a water bill, which, due to circumstances beyond the customer' s control (e.g. leaks on the customer' s side of the meter), reflects consumption in an amount that is at least two times the customer's average monthly usage over the previous three (3) month period No customer shall be eligible for such an adjustment more than once per three (3) calendar year period. No such adjustment shall be granted in the event that the adjustment would cause a violation of Village Code Section 74-78 regarding prohibited free service, or Village Code Section 74-81 regarding the provision of adequate revenue to cover all costs of operation, maintenance and debt service. Any downward adjustment shall be made based on the Village's then current step rates. The lowest step rate that results in an adjusted water bill commensurate with the customer's average water bill over the previous three (3) months of billing shall be applied. In the event that application of the lowest step rate results in an adjustment that continues to exceed an amount that is double the customer's average water bill over the previous three (3) months of billing, then an adjustment equal to an amount equivalent to double the customer' s average water bill over the previous three (3) months of billing shall be made. The Utility Director shall determine that the customer meets each of the following criteria prior to approving any EUC: • Customer notifies the Village of Tequesta's Customer Service Department of an excessive water bill that may be related to a leak or other circumstance beyond Page 332 of 478 Agenda Item #14. the customer's control. • Water consumption exceeds two times the customer's average monthly usage over the previous three (3) month period. • Customer acted promptly to remediate excessive water use (e.g. had leak on Customer's side of the meter repaired as soon as practicable) as documented by repair receipts or other acceptable methods. • The request for EUC was made within 1 month of the remedial action. No EUC may be approved where any of the following circumstances exist: • Excessive consumption is due to seasonal usage such as watering of sod, gardening, or usage from filling swimming pools and hot tubs whirlpools , or washing vehicles, etc. • A leak resulting in excessive consumption was caused by a third party from whom the customer is able to recover their costs. Examples include. but are not limited to, theft, vandalism, negligence and construction damage, including unoccupied or vacant properties. • When excessive consumption continues for two (2) or more months, there will be no adjustment for the second or subsequent months. • The meter has been accessed, tampered with, or turned on/off by anyone other than a Village of Tequesta Utility employee and that action results in excessive consumption. • The EUC would violate Village Code Sections 74-78 or 74-81. • A EUC was approved within the past three (3) calendar years at the same property. Notwithstanding the above provisions of this Excessive Variance Step Adjustment policy, the Village Manager may, from time to time, allow for step adjustments in excess of once per three (3) calendar years at the same property when extenuating circumstances exist that warrant the granting of relief. All such requests shall be reviewed on a case- by-case basis. Any relief granted by the Village Manager pursuant to this provision shall be limited to the same relief that would otherwise be available pursuant to the above EUC policy. 13. Miscellaneous Fees and Charges A. Returned Check - $25.00 if the face value does not exceed $50.00; $30.00 if the face value is more than $50.00 but does not exceed $300.00; $40.00 if the face value is more than $300.00. B. Late Payment Fees - 1% of outstanding delinquent amount with a minimum charge of$5.00. C. Past Due Amounts on Disconnected Service-A 1%per month penalty will be charged on all past due amounts after discontinuance of service plus any and all costs associated with securing collection of the past due amount. Page 333 of 478 Agenda Item #14. D. ....................................................... $17.59 Meter Tests E. 3/4" $79.23 l"------.....-------...------------_....---- $98.80 i5" $114/40 2"...........................................................................$l50.37 F. Field Premise Visit Duringbusiness hours............................................$26.3@ houra...see....~.......~~~~~~......~~.......~$5G.5 3 G. Line Location Services.******** $70.41 H. Plan Review............3Y6ofthe construction cost $150.00ndnimum l. .............................................. $100.87 J. Personnel & Equipment Charj!es Field Technician*............................................$4O.00/hoor Lead Technician*............................................$50.00/hoor Medium ---....---.----.$45.OU/hoor Heavy Equipment -----.--------.$8O.00/hour Materials-----------.-------��uLualCost *Includes use oJ pickup' {ouck- buoJiools, nodoozal equipment. All labor charges incurred outside of Regular Business Hours will bc charged at 1.5 times the hourly rate. 14. Tampe A. Removal charge..............................................................$/23.g4 B. Re-installation charge 3/4" $309.75 l" ur Larger ................................................Actual Cost C. Destruction ofmet*rrmXated equipment (1) Assessment for replacement of meter or meter related equipment (2) A minimum of$28.50udndnistrutb/c charge per occurrence 15. 2596 surcharge on monthly rates, fees, and charges except for those set forth at Section l3.C. will be imposed for all customers located outside the corporate limits of the Village. 18. See Sections 74-72 uod74-73" Village Code of Ordinances. Page 334 of478