Loading...
HomeMy WebLinkAboutAgreement_General_3/12/2020_Kimley-Horn345 Tequesta Drive TeciuRsta, FL 33469 Tequesta Public Works Department Memorandum To: Jeremy Allen, Village Manager From: Douglas M. Chambers, Director Public Works Subject: Country Club Drive Sidewalk Project Phase I 561-768-0700 www.tequesta.org Date: February 28, 2020 This Agenda item references replacing approximately 4,300 linear feet of existing 6' wide asphalt sidewalk and 39 driveway approach aprons with concrete on the east side of Country Club Drive from Eastwinds Circle to the Village limits at the Tequesta Martin County Line. Kimely Horn and Associates will provide professional engineering services. They will prepare a site survey for Phase 1 and delineate the easterly right of way and establish elevations. They will provide as needed technical and field services during the construction phase. Kimley Horn will provide a post construction certification letter upon review of the project confirming the new sidewalk meets ADA requirements. The Village Council approved a contract for pathway and minor construction services on July 11, 2019 with Wynn and Sons Environmental Construction Vice -Mayor Kristi Johnson Mayor Abby Brennan Council Member Vince Arena Council Member Laurie Brandon Village Manager Jeremy Allen Council Member Kyle Stone Company Incorporated. Wynn and Sons provided a proposal for Phase 1 based on contract rates in the amount of $265,175.00. The Village will issue a permit and purchase order to Wynn and Sons in the amount of $240,953. The Village will retain $24,222.00 in contingency for unforeseen conditions. The Village of Tequesta will issue a purchase order in the amount of $24,300 to Kimley Horn for professional engineering services. The total cost of this project is $289,475.00. Funding for this project will be shared by the Public Works and Storm Water Departments. The Public Works Department will provide funding in the amount of $211,774.00 in the Sidewalk and Pathway Capital Fund. The Utility Department will provide funding in the amount of $77,701 in the Stormwater Enterprise Fund. The project will start in mid May 2020 and take approximately 45 days to Completion. Douglas Chambers Director Department of Public Works Land/Easement Acquisition Equipment General Fund- (001) 210-546.350 Roads Note: No additional operating costs are expected as a result of this project NET ANNUAL IMPACT ON ws TOTAL OPERATING FUNDING VILLAGE OF TEQUESTA ENGINEERING SERVICES WORK AUTHORIZATION COUNTRY CLUB DRIVE IMPROVEMENTS — PHASE 1 This Work Authorization authorizes Kimley-Hom and Associates, Inc. to perform work set forth herein and is issued pursuant to The Professional Engineering Services Agreement, between the Village of Tequesta ("Client" or "Village's and Kimley-Hom and Associates, Inc. ("Kimley- Hom" or "Consultant"), dated May 12, 2016 ("Agreement"). All terms and conditions of said Agreement are hereby incorporated and made part of this Work Authorization. PROJECT UNDERSTANDING The Village desires to replace approximately 7,8001-F of existing and deteriorated asphalt sidewalk that runs along the westerly/northerly right of way of Country Club Drive will be implementing improvements within the Country Club Drive corridor from Tequesta Drive to the Palm Beach/Martin county line to improve safety and function for the residents. The existing asphalt sidewalk will be replaced with a new concrete sidewalk meeting American Disabilities Act (ADA) Standards. For budget management purposes, the planned improvements will be completed in two (2) phases as outlined below; Phase 1- Consists of approximately 4, 300LF, from Eastwinds Circle to the Palm Beach/Martin County line. Phase 2 - Consists of approximately 3,500LF, from Eastwinds Circle to Tequesta Drive. This work authorization will be for the Phase 1 improvements. Work within Phase 1 does not have any utility conflicts and will consist of the replacement of the existing asphalt sidewalk with a new concrete sidewalk in the same general location. The new concrete sidewalk will address ADA requirements. Existing driveway aprons (there are 33 within Phase 1) will be replaced as required to accommodate any changes due to the sidewalk grading required to meet ADA requirements. Replacement of any driveway apron will be determined in the field jointly with the Village, Contractor and Consultant. For Phase 1 services, the Consultant will not be preparing any design plans. Phase 2 of these improvements outlined above, will also include the replacement of a Village owned 8-inch asbestos cement water main installed under the sidewalk within this corridor. This work is planned for FY2021, and the Consultant will provide a separate work authorization for Phase 2 related services at that time. SCOPE Kimley-Hom will perform the following services: 1. Prepare a site survey of the corridor within Country Club Drive known as Phase 1, from Eastwinds Circle to the Palm Beach/Martin County line as outlined below; • Delineate the easterly right of way/property line • Establish NAVD 1988 benchmarks on -site. • Within the easterly right of way, locate above ground visible improvements and above ground evidence of utilities. • Obtain rim and invert elevations of the single drainage structure in this corridor. • Obtain elevations on existing driveways at edge of pavement, middle of driveway (swale) and front of sidewalk. 2. Provide as -needed technical and field services during the construction phase of the Phase 1 project to include field review with the Village and Contractor prior to construction commencement, field review of Contractors form boards prior to placement of sidewalk/driveway concrete and be available for questions during construction. 3. Provide a post -construction certification letter upon review of Contractor record drawings that the new sidewalk meets ADA requirements. ADDITIONAL SERVICES Any services not specifically provided for in the above scope, as well as any changes in the scope requested by the Village, will be considered additional services to this Work Authorization and will be performed based on subsequent Work Authorizations approved prior to performance of the additional services. INFORMATION AND SERVICES PROVIDED BY THE VILLAGE Kimley-Hom assumes that all information provided by the Village can be relied upon in the performance of professional services. The following information shall be provided to Kimley- Horn and/or the following services will be performed by the Village. Construction Contractor scope of services and costs Available Country Club Drive record drawing information DELIVERABLES The Consultant will provide the following deliverables for this project; 1. Site survey 2. Email responses to Village and Contractor requests 3. Consultant inspection reports/photos 4. Post -construction certification letter SCHEDULE Kimley-Horn will complete the work set forth under Scope Item No. 1 within 45 days after receipt of an executed Work Authorization and Purchase Order, exclusive of delays beyond the control of the Consultant. For Scope Items 2 and 3, Kimley-Horn will complete the Work described herein commensurate with the contractor's construction schedule. COMPENSATION Kimley-Hom will perform the services described in the Scope of Services (Items 1 thru 3 above) on an hourly basis with a not to exceed amount of Twenty-four thousand three hundred dollars ($24,300.00) in accordance with the hourly rates established in the Professional Engineering Services Agreement between the Village and Kimley-Horn. Accepted by: Village of Tequesta Je �ey Allen, Village Manager Date: X2 6 -A o Kimley-Hom and Associates, Inc. lop, Michael F. Schwartz, P.E., Sr. Vice President WYNN & SONS ENVIRONMENTAL CONSTRUCTION CO. INC. WEST PALM BEACH,FL. 33411 Village of Tequesta Estimate 10/30/2019 3754 Ship To COUNTRY CLUB DRIVE SIDEWALK REPLACEMENT EAST WENDS TO "TOWN LINE ALI, ITEMS PER PBC ANN, UIAL CONTRACT 2017-055 8-005 REMOVE EXISTING ASPHALT PER SY PER INCH LIFT 9,574 1.00 9,574.00 8-006 REGULAR EXCAVATION PER CY 212 5.00 1,060.00 8-010 FINISH GRADING PER SY 3,191 3.00 9,573.00 8-124 CONCRETE SIDEWALK (47 THICK) 50 SY OR GREATER PER SY 3,191 40.00 127,640.00 8-127 CONCRETE SIDEWALK (6- THICK) (DRIVEWAY) 35 SY OR 416 49.00 20,384.00 GREATER PER SY 8-128 CONCRETE SIDEWALK (6- THICK) (ADA RAMPS) PER SY 78 5T00 4,446.00 8-129 CAST -IN -PLACE AND/OR SURFACE APPLIED TACTILE 117 18.00 2,106.00 SURFACE PER SF 8-040 REMOVE PAVER BRICK PER SY 60 75.00 4,500.00 8-041 RESET PAVER BRICK PER SY 60 125.00 7,500.00 8-154 ROOT PRUNING (0"-36" DEEP) PER LF 423 10.00 4,230.00 8-145 SODDING (TO MATCH EXISTING) PER SY 1,625 4.00 6,500.00 39 DRIVE APRONS 8-127 CONCRETE SIDEWALK (6- THICK) (DRIVEWAY) 35 SY OR 780 49.00 38,220.00 GREATER PER SY 8-005 REMOVE EXISTING ASPHALT PER SY 2,340 1.00 2,340.00 8-006 REGULAR EXCAVATION PER CY 108 5.00 540.00 8-010 FINISH GRADING PER SY 780 3.00 2,340.00 w I CONTINGENCY FOR UNFORSEEN CONDITIONS 1 11 24,222.001 24,222.00 Total $265,175.00