HomeMy WebLinkAboutHandout_Workshop_3/29/2021 1 /main 01 - jupiterus1bridge 52 - 2 - /projects/ www.fdot.gov 1 Bridge Replacement Project From CR A1A to CR 707 - USPalm Beach CountyFinancial Project ID 428400Village of Tequesta Public WorkshopMarch 29, 2021Project Website: https:// 1 Bridge Replacement Project from CR A1A to CR 707 - US - Florida Department of Transportation 1 Bridge Replacement Project from CR A1A to CR 707 - US 2 Bridge Alt A1A - 1 Bridge - Aquatic Preserve Lake Worth Creek US Loxahatchee River 1 Bridge Replacement Project from CR A1A to CR 707 - US - ŷ Ʒ Ʃ ƚ b Florida Department of Transportation 1 Bridge Replacement Project from CR A1A to CR 707 - detour Intersection - Project Overview & NeedReplacement Bridge Features Chosen Construction ApproachPreImprovements & Traffic ManagementEnvironmental ConsiderationsBridge AestheticsStakeholder EngagementUpdate on Project Status & Schedule US 3 Harbour Jupiter Restaurant 1000 North 1 Bridge Replacement Project from CR A1A to CR 707 - US Jupiter Inlet Village - 10 feet from Bridge - Adjacent Properties and Features Jupiter Cove Condominium Building Florida Department of Transportation ŷ Ʒ Ʃ ƚ b > 900 feet from Bridge Jupiter Inlet Lighthouse 4 1 Bridge Replacement Project from CR A1A to CR 707 - US - Project Need Florida Department of Transportation Structural deficiencies of the existing bridge built in 1958Lack of facilities for pedestrians and bicyclistsSubstandard horizontal and vertical clearances at the navigable waterway channel Replacement of the existing bridge is needed to address the following: 5 similar to existing bridge 1 Bridge Replacement Project from CR A1A to CR 707 - US - Proposed Replacement Bridge Florida Department of Transportation Views of existing and new bridge from Sawfish Bay ParkNew bridge includes twin double leaf bascule span 6 New bridge south approach spans 1 Bridge Replacement Project from CR A1A to CR 707 - US - Proposed Bridge Appearance Existing bridge south approach spans Florida Department of Transportation Cleaner appearanceLess viewshed obstructionBridge piers placed to improve channel flow and reduce shore erosion 7 - - - Existing Proposed 1 Bridge Replacement Project from CR A1A to CR 707 - - US - - Bridge Typical Sections Florida Department of Transportation Quieter Improved ride for vehicles, bicyclists, and motorcyclists Separated 8 ft pedestrian sidewalks on both sides 8 ft shoulder with 7 ft buffered bicycle lane on both sides Solid bridge deck 8 1 Bridge Replacement Project from CR A1A to CR 707 - US - Bridge Configuration Florida Department of Transportation 9 Proposed Bridge Navigational Clearances 1 Bridge Replacement Project from CR A1A to CR 707 - US - Improved Navigational Clearances Existing Bridge Navigational Clearances Florida Department of Transportation 10 1 Bridge Replacement Project from CR A1A to CR 707 - US - Bridge Aesthetics Florida Department of Transportation Conducted seven Bridge Aesthetics Committee (BAC) meetingsBAC provided input and direction for bridge aesthetics ŷ Ʒ Ʃ ƚ b 11 1 Bridge Replacement Project from CR A1A to CR 707 - US - FDOT R/W way constraints - of - Bridge Construction Approach : used during demolition of existing bridge and construction of new bridge. due to right Florida Department of Transportation construction methods were evaluated to replace the bridge Not feasible Temporary Bridge 1. Three 12 Half Existing Bridge Section Waterline 2 - Remove Half ExistingFoundation Phase 1 - Existing Bridge Foundation Remove Half Existing Bridge Phase 1 Bridge Replacement Project from CR A1A to CR 707 - US - traffic on other half no Remove half of the Bridge Construction Approach 129M $ - Florida Department of Transportation increase in impacts to vehicular traffic during 4 months detour during removal operation Removal of half existing bridge with Removal of half of existing bridge foundationhalf of existing bridgeExtended closures, unplanned detours, and construction delays Significant risk for longer duration 30 months of two lanes of traffic on half of existing bridge60 months total construction duration Risk of existing bridge settlement/malfunctionMinimumSignificantexisting bridge openings Conventional Phased Construction: 2. bridge leaving one lane in each direction while constructing half of the new bridge.Construction cost estimate 13 all four lanes of and install Intelligent 1 Bridge Replacement Project from CR A1A to CR 707 construction method for this project - US - Preferred The intersection improvements Bridge Construction Approach Construct remaining half of new bridge Construct half of new bridge - Phased Construction Implement Construct as much of new bridge as possible with -- Florida Department of Transportation on existing bridge Hybrid Southbound Half of New Bridge detour detour -- PreTransportation Systems featuresPretraffic 20 month detour Detour complete 42 months total construction duration (compared to 60 months with Option 2) 3. Hybrid Phased Construction: is removing the existing bridge in its entirety and detouring traffic to Alt A1A 1414 Rendering of new bridge 1 Bridge Replacement Project from CR A1A to CR 7071 Bridge Replacement Project from CR A1A to CR 707 -- USUS -- ŷ Ʒ Ʃ ƚ b Hybrid Phased Construction of existing bridge settlement and extended unplanned detours 133M $ - reduces risk Florida Department of Transportation Florida Department of Transportation Avoids delicate removal of half existing bridgeSignificantly Expedites new higher bridge with two lanes and 44% less openingsAccelerates construction of bicycle & pedestrian facilities and left turn lane to CR A1AImproves work zone mobility and safetyReduces total construction duration by approximately 18 months Plan view of new bridge Benefits of Hybrid Phased ConstructionConstruction cost estimate 1 at SR 706 - US 1515 INTERSECTION IMPROVEMENT 3 INTERSECTION IMPROVEMENT 1 1 at Beach Rd/Alt A1A at Old Dixie Hwy - US ALT A1A at SR 706 INTERSECTION IMPROVEMENT 2 1 Bridge Replacement Project from CR A1A to CR 7071 Bridge Replacement Project from CR A1A to CR 707 -- USUS -- Florida Department of Transportation Florida Department of Transportation 1 at Beach Rd/Alt A1A1 at SR 706 -- USAlt A1A at Old Dixie HwyAlt A1A at SR 706 US Intersection Improvements & Traffic Management Mitigate community impacts during detourIntersection improvements along detour routeConducted detailed traffic studies at following intersections:New Intelligent Traffic Systems features along detour routeTraffic management to maintain mobility during construction in coordination with Palm Beach County 1616 1 Bridge Replacement Project from CR A1A to CR 7071 Bridge Replacement Project from CR A1A to CR 707 -- USUS -- ) MVDS Intelligent Transportation Systems for all signals within detour route: Florida Department of Transportation Florida Department of Transportation 1 for the NB and SB approach to the bridge - Intelligent Transportation System Improvements Permanent Provide Palm Beach County with real time travel time information for distribution to the publicReal time view of the project corridor to detect traffic incidents that may cause a lane blockageLane by lane traffic data for optimize traffic signal timingProvides information such as lane blockage information, travel time information as well as the status of the drawbridge along US Bluetooth travel time devicesClosed Circuit Television (CCTV) Cameras Microwave Vehicle Detection System (Dynamic Messaging Sign (DMS)FDOT SMART Work Zone Proposed 1717 1 Bridge Replacement Project from CR A1A to CR 7071 Bridge Replacement Project from CR A1A to CR 707 -- USUS -- Alternate A1A Bridge Work August 2021 to February 1 Bridge Project under same - Florida Department of Transportation Florida Department of Transportation Work will be performed prior to detour phaseWork includes substructure repairsSingle lane closures required for substructure repairsEstimated schedule 2022No impacts to navigational traffic Minor repairs to Alternate A1A Bridge will be performed during UScontract 1818 1 Bridge Replacement Project from CR A1A to CR 7071 Bridge Replacement Project from CR A1A to CR 707 -- USUS -- Intersection Improvements Alt A1A at Old Dixie Hwy (SR 811) Shift the intersection to the southwestLengthen left turn lane from northbound Alt A1A to northbound Old Dixie HwyAddition of signalImplemented prior to detourImprovement will be permanent Florida Department of Transportation Florida Department of Transportation 1919 all four 1 - Current Showing Updates 1 to westbound Alt A1A - 1 Bridge Replacement Project from CR A1A to CR 7071 Bridge Replacement Project from CR A1A to CR 707 -- USUS -- Intersection Improvements Alt A1A (Beach Rd) at US Two right turning lanes from southbound USImplemented prior to detourReverted back to current condition following completed bridge lanes open to traffic Florida Department of Transportation Florida Department of Transportation Shown at March 5, 2020 Public Meeting 2020 1 at SR 706 - 1 Bridge Replacement Project from CR A1A to CR 7071 Bridge Replacement Project from CR A1A to CR 707 -- USUS US -- Intersection Improvements 1 to - Florida Department of Transportation Florida Department of Transportation all four lanes open to Three left turning lanes from northbound US westbound SR 706 (two left turning lanes currently)Implemented prior to detourReverted back to current condition following completed bridge traffic 2121 1 Bridge Replacement Project from CR A1A to CR 7071 Bridge Replacement Project from CR A1A to CR 707 -- USUS -- SR 706 at Alt A1A all Intersection Improvements Florida Department of Transportation Florida Department of Transportation Two left turning lanes from southbound Alt A1A to eastbound SR 706 (single left turning lane currently)Two right turning lanes from westbound SR 706 to northbound Alt A1AImplemented prior to detourReverted back to current condition following completed bridge four lanes open to traffic 22 Temp nighttime closure Phase II 1 Bridge Replacement Project from CR A1A to CR 707 - US - peak hour times - Maintenance of Traffic Alt A1A at Old Dixie Hwy (SR 811) Phase I Florida Department of Transportation Phased MOT plan : - MultiMaintains intersection operationsOnly lane closure will be during non(9:30PM to 6AM) reopen at end of work periodAllows for sufficient working area to minimize disruption time 23 Phase IV 1 Bridge Replacement Project from CR A1A to CR 707 - US - Maintenance of Traffic Phase III Alt A1A at Old Dixie Hwy (SR 811) Florida Department of Transportation 2424 Phase V 1 Bridge Replacement Project from CR A1A to CR 7071 Bridge Replacement Project from CR A1A to CR 707 -- USUS -- Maintenance of Traffic Alt A1A at Old Dixie Hwy (SR 811) Florida Department of Transportation Florida Department of Transportation New Mast Arm Signal Pedestrians maintained while sidewalk is replacedConstruction time estimated at 220 daysTo be fully operational prior to bridge closure 2525 1 - 1 Bridge Replacement Project from CR A1A to CR 7071 Bridge Replacement Project from CR A1A to CR 707 -- USUS -- Maintenance of Traffic Alt A1A (Beach Rd) at US Florida Department of Transportation Florida Department of Transportation Prior to bridge closureAlternate A1A and Dixie Hwy Intersection is complete and one lane across bridge is openSouthbound dual right turn lanes 2626 1 - 1 Bridge Replacement Project from CR A1A to CR 7071 Bridge Replacement Project from CR A1A to CR 707 -- USUS -- Maintenance of Traffic Alt A1A (Beach Rd) at US Florida Department of Transportation Florida Department of Transportation During bridge closureIngress to Riverside Drive and Jupiter Cove maintained 2727 1 - 1 Bridge Replacement Project from CR A1A to CR 7071 Bridge Replacement Project from CR A1A to CR 707 -- USUS -- Maintenance of Traffic Alt A1A (Beach Rd) at US Florida Department of Transportation Florida Department of Transportation Final configuration following full bridge openingIngress to Riverside Drive and Jupiter Cove maintained 28 1 Bridge Replacement Project from CR A1A to CR 707 - US - Environmental Considerations Florida Department of Transportation Protection of Jupiter Inlet Lighthouse BuildingRelocation of the Jupiter Inlet Museum operationsNew bridge will enhance community cohesion, emergency response, and mobilitySeagrass and mangroves impact mitigationLighting design to protect sea turtlesLimit nighttime noise producing activities to protect sensitive aquatic species Sociocultural Resources Natural Resources 29 DATE May 6, 2016May 3, 2017 April 5, 2019 July 22, 2019July 10, 2019July 26, 2019 May 22, 2017 April 26, 2016 March 25, 2019March 27, 2017 October 4, 2018 August 10, 2016August 17, 2016 January 11, 2017October 19, 2016October 19, 2016 June 26, 2019 (5) February 27, 2019 September 23, 2016 ) USCG Meetings Agency (CRA) Committee (NCIC) Jupiter Inlet Village Jupiter Inlet District STAKEHOLDER Village of Tequesta Staff and Jupiter Inlet Lighthouse Coordinating Council (LRMCC) North County Intergovernmental Loxahatchee River Management US Bureau of Land Management Jupiter Community Redevelopment United States Coast Guard ( Village of Tequesta Utility CoordinationTown of Juno Beach Individual Council US Bureau of Land Management (BLM) 1 Bridge Replacement Project from CR A1A to CR 707 - US DATE - May 9, 2019 April 16, 2019April 26, 2016 June 18, 2019 March 15, 2018March 15, 2018March 20, 2019 May 29, 2019(4) May 30, 2019 (1) February 8, 2019 January 12, 2016October 11, 2017April 21, 2016 (2)April 25, 2016 (2)October 11, 2017 March 15, 2018 (4) September 12, 2016September 12, 2016September 18, 2019 February 8, 2016 (4) October 11, 2017 (4) Stakeholder Engagement Meetings Town Engineer Town of Jupiter StaffTown of Jupiter Staff STAKEHOLDER Town of Jupiter Utilities Town of Jupiter Council Town of Jupiter Town Engineer Town of Jupiter Individual Council Town of Jupiter Police Department Town of Jupiter Town Manager and Village of Tequesta Council Meeting Florida Department of Transportation 15, 2020 - DATE July 21, 2020 March 28, 2020March 29, 2021 July 14 30 CONSTRUCTION ! Harbour Jupiter PDJupiter PD Tequesta PD PBC Fire Rescue First Responders: Martin County Fire Palm Beach County Tequesta Fire Rescue STAKEHOLDER Martin County Fire Rescue Jupiter Island Public Safety ENGAGEMENT AND UPDATES WILL CONTINUE THROUGH Village of Tequesta Public Workshop Index Investment, Jupiter Cove, Jupiter DATE June 11, 2019 March 5, 2020 August 6, 2019 March 14, 2017 February 2, 2017 January 17, 2019January 30, 2017January 15, 2017October 24, 2017 February 15, 2017February 17, 2016 December 6, 2018December 5, 2016December 5, 2016December 3, 2018 December 20, 2016 September 20, 2017 HOA 1 Bridge Replacement Project from CR A1A to CR 707 - Harbour Developer) US Public Hearing FPL and TECO Jupiter Cove HOA Passages Condos - Jupiter Restaurants Interagency Meeting Associations (HOAs) Jupiter PD&E Kickoff Meeting Design Public Meeting Alternatives Workshop Jupiter Cove HOA Staff STAKEHOLDER Jupiter Inlet Colony HOA Index Investment (1000 North Jupiter Cove, Jupiter Dunes, Ocean Stakeholder Engagement DATE May 4, 2016 July 19, 2016July 22, 2019 April 26, 2016April 26, 2019 June 27, 2017June 28, 2018 March 9, 2018 August 23, 2016August 30, 2017 February 25, 2019 November 4, 2017 December 13, 2017 September 12, 2017 February 4, 2016 (BGPAC) September 8, 2016 (BTPAC) February 3, 2016 (CAC & TAC) February 18, 2016 (MPO Board) September 7, 2016 (CAC & TAC) December 12, 2016 (MPO Board) Florida Department of Transportation Commerce Committees Team (ETAT) STAKEHOLDER Palm Beach MPO / TPA and Bridge Aesthetics Committee Palm Beach North Chamber of Cultural Resources Committee Palm Beach County Fire Rescue Environmental Technical Advisory 3131 * e l u d e h c S y t i v i t ** c A n May 2025 o i March 26, 2021 t November 2024 ** c 1 Bridge Replacement Project from CR A1A to CR 7071 Bridge Replacement Project from CR A1A to CR 707 u-- r USUS t -- s n ** o ** time and early completion of detour, opening all four lanes of - C d e t ongoingMay 26, 2021 March 2023 - detour construction begins a - August 2025 m Pre i t s E Florida Department of Transportation Florida Department of Transportation Intersection improvementsInstallation of Intelligent Traffic Systems (ITS) features Repair of Alt A1A BridgeNew bridge construction outside footprint of existing bridge Anticipated detour phase completion July 2024 Detour phase ends to open Southbound half new bridge to two (2) lanes of traffic Final plans packaging Plans package received by bidding contractors Open Contractor Bids Late August 2021 Detour phase begins Open all four (4) four lanes of traffic on new bridge Project Complete *Final schedule developed by selected contractor**Incentives to contractor for ontraffic 32 01) - 32 - 2 - /main West Elevation of New Bridge in Open Position jupiterus1bridge 1 Bridge Replacement Project from CR A1A to CR 707 - US - /projects/ www.fdot.gov 4406 - Florida Department of Transportation 1 Federal Highway Bridge Replacement (Financial Project ID 428400 - West Elevation of New Bridge in Closed Position bing.wang@dot.state.fl.us 5/US - SRProject Contact Information:Bing Wang, P.E., FDOT Project ManagerPhone: (954) 777Email: Project Website: https://