Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 06_6/10/2021Agenda Item #6. Regular Council STAFF MEMO Meeting: Regular Council - Jun 10 2021 Staff Contact: Matthew Hammond, Utilities Department: Utilities Director 11 Approve Change Order #1 — Pinetree Drive-Tequesta Drive Stormwater Improvements — Ferreira Construction On August 13, 2020, the Village Council approved the award of Pinetree Drive & Tequesta Drive Drainage Improvements project to complete stormwater improvements at the intersection of Pinetree Drive & Tequesta Drive to address localized ponding in the roadway due to insufficient drainage infrastructure at the location. To ensure the lowest price for this project, the Village selected Ferreira Construction through a competitive bid selection process — Pinetree Drive & Tequesta Drive Drainage Improvements - ITB #UTIL 01-20 - July 3, 2020 — in the amount of $120,771.50. During the project several unforeseen conditions were discovered including below grade pipe conflicts grade changes that required the addition and deletion of various work scope items. As a result, the Utilities Department is requesting a final adjusting change order (Change Order #1) to the previously approved contract award in the amount of ($2,678.90) for the changes to the project scope resulting from the unforeseen conditions. Note that the approved allowance of $5,000 was not required for the project and will be returned to the Stormwater Enterprise Fund balance. If approved, the revised total cost for the project will be $118,092.60. Additionally, the proposed Change Order is requested to include an extension to the approved contract of 40 days due to delays related to the unforeseen conditions. The Pinetree Drive & Tequesta Drive Drainage Improvements project is complete and will be closed out upon approval of the final adjusting change order. This document and any attachments may be reproduced upon request in an alternative format by completing our Accessibility Feedback Form, sending an e-mail to the Village Clerk or calling 561-768-0443. BUDGETED AMOUNT: AVAILABLE AMOUNT: EXPENDITURE AMOUNT: $125,771.50 $125,771.50 $118,092.60 Additional Budgetary Information: Funding Source(s): Approve Change Order #1 with Ferreira Construction. Page 75 of 485 Agenda Item #6. Proposed Change Order No. 1 - Ferreira Construction.ada Page 76 of 485 Agenda Item #6. The following document is presented in a non- ADA compliant format. Please contact the Village Clerk's office if you would like to receive an ADA compliant version of this document. Page 77 of 485 Agenda Item #6. FERREIRA Village of Tequesta 345 Tequesta Drive Tequesta, FL 33469 Attention: Matthew Hammond PE, Utilities Director mhammond@tequesta.org Village of Tequesta 345 Tequesta Drive Tequesta Florida, 33469 Phone: 561-768-0459 Date: 5/25/2021 Job Name: Pinetree Dr. & Tequesta Bridge Drainage Improvements Job Number: Change Order: 4283-139033.00 001 Sent Via Email PROPOSED CHANGE ORDER Ferreira Construction Southern Division Co., Inc. will provide all labor, equipment, materials and supervision to perform the following scope of work. All work to be done in accordance with the plans and specifications contained in the base contract. - The list of below work items are shown as lump sum for each item and makeup the change order in its entirety. Item Description Unit Quantity Unit Price Total 1 ADDED PIPE LS 1.00 $ 7,000.00 $ 7,000.00 2 Pipe Install Delay LS 1.00 $ 901.36 $ 901.36 3 8" Pipe Deflection LS 1.00 $ 2,109.41 $ 2,109.41 4 Pipe Armor LS 1.00 $ 1,367.30 $ 1,367.30 5 Additional pipe to Avoid Sidewalk Conflict LS 1.00 $ 1,295.00 $ 1,295.00 6 Flatwork Concrete Adjustments LS 1.00 $ 2,015.03 $ 2,015.03 7 Curb Adjustment LS 1.00 $ (176.00) $ (176.00) 8 DELETE 8" Water Main LS 1.00 $ (17,191.00) $ (17,191.00) Total $ (2,678.90) Additional Days Requested Exclusions / Clarifications 1. All fees, including permit fees, are by others. 2. Engineering, testing, layout and as-builts are by others. 3. Unknown utility conflicts both public and private are at an additional cost. 4. All conditions, exclusions and clarifications in the base contract are applicable. Dlgi[ally signeE by Jahn Rock John Rock UN cn=lohc =Fe elraCon mc[ionCo In u=Rrojec[m—gManager, mall=jrock@lerrelraconstruRion.com, -US Signature: oa[e:lozl.os.2]14O11M-N-W Signature: Printed Name: John Rock Printed Name: Title: Project Manager Title: Date: 5/25/2021 Date: 13000 SE Flora Ave., Hobe Sound, Fl. 33455 • Phone: 772-286-5123 • Fax: 772-286-5139 www.ferreiraconstruction.com An Equal Opportunity Employer 4U Page 78 of 485