HomeMy WebLinkAboutDocumentation_Regular_Tab 19_7/8/2021Agenda Item #19. Regular Council STAFF MEMO Meeting: Regular Council - Jul 08 2021 Staff Contact: Matthew Hammond, Utilities Department: Utilities Director Approve Work Authorization with Wynn & Sons Environmental Construction for Stormwater Road Repairs In April 2021 the Village Council approved a work authorization with Hinterland Group for the rehabilitationof 44 segments of stormwater piping using the cured -in -place pipe (CIPP) method. Three of the areas that were rehabilitated have road damage caused by the stormwater failures: Seabrook Road, Chestnut Trail and Starboard Way. With the CIPP work complete, and causes of the road damage addressed, repairs are needed to the roadway in these areas. To ensure the best value, staff is recommending that the Village use the piggyback agreement with Wynn & Sons Environmental Construction based on the Palm Beach County Annual Pathway and Minor Construction Contract. This selection by Palm Beach County was completed through a competitive selection process — Annual Pathway and Minor Construction Contract (Bid #2020055). The term of this agreement is set to expire on November 16, 2023. The construction price for the proposed road repairs, based on the pricing in the Palm Beach County Annual Pathway and Minor Construction Contract, is $46,792.00. BUDGETED AMOUNT: AVAILABLE AMOUNT: EXPENDITURE AMOUNT: $47,704.01 $46,792.00 Additional Budgetary Information: Funding Source(s): Stormwater Enterprise Fund POTENTIAL MOTION- • • Authorize work authorization and associated purchase requisition with Wynn & Sons Environmental Construction for stormwater road repairs. Estimates - Stormwater Road Repairs - Wynn & Sons Protect Photos Page 184 of 287 Agenda Item #19. The following document is presented in a non- ADA compliant format. Please contact the Village Clerk's office if you would like to receive an ADA compliant version of this document. Page 185 of 287 Agenda Item #19. WYNN & SONS ENVIRONMENTAL CONSTRUCTION CO. INC. WEST PALM BEACH,FL. 33411 VILLAGE OF TEQUESTA 357 Tequesta Drive Tequesta, FL 33469 pbc annual contract 2020-055 Estimate Date Estimate # 6/9/2021 4753 Ship To DOUG CHAMBERS SEABROOK RD AT TEQUESTA DRIVE ASPHALT/CONCRETE REPAIRS Project Item Description Qty Rate 411 Total 9-020 PORTABLE MILLING MACHINE PER HOUR 24 100.00 2,400.00 9-024 SUPERPAVE ASPHALTIC CONCRETE (SP-9.5) TRAFFIC LEVEL 50 200.00 10,000.00 C) (0-200 TON ORDERS) PER TN (OVERBUILD Et LEVELING) 9-106 CONCRETE CURB (TYPE D) REMOVAL PER LF 15 10.00 150.00 9-105 CONCRETE CURB (TYPE D) (SEE NOTES) PER LF 15 8.75 131.25 9-132 6" CONCRETE REMOVAL PER SY 40 17.00 680.00 9-010 FINISH GRADING PER SY 100 2.00 200.00 9-124 CONCRETE SIDEWALK (6' THICK) (DRIVEWAY) - 8 SY TO LESS 35 95.00 3,325.00 THAN 35 SY PER SY 9-108 CONCRETE CURB Et GUTTER TYPE F REMOVAL PER LF 105 9.00 945.00 9-107 CONCRETE CURB Et GUTTER (TYPE F) PER LF 105 14.75 1,548.75 9-103 MISC. CONCRETE (INCL REINFORCING STEEL) PER CY 5.5 950.00 5,225.00 9-127 CAST- IN- PLACE AND/OR SURFACE APPLIED TACTILE 15 17.00 255.00 SURFACE PER SF 9-171 TRAFFIC PAINT (ALL WIDTHS Et COLORS) PER SF 800 3.00 2,400.00 9-172 THERMOPLASTIC PAVEMENT MARKING (ALL WIDTHS Et 800 7.00 5,600.00 COLORS) PER SF 9-143 SODDING (TO MATCH EXISTING) PER SY 100 4.90 490.00 9-058 MODIFY, REPAIR AND/OR REBUILD EXISTING CURB INLET 3 1,800.00 5,400.00 PER EACH Total $38,750.00 Page 186 of 287 Agenda Item #19. WYNN & SONS ENVIRONMENTAL CONSTRUCTION CO. INC. WEST PALM BEACH,FL. 33411 Village of Tequesta Ship To Mr. Doug Chambers 20 Starboard Way Asphalt Repair & 2 Concrete Flumes Estimate Date Estimate # 6/18/2021 4772 Project Item Description Qty Rate dh Total 9-005 REMOVE EXISTING ASPHALT (FULL DEPTH) (SEE NOTES) PER 184 0.75 138.00 SY 9-007 SHALLOW EXCAVATION (DEPTH <4 FT) PER CY 23 7.00 161.00 9-010 FINISH GRADING PER SY 46 2.00 92.00 9-012 6" BASE (INCL PRIME COAT) PER SY 46 6.00 276.00 9-013 8" BASE (INCL PRIME COAT) PER SY 46 17.50 805.00 9-024 SUPERPAVE ASPHALTIC CONCRETE (SP-9.5) TRAFFIC LEVEL 5 200.00 1,000.00 C) (0-200 TON ORDERS) PER TN 9-046 INLET (CLOSED FLUME) TYPE 1 PER EACH 2 1,500.00 3,000.00 9-143 SODDING (TO MATCH EXISTING) PER SY 20 4.90 98.00 As discussed, this does not include any adjustment of basin heights Total $5,570.00 Page 187 of 287 Agenda Item #19. WYNN & SONS ENVIRONMENTAL CONSTRUCTION CO. INC. WEST PALM BEACH,FL. 33411 Village of Tequesta Ship To Mr. Doug Chambers Chestnut Trail & Cedar Hill Lane Asphalt Repair Estimate Date Estimate # 6/18/2021 4773 Project E�6 -ion Qty dL, Rate Total 9-005 REMOVE EXISTING ASPHALT (FULL DEPTH) (SEE NOTES) PER 184 0.75 138.00 SY 9-007 SHALLOW EXCAVATION (DEPTH <4 FT) PER CY 23 7.00 161.00 9-010 FINISH GRADING PER SY 46 2.00 92.00 9-012 6" BASE (INCL PRIME COAT) PER SY 46 6.00 276.00 9-013 8" BASE (INCL PRIME COAT) PER SY 46 17.50 805.00 9-024 SUPERPAVE ASPHALTIC CONCRETE (SP-9.5) TRAFFIC LEVEL 5 200.00 1,000.00 C) (0-200 TON ORDERS) PER TN Total $2,472.00 Page 188 of 287 y' u e 1A ilL , ! 1 VAIlp 4 ` g . k : 71 ' y No Text nAm� - — ar Lu IL jp v r } I s .� i M6 s `avp y 4 ay z IF— ti I-N k r ,� I � ; w h, "' U ,„ �. �� ,� ,� i 1 A M i �� w � F ,e, � P r 4 J 40 e� No Text r � r � 4L 0 �. 4 f, t a y ti 4r Rt Alk Rk IN a. IP d t I %4L Al IL 9* IL 49 . if