Loading...
HomeMy WebLinkAboutAgreement_General_7/8/2021_Kimley Horn - Work Authorization- CO1DocuSign Envelope ID: BF52505E-1 1 DA-45E5-8AC5-3EB428F23CE3 Change Order No. 1 DATE: Tune 10, 2021 VILLAGE OF TEQUESTA VILLAGE RFQ. NO.: KH-U20.01b WORK AUTHORIZATION NO. FOR CONSULTING SERVICES PROJECT No. KIMLEY-HORN PROJECT NO.: G/L CODE: PROJECT TITLE: Beach Road Water Main Replacement - Phase 1 - Change Order No. 1 This Work Authorization, when executed, shall be incorporated in and shall become an integral part of the Agreement for Professional Services dated September 10, 2020 between the Village of Tequesta ("VILLAGE"), and Kimley-Horn & Associates, Inc. ("CONSULTANT" or "KIMLEY- HORN") hereafter referred to as the Agreement. INEUTFITBralm The Village identified a need to replace approximately 3,100 linear feet of existing 8-inch cement asbestos water main along Beach Road (AIA). This existing water main has experienced leaks and exposure during low tide events due to its current location. Kimley- Horn provided the Village with a proposal to design a replacement 10-inch PVC water main and connections for the proposed Sea Glass condominium and Coral Cove Park as well as provide certification services during construction. Construction has been contracted with Johnson -Davis, Inc. ("CONTRACTOR"). During the design of the Sea Glass condominium project by others, the fire hydrants proposed have been modified and relocated to the public right-of-way. The developer of the Sea Glass condominium has requested the Village complete the piping and fire hydrant installation under this water main replacement contract. The Village has requested Kimley- Horn provide additional services for this work to include, plan revisions, contractor coordination and PBC Engineering approvals/certifications as well as coordination with the developer's engineer to assist the Contractor in completing this work. II. SCOPE OF SERVICES The following is a description of the services to be provided under this Task Order. TASK 1 —Sea Glass Condominium Coordination 1. Coordination with the developer and developer's engineer on location of required WORK AUHORIZATION NO. KH-U20.01b - Change Order No. 1 1 of 3 DocuSign Envelope ID: BF52505E-1 1 DA-45E5-8AC5-3EB428F23CE3 piping modifications and fire hydrant locations at the Sea Glass condominium site. 2. Submittal of plan revisions to the PBC Engineering Roadway Department for permit modifications. 3. Coordination with PBC Health Department on the piping and hydrant tield deviations. 4. Coordination with the Contractor on the proposed piping and hydrant modifications and preparation of a change order. TASK 2 — Extended Certification Services During Construction I . Observe work performed by the Contractor to certify connections made to the previously installed water main crossings which will provide service to the future Sea Glass condominium. 2. Review and comment on revised record drawings submitted by the Contractor. All comments will be discussed with the Village prior to submittal to the Contractor. 3. Prepare and submit a final water main clearance application to the PBC Health Department and PBC Engineering Roadway Department. M. SCHEDULE Kimley-Horn will begin work upon receiving notice to proceed from the Village. This work will be performed concurrently with the Village and Contractor's schedule. Kimlcy-horn will perform the services described in the Scope of Services on an hourly basis with a not to exceed amount of Six Thousand Five Hundred Dollars (S6,500) in accordance with the hourly rates established in the Professional Engineering Services Agreement between the Village and Kimley-Horn. • The Village shall pay any permit certification fees directly to the respective regulatory agency. • Kimley-Horn will have access to site observations/notes made by the Village if required for permit clearances. WORK AUHORIZATION NO. KH-U20.01b - Change Order No. 1 2 of 3 DocuSign Envelope ID: BF52505E-11DA-45E5-8AC5-3EB428F23CE3 VI. A tRE MENT REFERENCE The work authorized under this Work Authorization shall be performed under the terms and conditions described within the Professional Services Agreement dated September 10, 2020, by and between the Village of Tcquesta ("VILLAGE") and Kimley-Horn ("CONSULTANT"). Compensation shall not exceed the hourly rates currently in effect under this Agreement. KIMLEY HORN & ASSOCIATES, INC. DocuSigned by: By: BGDD8704ABCE4G8 Print Name: Michael F. Schwartz Title: Senior vice President VILLAGE OF TEQUESTA _Print Name: .y- � �}�nnc;, ' r',10 " Date: 7/ 1 WORK AUHORIZATION NO. KH-U20.01b - Change Order No. 1 3 of 3 Certificate Of Completion Envelope ld: BF52505E1 1 DA45E58AC53EB428F23CE3 Subject: Kimley-Horn - Village of Tequesta BR Amendment.pdf Source Envelope: Document Pages: 3 Signatures: 1 Certificate Pages: 1 Initials: 0 AutoNav: Enabled Envelopeld Stamping: Enabled Time Zone: (UTC-05:00) Eastern Time (US & Canada) Record Tracking Status: Original 6/4/2021 7:58:23 AM Signer Events Michael F. Schwartz Mike.schwartz@kimley-horn.com Senior Vice President Kimley-Horn Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign In Person Signer Events Editor Delivery Events Agent Delivery Events Intermediary Delivery Events Certified Delivery Events Carbon Copy Events Samantha C. Graybill Samantha.Graybill@kimley-horn.com Security Level: Email, Account Authentication (None) Electronic Record and Signature Disclosure: Not Offered via DocuSign Witness Events Notary Events Envelope Summary Events Envelope Sent Certified Delivered Signing Complete Completed Holder: Tammy Culpepper Tammy.Culpepper@kimley-horn.corn Signature Docu4iynad by' 80DD870aAeCEaBB,.. Signature Adoption: Pre -selected Style Using IP Address: 73.204.224.247 Signature Status Status Status Status Status COPIED Signature Signature Status Hashed/Encrypted Security Checked Security Checked Security Checked DocuSign Status: Completed Envelope Originator: Tammy Culpepper 401 Fayetteville St. Suite 600 Raleigh, NC 27601 Tammy.Culpepper@kimley-horn.com I Address:4,7.44.210 Location: DocuSign Timestamp Sent: 6/4/2021 7:59:57 AM Viewed: 6/4/2021 8:02:30 AM Signed: 6/4/2021 8:02:35 AM Timestamp Timestamp Timestamp Timestamp Timestamp Timestamp Sent: 6/4/2021 8:02:36 AM Viewed: 6/4/2021 8:08:28 AM Timestamp Timestamp Timestamps 6/4/2021 7:59:57 AM 6/4/2021 8:02:30 AM 6/4/2021 8:02:35 AM 6/4/2021 8:02:36 AM Payment Events Status Timestamps