HomeMy WebLinkAboutHandouts_Regular_8/12/2021 jupiterN us- , ri ge
US 1 Bridge
Replacement Project
from CR Al A to CR 707
Financial Project ID#:
y�
428400-2-52-01, 443867-1-52-01
Federal Aid #: D421056B g "'
451
FDOT
jupite ill
US�-—16r 4g—e Bodler Barthelemy, P.E.
Project Manager
FDOT
Virgil Versaggi, P.E.
Senior Project Engineer
Mehta Engineering
MEET THE Scott Case, P.E.
PR
OJECT
Project Administrator
Evolution Engineering
Arnaldo Tony Grau, P.E.
' Project Administrator
Gannett Fleming
Angel Gardner
Community Outreach Specialist
The Valerin Group, Inc.
FDOT�
•
AGENDA '
Introduction
Project Overview
Incentives / Disincentives
Project Improvements
Traffic Impacts
Intersection Improvements
Alt Al A Bridge Work -
Environmental & Cultural Resources Mitigation
Project Schedule
Community Outreach
Questions a
Contact Information -
FDj7
•
r-
PROJECT OVERVIEW us- 1 bri�g_e
Purpose: To replace the existing bridge, improve facilities for
bicycle and pedestrian, and improve horizontal and vertical
clearances at the navigable waterway channel
Project Limits: From CR Al to CR 707
Project Duration: 1458 days (plus holidays and weather days)
Bridge Closure: 20-month bridge closure Spring 2023 � � \
Traffic Management Improvements: Completed prior to detour ".
Construction Begins: September 2021z
Anticipated Completion: Early 2026
Construction Cost: $122 Million
Contractor: Johnson Bros. Corp.
FDj7
•
INCENTIVES / DISINCENTIVES 0 s- 1 b r i�g—e
■ Incentive/Disincentive: $3.5 million (detour ends
and one lane of traffic open in each direction) ='
4
Bonus: Completion of two lanes of traffic in each
direction — $1 .5 million y ��
s =•� 1 is :,s
■ Bonus: Completion of project within original time
allotted (1458) - $1 million
F�j7
•
PROJECT IMPROVEMENTS
® Replacing the US 1 Bridge (Bridge No. 930562) over the
Loxahatchee River with bike lanes and sidewalks in each
direction
® Installing Intelligent Transportation System technology to
actively manage traffic flow
e
- - ■ Adding decorative lighting and drainage
® Upgrading signage and pavement markings
Now
■ Minor improvements to the Alt Al bridge (Bridge No.
930339) over the Loxahatchee River
FDOT�
•
Existing Bridge New Bridge
South Approach Spans South Approach Spans
FDj7
jupiter
IMPROVED NAVIGATIONAL CLEARANCES us- 1 ri ge
W,
Existing Bridge New Bridge
1�
f
21'at Fender - 25'at Center ,--
� 38'at Fender -
90'between Fenders =� ��� = 125'between Fenders r��;— =.-�-
� � �--y= 44%Reduction in Openings!
Navigational Clearances • . •
Center
* 21' at Fend- Fender
jupile
PLAN VIEW us�,�ri�ge
COVERED CONTROL JUPITER COVE
MAINTENANCE HOUSE CONDOMINIUMS
_ NEW OBSERVATION ENTRYWAY
DECK LOCATED BELOW
L NEW BRIDGE
=mill
SHORELINE �►,
0
CENTERLINE ii _ R/W LINE
0. OF CHANNEL PROTECTION
WWII U.S. NAVAL
JUPITER INLET BOAT RENTAL�`
' � HOUSING BUILDING
AND BOAT CLUB
FDj7
jupile
BRIDGE TYPICAL SECTION us�,�ri�ge
8' 7' 11' 11' 11' 11' 7' 8'
Sidewalk Bike Lane Travel Lane Travel Lane Travel Lane Travel Lane Bike Lane Sidewalk
FDj7
jupile
TRAFFIC IMPACTS us�,�ri�ge
■ Full bridge closure with traffic detoured to
Alternate Al A.
■ Lane closures may occur from 9:30 p.m. to 6
a.m. Sunday through Saturday on: US 1 ,
Ind iantown Road, Alternate AlA/Beach
Road, Old Dixie Highway.
® Access to adjacent properties will be
maintained.
■ Pedestrian and bicycle access will be
maintained.
■ Navigation of the channel will be maintained
for marine traffic. Channel restrictions may
occur.
FDj7
jupile
INTERSECTION IMPROVEMENTS us�,�ri�ge
lei L1 I I LVA,Wislymn"'In
■ Improvements to occur prior to bridge d
closure Legend11 Beach Rd. (N)
0001 Bridge Closure
Lessen impacts to public during detour Detour Route A- Fast (CR707) Not to Scale
c'-
■ Devices installed to monitor and actively
aP°r
manage traffic to maintain mobility Loxahatcheeniver
■ Intersection improvements along detour �cwPlow-
• '
route: P� : ... .
US 1 at Alt Al A (Beach Road) 1
Center St.
■ Alt Al at Old Dixie Highway (SR 811 )
• Alt Al at SR 706/Indiantown Road
� G
■ US 1 at SR 706/Indiantown Road 4
cc
Indiantown Rd.
r (SR 7 6)
INTERSECTION •
Alt AlA at SR 706
FDOT
jupile
INTERSECTION IMPROVEMENTS us�,�ri�ge
Alt A1A at Old Dixie Highway
(SR 811)
FEC RAILWAY
■ Shift the intersection to the ►►-
southwest
Lengthen left turn lane from
northbound Alt Al to r OLD DIXIE HWY
northbound Old Dixie Highway CAR
WASH Ir® Addition of traffic signal ``RIW LINE
■ Implemented prior to detour
■ Improvement will be permanent WALGREENS SHIPWRECK -- -
` „1l.rxv-are
FDj7
jupile
INTERSECTION IMPROVEMENTS us�,�ri�ge
'' I *SHEN PLOTT TO 24".x 36"
Alt Al A (Beach Road) at US 1 WALGREENS y SHIPWRECK `
BAR 8c GRILL
■ Two right-turn lanes from �+ ;
southbound US 1 to westbound it
Alt Al A '`a �^t ,' CITGO
KITE,; 4z
p, 44 � SHOP
■ Implemented prior to detour "
i -
■ Reverted back to current -
[] �_ —
condition following bridge
completion and all four lanes �T
open to traffic � V
FDj7
jupile
INTERSECTION IMPROVEMENTS us�,�ri�ge
.. -
US 1 at SR 706/Indiantown Road * `'
■ Three left-turn lanes from
northbound US 1 to westbound
SR 706/Indiantown Road
■ Two left turn lanes currently. tr
R ICENR K
■ Implemented prior to detour y�� r
■ Reverted back to current
condition following bridge
completion and all four lanes
open to traffic
BANK OF
4MERICACA
s s , Mood
F�j7
jupile
INTERSECTION IMPROVEMENTS us�,�ri�ge
SR 706/Indiantown Road at Alt Al --r
■ Two left-turn lanes from southbound
Alt AlAto eastbound SR - -
706/Indiantown Road
■ Single left turn lane currently
DUNKIN
■ Two right-turn lanes from DONUTS
westbound SR 706/Indiantown ,� CH
EVRDN
Road to northbound Alt Al A
■ Implemented prior to detour
■ Reverted back to current condition
following bridge completion and all
t MANGOS
four lanes open to traffic _= GRILL CLEANERS
*�,--- � GRILL '
1 vm
A
FDOTT
•
TRAFFIC MANAGEMENT &
MONITORING
The following traffic monitoring devices will be installed prior to
detour along detour route:
1 . Bluetooth travel time devices
■ Provides Palm Beach County with real-time travel time
information for distribution to the public
2. Closed Circuit Television (CCTV) Cameras
`"" '�' ■ Real-time view of the project corridor to detect traffic incidents
3. Microwave Vehicle Detection Systems (MVDS)
■ Lane by lane traffic data to improve traffic signal timing
- _ 4. Dynamic Messaging Sign (DMS)
■ Provides information such as lane blockage information, travel
y time information and status of the drawbridge along US 1 for
the northbound and southbound bridge approaches
FD&T
TRAFFIC MANAGEMENT &
MONITORING
Benefits:
■ Improve travel times
■ Monitoring 24/7
■Alleviate congestion
`\ ■ Real-time adjustments to traffic signal timing
■Advance notification to public of traffic delays
F�T�
•
ALT AlA BRIDGE
WORK
Minor improvements to Alternate Al Bridge
(Bridge No. 930339) over the Loxahatchee River
will be performed during US 1 Bridge
Replacement Project:
■ Work will be performed prior to detour phase
■ Work includes substructure repairs -
■ No impact to vehicular or navigational traffic
FDj7 —
•
ENVIRONMENTAL & CULTURAL MITIGATION u s- 1 b r i�g—e
■ Cultural Resources
s
• Protection of Jupiter Inlet Lighthouse and Museum
• Relocation of the Jupiter Inlet Museum operations ,,.,
• New bridge will enhance community cohesion,
emergency response, and mobility
• Preservation of archaeological artifacts if discovered
1
® Natural Resources
• Seagrass and mangroves impact mitigation A ,,
■ Lighting design to protect sea turtles
• Protection of endangered species within project limits
■ Limit nighttime noise producing activities to protect ,
iii�ii��illOrlii�ii�iiiliiIIIIIIIIII'll��sensitive aquatic species R _ - ._,_
FDj
•
change)ESTIMATED PROJECT SCHEDULE (subject to■rrrrrrrrrrrrrrrr
■
i a i
Fall 2021 Spring 2023 Fall 2024 Spring 2025 Early 2026
Pre-detour Phase Detour Phase Detour Phase Ends New Bridge Construction Project Completion
Construction Begins Begins (One lane in each direction Completed
open to traffic.) (All four lanes open to traffic.)
FDj7
WHAT TO EXPECT
■ Construction Phases:
■ Phase 1: Pre -Detour Construction
■ Phase 2: Detour begins. Construct bridge to allow one
lane in each direction
■ Phase 3: Construct remainder of bridge
■ Phase 4: Restore intersections to pre -detour conditions
■ Detour and work zone signage will be installed north and
south of the bridge work zone.
■ Ongoing coordination with the Town of Jupiter, Village of
Tequesta, and Jupiter Inlet Colony
■ Coordination will occur with emergency responders and
the Palm Beach County School District Transportation
Department during the bridge closure
■ Observation deck closed during construction
FD&�
jupile
COMMUNITY OUTREACH us�,�ri�ge
■ Regular distribution of project updates via email and
social media
r
■ All project updates provided to Town of Jupiter, Village of
Tequesta, and Jupiter Inlet Colony — :■•
■ Project information and project progression included on
project website: " -
www.fdot.gov/projects/oupiterusl bridge/main
■ Coffee with the project team _
■ Project team available to meet with community groups,
property owners and city officials --
■ Construction Open House scheduled for late September
FDj7 - .�
Jupiter
u 61s- r4g-e
� .
QUESTIONS?
FD&�
•
• • • -
Bodler Barthelemy
Bodler.Barthelemy@dot.state.fl.us
(561) 370-1127
CONTACT US
Virgil Versaggi
For additional information, please contact vversaggi@mehtaeng.com
the project team: (813) 210-1811
Angel Gardner
angel@valerin-group.com
(561) 886-8773
i
F�D7
WORK ZONE SAFETY
It's Everyone's Job
Speed is a contributing
factor in almost 1% of -
fatal work zone crashes,t
SLOW DOWN
ITS STORK ZONES Speed
FDGCT�
2019 NHTSA Data-hilp�; {�p�JFwwa dWarti+�{+,t ►rnau_taxi€feet_2021{nwr�aw_tactsrreer_2nrtpdt
FDOT