Loading...
HomeMy WebLinkAboutAgreement_General_6/25/2021_Chen-Moore & AssociatesVillage of Tequesta 345 Tequesta Drive Tequesta, FL 33469 To: Jeremy Allen —Village Manager From: Matthew Hammond — Utility Director CC: David Tinoco — Distribution Superintendent 561-768-0700 www.tequesta.org Date: July 12, 2021 Re: Work Authorization CM-STW21.01— Stormwater Permitting Please find a partially executed copy of Work Authorization (WA) CM-STW21.01 with Chen - Moore & Associates for your signature. This WA is for permitting services required for stormwater improvements on River Drive and Gulfstream Drive in the amount of $20,540.00. The FY20-21 Stormwater Enterprise Fund contains sufficient funding to complete this work authorization. Vice -Mayor Kyle Stone Mayor Frank D'Ambra, III Council Member Bruce Prince Council Member Laurie Brandon Council Member Molly Young Village Manager Jeremy Allen VILLAGE OF TEQUESTA CONSULTING SERVICES WORK AUTHORIZATION DATE: 06/25/2021 WORK AUTHORIZATION NO. CM STW21.01 VILLAGE RFQ. NO.: UTIL 06-20 FOR CONSULTING SERVICES PROJECT No. Alfa- G/L CODE: 403-411-531.302 CHEN-MOORE PROJECT NO.: 492.003 PROJECT TITLE: Bioswales at Gulfstream and Riverside This Work Authorization, when executed, shall be incorporated in and shall become an integral part of the Agreement for Professional Services dated September 10, 2020 between the Village of Tequesta ("VILLAGE"), and Chen -Moore & Associates ("CONSULTANT") hereafter referred to as the Agreement. I. PROJECT DESCRIPTION CMA shall provide engineering assistance with the design of drainage improvements at the following two locations: 1). Eastern swale along the northernmost extension of Gulfstream Drive, and 2). Southwest comer of Riverside Drive and Tequesta Drive II. SCOPE OF SERVICES The following is a description of the services to be provided under this Task Order. TASK 1— Data Collection CMA will review available as -built records, field photographs, perform a site visit, and review other available records to determine the best approach to re -grade the existing Swale and install the underdrain system. CMA will submit a Sunshine One Call design ticket to determine the presence of underground utilities that may conflict with the proposed improvements. CMA's sub -consultant (LIDBERG) will perform a limited property and topographic survey of the impacted area. CMA will provide a short technical memorandum documenting the findings of the data collection. An online meeting will be held to review the findings and discuss issues or concerns. TASK 2 — Draft Construction Exhibit Based on the collected data, a draft construction exhibit will be prepared by CMA to be WORK AUTHORIZATION NO. CM STW21.01 1 of 3 used by Village field staff or pre -approved vendors to construct. It is assumed that the construction exhibit will consist of the following sheets: • Cover Sheet • Plan Sheets (1 for Each Site) • Detail Sheet with Typical Section A draft of the construction exhibit will be provided for review and comment by Village staff. An online meeting will be held to review the plan and discuss issues or concerns. TASK 3 — Permitting For the Gulfstream Drive location an Environmental Resources Permit (ERP) application will be prepared based on the proposed improvements and under the assumption that a review of the entire system is not necessary. For the Riverside Drive location, a letter modification of existing permit 50-00682-S will be filed. It is assumed that one (1) Request for Additional Information (RAI) letter will be responded to in the process of procuring the permits. This task does not include preparation of a general ERP for any portion of the stormwater management system beyond the limits of the proposed bioswale improvements. TASK 4 — Final Construction Exhibit Based on the comments of Village staff on the draft submittal and the comments and conditions of the approved permit, CMA prepare a final submittal for use by Village field staff or pre -approved vendors to construct. It is assumed CMA will not be required to prepare documents in a manner to support advertisement for bid of the work. M. SCHEDULE The anticipated schedule is based on issuance of the Notice to Proceed and is projected as follows: Task 1 4 weeks Task 2 6 weeks Task 3 10 weeks Task 4 11 weeks IV. EXCLUSIONS The services outlined below are not included as part of the scope of work, although additional service agreements can be executed to assist the Village with these services if necessary: 1. Design of any improvements south of the eastern driveway at 374 West Riverside Drive, west of the existing curb inlet at the southwest corner with Tequesta Drive, east of Riverside Drive or north of Tequesta Drive. 2. Design of any improvements north of the driveway for 148 Gulfstream Drive, south of 140 Gulfstream Drive, or west of Gulfstream Drive. 3. Detailed field work for underground utility locates. 4. Designing the replacement or modification of any existing underground utilities. 5. Permitting of any existing facilities beyond the limits of the proposed improvements. 6. Engineering services during construction or construction administration. WORK AUTHORIZATION NO. CM STW21.01 2 of 3 V. CI COMPENSATION AND PAYMENT The CONSULTANT will perform the tasks as outlined in the scope of services for a Lump Sum Fee of $20,540.00 as outlined in Table A. Table A Budget Summary Description Total Task 1 — Data Collection $9,540.00 Task 2 — Draft Design Exhibit $4,970.00 Task 3 - Permitting $4,480.00 Task 4 — Final Construction Exhibit $1,550.00 TOTAL $20,540.00 AGREEMENT REFERENCE The work authorized under this Work Authorization shall be performed under the terms and conditions described within the Professional Services Agreement dated September 10, 2020, by and between the Village of Tequesta ("VILLAGE") and Chen -Moore & Associates ("CONSULTANT"). Compensation shall not exceed the hourly rates currently in effect under this Agreement. CHEN-MOORE & ASSOCIATES I� Print Name: Brent Whitfield Title: Director of Water Resources VILLAGE OF TEQUESTA By: _ ererr�4) A t t e n q1 e- r Date: - 112 \3� WORK AUTHORIZATION NO. CM STW21.01 3 of 3