Loading...
HomeMy WebLinkAboutAgreement_General_6/21/2021_Playmore Recreational'gE aF r�aG cp cou�y Memorandum To: Debra Telfrin From: Greg Corbitt, Director Of Parks & Recreation Date: July 27, 2021 Subject: Consent Agenda Item — Playmore Recreational Products & Services Agreement with Playmore Recreational Products and Services —to add play element at Constitution Park in the putting green area. The amount is $10,219.75 This item is budgeted in the current FY. 10271 Deer Run Farms Road, Suite 1 QUOTATION Fort Myers, FL 33966 P[AYMORE (239)791-2400 (239) 791-2401 fax 06/14/21 (888) 886-3757 toll free www.playmoreonlirie.com Job Number: 16418 Phase: Small PG Opt 1 Recreational Revision: Client: Village of Tequesta Job Constitution Park Products & Services 399 Seabrook Road 399 Seabrook Road Tequesta FL 33469 Tequesta FL 33469 Contact: Greg Corbitt Phone: 561-254-5251 Fax: Email: gcorbitt@tequesta.org Sales Rep: Ke%in Furman Terms: Net 30 Item Description Quantity Cost Subtotal l Equipment ZZUN8727 PLAYCUBE - GROUND LEVEL ZZUN8761 POLY CLIMBER - SMALL ZZUN7136 UNITY STEPPER - SMALL Discount School District of Manatee County 21-0053-MR Mulch 17 CY of Mulch 2 Freight Freight Playworld Freight 3 Installation PSI Installation Installation of Playworld Equipment Installation Installation of EWF Site Prep Site Work Notes: 1 $3,158.00 $3,158.00 3 S469.00 $1,407.00 3 $540.00 $1,620.00 -t S309.25 4309.25 I $663.00 $663.00 Subtotal: $6,538.75 1 S577.00 Sr577.00 Subtotal: $577.00 t $1,849.00 $1,849.00 l $475.00 $475.00 1 $780.00 $780.00 Subtotal: $3,104.00 Grand Totals: $10,219.75 Page I PlAYMORE Recreational Products & Services 10271 Deer Run Farms Road, Suite Fort Myers, FL 33966 (239) 791-2400 (239) 791-2401 fax (888) 886-3757 toll free www.playmoremline.com Client: Village of Tequesta 399 Seabrook Road Tequesta FL 33469 QUOTATION 06/1412021 Job Number:16418 Phase: Small PG Opt 1 Revision: Job: Constitution Park 399 Seabrook Road Tequesta FL 33469 General Terms: Acceptance by a signature, purchase order. or contract based on this proposal indicates that you are in full agreement with all terms and conditions of this proposal, induding the following: • Prices are valid for 30 days. unless otherwise noted. After 30 days. prices are subject to change without notice. • Sales Tax will be charged unless a valid Sales Tax Exemption Certificate is presented with order • Specify all colors and options in writing Any discrepancies that anse due to oral selections will be the responsibility of the customer • If the customer is installing equipment ail equipment is to be installed per manufacturers instructions and applicable guidelines. • Installation, site work, permits, engineering, etc are not included unless noted Building Permits: Building permits are the responsibility of the owner If a budding permit is required for your project the following options are available • Add 5%(minimum $1.500) to the quotatiordcontract price Playmore Recreational Products and Services will cover the costs of all the building permit fees and expeditor fees • Playmore Recreational Products and Services can assist the customer in obtaining their own pernd. Customer is responsible for all fees directly to the permitting agency and/or the expediting company NOTE — All zoning, planning, environmental. etc. permits and approvals are the responsibility of others as well as any required site plans. If signed and sealed engineered drawings are needed for the installation of equipment this will be included on the proposal. If it is omitted and later discovered necessary, the cost will be the responsibility of the customer Standard Services Include: • Shipping NotificationlReceiving Instructions • Layout of Equipment • Pre -Installation On -Site Meeting • Installation of Equipment and Materials per Manufactver's Instructions • Underground Utility Check (Sunshine State One Call) • Trash Clean Up (Leave on site.) o Accept Delivery and Unload Equipment (If site is ready) • Post -Installation Walk Through • Moving New Equipment at Job Site • Maintenance Explanation Customer Responsibilities (unless otherwise noted in the applicable quotationicontract): • Trash Disposal — Dumpsters or Off Site Disposal. • Accept Delivery and Unload Equipment (If site is not ready ) S500 00 Charge will apply if Customer warts Installers to Unload. • Provide Area for Storage and Staging. • Secure Site and Equipment. Some Optional Responsibilities (Must be clearly outlined in the applicable quotation/contract): • Removal of Existing Equipment • Site Preparation Grading Drainage Systems. etc • Engineered Drawings for Purchased Equipment • Other Permits or Engineered Drawings (i.e zoning permits. environmental permits. site surveys, etc.) Any other responsibilities must be clearly outlined in the applicable quotation/contract. General Notes AccessAJtilities. Access must be provided to the installation area for heavy trucks and equipment Access of equipment and personnel is the obligation of the customer to provide until the project is fully completed We will take every precaution to avoid damage. however any damage caused by the normal installation of our product. such as to sod concrete sidewalks private underground utilities. etc .will be the responsibility of the customer as will any additional costs associated with limiting damage such as providing plywood over sod for access If access is not reasonably dose to the jobsite. arty additional costs incurred due to having to transport materials and/or supplies will be the responsibility of the customer Rock/Foreign Object Clause. Most installations require digging of holes and footing equipment in concrete below finished grade. Removal of existing ground covers such as asphalt, concrete. tan bark. sand, pea gavel, wood fiber rubber matting poured -in -place rubber surfacing, or any other material that interferes or delays the digging of holes is the responsibility of others unless otherwise noted. If excessive underground obstructions such as rocks. coral, asphalt. concrete, pipes, drainage systems, root systems, water or any other unknown obstructions are discovered, charges will be added to the original proposal Playground Surfacing. All playground equipment is to be installed over safety surfacing per CPSC guidelines and ASTM standards. If the customer contracts for something contrary to the guidelines. they are accepting all responsibility for any liability and future litigation that may arise. Acceptance Signature. X Date d. a P O # 7 Page 2 of 2