Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 18_9/9/2021Agenda Item #18. Regular Council STAFF MEMO Meeting: Regular Council - Sep 09 2021 Staff Contact: Greg Corbitt, Director of Parks and Department: Parks and Rec Recreation Authorize Additional Change Orders in the Amount of $2,852.73 with Hedrick Brothers Construction in Connection with Construction of the New Community Center SUMMARY: Contract Potential Change Order #2000-026: CE #054 - Added CMU Piers and foundations at the Dumpster Enclosure. This document and any attachments may be reproduced upon request in an alternative format by completing our Accessibility Feedback Form, sending an e-mail to the Village Clerk or calling 561-768-0443. Approval of Change Order #2000-026 PCO#2000-026 Added Piers to Dumpster Enclosure Page 236 of 250 AandMDRIC;K 0 BROTHERS El CONSTRUCTION Hedrick Brothers Construction Co., Inc. 2200 Centrepark West Drive, Suite 100 West Palm Beach, Florida 33409 Phone: (561) 689-8880 PCO #2000-026 Project: 20-399-01 - TEQUESTA COMMUNITY CTR 399 Seabrook Road Tequesta , Florida 33469 Prime Contract Potential Change Order #2000-026: CE #054 - Added Piers at Dumps TO: VILLAGE OF TEQUESTA FROM: HEDRICK BROS CONSTRUCTION CO., INC 345 TEQUESTA DRIVE 2200 CENTERPARK WEST DRIVE SUITE 100 TEQUESTA Florida, 33469 WEST PALM BEACH Florida, 33409 PCO NUMBER/REVISION: 2000-026 / 0 CONTRACT: 20-399-01 - VILLAGE OF TEQUESTA COMM CTR REQUEST RECEIVED FROM: Mark Stutler (BENCHMARK III CREATED BY: Kim Blair (HEDRICK BROS CONSTRUCTION CORPORATION) CO., INC) STATUS: Pending - In Review REFERENCE: Benchmark III COR 13 FIELD CHANGE: No LOCATION: SCHEDULE IMPACT: POTENTIAL CHANGE ORDER TITLE: CE #054 - Added Piers at Dumps CHANGE REASON: Other CREATED DATE: 8/20 /2021 PRIME CONTRACT None CHANGE ORDER: ACCOUNTING METHOD: PAID IN FULL: Amount Based No TOTAL AMOUNT: $2,852.73 POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #054 - Added Piers at Dumpster Enclosure Additional costs associated with the added CMU piers and foundations at the dumpster enclosure. ATTACHMENTS: # SubJob Cost Code Description Type Amount 1 PCCO#022 Added Pires@ Dumpster 15-03-309 - Shell Additional costs associated with the added CMU piers and foundations at the dumpster enclosure. Subcontractor $ 2,610.00 Subtotal: $2,610.00 General Liability: 1.30 % Applies to all line item types. $ 33.93 Contractor's Fee: 6.50 % Applies to all line item types. $ 169.65 Subcontractor Default Insurance: 1.50 % Applies to all line item types. $ 39.15 Grand Total: $2,852.73 Contractor Hedrick Brothers Construction Co., Inc. 2200 Centrepark West Drive, Suite 100 West Palm Beach, Florida 33409 Owner VILLAGE OF TEQUESTA 345 TEQUESTA DRIVE TEQUESTA, Florida 33469 Signature Date Signature Date Page 237 of 250 Hedrick Brothers Construction Co., Inc. page 1 of 1 Printed On: 8/20/ 2021 12 :48 PM Agenda Item #18. 00.G BENCHMARK III August 19, 2021 Jacob Carrier Hedrick Brothers Construction Co., Inc. 2200 Centrepark West Drive, Suite 100 West Palm Beach, FL 33409 Re: Tequesta Community Center — COR No. 13: Added Piers at Dumpster Enclosure Dear Jacob, We are submitting this change order request in the amount of $2,610.00 for the additional costs associated with the added CMU piers and foundations at the dumpster enclosure. Attached you will find the itemized breakdown. If you should have any questions or need additional information, please call. Sincerely, Mark Studer Estimator marks@benchmark3.com 2696 SE Market Place • Stuart, FL 34997 Tel: 772-320-0206 • Fax: 772-320-0209 • E-mail: benchmark3corp(d)aol.com \\Benchmark-AP 1\redirects\Marks\Documents\Tequesta Community Center\Changes\COR Request No. 13 - Added Piers at Dumpster.docx Page 238 of 250 Agenda Item #18. Added Piers at Dumpster Enclosure for Tequesta Community center Village of Tequesta Change Order Request No. 13 Summary Sheet Item Description unit qty material labor subs/rental Material Labor Subs/rental Total unit cost unit cost equip Equip 1 general requirements Is 1 5 149 57 5 149 57 211 2 added 3'-6"x3'-6"x20" Pier Ftg ea 2 248.00 281.00 45.00 496 562 90 1,148 3 16"x16" CMU Pier Is 1 0.00 0.00 495.00 0 0 495 495 4 16"x16"x8" Conc Cap ea 2 32.00 12.00 0.00 64 24 0 88 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 subtotal 565 735 642 1,942 Material Sales Tax 7.00% 40 Labor Burden 28.0% 206 Builders Risk Ins. na 0 Contractors Liability Ins 1.20% 31 Markup 15.00% 392 0 0 Total 2,610 Page 239 of 250