Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 07A_6/13/2002lm:(A) INTEROFFICE MEMORANDUM TO: MR. MICHAEL R. COUZZO, JR., VILLAGE MANAGER FROM: JEFFERY C. NEWELL, COMMUNITY DEVELOPMENT SUBJECT: "PRELIMINARY PLAT' TEQUESTA CAY DATE: 6/3/2002 Subdivision Regulations Article III, section 1, set forth the guidelines for submission of a "Preliminary Plat" approval. Tequesta Cay (Centex Homes) hereby comes before the Village Council for approval of the Preliminary Plat based on the following criteria: 1) Submission of a completed plat meeting the criteria as set forth in Article III, Section 1. 2) Submission of a draft Preliminary Plat. 3) Submission of a Boundary and Topography Survey. 4) "Declarations" currently under review by Village Attorney. 5) Submission of a request for the placement of a "Dry Model' prior to final plat approval. 6) Submission of a request for a "temporary sales trailer" prior to final plat approval. 7) Review by staff. Staff has review all the submitted material and has found that the submitted plat has met the requirements of the subdivision regulations for preliminary plat approval. Under, Article II, section 2(5), staff is submitting the technical requirements of the site plan review to comply with this section. Staff agrees that this project meets the requirements of this section. Staff recommendation of approval is conditioned on the following- 1) Approval contingent upon final review and changes (if required) of the "Declarations" at the time of submittal for "Tentative Final Plat". 2) Approval contingent upon the changes requested in the "Dedications" as required by the Village of Tequesta. These changes are the addition of the phrase, "without recourse to the Village of Tequesta", added to the tracts A, B, and C. 3) This approval is based on form and legal substance of the preliminary plat and declarations. 4 Centex Homes is requesting a waiver to Article II, section 5(5). This regulation prohibits the issuing of any building permits prior to the recording of the final plat. They are requesting two items: 1) The construction of an eight (8) unit building prior to final plat approval. See enclosed request for further details. 2) The placement of a temporary sales trailer on the construction site prior to the final plat approval. See enclosed request for further details. Staff recommends the approval of the preliminary plat as submitted with the contingency as stated on page one of this memo. The Village Council has granted the above requests in the past. The Council is authorized under the subdivision regulations to grant such waiver in the mixed -used zoning district. 2 FILE No.834 05/24 '02 15:40 Il: FAX: PAGE 3i 3 CEINTEX HOMES May 22, 2002 Mr. Jeff Newell Director of Community De-elopment Village of Tequesta 357 Tequesta Drive Tequesta, Fl- 33469 RF- Tequesta Cay - ( entex Homes Request for appr )val to have a "pry Model" On the site and a Waiver to Article II of the subdivision Code Dear Mr. Newell: Southeast Florida Division also Jog Road, Suite 200 Boynton Beach, Florida 33437 Pnone: (sel) M-1000 Fax: (561) 536-1060 www.Cant&xHomes-BEFlorida.com Please accept this letter e s our request for Village Council approval of a waiver to allow a "Dry Model" on the Tequesta ( ay site. As you are aware, the Village of Tequesta Code allows the Village Council to grant wi livers to specified items when reviewing the proposed preliminary plat. Since there are no code., or ordinances related to "Dry model" construction in the Village of Tequesta's code of ordir ances, we have attached herein a copy of the land development regulation as it relates to "I )ry Models" for your reference. A "Dry Model" is defined as a model home or model row, which is built prior to receiving plat approval and/or engineerii g approval for the site. The model would be built without any exterior water or sewer connectic ns to the building giving it its name "Dry Model". This process of construction allows the de reloper to use the model as a showpiece for sales following site plan approval and prior to the p at/or engineering being approved. The developer understands that he is at risk if anything shoul i go wrong with the engineering approval or the approval of the plat. Following plat and enginot ring approval, water and sewer connections will be made to the model and final C/O will be away led. The units will eventually be sold as a spec unit. We request the following: Request a we ver to the subdivision code, Article II, Section V, Paragraph 5, which requires the pi at to be approved prior to the issuing of a building permit. Our request is to allow a br iilding permit to be issued after review and approval of the preliminary plat and prior 1 :) final plat approval by the Village Council. Commentary; This is to allow for the construction of Building No. 1 (8 units), four of which will be L sed as sales and the remaining four will be spec units. This has been waved on pre% ions projects reviewed by the Village Council, We appreciate your consid aration of this waiver. Sincerely, ichard H. Reace Assistant Planning and De sign Manager Centex Homes FILE No.834 05/24 102 15:40 I): FAX: PAGE 2i 3 CEIVTEX HOMES Southeast Florida Dlvislon 8198 Jog Road, Suite 200 Boynton Beech. Florida 23437 Phone: (561) 536.1000 Fax: (561) 536-1060 May 22, 2002 www.Cantaxtiomas• SEFlonaa. oom Mr. Jeff Newell Director of Community DeN, slopment Village of Tequesta 357 Tequesta Drive Tequesta, FL 33469 RE: Tequesta Cay — C 3ntex Homes Request for apprc Val to have a temporary sales trailer On the site and a Naiver to Article II of the subdivision Code Dear Mr. Newell: Please accept this letter is our request for Village Council approval of a waiver to allow a temporary sales trailer on It ie Tequesta Cay site. As you are aware the Village of Tequesta Code allows the Village Counci to grant waivers to specified items when reviewing the proposed preliminary plat. 1 Request a wai /er to the subdivision code, Article II, Section V, Paragraph 5, which requires the pl, it to be approved prior to the issuing of a building permit. Our request is to allow a bt ilding permit to be issued after review and approval of the preliminary plat and prior b) final plat approval by the Village Council. Commentary; this is to allow for the development of the proposed sales trailer/office for the subject property. This has been waved on previous projects reviewed by the Village Counci . The Village Council has also approved the use of temporary sales trailers on site; within the Village, We appreciate your consid, :ration of this waiver. Sincerely, Richard H. Peace Assistant Planning and De: ign Manager Centex Homes si"'mc >®WE� i-E NITI LE Mr. Jack Horniman, Consulting Planner Village of Tequesta 357 Tequesta Drive Tequesta, FL 33469 RE: Tequesta Cay — Centex Homes Request for approval to have a sales trailer On the site and a Waiver to Article 11 of the subdivision Code Dear Mr. Horniman: ja'•)I'aE V. vi: r,7.ild. t^`._ i %. Hol Drily C)Ma.,orc. March 27, 2002 Please accept this letter as our request for Village Council approval to have a temporary sales trailer on the site and a waiver for the following item on our request for Site Plan Review. As you are aware the Village of Tequesta Code allows the Village Council to grant waivers to specified items when reviewing the proposed site plan. Request a waiver to the subdivision code, Article 11, Section V, Paragraph 5, which requires the plat to be approved prior to the issuing of a building permit. Our request is to allow a building permit to be issued after review and approval of the preliminary plat and prior to final plat approval by the Village Council. Commentary: This is to allow for the development of the proposed sales trailer/office for the subject property. This has been waved on previous projects reviewed by the Village Council. The Village Council has also approved the use of temporary sales trailers on sites within the Village. We appreciate your consideration on these waivers. George G. Gentile, FASLA President q VILLAGE OF TEQUESTA DEPARTMENT OF CO1 &RJNITY DEVELOPMENT Post Office Box 3273 250 Tequesta Drive - Suite 305 Tequesta, Florida 33469-0273 (561) 575-6220 - Fax: (561) 575-6224 RECEIPT: _ CHECK NO.. AMOUNT; SITE PLAN REVEEW APPLICATION & CHECKLIST PROJECT: Tequesta Cay - A Centex Homes Development LOCATION: South side of Village Blvd.,± 350' west of US Highway One. PROPERTY CONTROL NUMBER 60-43-40-30-00-002-0010 ADDRESS: A. DRC REPORT & APPLICANT RESPONSE: see attched exhibit A B. STATEMENT OF OWNERSHIP: see attached exhibit: B C. STATEMENT OF INTENDED USE: see attached exhibit C D. STATEMENT OF COMPLIANCE WITH COMP PLAN & CONCURRENCY REQUIREMENTS: see attached exhibit D E. STATEMENTS OF PRELIMINARY REVIEW BY OTHER AGENCIES. see attached -ehibi F. GENERAL LOCATION MAP: see attached exhibits F G. ENVIRONMENTAL HAPACT ANALYSIS/STUDY: see attached exhibit G H. TREE SURVEY: see attached survey I. SITE PLAN: 1. ARCHITECT -ENGINEER -SURVEYOR PLANNER -DEVELOPER: x 2. DETAILED DESCRIPTION: (a) BOUNDARIES & TOPOGRAPHY x (b) EXISTING STREETS X (c) ADJACENT BUILDING &/OR STRUCTURES X (d) ACCESS (INGRESS & EGRESS) x (e) TRAFFIC IMPACT STATEMENT see attached exhibit H (f) TOTAL PAVING WITHIN PARKING AREAS (SQ. FT. & %) X (9) OFF STREET PARKING/LOADING AREAS X (h) TABULATION OF PARKING/LOADING SPACES x n (i) RECREATION FACILITIES & LOCATION interior of prod ect 6) SCREENS & BUFFERS 15'-25' landscape buffers (k) REFUSE COLLECTION AREAS curb side pick-up (1) AVAILABILITY OF UTILITIES: POWER X WATER x SEWER X TELEPHONE X CABLE TV x FIRE HYDRANTS x (m) PROPOSED UTII,ITY EASEMENTS OR GRANTS x (n) PROPOSED RIGHTS -OF -WAY none 3. GROSS ACREAGE / ACRES & SQ. FT. 3.52 (a) TOTAL OPEN SPACE (SQ. FT. & %) 4 7, 3 5 0 s . f . 3 0.8 % (b) TOTAL LOT COVERAGE (STRUCTURES)(SQ. FT. & %) 54,164 s.f. - 35.3% (c) TOTAL LOT COVERAGE (IMPERVIOUS SURFACE: ALL PAVING, WALKWAYS, PATIOS, DECKS, ETC.) (SQ. FT. & %) 108,510 s f - 70.7% (d) LOT COVERAGE (GREEN AREAS) (SQ. FT. & 9%): I . WITHIN ALL PAVING AREAS 9 0 0 7 s , f , - 5.9 % 2. REMAINDER ALL AREAS 36,028 s . f . - 2 3.4 % 3. TOTAL LOT COVERAGE 45,035 s , f. - 2 9.3 % (e) UNITS PER ACRE 16.4 8 (f) TOTAL SQ. FT. AREA ALL BUILDINGS, ALL FLOORS 1 o 7 $ 6 6 9 s . f , J. PROPERTY & LANDSCAPE MAINTENANCE PROVISIONS (AGREEMENTS / SURVIVABILITY BONDS) ----- K. PRELFVIINARY PLANS AS FOLLOWS: I. STORM DRAINAGE see attached engineering plans 2. SEWER LAYOUT see attached encineering plans 3. WATER DISTRIBUTION & SYSTEM LAYOUT see attached (INCLUDING BACKFLOW PREVENTER LOCATIONS) engineering plans 4. UNDERGROUND ELECTRIC LAYOUT (INCLUDING TRANSFORMER LOCATIONS) 11� 5. TELEPHONE & CABLE UNDERGROUND LAYOUT (INCLUDING ABOVE see final GROUND )UNCTION & DISTRIBUTION BOX LOCATIONS) p n rr i n a a r i n r7 drawings L. ARCHITECTURAL ELEVATIONS (ALL ORIENTATIONS) see a t t: a c g e d l a n$ M. BUILDING APPEARANCE & LANDSCAPING x N. SIGNS (PROPOSED NUMBER, TYPE, SIZE & LOCATIONS) 1 , 6 ' OA . . 0. PROPOSED TOPOGRAPHIC CONSIDERATIONS (DREDGING, FILLING, SLOPE, DRAINAGE PATTERNS, NATUH?AL VEGETATION, ACCESSIBILITY, RETAINING WALLS, BERMS, PRIVACY WAILS AND/OR FENCES) P. FLOODPLAIN MANAGEMENT CONSIDERATIONS: ZONE DESIGNATION 2. BASE FLOOD ELEVATION 3. PROPOSED FINISH FLOOR ELEVATION 2 2.7 5 min. 4. COASTAL HIGH HAZARD DESIGN CONSIDERATIONS Q. DEVELOPMENT STAGES (PHASES) none e,7 DATE 23 COPY SETS REQUIRED AS FOLLOWS: 2 Sets- Full Size, Engineered Signed and Sealed(Used for permitting) 8 Sets -Full Size 13 Sets -Reduced to 11 a 17 ONLY if legible Jur-117-226t 83.; 3 1—30484a ORD 127--1 Ppp 184a Can 2,670,744.N par 18,751,61) Prepared tayheturn to; qA D N N IA A iIM IM A IAI NN J DAL Girvin, Esquire J Douglas Rawls Girvin, PA j suite W, Oceanside Professional Building 1060 E.indiantovm Road Jupiter, Fladda 35477 (This space mzarvad for recording), TR 1USTEE$ DEEQ THIS INDENTURE made this _LL---day of July, 2001, by and between FIRST UNION NATIONAL BANK OF FLORIDA, successor by merger to the Bank of Palm beach and Trust Company, acting as trustee pursuarit to, and by virtue of, the powers vested in it by that certain Trustee's peed dated the 1st day of June, 1984, and recorded in Official Records Book 4258, Pages 77 to 82, Inclusive, public records of Palm Beach County, Florida, and that certain Trust Agreement designated as Land Trust No. 200, governing the premises herein conveyed and dated the 1st day of June, 1984, and every other power and authority to Grantor vested thereunder, hereinafter referred to as Grantor, and CENTEX HOMES, a Nevada general partnership, whose mailing address is 8198 Jog Road, Suite 200, Boynton Beach, Florida, hereinafter referred to as Grantee. WITNESSETH, that said Grantor, for and In consideration of the sum of Ten Dollars ($10.00) and other good and valuable consideration to said Grantor in hand paid by said Grantee, the receipt whereof is hereby acknowledged, has granted, bargained and sold to the raid Grantee, and Grantee's heirs and assigns forever, the following described land, situate, tying and being In Palm Beach County, Florida, to -wit: A parcel of land lying In the Southwest quarter of Section 30, Township 40 South, Range 43 East, Palm Beach County, Florida, being more particularly described as follows: Commencing at the intersection of the North line of said Southwest quarter and the Easterly right-of-way line of Old Dixie Highway, as recorded in Road Plat Book 5, Pages 144 -148, Palm Beach County, Florida, public records; thence bear S 22' 41' 51" E (bearing base), along said Easterly right-of-way line, a distance of 1,048,16 feet to the Point of Beginning; thence continue 5 22' 41' 51" E along said easterly right of way line a distance of 674.86 feet to the intersection with the North line of Tequesta Drive, as recorded in Official Record Book 6018, Page 1264, public records of Palm Beach County, Florida; thence S 67' 34, 48" E, along said North right-of-way tine, a distance of 35.28 feet; thence N 67' 32' 15' E, along said North right-of-way line, a distance of 318.51 feet; thence N 22' 34' 45" W, a distance of 205.00 feat; thence N 67.32' 15" E, a distance of 100.0 feet; thence S 22' 34' 45" E, a distance of 205.00 feet to the Intersection with said North right-of-way line of Taquesta Drive; thence N 67' 32' 15" E, along said North right-of-way line, a distance of 11.54 feet to the point of curvature of a curve concave to the South having a radius of 391.00 feet; thence Easterly along said curve, through a central angle of 5' 40' 14", a distance of 39.09 feet to the intersection with the West line of Tequesta Oaks, as recorded in Plat Book 79, Pages 93 - 97, public records of Palm Beach County, Florida; thence, N 22' 54' 08" W, along said West Line, a distance of 703.73 feet; thence S 67' 18' 09" W, a distance of 491.75 feet to the Point of Beginning, SUBJECT TO: restrictions, reservations and easements of record, if any, and taxes subsequent to December 31. 2000. TO HAVE AND TO HOLD the above -described premises in fee simple forever, with all of M 127'P 119149 MROTHY H. 11111a 612 P9 M*TY, FL (ThIS SPOC41 rv"rvs4 for —ding) Its rights, easements, appurtenances, tenements and hereditarrients to Grantee, their heirs, successors and assigns, to ftir use and behalf forever. The conveyance of the above -described real prop" Is made without warranties of title. IN WITNESS WHEREOF, Grantor has hereunto set Its hand and real the day and year first above written. FIRST UNION NATIONAL BANK OF FLORIDA, as trustee under L.T. No. 200 By: Vw*-Presidentend Trust Office we (Corporate S") STATE OF FLORIDA: COUNTY OF PALM BEACH, The foregoing instrument was acknowledged before me this !+_-A-ay of July, 2001 by r—'C - , as Vice -President and Trust Officer of the FIRST UNION NATIONAL BANK OF FLORIDA, who did not take an oath. VMuuCTOOTA N VEIMAH TWIM NarARypU=srA'M0FF"=oA F= CobOAMN ?a CCOOM Ce MWK;70A.aff 2 W (Notary Seall) ML Y wasno" Notary Public State of Florida Personally Known %>< OR Produced Identification Type of Identification Produced Page 2 GENTILE HOLLOWAY OVAHONEY 6 A 5 5 0 C I A I E 5. INC Tequesta Cay STATEMENT OF INTENDED USE March 27, 2002 The 3.52-acre subject parcel of land is found on the south side of Village Boulevard, approxim,ately 350' west of U.S. Highway One. , The parcel is borderred on.the north property boundary by Village Boulevard, bordered on the east by the mixed -use zoned Tequesta Terrace, A.L.F., bordered on the. south by the Tequesta Commerce Center and bordered on the west by vacant Preserve area. The proposed development consists of 58; fee simple, residential townhomes; each with a front - loading covered garage and driveway. There are two building types,. an 8 unit building and a 10 unit building. Tequesta Cay .also provides a recreation facility for its residents consisting of a pool, cabana and an open grassed area. The project will be accessed directly and exclusively from Village Boulevard, via a,divided, non -gated entry. Mail distribution will occur through the use of clusfer mailboxes located throughout the project. Refuse and recycle collection will'be provided by Nichols Sanitation through curbside pick-up services. Tequesta Cay provides each building and unit with.. ample landscaping to provide . the neighborhood with a harmonious landscape theme through the use of Laurel Oak street trees, Cabbage Palm and Queen Palm . driveway plantings and lush building foundation plantings to unify the buildings and walkways Exhibit `C' GENTILE HOLLOWAY O'MAHONEY - d A550L IAi E5. i9L Tequesta Cay STATEMENT OF COMPLIANCE WITH THE COMPREHENSIVE PLAN & CONCURENCY- REQUIREMENTS The proposed Tequesta Cay project is located on the south side of Village Blvd., approximately 350',west of U.S. Highway One, within the corporate limits of The Village of Tequesta, The project will have,58 units on 3.52 Acres' for a maximum density of 16.48 units peeacre. The project is consistent with the Village's Comprehensive plan, as follows: • The project's density i� below the maximum density of the Mixed Use District, (1,8 d.u./ac.), of the Village of Tequesta and is consistent with the density maximum as stipulated within the Comprehensive Plan. • The project is further consistent with the Comprehensive plan, as well as the Foncurrency requirements in that .it is located within the urban service area of the Village and has all the municipal services available including water, sewer, electrical power and other utilities that are found in other developed areas of the Village. Y • The project is consistent with the.Traffic element of the Comprehensive• plan in that the mixed use district is exempt from meeting the -service levels as established by Palm Beach County, so as to concentrate development in the mixed use district and revitalize the Village Center. • The project is within the service area of the Village of Tequesta's police and fire rescue services. • The project will provide on site recreation amenities including a pool, cabana, walkways and other open space that will minimize impacts to the Village"s recreation facilities. Exhibit `D' 11� Loxahatchee River 2500 Jupiter Park Drive, Jupiter, Florida 33458-8964 Telephone (561) 747-5700 Fax (561) 747-9929 e-mail: osprey@loxahatcheeriver.org Richard C. Dent, Executive Director January 14, 2002 M. Troy Holloway, Sr. Vice Pres. Gentile Holloway O'Mahoney 1907 Commerce Lane, Suite 101 Jupiter, Florida 33458 District Celebrating .30 Years RE: Tequesta Cove, Tequesta, Palm Beach County, Florida Dear Mr. Holloway: �1R�N�iFN� 0x, 0 1971 Award Winning Regional Wastewater Facility Best in Nation, EPA. Best in State, D.E.P. This letter is provided in response to your recent request concerning sanitary sewer service availability for the subject project. Please be advised that, as of this date, sanitary sewer service can be made available to the subject property upon the joint execution of a Developers Agreement and the payment of certain costs in accordance with the District Rules. Copies of the Developer Agreement and Chapter 31-10, F.A.C., are available for your review. Consistent with District policy, the Developer will be responsible for all costs associated with connecting to the existing wastewater system of the District. Please be advised that the plan submitted with your letter of January 4, indicates tying into a sewer line which is outside of the public right of way, on Tequesta Plaza property. Your client will be responsible to obtain the required easements to access this line. Should you require additional information on this matter, do not hesitate to contact me. Sincerely, in on es Deputy Di cto J:/dev/prq/tegcov/avaiftr.wps Loring E. "Snag" Holmes Matt H. Rostock Joseph O. EBis Richard C. Sheehaa G i Board Member Board Member Chairman Board Member Exhibit E 03/27/2002 08:48 561-575-6245 PUBLIC WORKS FAG PAGE 01 VILLAGE OF TEQUESTA UTILITIES DEPARTMENT `+ )?vSt Oice Box 3474. 136 Bridge Road ' o Tequesta, Florida 33469-0474 • (561) 575-6234 Eax:(561)575.6245 u March 27, 2002 SENT VIA FAX & US MAIL Mr. Troy Holloway Gentile, Holloway, & O'Mahoney 1907 Commerce Lane Suite 101 Jupiter, Florida 33458 RE: TEQUESTA CAY Dear Mr. Holloway. In response to your recent request, this is to advise that the Tequesta Utilities Department is the purveyor of water service to the above referenced. Service to be provided will be in accordance with the Tequesta Utilities Department Water Service Policy and appropriate Water Service Agreement as required. This is a letter of service availability only and not a commitment of service. As of this date, The Tequesta Utilities Department has capacity to serve this project and a firm commitment will be established when the Water Service Agreement and the Tequesta Utilities Department have executed the appropriate agreements and connection fees have been paid. Should you have any questions, please do not hesitate to give me a call Sin er , /Z. Russell R. White Public Services Supervisor c. Michael Couzzo Jr. Village Manager Jeffrey Newell, Director of Community Development 10435 Ironwood Rc,_ Palm Beach Gardens, FL 33410 Phone (561) 627-3600 . ,Adelphia Fax (561) 627-1266 January 10, 2002 Mr. M. Troy Holloway Sr. Vice President Gentile Holloway O'Mahoney 1907 Commerce Lane, Suite 101 Jupiter, FL 33458 Re: Tequesta Cove, Village of Tequesta Dear Mr, Holloway: This letter is to confirm Adelphia's availability of service to the above -mentioned property. Upon availability, please send a set of proposed or approved plats that would indicate where utility easements are located for our design staff. Thank you and we look forward to serving your property. Since ely, on E. Benson Construction Supervisor Q%My Documents\ Documents\ New Construction\ LETTERS\ Don Benson\Cable Availabllity\Tequesta Cove.doc V If OV'LVV(, "VL, aV. GO r&-t i49ia/.7V44J rrL IUrLILK JVF, 04� E 0 FPL January 30, 2002 Troy Holloway 1907 Commerce Lane, Suite 101 Jupiter, FI., 33458 Re: Tequesta Cove_ Dear Mr. Holloway Florlda Power & Light Company Thank you for contacting FPL early in your design process this wiil help you achieve your desired schedule for your project "Tequest Cove'. At the present time, FPL has sufficient capacity to provide electric service to the above captioned property. This service will be furnished in accordance with applicable rates, rules and regulations. Please provide the final site plan, site surrey, paving, drainage and electrical load data as soon as possible so the necessary engineering can begin. Early contact with FPL is essential so that resources may be scheduled to facilitate availability of service when required. IY, J oe Dragon 561) 67"342 Service Planner an FPL Group Company Tuesday 26 of Mar 2002, 561 640 3400 —>561 575 5260 Page i of From: Donna Sayles OBO: Donna Sayles Date: 03/26/02 Time: 3:53 pm 7501 North Jog Road West Palm Beach, Florida 33412 Telephone:(561)640-4000 Fax:(561)640-3400 To: Troy Holloway Company: Location: Fax Number: "575-5260" Subject: mailfax.tif Total # of Pages: 2 Contents: Here is the standard letter which was sent to all the municipalities. This identical letter was sent to Mr. Michael Couzzo of the Village of Tequesta. 'Tuesday 26 of Mar 2002, 561 640 3400 —>561 575 5260 Page 2 of 2 11' December 18, 2001 Mr. Charles Wu YOUR PARTNER FOR Interim Growth Mgmt. Director SOLID It.ASTF. SOLL71nN5 City of Palm Beach Gardens 10500 N. Military Trail Palm Beach Gardens, FL. 33410 Subject: Availability of Solid Waste Disposal Capacity Dear Mr. Wu: The Solid Wastc Authority of Palm Beach County hereby provides certification that the Authority has disposal capacity available to accommodate the solid waste generation for the municipalities and unincorporated county for the coming year of 2002. This letter also constitutes notification of sufficient capacity for concurrency management and comprehensive planning purposes. Capacity is available for both the coming year, and the five and ten year planning periods specified in 9J-5.005(4). As of September 30, 2001, the Authority's North County Landfills had an estimated 32,721,759 cubic yards of landfill capacity remaining. Based upon the existing Palm Beach County population, the most recently available population growth rates published by the Urtiversity of Florida Bureau of Economic and Business and Research (BEBR), and projected rates of solid waste generation, waste reduction and recycling, the Solid Waste Authority forecasts that capacity will be available at the existing landfill through approximately the year 2021, assuming the depletion of the Class I and Class III landfills is approximately balanced. The Authority continues to pursue options to increase the life of its existing facilities and to provide for all the County's current and future disposal and recycling needs. As par; of its responsibility, the Authority will provide an annual statement of disposal capacity, using the most current BEBR projections available. Please proNide copies of this letter to your plan review and concurrency management staff. If you have any questions or I can be of further assistance, please do not hesitate to contact me. Very truly yours, Marc C. Bruner, Ph,D. Director of Plarming and Environmental Programs 7401 NWh Jog Road, West Palm $each, Florida SU12 (561)6404tlQtl FAX 1561} 640-3400 Her, C.v Tequesta Cry Centex Homeg Villagc of Tcquesta l =01g.A.Location Map Land Use: Vvhihit 6v �^ Tequesta Ca. k.,enLex Homes Village of 'Tequesta ct 7%if"-Y-411911Zoning Map Zoning. Land Use: Mul�YR:SW 7e P114DER TROUTMOH CVNSULTING, 111C. 10­�sportation Planners and Engineers 2324 South Congress Avenue, Suite 1H West Palm Beach, FL 33406 (561) 434-1644 Fax 434-1663 Email: pindertroutman@msn.com October 24, 2001 Mr. Michael Nisenbaum Centex Homes 8198 Jog Road, Suite 200 Boynton Beach, FL 33437 Re: Village Boulevard Residential - #PTC01-156 Dear Mr. Nisenbaum: The purpose of this letter is to provide a traffic statement for the above referenced project to determine if the proposed development meets the requirements of Article 15, Traffic Performance Standards (TPS), of the Palm Beach County Unified Land Development Code (ULDC). It is proposed to develop 58 single family residential units east of US 1 in the Village of Tequesta. Per Section 15.(I)L, Coastal Residential Exception, of the Countywide TPS, in order to promote urban infill, residential developments in this area are exempt from the level of service requirements of TPS. The proposed residential development is within this Coastal Residential Exception area; therefore no further traffic analysis is required. However, for information purposes for the Village of Tequesta, a traffic impact analysis of the directly accessed roadway links is provided. Attachment 2 provides the daily, AM and PM peak hour trip generation for the proposed project. Project access is via one (1) driveway to Village Boulevard, which connects to both Old Dixie Highway and US 1. The directly -accessed two (2) lane link of Old Dixie Highway south of the County line has a current (2000) annual average daily traffic (AADT) volume of 6,365 and a peak hour volume of 592 (9.3% of 6,365). Historic traffic data for the last two (2) years shows a growth rate of -2.33% per year on this link. Data was unavailable for the three (3) years time frame. With application of 1% growth rate, to provide a conservative analysis, the projected 2004 volumes are shown below. No Major Project is projected to have a 10% impact on this link by buildout of this project Existing (2000) Background Growth Project * Total (2004) LOS D Service Volume Level of Service Old Dixie Highway South of County Line Daily AM Peak PM Peak 6,365 5,92 592 258 24 24 203 19 24 6,826 635 640 14,900 1,390 1,390 C C C * Project traffic is based on a maximum assignment of 50%. LelterNisenbaum 01-156 10-24-01 Exhibit `HI Mr. Michael Nisenbaum Re: Village Boulevard Residential - #PTC01-156 October 24, 2001 Page 2 The directly -accessed six (6) lane divided link of US 1 south of the County line has a current (2000) annual average daily traffic (AADT) volume of 22,370 and a peak hour volume of 2,080 (9.3% of 22,370). Historic traffic data for the last three (3) years shows a growth rate of -0.04% per year on this link. With application of, 1 % growth rate, to provide a conservative analysis, the projected 2004 volumes are shown below. No Major Project is projected to have a 10% impact on this link by buildout of this project. Existing (2000) Background Growth Project * Total (2004) LOS D Service Volume Level of Service US 1 South of County Line Daily AM Peak 22,370 2,080 908 142 23,420 48,900 C 84 13 2,177 4,550 C * Project traffic is based on a maximum assignment of 35%. PM Peak 2,080 84 17 2,181 4,550 C This analysis shows that, although the project is exempt from TPS, the directly -accessed links are projected to operate at adopted level of service standards. This development is in compliance with the Traffic Performance Standards of Palm Beach County. Attachment 3 provides the driveway volumes for the site. Based on the project peak hour turning movement volumes, auxiliary turn lanes along Village Boulevard would not be required per County Standards. If you have any questions, please do not hesitate to contact this office. /;P.E, rea M. Troutr>�nf X24 F/ldr ////// "_� Attachments LetterNisenbaum 01-156 10-24-01 SMQ a elo,1 1-0� VILLAGE BOULEVARD RESIDENTIAL ATTACHMENT 1 PROJECT LOCATION 10/22/01 "c I 0 au a. Q U v I m v w ro w O Ul LEGEND 17 -AM PEAK HOUR (1 3) -PM PEAK HOUR 406 -DAILY PROJECT TRAFFIC VILLAGE BOULEVARD RESIDENTIAL ATTACHMENT 3 PROJECT DRIVEWAY VOLUMES 10/22/01 "ca ,"-'IN le� Tequesta Cove Village of Tequesta, Florida Schnars Engineering Corporation Project No. 01 158 EXFILTRATION TRENCH CALCULATIONS Water Quality Calculations A. Calculations 1. The water quality volume will be stored in the exfiltration trench and dry retention areas. a. Exfiltration trench. V = WQ Volume = 4.32 Ac-In L = trench length = ? feet W = trench width = 5 feet Ka,,s = hydraulic cond. = 9.15 x 10' cfs/ft2/ft. Hz = depth to water table = 5.0 feet Du = Non -saturated depth = 4.0 feet Ds = Saturated depth = 0.0 feet FS = Factor of Safety = 2 L = V/(K(H2W + 2H2Du - DU2 + 2H2Ds) + (1.39x10'4)WDu)) L = 91 feet of exfiltration trench required (850' provided) 2. Calculate available storage at specific elevations to be used in stage -storage a. Exfiltration trench. V = Storage Volume = ? Ac-In L = trench length = 850 feet W = trench width = 5 feet Kan = hydraulic cond. = 9.15 x 10' cfs/ft2/ft. H2 = depth to water table = 2.0 feet, at elev. 17.50' Du = Non -saturated depth = 2.0 feet, at elev. 17.50' Ds = Saturated depth = 0.0 feet FS = Factor of Safety = 1.5 L = V/(K(H2W + 2H2Du - Du2 + 2H2Ds) + (1.39x10-4)WDu)) V = 8.05 Ac-In ;z 0.67 Ac-Ft at elevation = 17.50' NGVD. /J'J NO 9 0 pJamesW. Mahannah, P.E. FL Reg. No. 47066 (FOR THE FIRM) Tequesta Cove Village of Tequesta, Florida SEC PROJECT NO. 01158 SFWMD SURFACE WATER MANAGEMENT CALCULATIONS 1) SITE DATA: 2) STAGE ELEVATIONS: ACREAGE Percent: From: Building: 1.14 Ac. 32.3% 22.75 Pavement: 1.17 Ac. 33.1% 21.00 Lake 0.00 Ac. 0.0% 18.00 Green Lineal: 1.04 Ac. 29.5% 21.50 Green Lineal: 0.15 Ac. 4.2% 18.00 Green Lineal: 0.00 Ac. 0.0/0 19.50 Green Vertical: 0.03 Ac, 0.8y, 18.00 TOTAL AREA: 3.53 Ac. 100.0% Total Impervious: 2.31 Average Existing Grade: 65.44% Average Proposed Grade Ground Water Table: Total Pervious: 1.22 34.56% 3) FLOOD AND RAINFALL CRITERIA: 24 Hour Rainfall: SFWMD, Technical Publication #81.3 /0�i Year 6.75 in. 5 Year 9.00 in. 100 Year 11.00 in. Maximum Available Soil Storage, SFWMD: 4) COMPUTE STAGE STORAGE: Min. Road Crown (NGVD): Min. Floor Elev. (NGVD): To: 24.00 up 23.50 23.00 22.00 up 22.50 22.50 3.00 21.00 22.75 8.18 in. (Applied soil storage for depth up to 4') Stage: Pavement: Green Lineal: Green Lineal: Lake Green Lineal: Green Vertical: French Drain Total: 15.50 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 16.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 16.50 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 17.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 17.50 0.00 0.00 0.00 0.00 0.00 0.00 0.67 0.67 18.00 0.00 0.00 0.00 0.00 0.00 0.00 0.87 0.87 18.50 0.00 0.00 0.00 0.00 0.00 0.02 1.07 1.09 19.00 0.00 0.00 0.02 0.00 0.00 0.03 1.29 1.34 19.50 0.00 0.00 0.03 0.00 0.00 0.05 1.69 1.77 20.00 0.00 0.00 0.06 0.00 0.00 0.06 1.96 2.08 20.50 0.00 0.00 0.09 0.00 0.00 0.08 2.18 2.35 21.00 0.00 0.00 0.14 0.00 0.00 0.09 2.4 2.63 21.50 0.05 0.00 0.18 0.00 0.00 0.11 2.4 2.74 22.00 0.20 0.07 0.24 0.00 0.00 0.12 2.4 3.02 22.50 0.44 0.26 0.30 0.00 0.00 0.14 2.4 3.54 N3.00 0.78 0.59 0.38 0.00 0.00 0.15 2.4 4.29 J1 WATER QUALITY: Greater of the following (5A. & 5B.) Store the first inch for the entire site or the amount of 2.5 times the percentage of imperviousness. Page 1 Tequesta Cove Village of Tequesta, Florida SEC PROJECT NO. 01158 SFWMD SURFACE WATER MANAGEMENT CALCULATIONS A. First Inch: V= 1 in. x Total Area x 1 ft./12 in. Total (Ac.): V = ac-ft 3.53 0.29 B. 2.5 Times Percent Impervious: 1. Site Area = Total Area - (Lake Area + Bldg. Area) Total Ac.Z Lake: Bldg.: Site Ac. : 3.53 0.00 1.14 2.39 2. Impervious Area = Site Area - Pervious Area Site Ac.: Pervious: Im erv.: 2.39 1.22 1.17 3. 2.5 in. x Imperv./Site x Total Area x 1 ft./12 in.. Imoerv.: V= ac-ft 1.17 0.36 C. Total Required Detention: 1. The total required detention is either the first inch or 2.5 times the percent impervious, whichever is greater. The total required detention is: WO (ac-ft): 0.36 2. From the Stage - Storage Curve, the elevation is: Interpolate Stage between... Interpolate Runoff between... 17.00 17.50 0.00 0.67 Stage: 17.27 6) RUNOFF (ZERO DISCHARGE) A. Soil Stora e 1. Avg. Depth to Water Table = Avg. Proposed Grade - Water Level Avq. Grade: Water Level: D jU 22.50 3.00 19.50 2. Soil Storage (S) = Available Soil Storage x Pervious Area/Total Area (See C-35, SFWMD Vol.IV) Av. Soil St. Pervious: Total (Ac j: S = in. : 8.18 1.22 3.53 2.83 B. 100 Yr.-3 Day Storm Event Finished Floor Elevation: 22.75 NGVD Page 2 Tequesta Cove Village of Tequesta, Florida SEC PROJECT NO. 01158 SFWMD SURFACE WATER MANAGEMENT CALCULATIONS 1. Rainfall - 3 Day Duration (P): P72 = P24 x 1.359 P24 = 11.00 in. P72 = 14.95 in. 2. Runoff, Q (in.) Q = ((P . 0.2 x S)^2)/(P + 0.8 x S) P72 in.: S = in.: (in.): 14.95 2.83 12.02 3. Total Runoff Volume, V (ac-ft.) V= Q x Total Area x l ft. /12 in. in. Total (Ac..- V= ac 12.02 3.53 3.54 4. From the Stage - Storage Curve, the zero discharge elevation is: Interpolate Stage between... 22.00 22.50 Interpolate Runoff between... 3.02 3.54 Stage: 22.50 The proposed Finish Floor Elevation is adequate. C. 25 Yr.-3 Day Storm Event 1. Rainfall - 3 Day Duration (P): P72 = P24 x 1.359 P24 = 9.00 in. P72 = 12.23 in. 2. Runoff, Q (in.) Q=((P-0.2xS)^2}/(P+0.8xS) P72 in.: S = in.: (in.): 12.23 2.83 9.39 3. Total Runoff Volume, V (ac-ft.) V= Q x Total Area x 1 ft. /12 in. in. Total Ac.Z V = (ac-ft): 9.39 3.53 2.76 4. From the Stage • Storage Curve, the zero discharge elevation is: Interpolate Stage between... 21.50 22.00 Interpolate Runoff between... 2.74 3.02 1101 Stage: 21.54 i. 5 Yr.-1 Day Storm Event (Minimum Road Grade) Min. Road Elevation: 21.00 NGVD 1. Rainfall - 1 Day Duration (P): P24 = 6.75 in. Page 3 Tequesta Cove Village of Tequesta, Florida SEC PROJECT NO. 01158 SFWMD SURFACE WATER MANAGEMENT CALCULATIONS 2. Runoff, Q (in.) Q = {(P - 0.2 x S)^2}/(P + 0.8 x S) P72 (in.h S = in. in. 6.75 2.83 4.24 3. Total Runoff Volume, V (ac-ft.) V= Q x Total Area x 1 ft. /12 in. in.: Total (Ac.) V = (ac-ft): 4.24 3.53 1.25 4. From the Stage - Storage Curve, the zero discharge elevation is: Interpolate Stage between... 18.50 19.00 Interpolate Runoff between... 1.09 1.34 7) SUMMARY sired Storage: Soil Storage: ZERO_ DISCHARGE 5Yr.-1 Day Storm: 25 Yr.-3 Day Storm: 100 Yr.-3 Day Storm DATE PRINTED: 09-Jan-02 Stage: 18.82 The stage is at or below the Minimum Road Crown Elevation. 0.36 ac-ft 2.83 in 1.25 ac-ft 2.76 ac-ft 3.54 ac-ft PREPARED BY: JWM 18.82 NGVD Stage Elevation 21.54 NGVD Stage Elevation 22.50 NGVD Stage Elevation REVISED BY: DATE: 10/12/00