HomeMy WebLinkAboutAgreement_General_11/15/2021_Florida Design Drilling CorpPROJECT WORK AUTHORIZATION NO. 1 WITH FLORIDA DESIGN DRILLING
CORPORATION FOR FLORIDAN WELL REHABILITATION PROGRAM
THIS PROJECT WORK AUTHORIZATION NO. 1 is entered into and effective this K
day of IUo�, by and between the VILLAGE OF TEQUESTA, a Florida municipal
corporation with offices located at 345 Tequesta Drive, Tequesta, Florida 33469-0273, organized
and existing in accordance with the laws of the State of Florida, hereinafter the "Village"; and
FLORIDA DESIGN DRILLING CORPORATION, a Florida corporation with offices located at
7733 Hooper Road, West Palm Beach, Florida 33411, hereinafter the "Contractor" and collectively
with the Village, the "Parties".
1.0 Authorization
This Project Work Authorization is issued pursuant to the Agreement for Floridan Well
Rehabilitation Program the Village and the Contractor, dated November 15, 2021, hereinafter the
"Agreement". If there are any conflicts between the terms and conditions of this Project Work
Authorization and the Agreement, the terms and conditions of the Agreement shall prevail.
2.0 Project Description:
The Utilities Department has identified a need to complete rehabilitation services of three Floridan
Aquifer Wells.
3.0 Scope of Services
Under this Project Work Authorization, the Contractor will provide the well rehabilitation services
to the Village as detailed in the Drawings and Scope of Work prepared by Mock Roos & Associates
incorporated herein as Exhibit "A".
4.0 Schedule
The services to be provided under this Project Work Authorization shall be Substantially Complete
within one hundred and twenty (120) calendar days and Finally Complete within one hundred and
fifty (150) calendar days from the Village's issuance of a Notice to Proceed.
5.0 Liquidated Damages
Contractor shall pay the Village $50 for each day that expires after the time (as duly adjusted
pursuant to the Agreement) specified in the Schedule above for Substantial Completion or Final
Completion until the Work is substantially complete or finally complete respectively.
1 of 2
6.0 Compensation
In consideration for the above Scope of Services and within the Agreement, pricing shall be
pursuant to the Agreement. In consideration for the above Scope of Services and pursuant to
Exhibit `B", the Village shall pay the Contractor a total amount not to exceed four hundred sixteen
thousand, nine hundred seventy-nine dollars and three cents ($416,979.03) inclusive of a fifty
thousand dollars and zero cents ($50,000.00) contingency allowance.
I N W I T N E S S W H E R E O F, the parties hereto have executed this Agreement on the date and
year first above written.
W ITNES ES: FLORIDA DESIGN DRILLING CORP.
By: Michael Black, geniorVice President
�%.
(Corporate Seal
f? S _ aO : A �I 9, `r7CJ.-
A.c _
rl;uoi d 0/1 U
VILLAGE OF TEQUESTA s' ;; �O��
ATTEST: By: Frank D'Ambra, Mayor
..,.��° o FQ� I
Lori McWilliams, MMC�
Village Clerk ` ` G
=> SEAL
INCORPORATED
2of2
EXHIBIT A
Background
The Village of Tequesta has a water use permit (No. 50-00046-W) from the South Florida Water Management
District (SFWMD) that allows the withdrawal of 401 million gallons (MG) per year from the surficial aquifer and
1,251 MG from the brackish Upper Floridan aquifer. The Village currently operates three production wells (R1, R2,
and R3) tapping the Upper Floridan aquifer. A fourth well (R4) has not been significantly operated more than the
minimum required for testing, reportedly because of suspended solids production. Only having three wells in
production means that all three wells need to operate most of the time to pump the annual allocation that makes
up 76 percent of the Village's water supply.
The Village has coordinated with Florida Drilling to provide a proposal for the rehabilitation of production wells R1,
R2, and R4 piggybacking on the Town of Jupiter's contract for well rehabilitation. The following scope of work is to
be complete as part of the rehabilitation for Well Nos. R2 and R3 and also for Well No. R4.
Well R2 and Well R3 Rehabilitation — Including Acidization and development
The rehabilitation of Wells R2 and R3 will include the following: removal and reinstallation of the well head,
preliminary well video logging, well acidization, post acidization well development, step-drawdown testing, final
well video logging, and well facility disinfection and bacteriological clearance, site restoration, and temporary pipe
for by-pass connection. Below is a brief summary of the main items requested.
Preliminary Well Video Logging
Preliminary static and dynamic well video logging will provide an opportunity to inspect the well before beginning
rehabilitation activities. It will provide an indication of the casing condition, material, depth and be used to
determine whether there have been any visible changes to the well such as a collapsed borehole, fouling, or
infilling.
Acidization
Following the well video, a well acidization procedure will be performed using 32% (20° Baume) hydrochloric acid
(HCI) in an attempt to restore well capacity. HCI increases the permeability of limestone in the immediate vicinity
of the borehole by dissolving precipitated calcium scale and limestone that impedes water flow from the aquifer
into the well borehole thus increasing the capacity of the well.
For the Village's Wells R2 and R3, 'low strength, high volume' acidization method in which 32% HCI is diluted with
potable water to make a weaker acid mixture (ie: 1- 3% HCI) which is then injected into the well over an extended
period of time. It is estimate that 10,000 gallons of 32% HCI will be needed for each of the two UFA wells.
Advantages of this method include a longer acid contact time and less violent reaction resulting in less chance of
complications during the procedure. Depending on the results of the first acidization procedure, a follow-up
acidization treatment may be recommended and will only be conducted with the approval of the Village. The
double procedure is be budgeted (20,000 gallons/well).
Following acidization, the spent acid will be removed from the well. Water with a pH below 6.5 will be contained
and treated using a sodium bicarbonate solution to neutralize residual acid. The neutralized water will be
discharged to settlement tanks and then the stormwater system. Purging of the spent acid will be considered
complete when the discharge water from the well is clear with a pH of 6.5 or higher. It's estimated that as much as
3 to 4 million gallons (MG) of water may be generated during this phase of the rehabilitation effort. The capacity
improvement of the well will be evaluated and, based on the results, the decision to proceed with a second
treatment will be made at that time.
Post Acidization Well Development
Following acid treatment and spent acid discharge, a test pump capable of variable discharge rates will be installed
in the well and pump development will be performed to remove formation solids generated from acidization and
to maximize production. Pump development will continue at each well to the satisfaction of CCI. Ideally,
development continues until the sand concentration is less than 1.0 part per million (ppm) and SDI's are less than
3.0 at the design flow rate of each well. It's estimated that as much as 6 to 9 MG of water may be generated during
this phase of the rehabilitation effort.
Step-Drawdown Testing
Following pump development, a three step, step-drawdown test will be conducted at rates determined by CCI, but
anticipated to be between 800 gpm and 1,500 gpm. Each step will continue until the drawdown in the well
stabilizes or for a maximum of approximately two hours per step. A manometer tube and pressure
transducer/data logger setup will be used to measure the static water level and pumping water levels and during
pumping when the water level is above the top of the wellhead. Water level measurements below the wellhead
will be performed using an electric water level tape and the data logger/transducer setup. Static and pumping
water level data will be used, along with the pumping rates, to calculate a specific capacity value for each well. The
specific capacity is the ratio of the pumping rate to the drawdown at a given time and is used to determine the
productivity of the well. The new specific capacity data will be compared to the data collected during the wellfield
evaluation to determine the percent improvement.
Final Well Video Logging
Upon completion of step-drawdown testing, final static and dynamic video logs will be performed to document
post acidization well conditions.
Wellhead Reinstallation and Well Disinfection
After the completion of testing, the permanent wellhead and discharge apparatus, well transducer, and wellhead
components will be reinstalled. Well disinfection will be performed and samples collected to confirm the
disinfection was successful and that the well is ready for service. Bacteriological sampling can be performed at the
Village's request.
Temporary Discharge Pipe
Well R2 development water will be settled out in tanks onsite and then pumped east to the recently constructed
connection to the FDOT storm drainage system. Well R3 development water will be settled out in tanks onsite and
then pumped west to the recently constructed connection to the Villages storm water drainage system.
Well R4 Rehabilitation — Including Development
The rehabilitation of Well R4 includes preliminary static and dynamic video logging, reverse air development (if
necessary), high rate development, step-drawdown testing, final well video logging, and well facility disinfection
and bacteriological clearance. Construction details will be verified during well video logging. If the preliminary well
video logging indicates that the sand is originating from behind the casing then an alternative rehabilitative
approach will be suggested.
Preliminary Well Video Logging
Preliminary static and dynamic well video logging will provide an opportunity to inspect the well before beginning
rehabilitation activities. The static log will be used to view the casing condition, material, depth, and to determine
whether there have been any visible changes to the well such as a collapsed borehole, fouling, or infilling. The
dynamic well video logging will be used to determine the origin of the sand. There are three possibilities for the
origin of the sand including from behind the casing, within the open hole section of the well, and/or from leftover
debris that wasn't cleaned out of the well during construction.
If the sand is originating in a location other than the bottom of the well, alternatives such as installing a well liner
to deepen the casing, squeeze grouting, or backfilling the open hole may need to be considered.
Well Development
If the well is found to be of sound construction and there is significant infilling of sand at the bottom of the open
hole portion of the well, then the water well contractor will use a crane and drill pipe to reverse air develop the
sand out of the well. The reverse air development is not budgeted and is considered an alternative rehabilitation
approach.
If the well is found to be of sound construction and the source of the sand is from the formation within the open
hole, then the water well contractor will install a pump capable of variable discharge rates, but with a rate of at
least 2,000 gpm and preferably 3,000 gpm. Pump development will be performed to remove the sand from within
the open hole section of the well. Pump development will continue to the satisfaction of CCI. Ideally, development
continues until the sand concentration is less than 1.0 part per million (ppm) and SDI's are less than 3.0 at the
design flow rate (1,100 gpm) of the well. It's estimated that as much as 6.7 MG to 11.5 MG of water may be
generated during the rehabilitation effort (8 hours/day at approximately 2,000 to 3,000 gpm over 7 to 8 days).
Settling tanks will be used prior to discharge to the stormwater system.
Step-Drawdown Testing
Following pump development, a three step, step-drawdown test will be conducted at rates determined by CCI, but
anticipated to be between 800 gpm and 1,500 gpm. Each step will continue until the drawdown in the well
stabilizes or for a maximum of approximately two hours per step. Water level measurements will be recorded.
Static and pumping water level data will be used, along with the pumping rates, to calculate a specific capacity
value for the well, which is the ratio of the pumping rate to the drawdown at a given time, and is used to
determine the productivity of the well. Other measurements and observations will include SDIs, sand production,
and water quality parameters including temperature, pH, specific conductance, chloride, and total dissolved solids.
Final Well Video Logging
Upon completion of step-drawdown testing, final static and dynamic video logs will be performed to document
post rehabilitation well conditions.
Wellhead Reinstallation and Well Disinfection
After the completion of testing, the permanent wellhead and discharge apparatus, well transducer, and wellhead
components will be reinstalled. Well disinfection will be performed, and samples collected to confirm the
disinfection was successful and that the well is ready for service. Bacteriological sampling will be performed.
Temporary Discharge Pipe
Well R4 development water will be settled out in tanks onsite and then pumped through the existing raw
watermain to Well No. R2 where it will be further pumped west to the recently constructed connection to the
Villages storm water drainage system.
ELL
utNrw,ui w % x° w uu'i v o
a a o - c Mark St �\
o - s Robert SI
E z oha tl
Wmgo St
V Russell Si O
ached Dr Way c,
Gc ,
p- O
0—full T lh
N,tlage Blytl
- 2 .� r•O c F N`
.,b—d Way
Bimini Rdo
f
V N 9
� 4 �
7 u
on Q` N Dover Rd Waterway Rd
a z TequelO e,.a�' ~ m
v Tequesta0' 1^ae' L! 0 0
t Beacon St a Bridge Rtl S A
Church Rd " q, � a
D at
r - Leigh Rd m Cope Rd
rady Ln Rry eT Ter Franklin Rd w -k Coconut Ln
B rn Pfnevicw Rd O O - - -
F0 WHa� Windsrn RdW
ow O li
o .ggev er ly Rd W
mood Rd
qo ID,Karv� z a a f
2017 GOGGLE - MAP DATA^C 2017 GOOGLE
C` m
Ct z'
VILLAGE OF TEQUESTA
FLORIDAN WELL REHABILITATION
FORMATION FLUIDS DISPOSAL
R j&R4 a Z
� � Sl Jude S1�
Shay PI
I 'J -
C.- i aQ
c R,
OCn
r < C
l'J =
\n(`IMITV MAP
i
'—I
Core
f'.&
SECTION 25. TOWNSHIP 40 SOUTH, RANGE 42 EAST
PREPARED FOR
TEQUESTA, FLORIDA
PALM BEACH COUNTY
J U LY 2021
TOWM RAAVOP
FRANK D'AMBRA, MAYOR
KYLE STONE, VICE MAYOR
TOWN COUNCIL MEMBER
MOLLY YOUNG
INDEX OF SHEETS
SHEET NO.
DESCRIPTION
CO-1
COVER
CO-2
LOCATION AND KEY SHEET
CO-3
GENERAL NOTES
C7-1
WELL R2 CONNECTION
C1-2
WELL R3 CONNECTION
C5-1
DETAILS
TOTAL NO. OF SHEETS - 6
LAURIE BRANDON
BRUCE PRINCE
IT'S THE LAW!
CALL 46 HOURS BEFORE YOU Uil,
1-800-432 4770
SUNSHINE STATE ONE CALL OF FLORIDA, INC.
ennwn.*oonawc
Gti GMR- ny,W1NG
A- scn:Eo
auFNslons nccoa�nc.•
UTILITIES NOTIFICATION CENTER
-
FLORIDA E.B '+: e FLORIDA L.B N0.48
FIELD --
VILLAGE OF TEQUESTA
DATE JULY 2021
JOHNP CAIRNES
DRAWN JWB
P.A. No. C0027.01
MOCK• 1\OOV
FLORIDAN WELL REHABILITATION
DESIGN.JPC
e.
FLORIDAP.E.NO. 74737
FORMATION FLUIDS DISPOSAL
DWG NO ao az-25 ,a
�cADDFILE:
CONS
CONSULTING ENGINEERS
TEQUESTA. FLORIDA
APPR GGG
SCALE SHOWN
u4u'Kao
NO. DATE BY REVISION
DATE
5720 Corporate Way. West Palm Beach Flonda 33407 (5611683-3113—MockRoos.com
PALM BEACH COUNTY
SHEET CO-1
REPORT OF SURVEY
1. ALL ELEVATIONS SHOWN HEREON ARE IN FEET AND REFERENCED TO
SURVEY LEGEND
THE NORTH AMERICAN VERTICAL DATUM (NAVD) 1988. AND BASED ON
A BENCHMARK DESIGNATED'PAL B 3• PID 5791. HAVING AN
CM.P
CORRUGATED METAL PIPE
ELEVATION OF 3.55 FEET,
R.C.P
REINFORCED CONCRETE PIPE
2. THIS PROPERTY IS LOCATED IN FLOOD ZONE'S' ACCORDING TO
0
WOOD UTILITY POLE
FLOOD INSURANCE RATE MAP COMMUNITY PANEL NO. 120228 0001 C.
DATED SEPTEMBER 30, 1982 AND 120192 0106 B. DATED OCTOBER 15
E—
UTILITY POLE ANCHOR
1982.
Q
MAILBOX
3. ADDITIONS AND OR DELETIONS TO THIS SURVEY BY OTHER THAN THE
)IC
TELEPHONE RISER
SIGNING PARTY (OR PARTIES) IS PROHIBITED WITHOUT THE WRITTEN
CONSENT OF THE SIGNING PARTY (OR PARTIES).
—"—
OVERHEAD UTILITY LINE
4. COORDINATES SHOWN HEREON ARE REFERENCED TO THE STATE
QF
FPSL HAND HOLE
PLANE COORDINATE SYSTEM FLORIDA EAST ZONE. NORTH AMERICAN
DATUM 1983. ADJUSTMENT OF 2011 AND ARE FURTHER REFERENCED
9
SIGN
TO THE TRIMBLE VRSNOW REAL-TIME NETWORK AS VERIFIED BY
016" OAK
TREE SIZE 8 TYPE
REPEATED TIES TO VARIOUS NGS HORIZONTAL CONTROL POINTS
LOCATED IN THE VICINITY OF THE PROJECT.
N
WATER VALVE
LEGEND
SYMBOL LEGEND
L.B.
LICENSED BUSINESS
AT&T RISER
LSA
LANDSCAPE AREA
ED
CATCH BASIN
P.B.C.R.
PALM BEACH COUNTY RECORDS
ED
CURBINLET
OHW
OVERHEAD VNRES
q
CENTERLINE
P.B.
PLAT BOOK
e 0.00
EXISTING ELEVATION
PG.
PAGE
C
GREASE TRAP
PER THE PLAT OF JUPITER IN
(Pit
THE PINES (P.S. 26. PG. 19.
N
—
MAILBOX
P.B.C.R.)
SANITARY MANHOLE
PER THE PLAT OF JUPITER IN
Svx
SANITARY VALVE
(P2)
THE PINES SECTION'D- (P.B. 26.
PG. 137. P.B.C.R.)
e
SITE BENCHMARK
PER THE PLAT OF RIVERSIDE
STREET SIGN
(P3)
DRIVE PARK SECTION 'A' (P.B.
27, PG. 223. P.B.C.R.)
w x
WATER VALVE
U.E.
UTILITY EASEMENT
'z-
WOOD POWER POLE
T.O.N.
TOP OF NUT
0
WOOD POWER POLE
11—
PROPOSED GRADING
—BPM—
BLUE PAINT MARKS
—GPM—
GREEN PAINT MARKS
—OPM—
ORANGE PAINT MARKS
—PPM—
PURPLE PAINT MARKS
TREE LEGEND:
—RON—
RED PAINT MARKS
— — Oral
— OVERHEAD UTILITY WIRE
�•�
ACACIA
WOODEN FENCE
00
CABBAGE PALM
CHIANUNK FENCE
--CONK'--
EXISTING COMMUNICATION
00"
PALM
— —EXEC—
-- EXISTING ELECTRIC
OAK
— — CAS —
— EXISTING GAS LINE
00'D
— — JW —
— EXISTING UNKNOWN UTILITY
1
--x' SS--
SIZE", EXISTING SANITARY
- INDICATES TRU-DIAMETER
NOTE VERIFICATION
OF TREE SPECIES SHOULD
— —x' ST
— — SIZE "/ EXISTING STORM
BE CONDUCTED BY A PROFESSIONAL ENGAGED IN
— x" WV—
- - SIZE "t EXISTING WATERMAIN
THE FIELD OF NATURAL
SCIENCE.
FLORIDA E.B. NO.48 `^ FLORIDA L.B. N0.48 FIELD —
JOHN P. CAIRNES MO VK • RO O S rAPPR
N: JWB
FLORIDA P.E. NO. 74737 N JPC
CONSULTING ENGINEERS GGGDATE 5720 Corporate Way. West Palm Beach. Flonda 33407 (561) 683.3113. w .MockRoos.com E AS SHOWN
LOCATION AND KEY SHEET
VILLAGE OF TEQUESTA
FLORIDAN WELL REHABILITATION
FORMATION FLUIDS DISPOSAL
TEQUESTA. FLORIDA
DATE: OCTOBER 2021
P.A. NO. C0027.01
DWG. N0. 40-42-25-14
SHEET CD-2
GENERAL NOTES
15. CONTRACTOR SHALL LIMIT ACCESS AND CONSTRUCTION OPERATIONS TO
33. WHERE EXCAVATIONS TO A DEPTH IN EXCESS OF FIVE FEET (51 ARE REQUIRED.
54. PIPELINES SHALL BE INSTALLED WITH 3MINIMUM COVER.
WITHIN LIMITS OF ROAD RIGHT-OF-WAYS. THE CONTRACTOR SHALL PRESERVE
THE CONTRACTOR SHALL INCLUDE THE FOLLOWING INFORMATION IN THE BID'
FROM DAMAGE. ALL PROPERTY WITHIN OR IN PROXIMITY TO THE ROAD
55. ALL UTILITIES SHALL BE ADJUSTED TO NEW FINISH GRADES AND PROPERLY SET
1. THIS DRAWING SET HAS BEEN PRODUCED BY MOB WROOS AT THE VILLAGE OF
RIGHT-OF-WAY WAY OR IN ROUTE TO THE CONSTRUCTION SITE. IF ANY SUCH
A. REFERENCE TO THE TRENCH SAFETY STANDARDS THAT WILL BE IN
TO PAVEMENT CROSS SLOPE. CONTRACTOR SHALL ADJUST ALL INLETS.
REQUEST. THE DRAWINGS ARE TO BE USED GUIDELINES. BY
THE
PROPERTY IS DAMAGED DUE TO ANY ACTIVITIES OF THE CONTRACTOR, OR
EFFECT DURING THE PERIOD OF CONSTRUCTION OF THE PROJECT.
MANHOLE COVERS AND VALVE BOXES WITHIN THE LIMITS OF CONSTRUCTION.
VILLA'S
THE VILLAGE'S SELECTED CONTRACTOR FOR THE PROJECT, TO ESTABLISH
T,
SUBCONTRACTORS, SUPPLIES, ETC., THE CONTRACTOR SMALL IMMEDIATELY
B. WRITTEN ASSURANCES BY THE CONTRACTOR PERFORMING THE
WHETHER SHOWN ON THE PLANS OR NOT BEFORE
MINIMUM REQUIREMENTS FOR THE INSTALLATION OF COMPONENTS SHOWN IN
RESTORE THE DAMAGED PROPERTY TO ITS ORIGINAL CONDITION, OR BETTER,
TRENCH EXCAVATION THAT SUCH CONTRACTOR WILL COMPLY WITH
56. SIDEWALKS SHALL BE RECONSTRUCTED PER FDOT REQUIREMENTS WITH A 15%
THE DRAWINGS. AN EVALUATION OF THE OPERATION OF THE EXISTING
DRAINAGE SYSTEM AND THE IMPACT OF THESE IMPROVEMENTS ON THE SYSTEM
AT THE SOLE EXPENSE OF THE CONTRACTOR.
THE FLORIDA TRENCH SAFETY ACT.
SLOPE
WAS NOT PART OF THE REQUESTED SCOPE AND WAS NOT PERFORMED BY
16. CONTRACTOR SHALL SUBMIT MAINTENANCE OF TRAFFIC PLAN(S) AS REQUIRED
C. A SEPARATE ITEM IDENTIFYING THE COST OF COMPLIANCE WITH THE
MOCK-ROOS.
TO COMPLETE THE WORK IN ACCORDANCE WITH ALL MUNICIPAL, COUNTY. STATE
APPUCABLE TRENCH SAFETY STANDARDS.
2. PROPERTY UNES SHOWN ARE FROM THE SURVEY, COUNTY'S PROPERTY
AND FEDERAL LAWS AND REGULATIONS, AS APPLICABLE. AND SHALL SCHEDULE
35. ALL WORK SHALL BE OPEN AND SUBJECT TO INSPECTION BY AUTHORIZED
APPRAISERS OFFICE, AND KNOWN EASEMENTS. AND ARE APPROXIMATE.
THE WORK TO CAUSE MINIMUM DISTURBANCE OF NORMAL PEDESTRIAN AND
VEHICULAR TRAFFIC.
PERSONNEL OF THE VILLAGE. INVOLVED UTIUTY COMPANIES. PROJECT
ENGINEER. AND REGULATORY AGENCIES.
3. ALL ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM
OF 1908 (NGVD88).
17. ALL TESTS. ANALYSES AND INSPECTIONS ARE TO BE PERFORMED By A
36, LANE CLOSURES WILL BE ALLOWED MONDAY THROUGH FRIDAY SQD AM TO 4.30
QUALIFIED INDEPENDENT TESTING LABORATORY AND SHALL BE AT THE
PM WITH APPROPRIATE MOT AND FLAGGERS IN PLACE. COORDINATE WITH TEH
4. ALL COORDINATES ARE NORTH AMERICAN DATUM OF 8390.
CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
VILLAGE IN ADVANCE AND OBTAIN A RIGHT OF WAY PERMIT FROM THE VILLAGE
5. WRITTEN DIMENSIONS HAVE PREFERENCE OVER SCALED DIMENSIONS.
SCHEDULING THE INDEPENDENT TESTING LABORATORY'S VISITS AND FOR THE
PRIOR TO BEGINNING WORK
6 ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE FLORIDA
COORDINATION OF THE TESTING NTH THE INDEPENDENT TESTING LABORATORY AND ENGINEER.
37. MAINTENANCE OF TRAFFIC SHALL BE IN ACCORDANCE WITH CURRENT FDOT 6W
DEPARTMENT OF TRANSPORTATION (FDOT) STANDARD SPECIFICATIONS FOR
SERIES STANDARDS AND THE MANUAL UNIFORM TRAFFIC CONTROL DEVICES.
ROAD AND BRIDGE CONSTRUCTION. LATEST EDITION, AND FDOT DESIGN
18IN THE CASOF AN INCONSISTENCY BETWEEN DRAWINGS AND SPECIFICATIONS
. E
CONTRACTOR IS TO PROVIDE A MAINTENANCE Of TRAFFIC PLAN TO THE
STANDARDS. LATEST EDITION (UNLESS SPECIFIED OTHERWISE). ALL FDOT
OR IMTMIN EITHER DOCUMENT NOT CLARIFIED BY ADDENDUM. THE BETTER
KLUGE, PALM BEACH COUNTY. AND ALL APPLICABLE AGENCIES FOR RENEW
INDEXES ARE INCORPORATED AS PLAN REFERENCES HEREIN. CONTRACTOR IS
QUALITY OR GREATER QUANTITY OF WORK SHALL CONTROL.
AND APPROVAL PRIOR TO COMMENCEMENT OF WORK. CONTRACTOR SHALL BE
RESPONSIBLE FOR OBTAINING COMPLETE COPIES OF THE EDITIONS OF FDOT
19. AERIAL PHOTOGRAPHY SHOWN ON THE DRAWINGS ARE FROM THE PALM BEACH
RESPONSIBLE TO OBTAIN A PALM BEACH COUNTY MOT PERMIT PRIOR TO
INDEXES.
COUNTY DATABASE, LATEST EDITION AVAILABLE. AND AS SUCH, SHALL BE USED
BEGINNING WORK.
7 THE WORK TO BE PERFORMED BY THE CONTRACTOR INCLUDES ALL PERMITTING.
ONLY AS SCHEMATICS.
38. CONTRACTOR IS RESPONSIBLE TO OBTAIN ALL PERMITS REQUIRED FOR
INSPECTIONS. FURNISHING ALL MATERIALS. LABOR TOOLS, EQUIPMENT, WATER.
20. CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING TEMPORARY FILL FOR
CONSTRUCTION. CONTRACTOR MUST SUBMIT A DEWATERING S DRAINAGE PUN
LIGHT, POWER. TRANSPORTATION, SUPERINTENDENCE. TEMPORARY
THE CONSTRUCTION OF TEMPORARY PLUGS AS PART OF THE MEANS AND
TO SFWMD PRIOR TO CONSTRUCTION AND OBTAIN A DEWATERING PERMIT.
CONSTRUCTION OF EVERY NATURE, AND ALL OTHER SERVICES AND FACILITIES
METHODS TO CONSTRUCT THE PROJECT AND IS RESPONSIBLE FOR THE
39. WATER ELEVATIONS SHOWN ON THE DRAWINGS ARE SHOWN BASED ON
OF EVERY NATURE WHATSOEVER NECESSARY TO DEMOLISH, REMOVE,
REMOVAL OF SAME AT THE CONCLUSION OF THE PROJECT.
ELEVATIONS DURING SITE VISITS FOR REFERENCE PURPOSES, SOME WATER
ABANDON, DISPOSE, RELOCATE. CLEAR, MODIFY. DEWATER, CONSTRUCT,
21ALL ORGANIC AND OTHER UNSUITABLE MATERIAL IN AREAS TO BE FILLED SHALL
ADJACENT TO THE PROJECT IS TIDAL. NO CONTRACT PRICE ADJUSTMENT WILL
COMPLETE, DELIVER AND PLACE IN OPERATION THE ABOVE REFERENCED
.
BE REMOVED AND REPLACED NTH SUITABLE MATERIAL IN ACCORDANCE WITH
BE MADE IF ACTUAL WATER ELEVATIONS DO NOT CORRESPOND WITH THE
PROJECT AS SHOWN ON THE DRAWINGS AND/OR AS HEREIN DESCRIBED AS
SPECIFIED. ALL WORK TO BE IN ACCORDANCE WITH THE SPECIFICATIONS AND
SOUND CONSTRUCTION PRACTICES.
ELEVATIONS SHOWN ON THE DRAWINGS.
DRAWINGS.
22. CONTRACTOR MUST TAKE REASONABLE PRECAUTIONS TO CONTROL DUST AT
40. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REMOVAL, DISPOSAL,
ALL TIMES, WHETHER OR NOT THE SITE IS ACTIVE, AT NIGHT TIME, ON
ABANDONMENT. AND RELOCATIONS NECESSARY TO COMPLETE THE WORK
8, THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ESTIMATING PROPERLY
WEEKENDS, OR ON HOLIDAYS. CONTRACTOR MUST ALSO NOT LET AIRBORNE
WHETHER SHOWN ON THE DRAWINGS OR NOT. CONTRACTOR SHALL
THE DIFFICULTY AND COST OF SUCCESSFULLY PERFORMING THE WORK. PRIOR
DUST CROSS PROPERTY BOUNDARIES. CONTRACTOR SHALL WATER IF
COORDINATE RELOCATIONS WITH THE NECESSARY UTILITY COMPANIES.
TO QUOTING THE PROJECT, AS WELL AS AGAIN PRIOR TO COMMENCEMENT OF
CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE FOR TAKING STEPS
DIRECTED BY THE VILLAGE AND/OR AT SUFFICIENT FREQUENCY, QUANTITY, AND
41. CONTRACTOR SHALL RESTORE ALL AREAS DISTURBED BY THE CONTRACTOR'S
REASONABLY NECESSARY TO ASCERTAIN THE NATURE AND LOCATION OF THE
DEPTH, INCLUDING PRE-SOAKING TO CONTROL DUST AND PREVENT
ACTIVITIES INVOLVING CONSTRUCTION, STAGING AREAS, AND ACCESS ROADS IN
WORK, AND INVESTIGATE AND SATISFY ONESELF AS TO THE GENERAL AND
OBJECTIONABLE BLOWING OR DRIFTING OF DUST. SAND, AND OTHER DEBRIS.
KIND. ALL DISTURBED NON -PAVED AREAS SHALL BE PLANTED WITH -IN-KIND-
LOCAL CONDITIONS WHICH MAY AFFECT ITS COST, PROGRESS, PERFORMANCE
23. CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE FDEP GENERIC
VEGETATION.
OR SUCCESSFUL FURNISHING OF THE WORK FURTHER. THE CONTRACTOR IS
PERMIT FOR STORMWATER DISCHARGE FROM URGE AND SMALL
42. CONTRACTOR SHALL MAINTAIN A NEAT, ORDERLY, AND SAFE SITE AT ALL TIMES.
SOLELY RESPONSIBLE TO MAKE OR OBTAIN SUCH PROJECT SPECIFIC
EXAMINATIONS, INVESTIGATIONS, EXPLORATIONS, TESTS AND STUDIES AND
CONSTRUCTION SITES.
43. CONTRACTOR SMALL COMPLY WITH THE REQUIREMENTS OF THE FDEP GENERIC
OBTAIN ANY ADDITIONAL INFORMATION AND DATA WHICH PERTAIN TO THE
24. NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM (N.P.D.E.S.) DEVICES
PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND SMALL
PHYSICAL CONDITIONS (SURFACE, SUBSURFACE AND UNDERGROUND
C
SHOWN ON THE DRAWING ARE THE MINIMUM REQUIRED DEVICES THAT ARE TO
CONSTRUCTION SITESFACIL.
AT OR CONTIGUOUS TO THE PROJECT SITE OTHERWISE
BE INSTALLED. CONTRACTOR SHALL UTILIZE ADDITIONAL CONSTRUCTION
44. THE CONTRACTOR SHALL PROMPTLY REMOVE ALL MUD. DIRT OR OTHER
IT
DETERMINED THE CONTRACTOR WHICH MAY AFFECT ITS COST. PROGRESS.
DETERMINED
METHODS AND DEVICES SUCH AS TURBIDITY CURTAINS. SILT FENCES. AND
FLOATING SILT BARRIERS WHERE NECESSARY IN ORDER TO COMPLY WITH THE
MATERIALS TRACKED OR SPILLED ONTO EXISTING PUBLIC ROADS AND
PERFORMANCE OR SUCCESSFUL FURNISHING THE WORK SHALL NOT
E
STATE AND LOCAL WATER QUALM STANDARDS AND NPDESSHALL REQUIREMENTS.
FACILITIES DUE TO CONSTRUCTION.
NT NSMER
BE RESPONSIBLE FOR ANY CONCLUSIONS OR INTERPRETATIONS MADE BY THE
AT A SMEANS
CONTRACTORS MEANS AND METHODS SHALL KEEP TURBIDITY
45. THE CONTRACTOR SHALL COORDINATE WITH THE VILLAGE OF TEQUESTA FOR
CONTRACTOR BASED ON THE INFORMATION MADE AVAILABLE BY THE OWNER.
LS BELOW
LEVELS BELOW 29 NTUS ABOVE BACKGROUND.
THE SELECTION OF PROPOSED CONSTRUCTION STAGING AREAS AND/OR
9. PRIOR TO THE START OF CONSTRUCTION AND/OR ORDERING OF ANY MATERIALS
25. THE CONTRACTOR IS RESPONSIBLE FOR SITE SAFET, PEDESTRIAN MOT.
STOCKPILING OF MATERIALS.
OR FABRICATED ITEMS, THE CONTRACTOR SHALL CONFIRM. AT THEIR OWN
ACCESS RESTRICTION TO WORK/STORAGE AREAS. ETC.
46. CONTRACTOR SHALL LIMIT ACCESS AND CONSTRUCTION OPERATIONS TO
EXPENSE, ALL VERTICAL AND HORIZONTAL LOCATIONS. AND SHALL BE
WITHIN LIMITS OF THE ROAD RIGHT OF WAY (TYP.) AND THE UTIUTV EASEMENTS.
RESPONSIBLE TO VERIFY. IF'OTHER- STRUCTURES, UTIUTIES. ETC., NOT SHOWN
26. ALL LOCATIONS AND ELEVATIONS SHOWN FOR EXISTING GRADES FOR SURFACE
THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ANY DAMAGES OUTSIDE
ON THE DRAWINGS. EXIST WITHIN THE AREA OF CONSTRUCTION, THE
AND SUBSURFACE STRUCTURES, PIPING, ETC. ARE BASED ON THE BEST
THE LIMITS OF THE ROAD RIGHT OF WAYS.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ENGINEER WITH -AS
AVAILABLE INFORMATION. WHILE EVERY ATTEMPT HAS BEEN MADE TO PROVIDE
BUILT' INFORMATION AND WRITTEN NOTIFICATION OF ALL CONFLICTS WITH THE
ACCURATE DATA, THE CONTRACTOR SHALL CONSIDER ALL LOCATIONS AND
47. AREAS FOR THE STORAGE OF EXCAVATED MATERIAL ARE LIMITED. SUCH
PROPOSED CONSTRUCTION. THE CONTRACTOR SHALL NOT PROCEED WITH ANY
ELEVATIONS APPROXIMATE IN NATURE, PRIOR TO THE START OF CONSTRUCTION
MATERIAL MAY BE REMOVED AND STORED OFFSITE AND IF NECESSARY.
WORK OR ORDERING OF ANY MATERIALS UNTIL ALL CONFLICTS HAVE BEEN
ANDOR ORDERING OF ANY MATERIALS OR FABRICATED ITEMS, THE
RETURNED FOR BACKFILLING. UNSUITABLE MATERIAL SHALL NOT BE RETURNED
RESOLVED.
CONTRACTOR SHALL CONFIRM THE EXACT LOCATIONS AND ELEVATIONS. IN
FOR BACKFILUNG.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL LAYOUT AND
ADDITION, THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY IF -OTHER,
48. ALL EXCESS FILL FROM THE SITE SHALL BE LEGALLY DISPOSED OF OFF SITE BY
CONSTRUCTION STAKING AND ESTABLISHING ALL LINES AND GRADES
STRUCTURES, UTILITIES, ETC. NOT SHOWN ON THE DRAWINGS EXIST WITHIN THE
THE CONTRACTOR.
TOGETHER VWITH ALL REFERENCE POINTS AS REQUIRED By THE VARIOUS
AREA OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE RECORD
TRADES.
INFORMATION AND WRITTEN NOTIFICATION OF ALL CONFLICTS WITH THE
PROPOSED CONSTRUCTION TO THE ENGINEER. THE CONTRACTOR SHALL NOT
49. CONTRACTOR SHALL HAVE NO TRENCHES OPEN AT THE END OF EACH WORK
DAY. IF NECESSARY, TRENCHES SHALL BE TEMPORARILY BACKFILLED AND
11. THE CONTRACTOR SHALL IMPLEMENT TEMPORARY CONTROLS AND FACILITIES
PROCEED WITH ANY WORK UNTIL ALL CONFLICTS HAVE BEEN RESOLVED.
BARRICADED.
FOR ALL CONSTRUCTION ACTIVITIES AND SHALL COMPLY WITH ALL PERMITTING
2T ALL PROPOSED GRADES SHOWN ARE FINISHED GRADES, UNLESS OTHERWISE
50 THE CONTRACTOR SHALL BE REQUIRED TO FURNISH WATER AND COORDINATE
REQUIREMENTS OF FEDERAL. STATE AND LOCAL AGENCIES.
NOTED. THE CONTRACTOR SHALL SLOPE FINISHED GRADES UNIFORMLY
WITH THE VILLAGE OF TEOUESTA FOR USE OF A HYDRANT METER FOR POTABLE
12. CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK COMPETENTLY AND
BETWEEN OTHER FINISHED AND EXISTING GRADES.
WATER. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS AND
EFFICIENTLY, DEVOTING SUCH ATTENTION THERETO AND APPLYING SUCH
EQUIPMENT.
SKILLS AND EXPERTISE AS MAY BE NECESSARY TO PERFORM THE WORK IN
ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS. ENGINEER'S
26. STRUCTURE COORDINATES REFER TO CENTER OF STRUCTURE UNLESS
OTHERWISE NOTED.
51. RECORD DRAWING NOTES
REPRESENTATIVE MAY PERIODICALLY OBSERVE THE PROGRESS AND THE
29. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REMOVAL, DISPOSAL,
A ALL RECORD DRAWING INFORMATION SUCH AS ELEVATIONS.
QUALITY OF THE EXECUTED WORK, HOWEVER, THESE OBSERVATIONS ARE FOR
ABANDONMENT, CLEARING, GRUBBING AND RELOCATIONS NECESSARY TO
DISTANCES, LOCATION OF UNDERGROUND UTILITIES, AND ROAD
THE SOLE BENEFIT OF THE OWNER AND DO NOT RELIEVE THE CONTRACTOR OF
COMPLETE THE WORK WHETHER SHOWN ON THE DRAWINGS OR NOT.
CROSS -SECTIONS MUST BE OBTAINED By A PROFESSIONAL
ITS RESPONSIBIUTIES.
30. CONTRACTOR SHALL RESTORE ALL AREAS DISTURBED BY ACTIVITIES INVOLVING
SURVEYOR AND MAPPER. WHO IS LICENSED IN THE STATE OF
FLORIDA. THE SURVEYOR WISURVEYOR
BE RETAINED BY THE CONTRACTOR
13 CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE MEANS, METHODS.
CONSTRUCTION, STAGING AREAS, AND ACCESS ROADS IN KIND. ALL DISTURBED
INFORMATION MUST BE SIGNED AND SEALED.
TECHNIQUES, SEQUENCES AND PROCEDURES OF CONSTRUCTION.
CONTRACTOR SHALL BE RESPONSIBLE TO SEE THAT THE FINISHED WORK
AREAS SHALL BE RESTORED IN KIND. SEE RESTORATION NOTES ON SHEET CIA
AND C1-2.
B. UNDER NO CIRCUMSTANCES WILL ROADWAY PAVING WORK BE
COMPLIES ACCURATELY WITH THE SPECIFICATIONS AND DRAWINGS.
31. THE CONTRACTOR SMALL COORDINATE MATH THE NECESSARY UTILITY
ALLOWED TO STARUNTIL THE ENGINEER HAS REVIEWED THE T
RECORD DRAWING INFORMATION FOR WORK CONSTRUCTED WITHIN
14. THE CONTRACTOR SHALL CAREFULLY REVIEW ALL SUBMITTALS PRIOR TO
COMPANIES AND SUNSHINE STATE ONE CALL (8004324770) FOR ALL LOCATES A
THE ROADWAY AREA THAT WILL BE PAVED.
SUBMISSION TO THE ENGINEER THE CONTRACTOR SHALL CAREFULLY CHECK
MINIMUM OF 72 HOURS PRIOR TO COMMENCEMENT OF CONSTRUCTION.
AND VERIFY ALL FIELD MEASUREMENTS. REVIEW BY THE ENGINEER WILL BE
32, PRIOR TO COMMENCEMENT OF ANY EXCAVATION, THE CONTRACTOR SHALL
ONLY FOR CONFORMANCE WITH THE DESIGN CONCEPT OF THE PROJECT AND
COMPLY WITH CHAPTER 5560E THE FLORIDA STATUTES THE UNDERGROUND
FOR COMPLIANCE WITH THE INFORMATION GIVEN IN THE SPECIFICATIONS AND
DRAWINGS. ENGINEER'S REVIEW WILL NOT EXTEND TO MEANS. METHODS,
FACILITY DAMAGE PREVENTION AND SAFETY ACT.
SEQUENCES. TECHNIQUES OR PROCEDURES OF CONSTRUCTION, OR TO SAFETY
PRECAUTIONS OR PROGRAMS INCIDENT THERETO.
- 1To-mC�
+iGm,l oRAYANG
�s- A; unec
ACCQRDING• GENERAL NOTES
FLORIDA C.A. NO.48 FLORIDA L.B. NO.48
MOCK•ROOS
CONSULTING ENGINEERS
5720Corporate Way ,West Palm Beach, Florida 33407(561)683-3113,-MockRoos.com
FIELD: -
VILLAGE OF TEQUESTA
FLORIDAN WELL REHABILITATION
FORMATION FLUIDS DISPOSAL
TEQUESTA, FLORIDA
PALM BEACH COUNTY
DATE: OCTOBER 2021
JOHN P. CAIRNES
FLORIDAP.E. NO. 74737
DRAWN:
P.A. NO. C0027.01
DESIGN.JPC
OD FILE,
.a .� ��AD�ND,
D ncsolco-a.
APPR: GGG
DWG. NO. 40-42-25-14
N0. DATE BY REVISION
DATE
SCALE: AS SHOWN
SHEET: CO3
-
INSTALL 12" FORMATION FLUIDS DISPOSAL
90' DIP BEND, 3' MIN COVER, -,
•' - - .: PIPELINE ABOVE EXISTING SANITARY
CAP 12" C900 PIPE
-
6" BELOW GRADE
9eDIP BEND (ROTATED),
• \
-�*-=- —� 3- MIN COVER
1
-
INSTALL 12" FORMATION FLUIDS DISPOSAL
EXISTING IRRIGATION AND -'
PIPELINE 12" BELOW EXISTING WATERMAIN
LANDSCAPING TO BE
- --
RESTORED
_
- 75't OF 12" C900 -
-FORMATION FLUIDS
'DISPOSAL. PIPELINE -
(RESTRAIN ALL JOINIS) '
1�
V - �
x'.
E - INSTALL 12" FORMATION FLUIDS DISPOSAL
" PIPELINE 12" BELOW EXISTING WATERMAIN.
POWER, AND COMMUNICATIONS
REMOVE AND REPLACE EXISTING SIDEWALK
-
m AS NECESSARY TO MAKE CONNECTION, IF
PART OF A FLAG IS DAMAGED, THEN THE
I
ENTIRE FLAG SHALL BE REPLACED, 3 FLAGS
SHOWN, 120 SQUARE FEET
_
90"pI
BEND (ROTATED), :T 3
3' MIN COVER
•' `s y �'��'
CORE EXISTING STORM STRUCTURE AND 9i ' ' > g
'- Y
CONNECT 12" C900 PIPE VATH A SPOOL • -II
AND NON -SHRINK GROUT �• ry p;� `s: s
_ L-;��r•
POI,CMN�t
�
D I •45
-i
F
ADJUSS—En
4*
NV"
01.1:
Dry
I•
�
r
j
<
)
i
<
<
S
i
<
<
C
( i
�-
•: v:q.r �` •
j
< f
j
I
I i •
C1-1 RESTORATION NOTES:
1. CONTRACTOR IS RESPONSIBLE FOR ALL
RESTORATION IN KIND INCLUDING THE TRENCH
SIDEWALK, SOD. LANDSCAPING. AND HEDGE IN
KIND
III
FLORIDA E.B. NO 4E FLORIDA L.B NO 48
FIELD —
VILLAGE OF TEQUESTA
DATE OCTOBER 2021
$�
"sea
MOCK• ROOS
FLORIDAN WELL REHABILITATION
JOHN P. CAIRNES
DRAWN. JWB
P.A. NO. C0027.01
DESIGN. JPC
7v
#`
FIOMDA P.E. NO. 74737
CONSULTING ENGINEERS
FORMATION FLUIDS DISPOSAL
capDFILE:
APPR: GGG
DWG NO. 40-42-25-14
.p n.
TEQUESTA, FLORIDA
NO.1 DATE I BY I REVISION
DATE
SCALE.AS SHOWN
SHEET C1-1
—, c�:c-,
$720 Coslwrate Way. West Palm Beach Flonda 33407 (5611683-31 13. www.MockRoos com
PALM BEACH COUNTY
.-_- 6. 6-
d�
i
R
--TO EN
+iGM�_ �RRW W4
-.sioas nccoaoinc�.
.DD FILE:
ea,ownc�oa+c�
o
W
W
Z_
W
Q
� U
N
S
a
cY
0
fW DHv
OHW I7HW
ALLOWANCE: ALLOWANCE LINE ITEM
FOR REMOVING S' OF 10" VCP. INSTALLING A
K
FENRCO ADAPTOR, AND CONNECTING TO
EXISTING SANITARY STRUCTURE WITH 10" PVC'
O
ALLOWANCE: PROVIDE ALLOWANCE LINE ITEM - Y,
y
FOR REMOVING 5' OF 3" VCP. INSTALLING A-
' -- - -- r,_.w
" " -----
f—
•¢
FENRCO ADAPTOR, AND CONNECTING TO
— `-
80• BEN OWER INN. EL
-1.6 AND
.a -- o W
- _-- ---
EXISTING SANITARY STRUCTURE WITH 3" PVC
- ��
-
12" C 0 PIPE 6" BELOW GRADE
a:
\
vl
9DIP BEND LOWER INV. EL -2.2
?
9 0° DIP BEND UPPER INV. EL 0.6
r APPROXIMATE LIMITS OF TRENCH
-
PATCH. (VILLAGE WILL MILL AND
,!� RESURFACE ROAD, REPLACE CURB
CORE EXISTING STORM STRUCTURE AND
RAMPS, AND REPLACE CURB AS A
CONNECT 12" C900 PIPE WITH A SPOOL -
SEPARATE PROJEGTy — - - -
- -- - - - - -----
AND NON -SHRINK GROUT (DIRECT PIPE
--
TOWARDS DOWNSTREAM PIP
--
�'— ---
- --
-
25'3 OF42" C900
FORMATION FLUIDS
DISPOSAL PIPELINE
O
tKESTRAIN ALL JOINTS)
-
i
i
O
=�.
/
(
�
y2°
�S7VF;y5RtGTL'H:.
i A
- -Lu
(NTR.ANC YVA�
ASPSA[ T
I
WMANC!�W'4Y
Cl.NY(;YS:Ai.ti
•. SA-\
T`'F i"
el
I \
3.
C1-2 RESTORATION NOTES:
w
1. CONTRACTOR SHALL RESTORE TRENCH
(ASPHALT AND SODDED AREAS)
2. VILLAGE WILL MILL AND RESURFACE ROAD.
REPLACE CURB RAMPS. AND REPLACE CURB
Ilr�
C
AS A SEPARATE PROJECT
FLORIDA E.B. NO.48 FLORIDA L.B. NO.48 FIELD: —
JOHN P. CAIRNES MOCK RODS DEIGN: JPCB
FLORIDA P.E. NO. 74737
CONSULTING ENGINEERS APPR GGG
✓ S 10 �. DATE 5720 Corporate Way, West Palm Beach, Flonda 33407 (561) 683-3113, w .MockRoos.com SCALE: AS SH
VILLAGE OF TEQUESTA
FLORIDAN WELL REHABILITATION
FORMATION FLUIDS DISPOSAL
TEQUESTA, FLORIDA
PALM BEACH COUNTY
DATE: OCTOBER 2021
P.A. NO. C0027.01
DWG. NO. 40-42-2514
SHEET: C1-2
• SURFACE SURFACE REPLACEMENT SURFACE
TRANSITION (SEE NOTE 85) TRANSITION
EXISTING DITCH WIDTH (W) +4' SURFACE
PAYMENT I JOINT
REPLACED/A BASE
¢ (SEE NOTE a2)
oW ' EXISTING
O BASE
18'
ZTRACE
i WIRE STAGE 2
STAGE 1
N
112- VARIES 12
-
"�'I MI�
M0
NOTES
1. BEDDING SHALL CONSIST OF IN -SITU GRANULAR MATERIAL OR WASHED AND
GRADED LIME ROCK %-- Y- SIZING WITH EQUAL OR GREATER STRUCTURAL
ADEQUACY AS EXISTING. UNSUITABLE IN -SITU MATERIALS SUCH AS MUCK,
DEBRIS, AND LARGER ROCKS SHALL BE REMOVED.
2. BASE MATERIAL SHALL BE 10" MINIMUM OF CRUSHED CONCRETE.
3. ASPHALT CONCRETE PAVEMENT JOINTS SHALL BE MECHANICALLY SAWED
(BUTT JOINTS ONLY).
4. BASE MATERIAL (PER FOOT DESIGN STANDARDS) SHALL BE PLACED IN TWO
OR THREE LAYERS (6" MAX PER LAYER) AND EACH LAYER THOROUGHLY
ROLLED OR TAMPED TO THE SPECIFIED DENSITY.
5. FOR ROADS INSTALL 2" OF S411 ASPHALTIC CONCRETE NTH RG-70 PRIME
COAT AT 0.10 GAL / SO YD.
6. PIPE SHALL BE PLACED IN A DRY TRENCH.
THE BACKFILL FOR THE FIRST AND SECOND STAGES SHALL BE PLACED IN
MAXIMUM 6" LAYERS (COMPACTED THICKNESS) AND SHALL BE COMPACTED TO
100% OF MAXIMUM DENSITY AS DETERMINED BY AASHTO T-99.
STAGE 1
THE CONTRACTOR SHALL PROVIDE ADEQUATE COMPACTED FILL BENEATH THE
HAUNCHES OF THE PIPE. USING MECHANICAL TAMPS SUITABLE FOR THIS
PURPOSE. THIS COMPACTION APPLIES TO THE MATERIAL PLACED BENEATH THE
HAUNCHES OF THE PIPE AND ABOVE ANY BEDDING REQUIRED.
STAGE 2.
THE CONTRACTOR SHALL OBTAIN A WELL -COMPACTED BED AND FILL ALONG THE
SIDES OF THE PIPE AND TO A POINT INDICATING THE TOP OF SUB -GRADE
MATERIAL.
7. ALL ROADWAY REPAIR WORK SHALL BE PERFORMED IN CONFORMANCE
WITH APPLICABLE FOOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE
CONSTRUCTION.
8. DENSITY TESTS SHALL BE TAKEN IN 1 FT LIFTS ABOVE THE PIPE AT
INTERVALS OF 400 FT MAXIMUM (1 SET MINIMUM) AND UNDER EACH
STRUCTURE OR AS DIRECTED BY THE CONSTRUCTION COORDINATION
DIVISION. RESULTS SHALL BE SUBMITTED TO CONSTRUCTION
COORDINATION DIVISION AS PART OF THEIR FIELD REVIEW.
9. THE ROAD SHALL BE MILLED AND RESURFACED WITH 1• (ONE INCH) OF S-Ill
SURFACE COURSE FOR A FULL LANE WIDTH ENCROACHED BY THE TRENCH.
10. EXISTING PAVEMENT MARKINGS SHALL BE REPLACED IN -KIND.
11. SIDEWALK TO BE REMOVED BY SAVICUTTING AT THE NEAREST EXISTING
JOINT.
1 OPEN CUT AND TRENCH PAVEMENT REPLACEMENT
C51 NTS
EXIST. GROUND
Z
aF
OF
Q>
<a
ww
UXXX
Z
OZO
Zu
FUz
ZWW
i
7iv
aya13!0
JQZ
«
<
-i— I— I INVER
:07
12" i 112"
LOWER QUADRANT TO BE SHAPED TO -1
NOTE: RECEIVE PIPE BELL AND BARREL
1. FOR PLACEMENT OF BACKFILL MATERIAL SEE
SPECIFICATIONS.
2. PROVIDE A MINIMUM OF 30 INCHES OF COVER UNLESS
NOTED OTHERWISE ON PLANS.
EXIST. SIDEWALK TO BE REMOVED
BY SAWCUTTING AT THE NEAREST
EXISTING JOINT. SEE SHEET CI-2 FOR
OPEN CUT AND RESTORATION LIMITS
HAND PLACED SELECT
MATERIAL
(COMPACTED IN 6" UFTS)
2 PIPE INSTALLATION OUTSIDE OF ROADWAY
CS 1 NTS
FLORIDA E.B. NC. 48 FLORIDA L.B. NO 48
FIELD.—
VILLAGE OF TEQUESTA
DATE
OCTOBER 2021
JOHN P.CAIRNES
MOCK•ROOS
DRAWN. JWB
FLORIDAN WELL REHABILITATION
P.A. NO.
C0027.01
FLORIDA P.E. NO. 74737
DESIGN:JPC
FORMATION FLUIDS DISPOSAL
CONSULTING ENGINEERS
APPR: GGG
DWG. NO.
40 42-25 14
-Do FILE;
TEQUESTA. FLORIDA
N0. DATE BY REVISION
pq�
5720 Corporate Way. West Palen Beach, Flonda 33407 (561) 683-3113.—MockRoos.com
SCALE: SHOWN
PALM BEACH COUNTY
SHEET:
C5-1