Loading...
HomeMy WebLinkAboutDocumentation_Special Meeting_Tab 08C_8/22/2002Memorandum To: Michael R. Couzzo, Village Manar f, From: James M. Weinand, Fire Chief­7—,` ` Date: July 3, 2002 Subject: Award of a contract to David'(3rooks, Inc. for the relocation of electrical service to Well #7. Attached is a proposal request from David Brooks Enterprises for the relocation of the electrical service to Well #7; service to the fountain of Village Green Park and the demolition of the existing pump control structure. As you are aware, the electrical service to Well #7 needs to be relocated on this site. Some time ago Reese, Macon and Associates completed the engineering and drawings for this Well #7 service relocation. After this site was chosen for the new Village Hall, we sent these drawings back for redesign to accommodate the new Village Hall. Our engineers and staff have reviewed these drawings and feel that this service relocation will not interfere with the placement of the Village Hall on this site and we feel that this relocation needs to be completed before the Public Safety Facility is completed. We also concluded that David Brooks Enterprises would provide us with the best price for this project since they were already mobilized and where under a construction contract with the Village that fixes his markup to only 5% on subcontractors work and 15% on self performed work. The major portion of this construction project is electrical work; David Brooks has bid this project out with several electrical contractors to secure the best price. Mr. Brooks advised me that all the electrical contractors where within $1,000.00 of each other and he feels that it was in the best interest to award it to the electrical contractor who is currently working on site. Please forward this item to July 11, 2002, Village Council agenda for their consideration. E:\Administration DocumentsWillage Manager\Well 7 power relocation Agenda Item.doc RESOLUTION NO. 56-01/02 A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, APPROVING A PROPOSAL FROM DAVID BROOKS ENTERPRISES, PALM BEACH GARDENS, FLORIDA, FOR THE RELOCATION OF THE ELECTRICAL SERVICE TO WELL #7; SERVICE TO THE FOUNTAIN OF VILLAGE GREEN PARK, AND THE DEMOLITION OF THE EXISTING PUMP CONTROL STRUCTURE, IN THE AMOUNT OF $70,324.00, WITH FUNDS BEING APPROPRIATED FROM WATER UTILITIES, AND AUTHORIZING THE VILLAGE MANAGER TO EXECUTE THE APPLICABLE CONTRACT ON BEHALF OF THE VILLAGE. NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, AS FOLLOWS: Section 1: The proposal from David Brooks Enterprises, Palm Beach Gardens, Florida, for relocation of the electrical service to well #7 and the demolition of the existing pump control structure, in the amount of $70,324.00, is attached hereto as Exhibit "A" and incorporated by reference as part of this Resolution, is hereby approved, and the Village Manager of the Village of Tequesta is authorized to execute the same on behalf of the Village of Tequesta. THE FOREGOING RESOLUTION WAS OFFERED by Councilmember who moved its adoption. The motion was seconded by Councilmember , and upon being put to vote, the vote was as follows: FOR ADOPTION AGAINST ADOPTION The Mayor thereupon declared the Resolution duly passed and adopted this l lth day of July, 2002. Mayor Geraldine A. Genco ATTEST Village Clerk Mary Wolcott avid 9000 Burma Road, Suite '101 Palm Beach Gardens, FL 33403 561.863.1200 Fax: 561.863.1264 June 7, 2002 Mr. Mike Flattery Gee & Jenson Architects One Harvard Circle West Palm Beach, FL 33409 Re: Tequesta Public Safety Building Power & Control Revisions Pending Change No. 43 Dear Mike: We offer to perform the work associated with the power and control work outlined in drawings E-1, E-2 and E-3 by Reese, Macon & Associates dated 11 /27/01. The price for this work is Seventy Thousand Three Hundred Twenty Four Dollars ($70,324.00). We further request that the contract time be increased by three (3) days. Attached please find a cost break down for this work. Please review and let me know if you have questions or require further information. Sincerely, David Brooks Enterprises, Inc. David Brooks President Cc Chief Jim Weinand, VOT Rick Wilhelm, DBE File CAMSWORM-requestaRCI 43.doc Accepted: Village of Tequesta By: Print Name / Title General Contractors • Construction Management ESTIMAT °CORD Date: 11/20/01 David Brooks Enterprises, Inc. Project: Tg�_ bliC Safety Bldg.. Page: 1 of P.C. * 43 - Power & Control Relocation Prepared or DB :taiu Labor Total Material a Material Subcontract Subcontract Total Sheet Description Unit Quanti Unit Labor _ Unit — Total Unit Total Cost $250 Supervise and Coordinate LS 1.00 250.00 $250 $0 $0 Survey / Lay Out HR 8.00 $0 $0 85.00 $680 $680 As -Built Drawings HR 8.00 $0 $0 85.00 $680 $680 Concrete Mounting Pads SF 60.00 3.00 $180 3.00 $180 $0 $360 Misc. L'Scape / Irrigation / Grading LS 1.00 200.00 $200 300.00 $300 $0 $500 Building Demolition & Removal LS 1.00 $0 $0 2500.00 $2,500 $2,500 Electrical Subcontract Work LS 1.00 $0 $0 60555.00 $60,555 $60,555 Notes: 1. Excludes FPL fees $630 $480 64,415 65,525 State Sales Tax - % 0.06 $29 29 $630 $509 64,415 65,554 CHECK—> 65.554 Construction Fee % 15 / 5 % $95 $76 3,221 3,392 Bonds / Insurance % 0.020 1,379 70,324 rid? a - u- u— . ....r- r - - WOO ELCO III .11:.•il•:- May 10, 2002 David Brooks Enterprises, Inc. 3866 Prospect Ave. Suite #9 West Palm Beach, F133404 Attn: David Brooks Re: Village Of Tequesta Well #7 Subject: Scope Letter RECEIVED MAY 0 70�� Gerelco Electrical Contractors Inc. includes all labor and materials necessary to provide a complete and fully operating electrical system for the above referenced project. The following items are included; 1) New Service For Well #7 and Fountain. 2) Furnish and Install new power and control panel for the existing Fountain. 3) New Conduit and mire for new Fountain panel and Well #7. 4) All Equipment, Conduit and wire per plans and specified notes. 5) Demolition of existing service as per plans. 6) Permit fees are included. Excluded From Our Bid: 1) Temporary Power. 2) All concrete work inclusive of cutting, patching, and or pouring pads. 3) Service beyond FPL Hand Hole listed on plans. Total cost of scope of work: S 60,555.00 The above estimate is based on drawings E1 thru E3 dated on April 18, 2002 as prepared by JHHAM Engineering and Reese, Macon and Associates, Inc. If there are any questions or comments please cuutact me at 1-772-340-7474. Sloe ly, J-� k3 Trevor Palmer Project Estimator 521 N.W. Enterprise Drive, Port St. Lucie, Florida 34986 - (561) 340-7474 - Fax (561) 340-7475 E-mail: email@gerelco.com - Web Page: www.geralco.com 05/l0L02Lif 2J Job Number 22075 Sid Date 05/09/02 Bid Time 14:00 Estimator Trevor Palaver Square footage 0. Division 01 Raceway, Ftgs, & Boxes 02 Wire & Cable 06 Underground/Site 07 Misc 10 Grounding Total 02 Distribution gear (GRAYBAR) 30 Quote 30 (pull boxes) Total Sales Tax (6%) 1100'�Total Material J08 NAB ViIIage -of T.eguesta We11 #7 All Breakdowns (All) Non-Oucted_ Material T4u.1 Factor 475.11 25.0 % 1,421.28 25.0 % 1,332.19 25.0 % 2,200.00 25.0 % 32.31 25.0 % 5,460.89 0u9ted Material Labor Hours Di-Yi5isn Ill Easton. 01 Raceway, Ftgs, & Boxes 28.31 0.00 % 28.31 02 Wire & Cable 58.78 0.00 % 58.78 06 Underground/Site 340.32 0.00 % 340.32 07 Misc 160.30 0.00 % 160.30 10 Grounding 1.68 0.00 % 1.68 Total 589.39 589.39 Category f kul 112M Labor Rates Base Rate B r e S Electrician/mech. 100.0 589.39 42.00 0.00 0.00 Total 100.0 589.39 X 42.00 (AVG LAB RATE W/BURDEN) _ Non Productive LabQr Lxtensi-o $ 593.89 $ 1,776.60 $ 1,665.24 $ 2,750.00 $ 40.39 $ 6,826.12 $ 12,346.00 $ 3,188.00 $ 15,534.00 $ 1,341.61 $ 23,701.73 etc errs i on 24,754.38 $ 24,754.38 IIa� av ai �. v . • v..�- 0517.010z _ 16 : 23 Dr�cri�t.Lon demo/pump relaocation layout/schematics Total D"-r ptio STORAGE FORT RENTAL - COMPACTOR EORT RENTAL - BACKNOE Permit fees Total Job Subtotal (Prime Cost) Overhead (10%) Profit (5%) Job Total Actual Bid Price Material to labor ratio: 0.49 Cost per square foot Selling price per square foot !>1lB NAW : YiIlade of�ita we 11 #7 A1L�reakdowns lAlll N �uo rs � Factor IQLExpemu P,%Jg -2 Extension $ 2,500.00 $ 750.00 $ 3,250.00 IdAJ $ 500.00 $ 350.00 $ 750.00 $ 575.00 $ 2,175.00 $ 53,881.11 $ 5,388.11 % 2,963.46 $ 62,232.68 $ 60,555.00 $ 0.00 $ 0.00 11eJ av v� v ......�- 05/ 10/02 Ik,23 Village of Tequesta Well #7 9SIEdS19tl.i�Y PHASE Item # Description Qv Price U Ext Price Labor U Ext Labor -- 01 Raceway, Ftgs, & 8oxes --- 1591 2" Locknut 20.00 44.86 C 8.97 0.27 E 5.40 1592 2-1/21 Locknut 16.00 110.19 C 17.63 0.33 E 5.28 1603 2" Plastic Bushing 4.00 50.06 C 2.00 0.30 E 1.20 1604 2-1/2" Plastic Bushing 7.00 83.95 C 5.88 0.35 E 2.45 1989 2' Alum Rigid Coupling 8.00 472.98 C 37.84 0.00 E 0.00 1990 2-1/2" Alum Rigid Coupling 2.00 1,065.28 C 21.31 0.00 E 0.00 2013 2'02� Alum Nipple 12.00 1,813,10 C 217.57 0.60 E 7.20 2014 2-1/2'02" Alum Nipple 6.00 2,731.77 C 163.91 0.75 E 4.50 6485 i2xl2x6' Screw Cover Pull Box-Nema 3 1.00 QUOTE 30 0.00 2.28 E 2.28 -- 01 Raceway, Ftgs, & Boxes Total --- 475.11 28.31 --- 02 Wire & Cable --- 2796 #2 THNN CU Stranded Wire 2,764.00 394.03 M 1,089.10 17.50 M 48.38 2800 #3/0 THNN CU Stranded Wire 20.00 904.36 M 18.09 29.75 M 0.60 2801 #4/0 T.IHN CU Stranded Wire 280.00 1,121.75 M 314.09 35.00 M 9.80 -- 02 Wire & Cable Total --- 1,421.28 58.78 --- 06 Underground/Site -- 2065 2' PVC Male Adaptor 12.00 80.11 C 9.61 0.30 E 3.60 2066 2-1/2' PVC Male Adaptor 2.00 130.12 C 2.60 0.40 E 0.80 2119 2' PVC Coupling 12.00 56.12 C 6.73 0.12 E 1.44 2120 2-1/2' PVC Coupling 2.00 99.12 C 1.98 0.14 E 0.28 20 2" PVC Elbow 12.00 194.70 C 23.36 0.65 E 7.80 2132 2-1/24 PVC Elbow 2.00 339.90 C 6.80 0.80 E 1.60 7074 18"Wx36"D Trench -Back Hoe 808.00 0.00 E 0.00 10.00 C 80.80 7104 4'x4'x4' Manhole Excavate/Backfill/C 4.00 0.00 E 0.00 4.00 E 16.00 7118 18'Wx36'D Backfill & Compaction 900.00 0.00 E 0.00 9.00 C 81.00 8175 2" PVC (Schedule-80) 900.00 131.20 C 1,180.80 12.00 C 108.00 8176 2-1/2" PVC (Schedule-80) 50.00 200.62 C 100.31 14.00 C 7.00 8260 J BOX FUSH W/GRADE W/TRAFFIC COVER 4.00 QUOTE 30 0.00 8.00 E 32.00 --- 06 Underground/Site Total -- 1,332.19 340.32 --- 07 Misc --- 6928 Extract,Cap, Cover Existing Feeders 1.00 0.00 E 0.00 15.00 E 15.00 6929 Racks for equipment 2.00 350.00 E 700.00 6.00 E 12.00 6930 One Lot Of Gear labor 1.00 QUOTE 2 0.00 73.30 E 73.30 6931 Reconnect Existing Circuits 1.00 0.00 E 0.00 20.00 E 20.00 6932 OffIoad;handIe/stage manholes 1.00 1,500.00 E 1,500.00 40.00 E 40.00 --- 07 Misc Total -- 2,200.00 160.30 --- 10 Grounding --- 6671 5/8'xlO' Copper Ground Rod 2.00 1,505.02 C 30.10 0.58 E 1.16 6675 5/8" Ground Rod Clamp 2.00 110.58 C 2.21 0.26 E 0.52 --- 10 Grounding Total --- 32.31 1.68 Job Total 5,460.89 589.39 rBA ASPHALT BLOCK ?0"*NC CONCRETE CUTTING CONTRACTORS, INC. SERVING SOUTH FLORIDA SINCE 1971 2001 NORTH ANDREWS AVENUE POMPANO BEACH, FLORIDA 33069 COMPANY NAME`r,��c t7�5 STREET ADDRESS CITY, STATE, ZIP PERSON REQUESTING BID OFFICE PHONE DATE QUOTED QUOPEOFAX S -O Z �. COST. NO. P.O. 1 O MLAJA AREA (me) 947-OW O WEST PALM AREA (ml) 7v4m O FT. LAUDERDALE AREA (964) SZ I- e O FT. PIERCE AREA (WI) 465-4= O PIANO AREA 04) 9466m O FAX (954) 979-OW OINTERNET. 13E44NL• aboamYV*nw&A= JOB ADDRESS MAP PAGE LOT BLOCK UNIT OR SUBDIVISION JOB NAME oc - ball L�jc'1e,;olS,-q— NEAREST CROSS STREET JOB PHONE MOBIL PAGER �..,,BLYY JOB OPIZED PROJECT * OR JOB M WORK LAID OUT y� GENERAL ON JOB eo' WHERE TO MEET an J , JOB START DATE DAY 3 TIME SEE ON JOB Te-uf k O�Tz -y% , Il-) -�n i 6 ; rust 11 x /�' 'x a116 4-4 o G1P4-r' E3177ie,/' r � ��u� v' x �Z �3L4 �0000p oar 5 �EPRICES SUB 0 NGEIAtd� Mft ON JOB IS QUOTATIO . PC, 3 } CHA WE ASSUME NO RESPONSIBILITY FOR LAYOUT OR UTILITIES BURIE NOTICE: THIS QUOTATION IS VALID FOR 75 DAYS UNLESS OTHERWISE STATED. cRAVAILABLE YEE ❑ ���' Dia,= INSIDE WORK NO Y ❑ TOWER AVAILABLE ❑ Dlatanoe OVERTIME NECESSARY ❑ ACCESSIBILITY OUR SCAFFOLDING ❑ McIpM VACUUM REQUIRED ❑ BUCK HEIGHT OF WORK ❑ Fed PLASTIC a TAPE ❑ ❑ STAIRS ❑ SCAFFOLD Cl LADDER ❑ HOIST ❑ ELEV. ❑ PLANKS TRUCK TO WORK AREA Cl ❑ -,C_ Disto a E)(7RA Mµ REQUIRED to STAND - BY TIME WILL BE CHARGED AT $85.00 PER HOUR PER SPECIAL EQUIPMENT REQUIRED CUSTOMER COPY