HomeMy WebLinkAboutDocumentation_Regular_Tab 05_3/10/2022Agenda Item #5. Regular Council STAFF MEMO Meeting: Regular Council - Mar 10 2022 Staff Contact: Matthew Hammond, Utilities Department: Utilities Director Approve Change Order No. 1 - Reject Disposal Main Relocation Project (Temporary Location) - Hinterland Group On December 9, 2021, the Village Council approved the award of Reject Disposal Main Relocation Project (Temporary Location) project to temporarily move the concentrate discharge point to the west side of the Jupiter Federal Highway (US1) Bridge until the bridge construction is complete when it will be moved back proposed relocation plan agreed to in concept by FDOT and FDEP. To ensure the lowest price for this project, the Village selected the Hinterland Group through a competitive bid selection process — Reject Disposal Main Temporary Relocation - ITB No. UTIL 09-21 in the amount of $225,900.00. During the January 14, 2022 progress meeting for the US1 Bridge project the Contractor and CEI consultant for the bridge project requested that the Village of Tequesta delay the relocation work until August 2022 to better coordinate with the bridge work. To accommodate this request, the Utilities Department is requesting a change order (Change Order #1) to the previously approved contract award to postpone the issuance of the Notice to Proceed (NTP), which begins the contract times, to align with the current schedule for the US1 Bridge replacement. Financial implications of this change, if any, will be evaluated at the time the NTP is issued. This document and any attachments may be reproduced upon request in an alternative format by completing our Accessibility Feedback Form, sending an e-mail to the Village Clerk or calling 561-768-0443. BUDGETED AMOUNT: N/A AVAILABLE AMOUNT: N/A EXPENDITURE AMOUNT: N/A Additional Budgetary Information: Funding Source(s): N/A N/A POTENTIAL MOTION / DIRECTION REQUESTED: Approve Change Order No. 1 Change Order No. 1 - Reject Disposal Relolcation - Hinterland Group.ada Page 129 of 290 Agenda Item #5. The following document is presented in a non- ADA compliant format. Please contact the Village Clerk's office if you would like to receive an ADA compliant version of this document. Page 130 of 290 Agenda Item #5. Date of Issuance: March 10, 2022 Change Order No. Effective Date: January 8, 2022 Owner: Village of Tequesta Owner's Task Order No.: Contractor: Hinterland Group, Inc. Contractor's Project No.: Engineer: Kimley-Horn & Associates Engineer's Project No.: Project: Reject Disposal Main Relocation Project Contract Name: (Temporary Location) The Contract is modified as follows upon execution of this Change Order: Description: As a result of a request by the Florida Department of Transportation Commencement of Contract Times, as defined in Article 4 of the General Conditions, will commence to run on the day indicated in the Notice to Proceed which will be in excess of 60 days after the Effective Date of the Contract. Cost implications of delay (if any) will be evaluated at the time of issuance of the Notice to Proceed. Attachments: No. 1 - Request to Delay Concentrate Disposal Main Relocation Work CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES [note changes in Milestones if applicable] Original Contract Price: Original Contract Times: Substantial Completion: 90 $ 225,900.00 Ready for Final Payment: 120 days [Increase] [Decrease] from previously approved Change [Increase] [Decrease] from previously approved Change Orders No. _ to No. _ Orders No. _ to No. Substantial Completion: 0 $ 0 Ready for Final Payment: 0 days Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion: 90 $ 225,900.00 Ready for Final Payment: 120 days [Increase] [Decrease] of this Change Order: [Increase] [Decrease] of this Change Order: Substantial Completion: 0 $ 0 Ready for Final Payment: 0 days Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: Substantial Completion: 90 $ 225,900.00 Ready for Final Payment: 120 days RECO1 I1MENI?EQ:-, ACCEPTED: ED- By: t Cr , ' _ I w By: By: Engineer (if require` d� ) Owner (Authorized Signature) ontra or (Aut orized Signature) Title: Project Engineer Title Title Date: February 9, 2022 Date Date 21�i/ZZ C-941, Change Order Paee 1 of 2 Page 131 of 290 Agenda Item #5. Attachment A C-941, Change Order Page 2 of 2 Pa- ae- 1_1 �7�� of 290 asall`�&r9GE H�A Progress Meeting 16 Minutes Wednesday, January 26, 2022 — 9:00 am Mehta Project Field Office / Microsoft Teams 140 Intracoastal Pointe Drive, Suite 306, Jupiter, FL 33458 Financial Project ID: 428400-2-52-01, 428400-2-52-02, 428400-2-52-03 & 443867-1-52-01 Federal Project ID: D421056B Contract: T4564 County: Palm Beach Description: US 1 Bridge Replacement Project from CR A1A to CR 707 CONTRACT STATUS UPDATE NOTICE TO PROCEED (NTP) CONSTRUCTION BEGIN DATE ORIGINAL CONTRACT TIME HOLIDAY DAYS WEATHER DAYS TIME EXTENSIONS BY (S.A.) TIME EXTENSIONS BY (LETTER) ALLOTTED CONTRACT TIME (WITH TIME EXTENSIONS) CONTRACT DAYS USED FINAL ACCEPTANCE BONUS COMPLETION DATE DAYS USED JUPITER BRIDGE OPENING (I/D) 2 LANES OPEN DAYS USED JUPITER BRIDGE OPENING — NO EXCUSE BONUS ALL LANES OPEN DAYS USED START LIQUIDATED DAMAGES LIQUIDATED DAMAGES ASSESSED PERCENT CONTRACTTIME COMPLETE ORIGINAL CONTRACT AMOUNT APPROVED S.A. AMOUNT CURRENT CONTRACT AMOUNT CURRENT PAID TO DATE PERCENT COMPLETE COST August 12, 2021 October 18, 2021 1458 12 Pending (2) 1 0 0 1471 (October 19, 2025) 101 1458 (October 14, 2025) - $1M 101 600 Calendar Days from the start of Full Detour $3.5M Max, $35K / day Max Incentive — 500 Calendar Days 0 Days Used November 1, 2024 Bonus Amount — $1.5M 101 $15,313.55 /day Begins October 20, 2025 $0.00 6.87 % $ 122,211,089.68 $0.00 $122,211,089.68 $12,623,114.05 10.33% Page 133 of 290 Agen�ltj4E=� "'WIWAOL Contract Cost Analysis U*: v,t.7c%--d 887k Ia8Ef7 Incentive Tracking (Bridge Opening) Co"*Md nrnm 1) Attendees: Proiect Dashboard CAayiemd 1a3�: v.t�3� Contract Time Analysis uwAiY kwd gim Ia931} No Excuse Bonus (Bridge Opening) &M taa9n UrKwr Wmd go9% k0am a oi4j. od firs. i OW1 F I No Excuse Bonus (Final Acceptance) Uxanwktod 93.1% 093p ca.yo a d. &9' : A D693i Name Company E-mail address Contact # Attended Bodler Barthelemy FDOT District 4 PBOPS bodler.barthelemy@dot.state.fl.us 561-592-6375 ✓ Kyle Humphreys Johnson Brothers khumphreys@southlandholdings.com 727-409-4209 ✓ Clay Bores Johnson Brothers chores@southlandholdings.com 407-488-0738 ✓ Ethan Bailey Johnson Brothers ebailey@southlandholdings.com 386-965-5563 ✓ Angel Gardner Valerin Group angel@valerin-group.com 561-886-8773 ✓ Kody Hurley Johnson Brothers khurley@southlandholdings.com 808-674-7858 ✓ Steve Hedge Hardesty & Hanover shedge@hardestyhanover.com 954-368-6350 ✓ Daniel Castillo Hardesty & Hanover dcastillo@hardestyhanover.com 954-368-6365 ✓ Virgil Versaggi Mehta Engineering vversaggi@mehtaeng.com 813-210-1811 ✓ Jennifer Valmer Mehta Engineering jvalmer@mehtaeng.com 772-626-8778 ✓ Krystyna George Mehta Engineering kgeorge@mehtaeng.com ✓ April Liles Mehta Engineering aliles@mehtaeng.com 407-844-5130 ✓ Scott Case Evolution Engineering Consultants scase@eec-usa.com 561-677-0707 ✓ Ron Capobianco Jr. Evolution Engineering Consultants rcapobianco@eec-usa.com 954-464-8574 ✓ 21Pa< kc Page 134 of 290 asanair9GE H�A Tony Grau Gannett Fleming Agrau@gfnet.com 786-714-1857 ✓ Garth Bedward AT&T gb7410@att.com 561-540-9263 ✓ Miya Fisher COMCAST Miya_Fisher@comcast.com 561-436-9032 ✓ Martin Mikhail FPL martin.mikhail@powereng.com 561-701-0462 ✓ Jenna Louis Contractor on behalf of FPL Jenna.Louis@fpl.com ✓ Rona Solomon Contractor on behalf of FPL rona.solomon@fpl.com ✓ Barry Rawdon FDOT Barry.Rawdon@dot.state.fl.us ✓ Melanie Straub FDOT District 4 PBOPS melanie.straub@dot.state.fl.us 561-723-2153 ✓ Sybille Bayard CONSOR sbayard@consoreng.com 305-517-5598 ✓ Shelby Coke Coke Consulting, LLC scokeconsultingllc.com 561-632-4163 ✓ Kurt Johnson Johnson Brothers 722-422-0603 ✓ Murray Yates DRB msyates02eng@aol.com 407-405-0587 ✓ Ronnie Klein DRB ronklein@rskcsinc.com 772-461-9443 ✓ Rammy Cone DRB raycandy@aol.com 813-690-4065 ✓ 2) MOT/Safety a) MOT must be installed per TCP and/or Standard Plans. b) Lane Closure: i) 428400-2 (Roadway) Single Lane Closures in One Direction at a time allowed between 9:30 pm to 6:00 am ii) 443876 (Alt A1A Bridge) Dual Lane Closures allowed between 10:30 pm to 6:30 am iii) Provide 2 weeks advance notice for lane closures MOT Inspection Reviews (1) Lane Closures on Alternate AlA, 1 outside lane each Direction (NB&SB) (a) 11/22/2021-02/28/2022 (2) 1/26/2022- JBC stated no additional lane closures are anticipated in the next two weeks c) Inspection Notifications/Actions Required 3) Public Information a) Adjacent projects i) FEC Rail Project ii) Town of Jupiter: (1) CR A1A from Indiantown Rd to Jupiter Beach Road (2) Alternate A1A Drainage Project (Center Street and Indiantown Rd) (a) Anticipated Start Date of Feb 2022 iii) Jupiter Lighthouse and Museum (1) Artifacts will be stored starting in mid -December (2) All operations will cease at the existing structure at the beginning of Feb/Mar 2022 (a) 12/8/2021- Delayed due to lack of availability of materials b) Claims /Complaints c) Public Information Coordination Items i) Resident request for signage at Alt A1A & Eganfuskee Street (1) 1/26/2022 Under review ii) 1/26/2022- JBC requested Angel's assistance in contacting 818 bldg. to complete the precondition survey. Angel will reach out to the association and will notify the property managers to give access to the Specialty Engineer. d) Special Events i) 4/8-4/9/22 (Friday and Saturday) 6 pm to 9:30 pm, Wild & Scenic Film Festival, Jupiter Inlet Lighthouse & Museum e) CEI will follow up with TMC about posting a message on 1-95 and Turnpike DMS boards when significant issues occur within the project detour route 31 P Li Page 135 of 290 Agen�ltj4E=� "'WIWAOL 4) Utilities a) Please be mindful of any utilities within the project limits. It is the Contractor's responsibility to contact and coordinate with the respective utility owners. b) Coordinate with Palm Beach County Traffic Department for Equipment and Inspection. c) FPL: Martin Subaqueous Directional Bore Relocation (During Construction Phase 1) (1) ACOE Permit Status (a) 9-22-21 FPL sent the Army Corps permit but is awaiting concurrence for the real-estate easement, has not heard back. (b) 11/24/2021- Martin will follow up to see if FPL has sent and/or received the signed documents into ACOE; no further update is available (c) 12/8/2021- should have a letter of commitment from ACOE for FPL signature this week (d) Letter sent to FPL for signature on 12/8/2021. (i) FPL has sent it to the appropriate Department for signature 1. Martin followed up yesterday, still waiting on a signature a. Martin will follow up with the permit department and advise them to email directly to Scott Case b. 12/22/2021- FPL resent revised/updated file to permitting Department and provided dept with Scott's contact info for resubmittal c. 1/19/2022- FPL stated still waiting on signature i. CEI advised FPL will receive a notice of noncompliance with the UWS and at this point it is highly likely that FPL will be causing a direct conflict with the contractor's work ii. Barry Rawdon with FDOT requested an email be sent from FPL to CEI team providing a written update before the next meeting 1/25/2022- FPL still pending signature. a. 1/26/2022- email was sent to the ACOE real estate to follow upon review. FPL will not secure a contractor until after receiving all permit approvals (a) 12/15/2021— Project has not gone to bid yet (2) Overhead Work will begin in Mid -November 2021 (a) 12/22/2021- FPL stated work would start 1/17/2022; FPL was reminded to coordinate with TECO to avoid contacts (b) 1/19/2022- FPL has stated this should be completed by the end of this month (i) CEI advised no work has been observed onsite and requested an email stating when they will be onsite (c) 1/26/2022- FPL has been sent to Construction. CEI asked once item is in construction when can we expect to see an FPL contractor in the field? FPL representative is unable to provide any information other than that completion date was set for a 1/31/2022. Construction office has not notified him of any delay to the original scheduled date. (3) FDEP Permit Status (a) 12/15/2021- no update from FPL permit coordinating team (b) 12/22/2021- no updates (c) 1/19/2022- partially approved (i) Items Outstanding are unknown; FPL will inform CEI Team (ii) CEI advised there is only 2-3 months before the work will need to be complete otherwise FPL will be causing a delay (d) 1/26/2022 — No update (4) CEI requests FPL's permit coordinators contact information (a) As of 12/21/2021, CEI has not received contact information 41Pa`�� Page 136 of 290 Agen�ltj4E=� "'WIWAOL (b) FPL is unable to give contact info to coordinate ii) Removal of Light Poles (Phase 1, Duration 10 Days E.A.) (1) Station 1533+147 RT 46' to 1533+17 LT 24' (2) Station 1541+95 RT 44' to Station 1541+95 L 25' (a) JBC will need to put in a service request to have the lights decommissioned prior to removal (b) FPL does not require a permit for this work (c) 11/29/2021— Design Completed iii) Removal of abandoned poles from Right of Way R.T. north of Intracoastal (1) 1/25/2022- removal of poles is under design review iv) Placement of Buoys for existing subaqueous bore (1) 12/8/2021- Need FPL to mark the existing line in the water (2) 12/15/2021- Martin will follow up with locate Department; request located ticket number (a) FPL does not have any updates and suggested JBC follow up through the 811 website (b) 1/19/2022- CEI advised that FPL is in violation of the Florida statute as JBC has requested locates several times and FPL is only marking on land and not placing buoys as requested. (i) JBC provided FPL with a phone number to contact the superintendent on site (c) 1/25/2022- FPL has followed up with locate team, waiting on response (d) 1/26/2022- FPL is requesting a Contractor surveyor to GPS the buoys after placement so they can be replaced by the contractor (i) JBC stated they will not be responsible for replacing the buoys if dislodge, lost, or missing (ii) CEI stated FPL is required by law to provide markings. (iii) Martin expressed he is not in charge of locates. CEI informed Martin that as the representative for FPL the CEI is bringing it to his attention and requested a contact for Florida 811 and escalate the issued through 811. (iv) CEI will investigate who at FPL this issue can be escalated to and follow up further. v) FPL Service Points for Signal, ITS, and Lighting (1) 01/19/2022 FPL Representative to follow up on status of service points (2) 1/25/2022- FPL stated there are being reviewed, stated some locations may not work and will send follow up. (a) 1/26/2022- CEI requested a completion date for the review of the services points. FPL stated would provide ASAP, CEI reminded that this information was requested 2 months ago. a) AT&T: Garth i) Notify AT&T a minimum of 10 business days prior to needing support, protect of adjustment of facilities during construction. ii) Relocation of Buried Fiber Optic Lines and Telephone (Preconstruction) Station 1523+10.30 L.T. 70' to 1532+50.60 L.T. 80' (Mast -Arm and Drainage Structures; US-1) and Station 1526+59.19 (Mast Arm; US-1) (1) 9-22-21 Garth stated he does not believe there are any conflicts with the Mast Arm at A1A. (2) Design of relocation south of the US-1 Bridge is still ongoing. (a) 10/6/2021; AT&T Design is still working on the US1 location. No firm date yet. CEI requested a tentative date, not available at this time (b) 10/13/2021-AT&T Design subcontract has an extensive backlog of work, and no date on completion of design is available currently (c) 10/13/2021- AT&T to notify CEI team when the permit is submitted to FDOT Permit office (d) 10/27/2021- design is pending from the vendor (e) 11/17/2021- The design was due to AT&T construction on 11/15/2021, but it still has not been received. AT&T will forward to FDOT and CEI once received (f) 12/8/2021- still in design the last update, the designer resigned, and they are trying to get a new designer to complete (i) CEI stated this work might affect the removal of palm trees (ii) JBC was advised to refresh locates 5 1 ' ai Page 137 of 290 Agen�ltj4E=� "'WIWAOL (g) 12/22/2021- CEI stated AT&T has requested for JBC to refresh locates, mark location of MSE wall and mast arms (i) JBC requested this request be sent via email and stated this would be done as a favor as the UWS does not require them to provide this information (ii) 1/19/2022- CEI advised that all areas were marked by contractor as requested and moving forward AT&T will be responsible for all markings. (iii) 1/19/2022- Ron will follow up with Garth regarding locates (h) 1/26/2022- Design is complete, called in locates to check for conflicts, 2 weeks to activate the permit and procure materials. (i) CEI advised that all markings were done 2 weeks ago and JBC will not be remarking. AT&T will be responsible for all markings. (ii) Garth will provide a meeting invite as soon as locates are complete. CEI is unavailable Wednesday mornings and JBC is unavailable Thursday mornings. (3) Adjustment of Manhole Frames (During Phase 1) adjustments are not needed if less than 3/8" (a) Station 347+20, LT 30' (b) Station 635+20, LT 80' (c) Station 635+40, LT 80' b) Village of Tequesta: Samantha provided update via email i) Relocation of Brine Discharge Line Station 1540+25, 65 R.T. to Station 1540+98, L.T. 93' (Temporarily relocating line) (1) 10/13/2021- Reject main on US-1 north of Jupiter Cove has been relocated, the outfall is in the process of being bid with the Village, Village is purchasing materials (a) Advertising for the outfall has commenced. Prebid meeting 11/8/2021 and anticipated Bid close date of 11/18/2021, Pre bid meeting held today, expect to have Contractor ready to begin by the 15t of the year. (b) Bids will be presented to the council at the 12/9/2021 meeting. Temporary relocation work is expected to be completed by the end of the first quarter (2) 10/13/2021- The Village is still pending issuance of Army Core Permit (a) 11/3/2021- Permit has been transferred to a new reviewer, waiting on a response from ACOE about previous coordination and agreements with the reviewer (b) 11/10/2021- still awaiting approval (c) 11/17/2021 - Received RAls, responded, and all needed additional information. VOT expected to have it resubmitted by Thanksgiving (d) Village responded to ACOE comments, waiting to hear back from ACOE (i) 12/8/2021- Awaiting response from ACOE; CEI will follow up and try to expedite (e) 12/15/2021- Still waiting to hear back from ACOE (f) 12/22/2021- had a meeting with ACOE, submitted additional information, and hopes to have the permit by mid -January. Prepared to start once permit is received (g) 12/27/2021 CEI sent email update to all invested parties regarding correspondence received from ACOE. (h) 1/5/2022- responded to all questions and received further follow up questions regarding the temporary relocation. Samantha is working on the response today. (i) 1/19/2022- everything has been sent over to ACOE and there is not an update other than the reviewer stating it is actively being worked on (i) 1/26/2022 — No Update (3) 11/17/2021- Village of Tequesta is in pursuit of Contractor — Bids are due today (i) Bidders have been notified that they should be ready to mobilize once the ACOE Permit is issued (ii) Materials will be available by 11/30/2021 (iii) Work is expected to be complete by the end of February. (b) 12/8/21 Bid to be awarded tomorrow at Council Meeting; Material to arrive next week and stored at VOT Water Treatment Plant 61Pa�� Page 138 of 290 Agen�ltj4E=� "'WIWAOL (4) 01/14/2022 JBC and CEI team requested the Village of Tequesta delay the construction of the Temporary Brine line till after the installation of the new bulkhead. (a) 1/22/2022- VOT asked when during the summer. JBC stated 71112022. (i) CEI stated this would just be for the temporary (ii) Samantha is waiting on a response from management and will provide an update as soon as available 1. 1/26/2022- VOT agrees to delay until 8/2022 ii) Contractor must coordinate with the Village of Tequesta for the permanent relocation of the line once the bridge construction is complete. (Station 1540+98, LT 93' to 1540+34, RT 93') c) Town of Jupiter: (1) Completed d) Comcast: Miya i) Removal of service from wooden Pole for Jupiter Lighthouse & Museum (1) The museum should be relocated by the first week of January 2022. Comcast will coordinate the transfer of services at that time. (a) 12/8/2021- CEI advised that work will be delayed until April due to material shortage for the museum to relocate e) TECO/Peoples Gas: not in attendance i) Relocation of the subaqueous directional bore from 1527+40, R.T. 98' to 1542+80 RT 118' (During Construction Phase 1) UWS Completion Date 01-14-2022 (1) TECO will have as-builts/bore logs provided by the end of January (a) 1/5/2022- TECO is working on as-builts now. (i) 1/26/2022- still waiting on as-builts Excuse Utility Representatives 9:43 a.m. 5) Project Schedule a) Baseline Schedule Pending resolution of server issues (1) 9-22-21 Johnson & Bros are currently unable to access email; JBC stated they are working to resolve the problem and he would notify CEI as soon as they have access. (2) 10/6/2021- JBC is still working through P6 service problems; JBC expects to have an update by the end of the day (3) 10/20/21 pending issues with Oracle; may need to rebuild schedule from scratch (4) 10/27/2021- no update from Oracle JBC is continuing to try and recover files. JBC stated one more week is needed to attempt to resolve before deciding to rebuild. (5) 11/3/2021- JBC stated the schedule would be submitted by the end of November 2021 (6) 11/24/2021 JBC is working on completing and will provide an update early next week (7) 12/08/2021- JBC said they are actively working on it and expect to have it in two weeks (8) 12/15/2021- JBC stated hoping by next week, unable to confirm an exact date (9) 12/22/2021— pending Submittal of schedule — non-conformance will be issued each day until Johnson Bros provide an acceptable schedule. (a) JBC stated schedule is drafted and under review. (10)1/5/2022- JBC will follow up with their scheduler (11)1/18/2022 JBC staff working with the CEI team to develop a Baseline CPM Schedule (a) 1/19/2022- CEI should be done with draft by next week (i) JBC will have two weeks once received to deliver baseline schedule (b) 1/26/2022- CEI will send to JBC by the end of next week at the latest 71 P<<` Page 139 of 290 Agen�ltjf=� "'WIWAOL b) Three-week Planning Schedule Contractor FAP No Contract No. Johnson Bros Corp D4210565 T4564 Legend Actrvity Started Activity Remaining Holiday, Nonwork Nornmrk Day ( Tentative Pour C Crdical Path Jupiter US-1 Bridge Replacment - 2022 Schedule I Date: 1/213/2022 Jan-22 Feb-22 W Th F 5 5 M T W Th F S 5 NI T W Th F 5 5 M T Three Week Planning Schedule 1/19122 2/8/22 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 B Construction - Stage I ID Activity Name Duration Start Date End Date Predecessors;A2290 ors A2220 Remove Existing Timber Piles t1 30 1/10/2022 2/18/2022 A1010 C C C C C C C C C C C C C C C C A2180 Remove Existing Bulkhead {Partiall 15 1/17/2022 2/712022 A1010 C C C C C C C C C C C C C C C C A2270 Drive Piles - Bascule Pier 5 Phase I 25 113112022 3/7/2022 A2250 40 CRepair Sent Cap 3-SR811Phase 1 10 11/24/2021 211112022 A2029 60,A2040 Repair Bent Cap 2 - SR811 Phase 1 10 12/20/2021 2/11/2022 A2030 60 A c) Weekend work: Provide a 2-day notice to allow the CEI team to schedule an Inspector. d) Holiday work: Any request to work must be received 10 days prior 6) Construction Operations a) Alternate A1A i) JBC believes cathodic protection is a sole source; CEI will look into it further (1) 11/30/2021- CEI confirmed with FDOT Material office that cathodic protection is not sole source and sent email to JBC informing of such (2) JBC still believes Structural Technologies is sole source and intends to submit an NOI if unable to find a solution (a) 12/15/2021 working toward a resolution with Structural Technologies (3) 12/22/2021- JBC has worked it out and will be submitting shop drawings and materials early next year (a) 1/19/2022- JBC is having contractual difficulties with Structural Technologies regarding type of contract to be executed between the 2 parties (Transfer of Liability) (i) Based on the specifications JBC position is that Structural Technologies is a subcontractor while Structural Technologies wants a Purchase Order (Supplier). (ii) JBC feels this a sole source issue and if an agreement with Structural Technologies cannot be executed the specifications and design are not constructible (iii) CEI will follow up with State Materials and District Office (4) 1/26/2022- JBC believes they have resolved their contract dispute with Structural Technologies (a) QC Plan should be submitted shortly (b) Materials are being entered in MAC but a problem with Mix Designs (i) Materials have been reviewed and approved by Anode Supplier (c) Shop Drawings should be submitted shortly ii) Pier 2 (1) Limits of removal of concrete extended on Pier 2 north face b) US-1 Bascule Bridge i) Removal of Debris from Waterway (1) 12/15/2021- will be done once the test piles are done ii) Removal of Bulkhead iii) Status of Production Pile Installation Plan and revised Test Pile Plan (1) 1/5/2022-JBC will revise (a) 1/19/2022- will submit revised Test Pile Plan by the end of the week (2) 1/19/2022- expects to drive by second week February; While installation of Template will start on Jan 30, 2022 (3) JBC stated it is actively being worked on iv) JBC requested that the flush pipe be removed and are there any permitting issues that would prevent the pipe from being removed (1) Pipe is Privately Owned and permitting may be an issue 81Pa,"c Page 140 of 290 Agen�ltj4E=� "'WIWAOL v) JBC requested CEI to assist with notifying private property owner to remove private irrigation within the FDOT R/W (1) CEI has already advised everything will need to be relocated out of the ROW but will follow up again 7) Administration a) Status of Job Site Bulletin Board i) Up to date b) EEO i) Monthly Labor Interviews for January (1) Required:15 (2) Obtained: 12 c) OJT i) No. of trainees have been set to 27. (1) JBC will be submitting a request to reduce the number of required Trainees (a) 12/8/2021- JBC stated will provide after the 15t of the year (b) 1/5/2022- JBC stated will work on this week and next week and get it in (2) OJT schedule and Proficiencies signed by CEI Team and sent to District for Final Approval (a) 11/17/2021- Department is withholding approval of the Proficiencies and Initial OJT schedule until the request for the reduction in number of trainees is received. Johnson Bros thinks they can have this information to the Department by the end of the year. (b) 11/17/2021- April stated that JBC is in compliance at this time and the Department is awaiting the accurate number of trainees before approving (c) 1/5/2022- Due to JBC stating there is a request for reduction during previous EEO meetings there is a potential for a noncompliance to be issued if JBC does not provide a more accurate depiction of the number of trainees (i) 1/19/2022- JBC will provide and update by 1/28/2022 d) Sublets received and accepted i) Florida Drawbridge Inc ii) Acmes Barricades L.C. iii) Edwards Electric iv) ACCU-CUT Concrete Services v) Gerelco Traffic Controls Inc. vi) All Florida Tree & Landscape, Inc. vii) Tree planters of South Florida and PJ's Land Clearing & Excavating (2"d tier to All Florida Tree & Landscape) (1) EEO officers have been added to the board e) Reminder- update the EEO officers on the board to include all subcontractors f) DBE i) The DBE Goal for this Contract is 11%, as listed in the bid documents. (1) Current DBE anticipation percentage: 0.00% - Does JBC anticipate any DBE's on the project? (a) 1/26/2022- CEI RCS offered to assist JBC with locating DBE's if needed (1) JBC stated the fencing subcontractor is a DBE ii) Use the EOC system monthly to input DBEs and advise CEI of new DBEs working on the project and updates via this online system. iii) When a commitment changes in the EOC, the sublet must be revised to match the commitment. g) Compliance Violations: None 8) Design a) Upcoming Plan Revisions: i) Plan Revision 3 and 4 on the SharePoint Site (1) Includes: 91P<<<�� Page 141 of 290 Agen�ltjf=� "'WIWAOL (a) Stairwell Clearance modifying one (f) Bid Question responses of the floors (g) Power service at Indiantown/US1 (b) Misc. Metal Detail for (h) Alternate A1A Cap Counterweight Platform (i) PBCTD- installing new ITS cabinet- (c) Structural Steel RFls US1/ Alt AlA will need multitap (d) Fender Mounting Blocks from FPL and run conduit (e) Sanitary Sewer Revision (2) 12/15/2021- JBC will forward to Gerelco for Review prior to responding (a) 12/22/2021- JBC provided to sub, awaiting a response (i) Still have not received a response from Gerelco b) Pending Design issues to be addressed i) ADMS Camera iv) Paint Color Issues ii) Reinforcing Steel for the Fender Blocks (1) Colors will be changing iii) Signal Configuration at Alt A1A and Old (a) JBC requested that the color Dixie Highway texture/finish be included (1) 12/22/2021- County requested that the v) CS-12 to End Wall conflict with Concrete crosswalk be relocated to the west side Sheet Piles of the intersection (1) RFI-53 Response (a) With FOR plan revision forth coming c) CEI asked if there was anything else that needed to be brought up to design. i) Not currently d) Permits i) Loxahatchee River District (Sewer Permit, FDEP) 9) RFI's a) Open: Ped Pole Please provide the names that are to be applied to the Ped Detector Push 058 1/25/22 Street Signs Button Signs FTP-6813-06 on sheets b) See attached RFI log i) 1/19/2022- JBC expressed concern regarding the precast seal slab and fender system.... design/process regarding bolts and fenders and the shop drawing approvals (1) CEI and Design stated Mounting blocks- if design does not have the whole drawing they cannot verify the system works as a whole (a) Anchors have been approved as noted (2) To expedite the response and development of plans, JBC requests H&H to attend a standing weekly design meeting for the Fender and Precast Seal Slab Systems ii) JBC has not had a chance to review RFI 57 10) Shop Drawings/Plans a) 1/26/2022- FOR provided update for the following i) 025-pending county approval ii) 029- will provide response by Monday iii) 030- will provide response by Monday iv) 031- pending county approval v) 033- pending county approval vi) 034- pending county approval b) See log attached for the status of all other Shop Drawing/Plan submittals 101Pa`c Page 142 of 290 Agen�ltj4E=� "'WIWAOL c) 11/17/2021- JBC requested if they could submit the Precast Seal Slab Engineered drawings as 30, 60, 90% plan reviews instead of the final product due to the complexity of coordinating the design of the Fender Blocks and System with the precast segments. FOR had no objections with this approach b) Critical Shop Drawings outstanding i) DMS Sign — long lead item (1) Partial submittal received by FDOT (1) 1/19/2022- JBC will follow up with iii) Spall Repairs Gerelco (1) JBC is working with the suppliers (2) 1/26/2022- JBC stated will have to (a) See Section 6.a.3.i for delay of shop follow up internally ii) Mast Arms - long lead item drawing 11) Environmental Project Environmental Permits need to be kept active — CEI will request an extension of permit expiration dates 90 days before expiration. Commencement of Construction notices have been sent. Department has requested both Army Core Permits be extended Agency Permit No, Expiration Date U.S. Army Corps of Engineers (US-1 Bridge) SAJ-2019-03258 (NW-MMT) March 18, 2022 U.S. Army Corps of Engineers (Reef Establishment) SAJ-2006-07012(SP-JKA) February 14, 2023 FDEP —Reef Establishment 50-0231153-005-EM January 30, 2028 Coast Guard Bridge Permit 7-20-7 December 4, 2025 SFWMD General ERP 50-103836-P August 12, 2025 U.S. Army Corps of Engineers (Alt A1A Bridge) SAJ-2020-03345 (NW-VCB) March 18, 2022 State Fire Marshal SFM21-000157 N/A SFWMD Individual ERP 50-103092-P July 16, 2025 SFWMD Individual Water Use 50-09836-W November 28, 2023 a) If any suspicion of contamination, stop working, protect the area, and contact the District Contamination Impact Coordinator, (954) 777-4286. i) Potential Soil Contamination at 1528+50 to 1529+50 (R.T.) ii) Potential Ground Water Contamination 1552+00 (LT), 1552+16.81 (LT), and 629+90 (LT) to 639+49.92 (LT) iii) Involvement of CAR Contractor will not be required unless JBC proposes dewatering within 500-ft b) Archaeological i) Notify Department's District Cultural Resources Contract Manager at 954-777-4334, not less than 30 calendar days before any ground -disturbing operations within archaeological sites from Sta.1541+80 to Sta. 1557+00 will occur during the detour phase. c) Barge placement— Reminder need to provide 1' of clearance between the barges and the seagrass 12) Vibration and Settlement Monitoring a) Status of Preconstruction Inspection of structures identified in plans and within 75 feet of roadway compaction (2) 12/8/2021 PaFtia.l submittal received, need a Fepert feF all le-c-atie—ns identified in the Settlement b) Do not use vibratory equipment within 200 feet of the historic Jupiter Inlet Lighthouse Museum i) Bureau of Land Management (BLM) requests 2 weeks' notice for wrapping the lens for the test pile operation (1) To wrap the lights will take 2-3 hours. 24 hours minimum notification but would like as much time as possible so the Coast Guard can be notified (2) 1-26-2022 At this time JBC can not speculate on duration of the lens wrapping for pile driving c) JBC Completed the install of the Museum Chimney Lateral Supports i) TOJ has temporarily supported the damaged Foundation Pier 111PaC Page 143 of 290 asall`�&r9GE H�A Vibration Monitoring Location Monitor ID Violation Occurrence Existing US-1 Bridge over Loxahatchee River (Br. No. 930005) Sierra 5971 Sierra 5630 Jupiter Inlet Lighthouse Museum Sierra 5655 (2) 12/17 Jupiter Cove East Building & Associated Car Port Structures Sierra 5663 1000 North Restaurant Sierra 5713 1000 North, Building 818 Sierra 5622 Office Building at 1044 US-1 Sierra 5622 Utiki Restaurant Building Sierra 5648 Jupiter Inlet Boat Rentals & Boat Club Sierra 5648 d) Threshold Limits i) 0.2 inches/sec for World War II Naval Housing Building ii) 0.5 inches/sec for all other Structures iii) 0.5 inches/sec for the existing bridge (1) 01/19/2022 — Received response from Specialty Engineer; issue is under review by FDOT (a) 1/26/2022- CEI expects to have a response by next week Settlement Monitoring Below is a list of structures that have been identified in the accepted Settlement Monitoring plan Building/Structure Names Address Cumulative Settlement (in) Existing US-1 Bridge over Loxahatchee River (Br. No. 930005) US-1 over Loxahatchee River 0.006 (North)/ 0.005 (South) Jupiter Inlet Lighthouse Museum 500 Captain Armour's Way .006 Jupiter Cove East Building & Associated Car Port Structures 1648 Jupiter Cove Dr. 0.003 (Building)/.006 (Carport) 1000 North Restaurant 1000 US-1 Office Building at 1044 US-1 1044 US-1 .007 Utiki Restaurant Building 1095 A & B North A1A .008 Jupiter Inlet Boat Rentals & Boat Club 1095 North A1A Sunoco Gas Station 151 US-1, Jupiter, FL 33477 Bank of America 51 US-1, Jupiter, FL 33477 Chevron 33 Alt A1A, Jupiter, FL 33477 Johnny Mango 71 E Indiantown Rd #805, Jupiter, FL 33477 Concourse Village Shopping Center — Dunkin 131 Alt A1A, Jupiter, FL 33477 Walgreens 1448 US-1, Tequesta, FL 33469 Shipwreck Bar and Grille 1511 N Old Dixie Hwy, Jupiter, FL 33469 Citgo 1531 N Old Dixie Hwy, Jupiter, FL 33469 Lighthouse Diner 1 1510 US-1, Jupiter, FL 33469 Von Langen 1 1380 US-1 #201, Jupiter, FL 33469 a) Settlement Monitoring Frequencies i) Existing Bridge (T108.10-2.2) — Monthly During Pile Driving Activities ii) Chimney Support (T108-3.8) — Follow Specification 108 iii) Follow Specification 108-2.1.5 for all activities and frequencies 121Pac Page 144 of 290 Agen�ltj4E=� "'WIWAOL b) Locations where no construction activities have occurred or is not currently occurring within a reasonable distance no report, is required (i.e., Roadway when pile driving is occurring) i) Add a note to the submitted report work has not commenced or no activities occurred in this area c) Missing Reports: i) Signed and Sealed Precondition Inspection Reports and Pictures (AFT is actively working on this) (1) 100 North Building 818 13) Materials/Quality Control/Testing a) MAC Update i) Needs Concrete Producer for Class IV b) Upcoming QC/VT Tests i) Missing result for E0002Q (1) 1/26/2022- Newton (QC) was having MAC login issues and is working on getting it submitted (2) The existing material sampled is classified as A-3 and can be used as Pile Backfill c) Need shop drawing submittals for Spall Repair Materials, approved by Anode manufacturer d) APL products need to be submitted to CEI for tracking purposes e) Drainage Precast Manufacturer Certification f) Optional Pipe Material identification i) Needs to be identified before any road work activities ii) JBC stated likely will be using HDPE and Concrete (1) CEI requested supplier information and further details; JBC will send an email iii) 1/26/2022- JBC is still working on this. CEI reminded that the optional pipe material will need to be entered in MAC g) CEI requests copy of delivery ticket, heat ticket, mill certification and sample information for bars when ordered/delivered 14) Foreign Steel Request a) Request to incorporate foreign steel for Hydraulic Motors was denied by Department b) Reminder CEI Team needs Invoice and Mill Certifications to accept the Foreign Steel for the Fender Bolts c) All Material Containing Steel or Iron needs to be accompanied by a Manufactures Buy America Certification i) Buy America tracking (allowable .1% of contract amount = $122,211.09) (1) *Tentatively approved pending submittal of the invoice Item Invoice Invoice Invoice Cumulative Amount Cumulative Manufacture Description # Date Amount of Foreign Steel Percent of Foreign Steel Shibata Fender Anchor $28,960 Fender Team I Bolts 1 .00 $28,960.00* 23.70% Remaining Allowable $93,251.09 76.30% 15) Contractor Submittals a) Weekly i) Three-week planning schedule ii) SWPPP for the previous week (1) 1/26/2022- Received b) Monthly (reminders) i) CPM Schedule update (1) Must be submitted and accepted by 02/20/2022 to prevent withholding of estimate ii) Due by 12:00 pm Monday after cutoff (Next cutoff 2/20/2022) (1) Construction Compliance with Specifications and plans 131Pa. c Page 145 of 290 Agen�ltj4E=� "'WIWAOL (2) Disbursement of previous payments to subcontractors. (3) MOT Certification and other quantity certifications (4) Monthly CDS cert (6) Stockpile material certification (if requested) (a) 2-weeks' notice and detailed pictures if locations are out of state c) Pre -construction documents i) Identification of Optional Drainage Pipe Material (1) Needs to be entered in MAC d) Railroad Coordination/Compliance i) FEC training is needed for RDWY and ITS ii) Sun rail for flaggers (1) 1/26/2022- JBC does not anticipate needing flaggers in the next 2 months 16) Work Orders/Supplemental Agreements WO # Description Responsible Party Status 001 30 Day Flex Time Extension None Executed 002 22 Day Flex Time Extension None Executed 003 Incorporation of PCMS for modem None Executed 004 ATC Controller CEI Drafting Work Order 005 Incorporation of Electronic Density Log Book CEI Drafting WO $0.00 SA # Description Repoonsible Party Status Plan Revision 3 & 4 and associated Specs. JBC Pending concurrence of prices a) Status of Incorporating July 2021 Standard Specification 715; eliminates the Monthly Certs for thermoplastic material i) 10/6/2021- JBC is waiting until they have a striping subcontractor before deciding, will have an answer early next year ii) 1/5/2022- still waiting to select subcontractor iii) 1/26/2022- still waiting to select subcontractor b) Plan Revision 3 and 4 i) Pay Item 141-70 Cost — Bid Question 34168 and 34186 (1) 11/17/2021- JBC is working on pricing could take a few weeks (2) CEI requested a price be submitted by the end of the year (2021). (3) 11/24/2021- JBC is working on pricing and should have it shortly (4) 12/8/2021 Awaiting Concurrence of proposed price offer or counter (a) JBC will review (b) CEI reminded JBC that an email response is needed (5) 12/22/2021 JBC is finalizing the cost and will follow up with Scott (6) 01/05/2022 Awaiting a response from JBC (7) 01/18/2022 CEI provided JBC with Final Price Offer, awaiting a response. (a) Unilateral Payment will be issued if agreement is not made by close of business on 01/21/2022 (i) CEI stated open to revising date dependent on the outcome of further discussion with JBC scheduled for after meeting (b) 1/19/2022- JBC stated they feel the scope has not been clear and feels that a unilateral would be unfair until everything has been clarified. Also expressed concern regarding adding work when there is such a tight schedule. (8) SA is being drafted to incorporate all changes except specification revision for Pay Item 141-70. 141Pa`�c Page 146 of 290 Agen�ltj4E=� "'WIWAOL 17) Notice of Intent (NOI) Open NOI # Description Initiated Responsible Party Status Time Impacts 001 Test Pile 8/17/2021 TECO Utility Company has until 1/19/22- All work has been Conflict 1/14/2022 to relocate complete and CEI requested with TECO their line per their UWS. that JBC recind. JBC stated they 1/18/2022 — Utility will look into the letter that was Company completed sent and provide a response work on 1/14/2022 per 1/26/2022- JBC still debating on UWS Schedule rescinding N01. JBC assumed N01 was closed based on Department's No Entitlement Letter. If an agreement N01 still needs to be rescinded 002 Test Pile 01/25/2022 FPL Utility company has all of 1/26/2022- Not at this time Conflict Phase 1 to complete with FPL relocation work a) Potential NOI's i) JBC stated if issues are not resolved: (1) Cathodic Protection for Structural Technologies (2) Hydraulic Motors (3) Precast Seal Slab Design 18) Contractor's Past Performance Rating (CPPR) a) The CPPR rate could be affected by late submittals, non-conformance to MOT requirements, and non -pursuit of work. Therefore, a review of the schedule and controlling items of work will be evaluated to determine non - pursuit days. b) Contractor CPPR score — Wevember December- (1117 c) MOT, issues dealing with Safety, and blatant disregard to the Contract Documents can be automatically escalated to Deficiency Letters d) Escalation meeting 12/15/2021 @ 2:30pm for DL issued on 8/28/21 and 9/17/21. i) Outcome of meeting- DL determination will be postponed until after Submittal of Baseline Schedule e) CEI reminded JBC when subcontractor is onsite to notify inspection staff to avoid rework f) Any questions or concerns from Johnson Bros regarding the use of CPPR? i) 1/26/2022- JBC stated no auestions currently CPPR Status Type of Deficiency Occurrence VW DWL DL Notes Non -Pursuit (Category 1) MOT (Category 2) Timely Submittal (Category 3) 11 4 2 6 6 DL (8/28/21, 9/17/21, 11/30/21, 12/7/21, 12/14/21, & 12/21/2021) - Issued for Precon Submittal documents and Baseline Schedule. Coordination (Category 5) 1 1 Cooperation with CEI Personnel and Property Owners Mitigation of Cost and Time (Category 6) Environmental Comp. (Cat. 7) Non -Conformance (Category 8) 42 12/21/2021-01/26/2022 151Pa`,c Page 147 of 290 asanair9GE H�A 19) Contractor Required Maintenance - Started 10/18/2021 a) Existing US-1 Bascule Bridge b) Mowing & Litter i) TOJ is currently performing c) Signalization & ITS d) Lighting iv) The Contractor took over Maintenance Responsibilities on 11/12/2021 (1) Status of repair of Outage Inspection performed 01-07-2022 (a) 1/19/2022- All repairs have been made JBC will respond via email (b) 1/26/2022- CEI requested official response via email once again 20) CSI's a) None currently 21) Upcoming Meetings: a) Weekly Progress meeting 02/02/2022 b) Smart Work Zone Roles and Responsibility Meeting - TBD c) DRB — 3/23/2022 d) Pre -activity Meetings TBD i) Earthwork (1) Pending Submittal and approval of Q.C. Plans (2) EDS Training Feb 16, 2022 ii) Concrete (1) Pending Submittal and approval of Q.C. Plans iii) Drill Shaft (1) Pending approval and Submittal of Drilled Shaft Plan (2) Will schedule 2 meetings due to different contractors iv) Signal and ITS 01/26/2022 at 2:00 pm v) Thermoplastic and Green Bike Lane Markings vi) Asphalt (Pre -paving Meeting) (1) 1/26/2022- JBC is still waiting to see if it will be self -performing yet. Will follow up internally. vii) Mass Concrete (1) Pending Contractor's Mass Concrete Plan submittal and approval viii) Cathodic Protection (1) Still working with Cathodic Protection subcontractor and QC Company (2) Will Tentatively schedule for 2/2/2022- 2:00pm 22) Action Items Item Responsible Description Due Date Status # Party Initial Submittal due end JBC and CEI 1 Baseline CPM Schedule Preconstruction Conference of November 2021 Precondition Survey Pending JBC 2 Reports and Pictures Past Due 3 Revised Test Pile Plan Past Due Pending JBC 4 Production Pile Plan 1/31/2022 Pending JBC 161Pa`gc Page 148 of 290 asanaiir9GE H�A 23) Open Discussion: a) None Meeting Adjourned at 10:27 am 17�r Page 149 of 290