HomeMy WebLinkAboutAgreement_General_10/13/2022_Kimley Horn Kim ey>>>Horn
September 7, 2022
Jeremy Allen
Village Manager
345 Tequesta Drive,
Tequesta, FL 33469
via email:jallen@tequesta.org
Re: Amendment Number 1 to Professional Services Agreement
Dear Mr. Allen:
Kimley-Horn and Associates, Inc. ("Kimley-Horn" or '`Consultant") and the Village of Tequesta
("Client")entered in a Professional Services Agreement dated June 21,2022("Agreement")concerning
Tequesta Remembrance Park ("Project").
The parties now desire to amend the Agreement to include services to be performed by Consultant for
compensation as set forth below in accordance with the terms of the Agreement,which are incorporated
by reference.
Consultant will provide the services specifically set forth below.
Task 1b: Geotechnical Services:
The scope of work will consist of performing field verified services as noted in Table 1. Borings
will be located in the field by out drilling personnel by measuring distances with a tape from
known reference points. Elevations at boring locations can be interpreted from a topographic
plan if furnished by others. Some adjustments in the boring depths may be necessary
depending upon the subsurface conditions encountered.
Field Testing:
Building: Two (2) Standard Penetration Test (SPT) Boring to a depth of 20 feet
Drainage Design: One (1) Borehole Permeability Test
Prior to drilling at the project site, TSFGeo will notify the local utility companies and request
that underground utilities be marked (Sunshine State One Call). The proposal assumes that the
Contractor/Client will locate private utility lines, if any, in the field or clear boring locations of
utility conflicts prior to mobilization of the drill rig.TSFGeo will recommend a utility line locating
service upon request. TSFGeo will need to receive an "All Clear" relative to utilities before
mobilization.
kimley-horn.com 1920 Wekiva Way,West Palm Beach, FL, 33411 (561)845-0665
Kimley>>>Horn
The services currently authorized to be performed by Consultant in accordance with the Agreement
and previous amendments, if any, shall be modified as follows:
Fee and Billing table is modified as follows to correct scrivener' errors as well as noting the
addition of the Geotechnical Services as Task 1 b.
Task No. Description Fee
1 Survey Services $ 3,134
lb Geotechnical Services $5,875
2 Design Development/Site Plan Package $17,410 $17,700
3 Bid/Construction Documents $19,060 $19,570
4 Permitting Services $7,345 $7,230
5 Final Bid/Construction Documents $10,680
6 Project Representation/Meetings $1175454MAX) $9,300(MAX)
7 Limited Bid Phase Services $4,485-(MAX) $ 5,235(MAX)
8 Limited Construction Phase Services $22,060-(MAX) $17,610(MAX)
Total Lump Sum Fee(tasks 1-5) $-56414 $64,189
Total Maximum Fee(with Hourly tasks) $44459 $96,334
We will provide our services as expeditiously as practicable with the goal of meeting the following
schedule:
The Geotechnical engineer's fieldwork is expected to commence within 2 weeks of utility
clearance and take approximately 1 to 2 days to complete, weather permitting. A report can be
submitted in less than three weeks after completion of the field exploration.
For the services set forth above, Client shall pay Consultant the following compensation:
Lump sum fee of$5,875 for Amendment#1 (Task 1 b).
(remainder of page intentionally blank)
2
kimley-horn.com 1920 Wekiva Way,VVest Palm Beach, FL, 33411 (561)845-0665
Kimley*Horn
We appreciate the opportunity to provide these services to you. Please contact me if you have any
questions.
Very truly yours,
KIMLEY-HORN AND ASSOCIA. ^S, INC.
Signed:
Printed Name: Michael F Schwarz, P.E.
Title: Sr. Vice President
AGREED AND ACCEPTED:
VILLAGE OF TEQUESTA
By:
Title: Malior-
Date: t O - l 3-dD a.b--
3
kimley-horn.com 1920 Weniva Way. West Palm Beach Fl 3341 1 ,3'1 345-WS5