Loading...
HomeMy WebLinkAboutAgreement_General_10/13/2022_Kimley Horn Kim ey>>>Horn September 7, 2022 Jeremy Allen Village Manager 345 Tequesta Drive, Tequesta, FL 33469 via email:jallen@tequesta.org Re: Amendment Number 1 to Professional Services Agreement Dear Mr. Allen: Kimley-Horn and Associates, Inc. ("Kimley-Horn" or '`Consultant") and the Village of Tequesta ("Client")entered in a Professional Services Agreement dated June 21,2022("Agreement")concerning Tequesta Remembrance Park ("Project"). The parties now desire to amend the Agreement to include services to be performed by Consultant for compensation as set forth below in accordance with the terms of the Agreement,which are incorporated by reference. Consultant will provide the services specifically set forth below. Task 1b: Geotechnical Services: The scope of work will consist of performing field verified services as noted in Table 1. Borings will be located in the field by out drilling personnel by measuring distances with a tape from known reference points. Elevations at boring locations can be interpreted from a topographic plan if furnished by others. Some adjustments in the boring depths may be necessary depending upon the subsurface conditions encountered. Field Testing: Building: Two (2) Standard Penetration Test (SPT) Boring to a depth of 20 feet Drainage Design: One (1) Borehole Permeability Test Prior to drilling at the project site, TSFGeo will notify the local utility companies and request that underground utilities be marked (Sunshine State One Call). The proposal assumes that the Contractor/Client will locate private utility lines, if any, in the field or clear boring locations of utility conflicts prior to mobilization of the drill rig.TSFGeo will recommend a utility line locating service upon request. TSFGeo will need to receive an "All Clear" relative to utilities before mobilization. kimley-horn.com 1920 Wekiva Way,West Palm Beach, FL, 33411 (561)845-0665 Kimley>>>Horn The services currently authorized to be performed by Consultant in accordance with the Agreement and previous amendments, if any, shall be modified as follows: Fee and Billing table is modified as follows to correct scrivener' errors as well as noting the addition of the Geotechnical Services as Task 1 b. Task No. Description Fee 1 Survey Services $ 3,134 lb Geotechnical Services $5,875 2 Design Development/Site Plan Package $17,410 $17,700 3 Bid/Construction Documents $19,060 $19,570 4 Permitting Services $7,345 $7,230 5 Final Bid/Construction Documents $10,680 6 Project Representation/Meetings $1175454MAX) $9,300(MAX) 7 Limited Bid Phase Services $4,485-(MAX) $ 5,235(MAX) 8 Limited Construction Phase Services $22,060-(MAX) $17,610(MAX) Total Lump Sum Fee(tasks 1-5) $-56414 $64,189 Total Maximum Fee(with Hourly tasks) $44459 $96,334 We will provide our services as expeditiously as practicable with the goal of meeting the following schedule: The Geotechnical engineer's fieldwork is expected to commence within 2 weeks of utility clearance and take approximately 1 to 2 days to complete, weather permitting. A report can be submitted in less than three weeks after completion of the field exploration. For the services set forth above, Client shall pay Consultant the following compensation: Lump sum fee of$5,875 for Amendment#1 (Task 1 b). (remainder of page intentionally blank) 2 kimley-horn.com 1920 Wekiva Way,VVest Palm Beach, FL, 33411 (561)845-0665 Kimley*Horn We appreciate the opportunity to provide these services to you. Please contact me if you have any questions. Very truly yours, KIMLEY-HORN AND ASSOCIA. ^S, INC. Signed: Printed Name: Michael F Schwarz, P.E. Title: Sr. Vice President AGREED AND ACCEPTED: VILLAGE OF TEQUESTA By: Title: Malior- Date: t O - l 3-dD a.b-- 3 kimley-horn.com 1920 Weniva Way. West Palm Beach Fl 3341 1 ,3'1 345-WS5