HomeMy WebLinkAboutDocumentation_Regular_Tab 19_11/10/2022Agenda Item #19.
Regular Council
STAFF MEMO -D
Meeting: Regular Council -Nov 10 2022
Staff Contact: James Trube, Fire Chief Department: Fire
Approve the Purchase of Traffic Pre-emption Devices
Safely responding to incidents are a high priority for all Fire Rescue Agencies. Furthermore, the amount
of time it takes the apparatus to navigate through traffic to the emergency and the amount of time it
takes to transport someone to the hospital can significantly impact the outcome of the emergency
incident.
One way to mitigate safety issues and delays in response is by the use of traffic pre-emption devices.
These devices communicate with the traffic signal via radio, cellular and GPS. As the unit responds
towards a traffic signal, the light is changed to green and allows for the flow of traffic to continue ahead
of the responding emergency vehicle. All other intersection lights are turned red allowing for a smooth
and safe response.
When you factor in the upcoming traffic issues associated with the US 1 Bridge construction (spring
2023) it can be assumed that our apparatus may face delays when responding east of the railroad
tracks and that our rescues will be delayed as they navigate through heavy traffic when transporting to
Jupiter Medical Center. To help alleviate this issue; FDOT has agreed to purchase the Glance Priority
and Preemption Suite and install at intersections along the Al A Corridor between Tequesta and Jupiter.
The Fire Rescue staff requests that Village Council approve the purchase of five (5) vehicle transmitters
and four (4) additional traffic control receivers for the Tequesta Drive Corridor. The acquisition of vehicle
transmitters and traffic control receivers for additional intersections can certainly serve as a mitigating
factor during the upcoming bridge construction, improve our response time during normal operations
and add to the safety of our residents and responders. The equipment requested was included in our
budget as part of our Capital Improvement Plan and our Fire Rescue staff recommends approval of this
request to purchase the Glance Priority and Preemption Suite as described from Temple, Inc.. This
equipment is a matched component proprietary system and is what the FDOT will be installing. Temple,
Inc. is the sole provider of the Glance Traffic
Pre-emption Device equipment. Thank you.
This document and any attachments may be reproduced upon request in an alternative format by
completing our Accessibility Feedback Form, sending an e-mail to the Village Clerk or calling 561-768-
0443.
Page 407 of 475
Agenda Item #19.
PROJECT NAME: Pre-emption
Devices
Proposed:
39, 986.75
PROJECTED TOTAL: 39,986.75
BUDGET: 55,000.00 ENCUMBERED: 0
Projected Remaining:
15,013.25
• • • - • - oil
Fire Rescue staff recommends approval of this request to purchase the Glance Priority and Preemption
Suite as described from Temple, Inc.
Memo - Traffic Pre-Emption Devices
Temple - Single Source Letter
Traffic Pre-Emption Device Quotes
Page 408 of 475
Agenda Item #19.
Village of Tequesta
Department of Fire -Rescue Services
357 Tequesta Drive
Tequesta, FL 33469
00F
RES
James Trube, Fire Chief
To; Village Mayor and Council Members
From. James Trube, Fire Chief
Date- October 27, 2022
Re- Traffic Pre-emption Devices
561-768-0500
www.tequesta.org
Safely responding to incidents are a high priority for all Fire Rescue Agencies.
Furthermore, the amount of time it takes the apparatus to navigate through traffic to the
emergency and the amount of time it takes to transport someone to the hospital can
significantly impact the outcome of the emergency incident.
One way to mitigate safety issues and delays in response is by the use of traffic pre-
emption devices. These devices communicate with the traffic signal via radio, cellular
and GPS. As the unit responds towards a traffic signal, the light is changed to green
and allows for the flow of traffic to continue ahead of the responding emergency vehicle.
All other intersection lights are turned red allowing for a smooth and safe response.
When you factor in the upcoming traffic issues associated with the US 1 Bridge
construction (spring 2023) it can be assumed that our apparatus may face delays when
responding east of the railroad tracks and that our rescues will be delayed as they
navigate through heavy traffic when transporting to Jupiter Medical Center. To help
alleviate this issue; FDOT has agreed to purchase the Glance Priority and Preemption
Suite and install at intersections along the AlA Corridor between Tequesta and Jupiter.
Vice -Mayor Kyle Stone Mayor Molly Young Council Member Frank D'Ambra III
Council Member Laurie Brandon Council Member Aaron Johnson
Village Manager Jeremy Allen Page 409 of 475
Agenda Item #19.
The Fire Rescue staff requests that Village Council approve the purchase of five (5)
vehicle transmitters and four (4) additional traffic control receivers for the Tequesta
Drive Corridor. The acquisition of vehicle transmitters and traffic control receivers for
additional intersections can certainly serve as a mitigating factor during the upcoming
bridge construction, improve our response time during normal operations and add to the
safety of our residents and responders. The equipment requested was included in our
budget as part of our Capital Improvement Plan and our Fire Rescue staff recommends
approval of this request to purchase the Glance Priority and Preemption Suite as
described from Temple, Inc. This equipment is a matched component proprietary
system and is what the FDOT will be installing. Temple, Inc. is the sole provider of the
Glance Traffic Pre-emption Device equipment. Thank you.
3equesta Fire Rescue
'Traffic Pre-emption Devices
Quantity
Description
Unit Price
Extension
Intersection Equipment & Installation
4
Glance TIMM 500 Preemption/Priority System
$4,340.00
$17,360.00
Al 500-086-02 - Preempt/Priority FMU2 4G Video with 4-port switch
Conn/Svc/Supp Plan 2 yr fixed - Cabinet -Standard Data Plan
4
Installation of Glance TIMM 500 P re m pt i ve/Priority Systems
$ 492.50
$ 1,970.00
Total Intersection Equipment & Installation
$19,330.00
Vehicle Equipment & Installation
5
Glance TIMM 500 Preemption/Priority System -- Vehicle Kit
$3,110.00
$15,550.00
Conn/Svc/Supp Plan 2 yr fixed - Vehicle
5
Installation of Glance TIMM 500 Pre-Emption/Priority - Vehicle Kit
$1,021.35
$ 5,106.75
Total Vehicle Equipment & Installation
$20,656.75
Grand total
t :zQ QQr, 7r,
2 Page 410 of 475
Agenda Item #19.
October 4, 2022
Village of Tequesta
345 Tequesta Drive
Tequesta, FL 33469
RIE: Glance Vehicle On Board Device: Temple Glance 500-066
Florida DOT APL Number: 663-001 -011
To whom it may concem:
This letter confirms that Temple, Inc. is the sole provider of the Glance Vehicle OBU —
500-066 and associated components utilized for emergency vehicle preemption priority
and transit applications in the states of. AL., AR, FL, GA, LA,, MS, NC, SC, and TN.
The Glance Preemption / Priority System is a matched component proprietary system.
This device and its software provides cloud -based vehicle to infrastructure ranging and
automatic over -the -air software updates and upgrades.
There are no agents, dealers or manufacturers that are authorized to represent or sell this
product in the state of Florida.
If you desire additional information, please contact me at the toll free number below or
email forrest.temple@temple-inc.com.
Sincerely,
Forrest Temple
President
Temple, Inc.
P.O. Box 2066 1P Decatur, AL 35602-2066
(256) 353-3820 a(800) 633-3221
SaleslCustomer Fax (256) 353-4578 s Accounting Fax (256) 353-3351 Page 411 of 475
Agenda Item #19.
E.MPLE, INC.
fox 2 50 Davis
Stu, AL 35602
'hone: Main mice Toll. Free 33 - 221
, n 7�7 1- &
1.954=2022
Serving the South's
Traffic Needs
for Over 50 Years
DATE:
TO: James B. Tnube
119'40et-22
TERMS: Net. 3' Days, FOB
Fire Cht ef
Teq.�� '` .�
Shipping Prepaid
Aloe
T r esU Drive a: s, A I X�� 'any# RiversideDELIVERY:pi
t Weeks AR
Tequeeft Glance Cabin Equlpmnt Pre-empt
SALESPE SON:
s elPafford
COTE� # T ue� . I: die CabinetE � �'� ��
Pa �
CONIDMON& The: i es.Brid: ftns: on Vft gubtation- are subject to v& changes. r'other agreements
less armed; in Ong. by Temple, Inc.. All qww#ws and a me r . are cordingent upon stfikes, accidents.,
fireso ayWability. of ratedals -and'all oftr uses beyond our conbvl, Pdm am based on wst and.Gondifims
.6 ' '.gin the date . -t a bon � a %i eat � s . ��/ � f� reel s tap •
' Prime
antq De� ion
.Qu'
��
$ 41340-00 17L360,00
Al 500-86-2 — PreempWflodty MU2 G Vi eo vAtl 4-portswitch
Conn/Sv&Supp Plan 2 Yr fted - Ci e - Standard Data Plan
Glance TI M 500 PreemptionlPfiority System
$ , 84.00 1, -0
i 5 — Pr emp Priority FMU2 4G Video with pcwt swig
Conn/Svc/Supp Fran 5 Yr fixed 1- Cabinet i Standard Data Plan
Glance TIMM '5. Preem tWPr r y sum
$ 6,530.E 261120,00
Al 50preemptlponty FMU2 4G Video :with4-port Witch
Corm/Sv*/Supp: Plan 10 Yr fisted - Cabin a Standard Date Phan
Esatimated 2 Year Renew
0.00
Esatimated 5 Year Renewal
$ 1, 90.00
E a tir at d 10 Year. w*wW.
$ 2. ,5.0
. ode: a: mil.modem when technology -cbange.
3+ Telephone. and email WOPcd ft'6m AI
. 'E. Ct d: warranity. on hater
. No overage Charges
6. over-the-r mare' updates
. 'fir- the air merit r uPdat0s
. Al Connected VWtde services - Travel Safely
Q6W Valid. for 3& Days
.Sheldon Paffolrd
A= nt Representative
Page 412 of 475
Agenda Item #19.
ELCQ
mtrols
October 24, 2022
ATTN: Tequesta Fire Rescure
Judy Jones
Ernal 1: Jones cirTe ue ta.gre
RE*1 Glance TIMM 500 Preemption/Priority Systems., Install Only
Description,.
4 Device Glance TIMM 500 Preemption Priority Systems
Lump Sum Install Price
$11970-00
Please contacny t me with aquestions or comments you have regarding the above information. I can be reached at (772) 340-7474.
Respectfully,
Gerelco Traffic Controls, Inc.
Jake Ridinger
Vice President
Jri l r relco.com
772-340-7474
560 NW Enterprise Dr. Port St. Lucie, Fl. 34986
Page 413 of 475
Agenda Item #19.
EMPLE., INC.
P.. ' 2 50 Davis Street
Decatur, AL 35602
Phone: Main office Toll Free -3221
Leal 47-7 1-44
1954 - 2022
Serving the South's
Traffic Needs
for Over 50 Years
DATE:
TO:Jarnes B. T ru Ise 1 t-
22
• Fire Chief TERMS: Net 30 Days, FOB
Tequeta Fire Rescue Shipping Point, Prepaid
and Allowed
DELIVERY:
EF Y:
Te ues a Glance Pre -ern - Vehicle {its 4 to 6 Weeks k
SALESPERSON:
Pheldon Pafford
QUOTE #: Te uesta FR Glance Vehicle Equipment 10-19-22 Page 1 Of 1
CONDITIONS: The prices and terms on this quotation are subject to verbal changes or other agreements
unless approved in writing by Temple, Inc.. All quotations and agreements are contingent upon strikes, accidents,
fires, availability of materials and all other causes beyond our control. Prices are based on cost and conditions
existing on the date of the quotation and are subject to changes by Temple, Inc. before final acceptance.
Quantity - - Description I Price lExtended
5 Glance TI M Soo Preemption/Priority System
Vehicle Fit
Conn/ v /Supp Plan 2 Yr fixed - Vehicle
Glance TIMM Soo Preemption/Priority System
Vehicle fit
C nn/Svc/Supp Plan 5 Yr fixed - Vehicle
Glance TIMM 500 Preemption/Priority System
Vehicle tit
Conn/ v /Supp Plan 10 Yr fined - Vehicle
Esatimated 2 Year Renewal
Esatimated 5 Year Renewal
Estimated 10 Year Renewal
1. Guaranteed connectivity
. Upgrade of cell modem when technology changes
3. Telephone and email support from Al
4. Extended warranty on hardware
5. No overage charges
O. over -the -air software updates
7. over the air security updates
. Al Connected Vehicle services - Travel Safely
Quote Valid for 30 Days
3,110.00 1 , . 0
4260.00 19 0 -00
59305.00 , -0
730.00
19790.00
,75.00
Sheldon Pafford
Account lepresentatle
Page 414 of 475
Agenda Item #19.
STROBES-R-US
POMPANO BEACH LOCATION
2681 MAMMONDVILLE RD POMPANO BEACH, FL 33069
JUPITER LOCATION
STRE38ESRUS 15335 PARK OF COMMERCE BLVD JUPITER, FL 3347$
DURAMAG9
Ship To:
Tequesta Fire -Rescue
ATTN. James Trube
57 Teuesta Drive
Tequesta, FL 33469
Official Estimate
Date Estimate #
10I2712022 3606$
Reference INSTALL TRAFFIC PRE-EMPTION X5
Product Description {sty Cust. Price
**THIS QUOTE IS PER BSO CONTRACT ## 1 00 A
* `THIS QUOTE I S FOR ADDIN G Glance T I M M 500 'Pre-emptinn/Priority
Sy tem Vehicle Kit from Temple, INC INTO 5 APPARATUS,
RESCUE, 2 ENGINES ES and 1 LADDER TRUCK
**WORK WILL BE DONE AT STROBES R US IN JUPITER, FL. IT WILL
BE CUSTOMER'S RESPONSIBILITY FOR DROP OFF AND PICKUP OF
VEHICLE
"TIT QUOTE IS GOOD FOR 50 DAYS
INSTALL CUSTOM INSTALLATION PER HOUR 82.50 51.0
INSTALL:
1 X Glance TI M 500 Pre-e pti n/Priority System Vehicle Kit
ANTENNA LOCATIONS TO BE DETERMINED
-RES ES
2-ENGINES
1-LADDER
Due to the constantly changing cost of raver materials and updates to
manufacturer list prices quote are valid as follows:
EMERGENCY CY VEHICLE DIVISION QUOTES
SPECIALTY VEHICLE DIVISION QUOTES
Phone # Fax #
954-946-9955 954-946-9677
VALID 30 DAYS
VALID 10 DAYS
E-mail
SALE,SU.C11
Subtotal
Sales Tay (7.00%)
Total
Web Site
VVWW.STR BES-R-U .
Total
5,10 .75
$5,106.75
0. 0
$55106.75
Page 415 of 475