Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 10_12/8/2022Agenda Item #10. Regular Council STAFF MEMO -D Meeting: Regular Council -Dec 08 2022 Staff Contact: Marjorie Craig Department: Utilities Utilities Department Update Attached please find the monthly Utilities Department report. This document and any attachments may be reproduced upon request in an alternative format by completing our Accessibility Feedback Form, sending an e-mail to the Village Clerk or calling 561-768- 0443. BUDGETJMORMATION: PROJECT NAME: N/A BUDGET: N/A Proposed: N/A PROJECTED TOTAL: N/A None ENCUMBERED: N/A Projected Remaining: N/A 22.1128.NOV for DEC VC Mtg Utilities Update signed Page 168 of 434 Agenda Item #10. V'111age of T 345 Tequesta Drive 561-768-0700 Tequesta, FL 33469 www.tequesta.org To: The Honorable Mayor and Village Council Through: Jeremy Allen, Village Manager From: Marjorie G. Craig, PE, Director, Utilities Department Date: November 28, 2022 Re: Utilities Department Monthly Report The Utilities Department monthly report for November is found below: Stormwater • El Portal Stormwater & Sidewalk Improvements —soil borings have been conducted and the data received back week of November 20t"; 100% plans expected mid -December with the design modifications and soil boring info • FDEP Vulnerability Assessment Grant/Project o Kick-off meeting held Nov 22nd: Jones Edmunds shared the web -based GIS map they've created of existing geo-coded Village related assets and data gathered from the Village, County, and other available resources; o Map conceptually reviewed, FDEP inundation model guidance document provided, and steps moving forward discussed including gathering more geo-coded data/ filling data gaps o Grant document received from FDEP for execution — on agenda for approval Water • FDEP State Revolving Loan (SRF) Fund loan — o Bid solicitation issued on DemandStar on November 15t" for approved first tranche projects: Water Main (WM) Project 1- Tequesta Drive and WM Project 4 —Country Club Dr. (South) —estimated cost $2.63M o Pre -bid December 6th with FDEP SRF staff invited o Bid opening December 15tn • EDOT Bascule Bridge (US 1 Jupiter) Project — temporary relocation of our water treatment plant concentrate pipe initiated by contractor; expected to be completed Tuesday, November 29t"; contractor experienced unanticipated problems with their pipe fusing equipment Vice -Mayor Kyle Stone Mayor Molly Young Council Member Frank D'Ambra III Council Member Laurie Brandon Council Member Aaron Johnson Village Manager Jeremy Allen Page 169 of 434 Agenda JMURI Vl (Cont'd) RE: Utilities Department Monthly Report Page 2 of 2 To: The Honorable Mayor and Village Council From: Jeremy Allen, Village Manager, Through: Marjorie Craig, PE, Director, Utilities Department Date: November 28, 2022 County Line Road Bridge Replacement project — Martin County has agreed to include VOT in their project for our potable water main and untreated well water main. A kick-off meeting was held with Martin County and their engineering consultant, DRMP. Still working on an interlocal agreement. This change was made from coordinating with LRD on a directional bore under the bridge to coordinating with Martin County, since they will allow pipes back on the bridge after construction, allowing us better access. • Water Utility Financial Feasibility Update — meeting held to review updated model expanded to 20 years and data gaps; goal of study is to update financial forecast of the water utility due to substantial increases in materials/ constructions and supply chain issues to forge a path forward for project phasing and financial sustainability • Jupiter Island interconnect — providing about 100,000 gallons of Tequesta water per day (down from closer to 200,000 in August) Grants Gulfstream Dr. & Riverside Dr. Bioswale 319 Grant - grant report provided to FDEP for contracted services; preparing pay request and final report for FDEP submittal Village of Tequesta Page of 434 Agenda Item #10. N 3 c > a v y a � u C O FO v } - M O z < O O u LL z V' o v Q 0 i i a N F o O w N = LL z 2 n - � w C F ■ Fr a9 Wa Fr s �qaS gig �b Fr7 /7 � f6 ao� l � - Fes' 3 m qb c 4% i Fry✓ P� cc P� 4ay F FZ ❑ 7 LL ■ a9W a� ray a0 a9 Wa a9 0 0 0 0 0 0 0 0 0 - 0 0 0 0 0 0 o O 'lb Wa Erg �qaS SI I' b F2' Fla 47 � C Er7 qb T L Fry, PLG � cp C E2Z ■ P✓ M N Fr r 9y LL PSG P rry a9 Wa rr ap a9 Wa' rr o2 a9 0 0 0 0 0 0 0 0 0 100 ro � O c O Fr 9Wa�°as Fr 9Wa�oaf F2 E� Fr c �7 Fr a4 C to � Fla G7 2 O7 C7 ab o E2 qb F O1 r9,P � u y V � F 9yP� Er�P2 Fr2 Py 9a Fr7 y ■ c G V F� 9y P rry V P�4 a4W$ r2 ap LL W rr a�a0 a9W � 9Wa rd °2 a a4 a 0000�0000000o O ° o 0 0 0 0 0 0 Er a4W Z CZ) Fr a4W Fr s qaS � Fr s qa.(` Eta 7 u _ Fra 4 r7P � Q Fr'PLG qb LL d E o qb F7 y9a FrZ y u y P 2 rr O M ® P74P rr a l d � rz 4Wa'a 0p LL a a9W aa rr a0 9 i I.�r Wa�O •G z a a 4Wa Er �02 d 9°� O aora .+ ■ d9O o �a0 wm o a .+ N O ti of 434