Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 09C_8/23/1990VILLAGE OF TEQUESTA WATER DEPARTMENT Post Office Box 3474 • 357 Tequesta Drive Tequesta, Florida 33469-0474 • (407) 575-6230 M E M O R A N D U M: TO: Thomas G. Bradford, Village Manager -/ FROM: Thomas C. Hall, Water System Manager"/ DATE: August 15, 1990 SUBJECT: Telemetry For Remote Sites As you are aware, $55,000 has been allocated in this year's budget for the above. These upgrades and computer enhancements will allow us to allocate our man-hours in a more productive manner by --reducing travel time, fuel costs and physical inspections. After approval, I would anticipate this project to be completed within six months of that date. Encumbrances will be carried over into FY-91. Quotes have been received from vendors relative to this work and a brief summary is as follows: o Florida Measurement and Control (Aquatrol) Hardware & Software -- $35,870.00 This is a sole source supplier to provide additions to existing Aquatrol equipment. The hardware and software addition will add automation to Wellfield #5 which will include start/stop, flows and water level drawdowns. Drawdown instrumentation will also be added to Wells 23 and 7R. Additionally, we would then be able to abandon several of the Southern Bell leased phone lines which are used for start/stop controls only. o Sensus Technologies (Rockwell) Metering equipment -- $ 3,876.50 Equipment will be provided to modify existing Rockwell flow meters at each well and then information will be transmitted to the Water Treatment Plant through our telemetry system. We spec and use Rockwell (now Sensus) water meters exclusively for flow measurement in our wells and distribution system. Page 2 August 15, 1990 Telemetry For Remote Sites o Electrician (R.A.J Electric) Hardware and wiring installations -- $ 6,000.00 We have been using this vendor for our electrical needs in our water system and have been extremely happy with the quality of work, service response and pricing. Several other local vendors have been previously used and did not meet our standards relative to time and costs. Total anticipated cost: $45,746.50 Our Water Treatment Plant personnel will be providing some support labor with hardware installation thereby helping to keep costs at a reasonable level. I would like to request this item be placed on the Village Council Agenda for their review and approval on August 23, 1990. I will be happy to address any of their questions or concerns at that time. TCH:gk