TO: Thomas G. Bradford, Village Manager
FROM: Gary Preston, Director of Public Works & Recreation �'
DATE: September 7, 1990
SUBJECT: Cost Proposal for the Tequesta Drive Pathway
As you are aware, the new Tequesta Drive Pathway from U.S.
Highway One to the entrance of the Country Club has been placed
in the Capital Improvement Program for completion in FY 90.
Part of this pathway was completed during the Tequesta Drive
Improvement Project and a total of three (3) sections remain for
completion: Willow Road to Seabrook Road, Seabrook Road to
Riverside Drive and Riverside Drive to Country Club Drive.
As of this date, a total of $112,372 remains in the Park
Land Contribution Fund for this project. I have received a cost
estimate from the Palm Beach County contractor, R.W.S. Concrete
Service, Inc., listing the cost for removal of the existing
eighteen (18) year old asphalt pathway and the placement of a
five (5) foot concrete pathway to be $104,100. Anticipated
expenses for palm tree relocation, sod, property owner landscape
relocation, and other miscellaneous cost will be an additional
$26,000, bringing the total to $130,000. These additional
expenses are necessary as the Village has always required the
construction of all concrete pathways to be located on the
property line.
The expected cost and scenario for each section is as
follows:
Willow Road to Seabrook Road - The majority of this section
of new pathway will be located on the north side of
Tequesta Drive. A small portion of this pathway will be
located on the south side of Tequesta Drive in front of
Gallery Square South. The residents of Willow Road, Blair
House East and West, have requested this pathway for
several years end are pleased that the construction is
forthcoming. Approximate cost for this section is $25,000.
P.
Recycled Paper
TO: Thomas G. Bradford, Village Manager
RE: Cost Proposal for the Tequesta Drive Pathway
Page 2 -
-------------------------------------------------
Seabrook Road to Riverside Drive - Completion of this section on
the south side would require the removal of the existing asphalt
pathway, which is presently in a deteriorated condition and lies
in the swale area. Placing this section of pathway on the
property line will prevent water and sand from accumulating and
will allow a greater degree of safety for the users. I have
talked to sixteen (16) of the twenty (20) homeowners along this
section and the majority are disappointed that the pathway will
be moved closer to their homes. Many of those who are against
this change are fearful that the Village will soon widen
Tequesta Drive to four lanes once the pathway is located on the
property line. Some residents will attend the Council Meeting
to express their concerns. A total of twenty (20) Royal Palms
will need to be relocated approximately three (3) feet to allow
room for the new pathway. Approximate cost for this section is
$52,000.
Riverside Drive to Country Club Drive - The majority of this
section of pathway on the south side is in fair condition and
was originally located on or near the property line and out of
the swale area. A great deal of the expense in this section
goes toward crossing the Tequesta Drive bridge. Approximate
cost for this section is $53,000.
The Village Council may wish to consider completing only
the sections from Willow Road to Seabrook Road and Seabrook Road
to Riverside Drive at a proposed cost of $77,000. This would
leave $35,000 in the Park Land Contribution Fund to begin
providing facilities at Constitution Park. Completion of the
Riverside Drive - Country Club Drive pathway could be included
in the Capital Improvement Program for FY 94 or FY 95.
Please find attached the following items relative to the
consideration of approval for this project.
o Cost Proposal - Section by section
o Cost Proposal for Pathway Removal and Construction from
R.W.S. Concrete Services, Inc.
o Bids from Rood Landscape Company, Inc. and Jenkins
Landscape Company for relocation of twenty-nine (29)
Royal Palms
o Tequesta Drive Right -of -Way Survey from Gee & Jenson
with construction comments
o Recommendation and comments from Richard Staudinger,
P.E., Gee & Jenson
I would appreciate having this item placed on the September
13, 1990 Council Meeting agenda for approval.
GP/ jmm
Section
Willow Rd. to Seabrook Rd.
Seabrook Rd. to Riverside Dr.
Riverside Dr. to Country Club Dr.
SECTION BY SECTION
TEQUESTA DRIVE PATHWAY
R.W.S. Concrete Palm Tree
Service, Inc. Relocation Miscellaneous Total
$19,294.76 $3,150 $ 2,555.24 $25,000
$34,098.95 $7,000 $10,901.05 $52,000
$50,700.63 --- $ 2,299.37 $53,000
�ii, at � iaa
DATE: SEPTEMBER 5_. 1990
TIME:
TO: GARY PRESTON
OF: PUBLIC WORKS
FAX#: 575-6203
FROM: RICHAR7p S LVESTRR
OF: R.W.S. CONCRETE SERVICE- INC
FAX#: 586-7233
SPECIAL INSTRUCTIONS:
CONFIDENTIAL
UGRENT
PLEASE REPLY
FOR YOUR INFO
MESSAGE:
# OF PAGES: f,
COPYS TO:
***IF NOT RECEIVED CORRECTLY, PLEASE CALL:586-7202
QUALF"
. hL
RoWnSm
CONCRETE 817RVICE, INC. OUR MOTT,
7020 Georgia Avenue • West Palm Beach, Florida 33405 • (305) 586-720i
WILLOW ROAD TO SEABROOK ROAD
SQUARF FOOTAGE
ASPHALT 6"
SQUARE YARD
1)
18' x 4'
72
8.00
.2)18.5' x 5'
92.5
10.28
3)
17' x 5'
85
9.44
27.72
SS ARE FOOTAGE.
ASPHALT 4"
SQUARE YARD
4)
222' x 5'
1110
122.22
SQUARE FOOTAGE GRASS 4" SQUARE YARD
5) 256' x 5' 1280 142.22
6) 406' x 5' 2030 225.56
7)287.5' x 5' 1437.5 159.72
8) 149' x 5' 745 82.78
610.28
TOTAL FOR WILLOW ROAD TO SEABROOK ROAD
27.72 sly @ 6.30=$174.64
27.72 sly @23.85=$661.12
total $ 835.76
122.22 sly @6.30-$769.99
122.22 sly @18.90=$2,309.96
total $3,079.95
610.28 s/y @ 6.30=$3,844.76
610.28 sly @18.90-$11 534.29
total $15,279.05
$ 19,294.76
.
ouALm
ed
RmWmSw
CONCRgTE SERVICE.
INC.
OUR MOTTO
7020 Georgia Avenue
• I West Palm Beach. Florida 33406
• (305) 586.7202
SEABROOK ROAD
TO RIVERSIDE ROAD
SQUARE FOOTAGE
ASPHALT 6"
S UARF YARD
1) 115' x 5'
575
63.89
2) 18.5' x 5'
92.5
10.28
3) 34.9' x 5'
173.75
19.39
4) 28' x 5'
140
15:56 225.49
sly @ 6.30=$1,420.59
5) 24' x 5'
120
13'3.3 225.49
9/y @23.85=$5,377.94
6) 20' x 5'
100
11.11
total $6,798.53
7) 31' x 5'
155
17.22
8) 22' x 5'
110
12.22
9) 28' x 5'
140
15.56
10) 15' x 5'
75
8.33
11) 10.5' x 5'
52.5
5.83
12) 33' x 5'
165
18.33
13) 26' x 5'
130
14:44
REMOVAL OF ASPHALT
14) 1600' x 5' 8000
225.49
888.9 @ 6.30=$5,600.70
SQUARE
FOOTAGE
GRASS 4"
SQUARE YARD
15)
124'
x
5'
620
68.89
16)
61'
x
5'
305
33.89
17)
140'
x
5'
700
77.78
18)
42'
x
5'
210
23.33
19)
68'
x
5'
340
37.78
20)
60'
x
5'
300
33.33
21)
56'
x
5'
280
31.11
22)
56'
x
5'
280
31.11
23)
162'
x
5'
810
90.00
24)
71'
x
5'
355
39.44
25)
67'
x
5'
335
37.22
26)
367'
x
5'
1845
203.89
27)
161'
x
5'
805
89.44
28)
115'
x
5'
575
63.89
861.10
TOTAL FOR SEABROOK ROAD TO RIVERSIDE; DRA VF
861.10 sly @ 6.30= $ 5,424.93
861.10 sly @18.90= $16,274.79
total $21,699.72
$ 34,098.95
(4)
MUM
MRvvK1
RaWaS., 4
CONCRETE SERVICE, INC. OUR MOTTC
7020 Georgia Avenue • West Palm Beach, Florida 33406 0 (305) 586-7202
RIVERSIDE DRIVE TO COUNTRY CLUB DRIVE;
SQUARE FOOTAGE
ASPHALT 6"
SQUARE YARD
1)
150' x 5'
750
83.33
2)
65' x 5'
325
36.11
420.55
sly @ 6.30=$ 2,649.47
3)
70' x 5'
350
38.89
420.55
sly @23.85=$10,030.12
4)
472' x 5'
2360
262.22
total $12,679.59
420.55
SQUARE FOOTAGE
ASPHALT 411
SQUARE YARD
5)
521' x 5'
2605
289.44
6)
92' x 5'
460
51111
1149.44
s/y @ 6.30-$ 7,241.47
7)
356' x 5'
1780
197.78
1149.44
sly @18.90=$21,724.42
8)
1100' x 5'
5500
611.11
total28,965.89
1149.44
REMOVE ONLY ASPHALT
SQUARE FOO.1'AGE
SQUARE YARD
9)
15' x 7.5'
112.5
13
13 sly
@11.25 p/s/y= $146.25
10)
132' x 5'
73.33
73
73 sly
@ 6.30 p/s/y= $459.90
REMOVAL OF C & G
82 1. f. @ 3.50 p/1/f= $287.00
REPLACEMENT OF C & G
82 1. f. @11.30 p/Z/f= $926.60
REMOVAL. OF ASPHALT FOR C & G
150 l.f.
280 1 , t .
430 1.f.. @ 1.60 p/l/f- $688,00
REPLACEMNT OF C & G
150 l.f .
280 1. f .
430 l.f. @11.30 p.l.f.-$4,859.00
it)
GUAM
sttr10
■WaSw
4
CONCRETE SERVICE, INC. OUR MOTTO
7020 Georgia Avenue West Palm Beach, Florida 33405 • (306) 586.7202
RIVERSIDE DRIVE TO COUNTRY CLUB DRIVE, CONTINUED
TWO FLMIES
REMOVAL
S.W. CORNER .55' x 4'- 220 s/f
S.E. CORNER 28' x 4'= 112 s/f
REELACF.MF NI-T
S.W. CORNER 55' x 4'= 220 Of
S.E. CORNE.K 28' x 4'= 112 sly
SQUARE FOOTAGE GRASS 4"
11) s5' x 5' 175
25 sly @ 6.30-$15 7.50
12 s/y @ 6.30=$ 75.60
25 sly @23.85=$596.25
12 sly @23.85=$286.20
SQUARE YARD
19.44 19.44s/y @ 6.30=$ 119.70
19.44s/y @18.90=$:453.1.5
total $572.85
TOTAL FOR RIVERSIDE DRIVE TO COUNTRY CLUB DRIVE
$ 50,700.63
(9)
WAM
RmWaSm M�
CQNCRR'TE SERVICE, INC. OUR MOTTC
7020 Georgia Avenue • West Palm Beach, Florlde 33405 • (305) 586-7202
TOTAL FOR WILLOW ROAD TO SEABROOK ROAD: $19,294.76
TOTAL FOR RIVFRSIDE DR. TO COUNTRY CLUB: $50,700.63
TOTAL FOR SEABROOK RD. TO RIVERSIDE DR: $34,098.95
GRAND TOTAL $104,094.34
(41)
%_. , V-1 —,—
•rooa:lia'»rvt31 r�fa+wranal.r.a.noertaltrll[[t,ekmaM '
r-art:}
ROOD LANDSCAPE CO., INC.
P.O. Box 3768
TEQUESTA, FLORIDA 33469-0768
(407) 746-5186
PROPOSAL ED TO
l�$t1 MITT
J (//
PHONE _
-- G 2 'O
DATE
_
STREET
JOB NAME
CITY�E AND ZIP CODE
JOB LOCATION
S
VO t"', IV
c;:
ARCHIJECT DATE OF PLANS
V�J
PJO6B PHONE
We hereby su it specifications and estimates for:
—_—
/J.............. .i>........... '. cam_ . _ (� /J / 41-
y
We FropilliP hereby to furnish material and labor — complete in accordance with above specifications, for the sum of
Payment to a as follows: On ollars
($ ✓ J V -cjo
7
All material is guaranteed to be as specified. All work to be completed in a workmanlike /
manner according to standard practices. Any alteration or deviation from above specifics Authorized
involving
extra costs will be executed only upon written orders, and will become on Signature
harge over and above the estimate. All agreements contingent upon strikes, accidents
Le-t',ra
ays beyond our control. Owner to carry fire, tornado and other necessary insurance. Not is proposal may be
orkers are fully covered by Workmen's Compensation Insurance. withdrawn by US if not accepted within__
o days
^' `rr ptatlre of 11roposal —The above prices, specifications
and condlta9!ij ArE 3Ahsfa4ipry end Ar9 horepy pi �fppll'dr iQd AfE 94Ih9rlt5fl
Signature
//1
denkilli cfail licaPe CO.
LANDSCAPING 12260 S.E. DIXIE HWHWAY FSTATE MAINITNAN( .
'IYiEES. PLANTS & SNW)148 HOBE SOUND, FLORIDA 33455 IMUCATION
THEE SURGERY HOBS SOUND • (407) 546•201 .1UPITZR • (407) 746.3782 DJUVEWAYS
FAX • (407) 5.6.6682
September 7, 1990
Village of Tequesta
357 Tequesta Drive
Tequesta, FL 33469
Attn: Mr. Gary Preston
Re: Tequesta Drive Project
Dear Mr. Preston,
The following is our proposal to transplant Royal Palms:
Transplant 29 Royal Palms approximately
4' from existing location @ 420.00 12,180.00
If this proposal is acceptable to you, please sign and return one copy. We
will schedule work upon receipt of the signed contract.
Sincerely,
Jenkins Landscape Company
Harold E. Jenkins iI
President
Approved
Dated
HJ/kll
ON
GEE&JENSON
September 7, 1990
Mr. Gary Preston, Director of Public Works
Parks and Recreation
Village of Tequesta
357 Tequesta Drive
Tequesta, Fl 33458
Re: Tequesta Drive Relocation of Bike Path
Dear Gary:
This letter is sent to you to confirm my concurrence with your
decision to relocate the existing asphalt bicycle path along
Tequesta Drive out of the roadway drainage swale area by locating
the new concrete bikeway adjacent to the existing right-of-way
line.
My opinion is, that the primary benefits of this relocation is
safety of the users of the bicycle path by relocating it away from
traffic; an additional benefit of this decision will be to
decrease future maintenance costs associated with maintaining a
flexible pavement bike path near a drainage swale. Maintenance
costs for a concrete path located on the right-of-way out of the
drainage way will be significantly less in the long term.
Hcwever, the primary benefit cf relocation of this bicycle path
is to remove it a significant distance away from vehicular
traffic on Tequesta Drive. We have also reviewed the bid price
for this work and concur that the prices bid are reasonable.
Please call if you have any further questions in this matter.
Very truly yours,
W. Richard Staudinger, P.E.
WRS:ce
# 90-004
cc: Tom Bradford, Village Manager
brand fax transmittal memo 7671 J r or pages
One Harvard Circle - West Palm Beach, Florida 33409-1923.407/683.3301 - FAX 407/686.7446
SYNOPSIS OF PROPOSED
TEQUESTA DRIVE PATHWAY PROJECT
o Project entails provision of a five (5) foot concrete pathway
to be located at the edge of the right-of-way.
o Placement at the edge of the right-of-way is for the purpose
of enhancing pedestrian safety and swale drainage.
o Concrete is recommended over asphalt due to the three (3) to
four (4) times greater life expectancy.
o The proposed pathway location will be on the north side of
Tequesta Drive from Willow Road to Gallery Square North and
on the south side of Tequesta Drive from Gallery Square South
to Country Club Drive.
o
The estimated cost for pathway removal, construction, palm
tree relocation, sod and miscellaneous
expenses are:
Willow Road to Seabrook Road $25,000
Seabrook Road to Riverside Drive $52,000
Riverside Drive to Country Club Drive $531000
o
Funds for these recreational improvements3a1are from
recreational impact fees, not taxes. Funds available in this account - $112,372.
t�
o
Tequesta Drive is not contemplated for four ( 4 ) lapin S'Gkl `cS
o
All utility relocation are to be t
done at ex
expense of utility. �
��
o
Relocation of 29 Royal Palms to accommodate the new pathwa
will be at Village expense. y
o
All areas will be restored to current conditions at Village
expense, including sod and
sprinkler system.
o
All landscape and other facilities on the proposed pathway
route will be relocated
at Village expense.
o
This pathway was brought to the attention of the residents at
Budget Workshop Meetings
in 1987 and 1989 and in the Village
Newsletter in January 1990 and August 1990.
o
This project is a part of the Village's Recreation and Open
Space element of the Comprehensive
Plan.
10
Concrete pathways are presently located on the edge of the
right-of-way in
Shady Lane, Shay Place, Ridgewood Circle,
Bayview Terrace, Tequesta Pines, Chapel Court,
Key West
Village and on Tequesta Drive.
I am Muriel Panning and I have lived at 438 Tequesta Drive for ninteen years.
I am speaking for the citizens of the Village of Tequesta to bring our problem to
the attention of the 'Tillage Council (subject: Pathway on Tequesta Drive).
This problem came to lightsome two weeks ago when we found stakes in our front yards
(red ribbons attached). When the Village Hall was contacted, we discovered that a
new 5 ft. concrete "pathway", not "sidewalk", not "bicycle" was to be installed not
on the old path, but on the village property line.
Most of us have spent thousands of dollars over the years watering and maintaining
these properties.
We were also told that 29 palms would be moved, light poles moved, water meters moved,
sprinklers taken up and relocated, trees moved, the old path torn up and re -sodded,
all at the expense of the Village.
It is our understanding that the expense will be covered from the Recreation Dept.
Budget (impact fees) and according to a Village spokesman "will not cost the residents
a cent". 'We wonder how much money from impact fees does the Recreation Dept. actually
have for this project.
'de, the residents feel this is an absolute waste of public money since the old path
can be repaired etc. at a fraction of the cost of putting in a new path.
According to figures in our possession the total cost is $130,00.00. No mention
is made of removing and relocating light poles or removing and relocating water meters
or other incidentals. A major charge not listed is the cost of Gee and Jensen plans.
We feel the Village has acted in rather an under -hand way in not telling any of us
what was happening until the stakes appeared.
We are also rather mystified as to what has suddenly prompted the moving of the path.
Attached to this statement is a Petition from the residents involved.
im
MRS. MURIAL MANNING MR. EDWARD F. WILLIAMS
438 Tequesta Drive 426 Tequesta Drive
Tequesta, FL 33469 Tequesta, FL 33469
FROM: ATY. GILBERT T. BROPHY
RE: Summary of Village of Tequesta, Pathway/Sidewalk 5' both sides of Tequesta Drive
80' Right of Way. See: Gee & Jensen Engineers Site Plan, 5' wide, 4" deep except
at crossing, 6".
On Thursday 6 SEP I met with Director of Public Works and Village Manager on the
impending 5' Pathway for Tequesta Drive (TD), and Agenda item for 13 SEP Council Meeting.
Summary is in gist and not quotes.
MANAGER THOMAS G. BRADFORD (575-6200): By Village Standards, the pathway is at
the R/W's end and against the Owner's Lot: Jupiter in Pines Sec. "B" PB 26, pg 18.
Village changed from use of sidewalk to a broader definition--pathway--defined by Ordinance.
Pathways were relocated from 19 year old bike path by Village Engineer Gee & Jensen,
BECAUSE:
1. Proper Civil Engineering Standards
2. For safety of multiple users/pedestrians -- to further separate them from motor
vehicles.
3. Increased Percolation in swale area.
4. Conformity with existing sidewalks on South Side of Tequesta Drive -- Saturn
& Mars area.
5. Uniform 5' concrete Pathway on both sides of Tequesta Drive East, starting
at Country Club gates to Willow Road.
This TD improvement has been in capital plans for 3 years and 1990 is the year
to implement it by approval of the Council this next Thursday 7PM, after the 1991 Budget
Public Hearing. There is no available narrative on this proposal for distribution to
residents. The file is iri Public Works and it is to be presented to Council by PW Director.
Funds are from impact fees contributed by Developers.
Above standards/criteria are in the Village Comprehensive Plan, consistent with
the Code of Ordinances and Community Objectives.
No Plans exist for four (4) laning TD. The Traffic Court and other Road
performance standards as well as State concurrency law, must first be met before the 80'
R/W may be 4 laned. In fact next year TD will be resurfaced as is. Projected life of
Village's 2 lane bridge is about 15 years with inspections being carried out by DOT.
P.W. DIRECTOR GARY PRESTON (575-6240): Subject Pathways are recreational in
character ing mu tip a use. at ways are wide 4" deep except at Crossing, be 6" deep.
Loaned the Gee & Jensen Site Plan -please return.
Estimated costs below are from Park Land Contribution Fund, NOT residents' taxes.
Pathway $104,000.
Royal Palm Relocation 10,000.
Sod 2,700.
Approximate Mis. 13,300.
Total .......... $130,000.
w
ENCON, FPL and other Utilities have been alerted and they will individually move
their own equipment/poles/lines, etc. in the 80' R/W to accomodate the new 5' Concrete
pathways.
Individual trees/shrubs/planters of affected Property Owners will be relocated
by Village. Damaged grass will be replaced by the Village. Existing concrete drives are
not to be cut --match up from each side. Village representative will be out on the job
to coordinate. By far, most of Owners he spoke with door to door were pleased with the
proposal, and Mr. Preston hopes the support will be overwhelmingly favorable. E.G.
Blair House Condo urged the installation of a Village Sidewalk.
Reasons for the new location and justification of Pathways is:
1. Present blacktop bike path is deteriorated, some 18 years old.
2. In heavy rains, water brings sand onto the bike path, making it difficult to
maintain a clean surface.
3. Old bike path is near edge of road; farther back is safer.
4. Swale area from Seabrook to Riverside on South side is a problem area and will
be improved.
Mr. Preston is unaware of any plan to widen TD.
Assuming Council approves the plan, the pathways should be completed by
Thanksgiving. Estimate for 29 Royal Palm to be moved is $330. each.
RECOMMENDATIONS:
1. Obtain copy of Ordinance defining Pathway, and restrictions on use thereof.
2. Fzpert written Opinion from a Civil Engineer to determine the true total costs
of this project; deliver to Manager.
3. Designate Spokesperson for the Village Meeting.
September 10, 1990
PROFESSIONALLY,
c� n
GILBERT T. BROPHY
THE FLORIDA BAR NO. 9122
Parkway Plaza -Unit 15
810 Saturn Street
Jupiter, FL 33477
407/746-5188
A
VILLAGE OF TERUESTA
Gary Preston
Director of Public Works & Recreation
-4
/O(/000
/0 006
d �00
131 3 0
/3Q i do0
We the undersigned property owners on Tequesta Drive adversely affected by
the sidewalk relocation project pending, do hereby petition the Tequesta
Town Council to take iirmediate action to halt all spending and cancel this
project. We feel this activity is detrimental to our property values,
an unnecessary expenditure of funds and a devious step toward the four -
lane widening of Tequesta Drive.
'What we have now is adequate, edging and minor renovation is a reasonable
step to augment the existing walkway but not a major alteration of our
Palm lined road which may lose all of its Palm trees in this project.
TO BE PRESENTED TO VILLAGE CCUtiCIL MEETING THURSUAY lath SEPTEMIEFZ AT 7.CCFM.
NA1,1Z ADDRESS. LUTE PHONE #
r 3 71
S u--/vim
7y?��.j%o
Al-
Ie
--._?a _ _a z
7�0
We the undersigned property owners on Tequesta Drive adversely an'ected by
the sidewalk relocation project pending, do hereby petition the Tequesta
Town Council to take immediate action to halt all spending and cancel this
project. We feel this activity is detrimental to our property values,
an unnecessary expenditure of funds and a devious step toward the four -
lane widening of Tequesta Drive.
What we have now is adequate, edging and minor renovation is a reasonable
step to augment the existing walkway but not a major alteration of our
Palm lined road which may lose all of its Palm trees in this project.
TO BE _PRESENTED TO VILLAGE COUNCIL METING THURSDAY 13th SEPTEM ER AT 7.00PM.
NAME. ADDDDREE-SSS. WT# PHONE #
Ifl 41
cam,
�` //7 -
�.v
We the undersigned property owners on Tequesta Lrive adversely affected by
the sidewalk relocation project pendinw, do hereby petition the Tequesta
Town Council to take immediate action to halt all spending and cancel this
project. We feel this activity is detrimental to our property values,
an unnecessary expenditure of funds and a devious step toward the four_
lane widening of Tequesta Lrive.
What we have now is adeouate, edf-ir.� and minor renovation is a reas)nable
step to auement the existin.T ,,Talkway but not a major alteration of our
Palm lined road which may lose all of its Palm trees in this project.
TO BE PRiSENTED TO VILLAGE COUNCIL iEE'VlfiG THUiZSLAY 13th GEPTEMER AT 7.00FM.
N Ar . ALLtiI S5.
I,U�1';t Fh0ivE it
- - - -- - it _ �-
�.t_l_a- —t--..mac', �'�'• � v y ----
��� � �. _ �/
14 e �CL-L S I lj,L �? ,( GC. ,'CLC.G..
- ---- -- -
el
Oq
06