MEMORANDUM:
TO: Village Council
FROM: Thomas G. Bradford, Village Manager
DATE: June 7, 1990
SUBJECT: Water Rate Study; Agenda Item
Previously, I provided you with a Water Department Action
Plan in response to our anticipated SFWMD Allocation Permit.
One of the first items to undertake is a rate study considering
financial and conservation status and objectives. Attached is
Gee & Jenson's proposal to conduct the same. Funding is
available within the Water Department operations budget to
accomplish this work.
It is recommended that the Village Council authorize the
Village Manager to secure this rate study expeditiously.
TGB/ j mm
Attachment
VILLAGE OF TEQUESTA
Post Office Box 3273 • 357 Tequesta Drive
Tequesta, Florida 33469-0273 • (407) 575-6200
FAX: (407) 575-6203
M E M O RAND UM
TO: Village Council
FROM: Thomas G. Bradford, Village Manager / -/If�
DATE: June 7, 1990
SUBJECT: Water Department Action Plan
Based upon the 5-year Allocation Permit contemplated from
the South Florida Water Management District and the ramifications
thereof, appearing below, please find a proposed Action Plan for
adjusting Water Department operations accordingly.
1) Immediately authorize Gee & Jenson to begin the Western
peninsula testing program and/or hydrogeologic study to
determine aquifer parameters necessary prior to permanent
well drilling.
2) Calculate the equivalent residential connections
remaining within the water system in order to project a
time line for the possible implementation of a moratorium
on new water hook ups.
3) Compare the projected date of moratorium implementation
to the estimated date of completion of the western
peninsula surficial aquifer wells to determine if an
emergency situation can be declared in order to expedite
engineering design and construction activities.
4) Immediately authorize Gee & Jenson to conduct a rate
study to review adequacy of the same from a financial and
conservation prospective. Capital connection charges
should be reviewed pursuant to previous commitment to
review the same on an annual basis.
5) Expedite completion of Water Treatment Plant Master Plan
project based upon information contained within the SFWMD
allocation permit.
Memorandum to Village Council
Re: Water Department Action Plan
June 7, 1990
Page 2 -
------------------------------------
6) Review adequacy of current conservation efforts in order
to enhance the same to effect further cuts in
consumption.
7) Immediately proceed with design and construction of the
3,000,000 gallon storage tank at the Water Treatment
Plant where indicated within the Master Plan
accomplishing the same either through the CCNA procedures
or emergency conditions as required.
8) Amend the 10-year Water Department Plan to coincide with
the 5-year Allocation Permit from SFWMD and adopt the
same.
9) Amend the Capital Improvement Program to coincide with
contemplated projects necessary to secure water resources
allowed pursuant to the SFWMD permit.
10) Draft a personnel plan to provide necessary human
resources to provide for heavy anticipated contract
administration program. Adjust FY90-91 operating budget
accordingly.
11) Ascertain legality of eminent domain outside Village
boundaries.
12) Secure the services of a quality Bond Counsel firm and/or
financial consultant in order to present financing
package to Village Council for review and approval.
13) If an emergency situation does not exist, immediately
create a team to include one or more Village
Councilmembers to allow the Village to secure the
services of an engineering firm in accordance with the
requirements of the State Consultant's Competitive
Negotiations Act (CCNA) to design the wells necessary for
the western peninsula, the sub -aqueous crossing of the
north fork of the Loxahatchee River, the water line to
the Water Treatment Plant and possibly Well 24 adjacent
to the Children's Hospital. Note: Well 24 may be
designed and constructed under separate contract in order
to expedite, if need be.
14) Study or ascertain the need to design and construct
reverse osmosis (RO) facilities at this time depending
upon anticipated yield from the surficial aquifer on the
western peninsula. Assuming RO facilities are needed
immediately, ascertain whether RO facilities should be
designed to utilize 100% of Floridan Aquifer allocation.
RE: Water Department Action Plan
June 7, 1990
Page 3 -
------------------------------------
15) If emergency conditions have been implemented, select
engineer(s) to design RO facilities. Thereafter, select
contractor(s) to construct the same.
16) If no emergency, have CCNA team select engineer(s) for RO
facilities project(s). Thereafter, solicit sealed bids
for contractor(s).
17) Upon receipt of Gee & Jenson western peninsula test wells
report, ascertain feasibility of modifying South Florida
Water Management District (SFWMD) allocation permit
upward if data is favorable.
TGB/mk
cc: Thomas C. Hall, Water System Manager
Wendy K. Harrison, Admin. Asst. to the Village Manager
Bill C. Kascavelis, Finance Director/Village Clerk
John C. Randolph, Esq., Village Attorney
W. Richard Staudinger, P.E., Gee & Jenson
0
GEE &JENSON
Engineers-Arch0eds-
Planners, Inc.
Mr. Tom Bradford
Village Manager
Village of Tequesta
P.O. Box 3474
Tequesta, FL 33468-0237
May 3, 1990
Revised June 8, 199
Re: Water Rate Review
Water Capital Connection Change Review
Dear Tom:
VILLAGE OF
lEftESTA
-JUA, A 8 799r
VILLAGE
MANAGER'S
OFFICE
At your request, we have prepared the attached Scope of Services
for the referenced projects. In accordance with Section 4-C of
our Professional Services Agreement with The Village of Tequesta,
we propose our fees to be lump sum as follows:
1. Commodity Charge Review Adequacy and
Conservation Rate Review
Scope Items 1 through 5 $5,260.00
2. Annual Capital Connection Charge Review
Scope Items 1 through 7 $3,510.00
We propose to complete services within thirty (30) days of
authorization by The Village of Tequesta. Presuming authorization
on approximately June 18th, this would set a completion date of
July 17, 1990 (written letter report and recommendations).
Because there is a Council Meeting on the 12th, we would strive
to have a draft report ready on July 6th for review with the
Council on the 12th, and a final report ready for transmittal and
review with the Council on the 26th of July.
Please review these fees and scopes. We are prepared to begin as
soon as you confirm the scope and fees.
Very t ul urs,
/<C
W. Richard Staudinger, P.E.
WRS:ce
#50-101
cc: Mike Rocca
ter.
One Harvard Circle • West Palm Beach, Florida 33409-1923 •407/683-3301 • FAX 407/683-3301
Village of Tequesta
Commodity Charge Revenue Adequacy and Conservation Rate Review
Scope of Services:
1. Obtain fiscal 1991 Water System proposed budgets, 1990
water production data, 1990 user consumption
characteristics, number of users by classification,
growth projections and other relevant data from
Village.
2. Review data and develop revenue projections based on
anticipated Water System activities for fiscal year
1991.
3. Analyze revenues from commodity charges and
conservation rates and prepare adjustments to obtain
required levels of revenues.
4. Prepare draft letter report reflecting the commodity
rate adjustments together with conservation rate
structure and present to Finance Committee.
5. Prepare final letter report with recommendations and
present to Village Council.
6. Additional services concerning the Commodity and
Conservation Rates as mutually agreed.
Is
Village of Tequesta
Annual Capital Connection Charge Review
Scope of Services:
1. Obtain current and five year facility projections
including cost estimates on Water System Capital
Improvements from Village.
2. Review Capital Improvements and projected costs to
determine capacities and services provided by
improvements.
3. Prepared schedule of Capital Improvements and costs
which represent system or capacity expansion.
4. Estimate number of Equivalent Residential Connections
represented by Capital Improvement expansion.
5. Prepare schedule indicating level(s) of Capital
Improvement Charges required pursuant to Capital
Improvement expansion.
6. Prepare draft letter report and present to Finance
Committee.
7. Prepare final letter report with recommendations and
present to Village Council.
8. Additional services concerning the Capital Improvement
Charge as mutually agreed.