HomeMy WebLinkAboutAgreement_General_4/13/2023_Kimley-Horn WA County Line RdVILLAGE OF TEQUESTA
ENGINEERING SERVICES WORK AUTHORIZATION
COUNTY LINE ROAD UTILITY RELOCATIONS
This Work Authorization authorizes Kimley-Horn and Associates, Inc. to perform work set forth
herein and is issued pursuant to The Professional Engineering Services Agreement between
the Village of Tequesta ("Client" or "Village") and Kimley-Horn and Associates, Inc. ("Kimley-
Horn" or "Consultant"), dated May 12, 2016 ("Agreement"). All terms and conditions of said
Agreement are hereby incorporated and made part of this Work Authorization.
PROJECT UNDERSTANDING
Martin County Public Works Department has notified the Village that the S.E. County Line Road
Bridge, located between Girl Scout Road and Ridgeview Drive, is being planned to be replaced.
The bridge design plans are currently being prepared. The County's tentative schedule for
commencement of bridge construction during the 4th Quarter of 2023. The Village currently
maintains a 12-inch raw water main and an 8-inch potable water main that is attached to the
bridge on the south side. The Village desires to replace both mains with a new horizontal
directional drill under the river prior to bridge construction.
This work authorization will be for the development of design plans, permitting services, bidding
assistance and limited construction administration/inspection services. The scope of services
noted below address services to be performed by the Engineer. The project will consist of eight
(8) sheets as outlined below.
• C-1 Title Sheet
• C-2 General Notes
• C-3 Key Map
• C-4 — C-6 WM and RWM Relocation Plan (1" = 20')
• C-7 Directional Drill Plan and Profile Sheet
• D-1 — D-2 Detail Sheets
SCOPE
Kimley-Horn will perform the following services:
Task 1 Data Collection/Field Investigation
Task 1.1 Subsurface Survey
Kimley-Horn will utilize Infra Map Corp., to perform up to five (5) soft dig utility test holes, at
locations determined by the Engineer, mainly concentrated around the proposed points of
connections.
Task 1.1 Deliverables
• Subsurface Survey Report (Findings with Exhibits in PDF format)
1 of 5
Task 2 Desian Services (Bore Schematic, 90% and Final Submittals
Task 2.1, Bore Schematic
The Engineer will "walk" the proposed route to confirm constructability issues to be discussed
with the Village. The Bore Schematic shall address the requirements of the project and will
outline the bore profile to be used in the development of the design plans. The intent of the Bore
Schematic is to acquire Village acceptance of the new utility alignment and bore depth for use in
the permit submittal packages to the USACE and for the FDEP ERP permit.
Task 2.2, 90% Plans
Upon acceptance of the Bore Schematic by the Village, Kimley-Horn will commence with the
90% design plans incorporating Village comments from the Bore Schematic review and
developing the plans to a level that if no comments are made, that the plans would be sufficient
for signing and sealing for issuance into the permitting agencies (FDEP General and Specific
permits, and Martin County R/W permit) noted in Task 3 below. Kimley-Horn will provide an
updated opinion of probable construction cost and technical specifications with the 90%
submittal.
Task 2.3, Final Plans
Upon acceptance of the 90% design by the Village, Kimley-Horn will finalize the plans and
technical specifications (including insertion of Village provided upfront documents) for a
complete set of documents to be used for bidding and construction.
The drawings will be based on AutoCAD (2022) Civil 3D base files. The drawings will depict the
proposed utility relocation work in plan and profile view at a 1" = 20' scale, depicted in a single
plan/profile view per sheet. Technical specifications will be developed based on Village Design
Standards.
Task 2.1 thru 2.3 Deliverables
• Bore Schematic
• 90% and Final Plans (PDF and AutoCAD format)
• Opinion of Probable Construction Cost (PDF and Excel format)
• Technical Specifications (PDF and Word format)
Task 3 Permitting Services
Kimley-Horn will prepare permit support documents and submit accordingly to the following
regulatory agencies and will provide assistance in addressing a reasonable set of questions
from the permitting agency in order to move forward with permit application submittals. Note that
for the FDEP ERP and USACE permits, Kimley-Horn will prepare the applications and
supporting documents, using the Bore Schematic plan, upon notification/issuance of a Purchase
Order by the Village and will make the submittals within 10 days. The other applications will
require 90% design plans for those submittals.
• Martin County Engineering Department, "Right -of Way Use" Permit Application
2 of 5
• FDEP "Notice of Intent to Use an Environmental Resource General Permit", DEP Form
62-330.402(1).
• Army Corp of Engineers (USACE) "Application for Department of the Army Permit",
USACE Form OMB No. 0710-0003.
• FDEP "Notice of Intent to use General Permit for Construction of Water Main Extensions
for PWS", DEP Form 62-555.900(7).
• FDEP "Application for a Specific Permit to Construct PWS Components", DEP Form 62-
555.900(1),
Task 3 Deliverables
• Copies of permit applications (PDF format)
• FDEP Correspondence/Emails
• Responses to FDEP Requests for Additional Information
• Permits received
Task 4 Martin County Public Works Coordination
Kimley-Horn will coordinate the design plans prepared above with Martin County and their
bridge consultant to address the raw water and water main drill location with the proposed
bridge demolition work, and future bridge construction. This task will be limited to two (2)
meetings with the Village and County.
Task 4 Deliverables
• Copies of meeting minutes
• Design plans received by County or their consultant
Task 5 Proiect Manaaement
Project management includes activities related to initiating, planning, executing, controlling, and
closing the Project. The Consultant will perform a technical review of deliverables, in accordance
with standards, prior to transmitting them to the Client. Under this Task, the Consultant will be
responsible for overall coordination and oversight of the project execution. The task includes
monthly invoicing, project financials, enter subcontracts, and start the Project within 7 calendar
days upon receiving the Notice to Proceed, along with coordinating the project progress meetings
throughout the duration of the project.
ADDITIONAL SERVICES
Any services not specifically provided for in the above scope, as well as any changes in the
scope requested by the Village, will be considered additional services to this Work Authorization
and will be performed based on subsequent Work Authorizations approved prior to performance
of the additional services.
INFORMATION AND SERVICES PROVIDED BY THE VILLAGE
Kimley-Horn assumes that all information provided by the Village can be relied upon in the
performance of professional services. The following information shall be provided to Kimley-
Horn and/or the following services will be performed by the Village.
• Record drawing information
• Assistance during construction to supplement the Kimley-Horn inspector
3 of 5
ASSUMPTIONS
The Engineer has made the following assumptions in the development of this scope of services:
1. The Village will pay for all permit related fees.
2. The project does not require any environmental related work along the proposed utility
route.
3. FDEP and the ACOE will not require a legal description and sketch of the proposed river
crossings.
4. The Village will be responsible for any easements required on private property.
SCHEDULE
The term of the contract is for approximately seven (7) months from the issuance date of the
Purchase Order. Unless indicated otherwise, Kimley-Horn shall commence work within ten (10)
days after receiving the fully executed contract/Purchase Order.
Task Name
Duration
Task 1.1 Subsurface Survey
45 Days
Task 2.1 Bore Schematic
20 Days
Task 2.2 90% Plans
25 Days
Task 2.3 Final Plans
25 Days
Task 3 Permitting Services
- FDEP ERP and USACE
Submit 30 days after contract approval
- FDEP Water
45 Days
- FDEP RWM
45 Days
- MC R/W
60 Days
Task 4 Martin County Public Works Coordination
Occurs during Task 2 work
Task 5 Project Management
Ongoing
COMPENSATION
The total amount to be paid by the Village to Kimley-Horn for Scope of Services Tasks 1 thru 5
is a lump sum of $110,450.00.
Task Name
Lump Sum Fee Amount
WM/RWM Relocation
-
Task 1.1 Subsurface Survey
$4,900.00
Task 2.1 Bore Schematic
$12,600.00
Task 2.2 90% Plans
$30,950.00
Task 2.3 Final Plans
$12,100.00
Task 3 Permitting Services
$32,200.00
Task 4 Martin County Public Works Coordination
$3,100.00
Task 5 Project Management
$14,600.00
4 of 5
Accepted by:
(For County Line Road Utility Relocations)
Village of Tequesta
Molly Young
Mayor
Date: L4—13' 23
5 of 5
Kimley-Horn and Associates, Inc.
'�� Zw-.--
Jason 4. Lee, P.E.,
Vice President
Date: y JdJ3
`T
00
C
a
C
Mo
C
LU
OAS
U
v
u
U
Q
N
M
>.lj�
ba
LD
m O
N a-
}L Lu �
o�
0
0
0
o
Ln
Ln
c
":t
a
Lrn
O
O
o":t
=
O
v
n
n
rl
in
"i
Ln
00
�4
rq
in
E
V�
v>
v�
ar
oc
O
O
r
T
Zt
N
00
U
0
00
0
O
O
Q
Q
Q
Q
Q
C
a1 N
OO :E�,
Z
4�r
Z
Z
Z
z
~
Ln
6
00
00
m
azCC
(D
o
0
00
jo
`
LLn
Ln
ar
(/}
v
v
C
W
a
aa
z
Lna
er
z
a
z
a
z
z
o
v
3
Q
o
0
iA
in
t
r
0
0
0
0
C
00
o
0
06
Lri
o
d'
r�
co
Ln
M
N
r-
Ln
r-
O
en
r-I
+n
r-I
V}
i^
Ln
Ln
LA-
LA
co
C
�_
H
0o
C
tw
co c
H
C
L10
N
•V
p
v
v
C
�
4-
C 4-1
w
N
H
QJ
c
L
p
N
7A
E
ZA E
a
N
a
ucr.
0
L
w
L
O a
C1
4-1
M
Ln
-1
J
H
N
cC
a,
U
U
U
O
-a
E
m
u
o
L n
c:a
>
v
O
4� 0
C
,.., Z
C
a-�
C
O
L
a 0
L
a! p
aJ
W
a,
CL
a
E
E-a
E
O
0
-a
y
v
v a
v
,�
c
N
3
cua '�
v
cuo U
v
E
a0—u
��_oaz
aia."W
7
w
t
c�
0)
p
H
O
C
7
L
aJ
0
7
p
t1
cpi
3
L O
LO
U
°�°
E
N
cn
Ln
L9
v
N
t
L
O
-a w
L
m
O
Ln
O k
7
cu
c
v
E >
0
m O
u
O
4-+
4
>
a)
N M
Q L
O
EL E
a) a
3
N .O
L o
L
E E
O O
C L
tH
C O
Ln
O Ln
v 00
N �
C C
O +�
u �
V
L
a
C
u �
v
o to
L C
CL L
v v
c C
Lo °0
c
_ LU
0'6
O u
t
H !E
a..,
a) L
bn Q
N
M
v
r,
0
v
O TT
N
l�
- O
D_
N
cr
E
�'
L
U
N E
C
� O
3
u
4, C
Q
N
'>
O41
*
Z Luv