Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 9A_7/13/1989 54 II ORDINANCE NO. 11 I AN ORDINANCE OF THE VILLAGE COUNCIL OF THE I VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA, I AMENDING CHAPTER 18 OF THE CODE OF ORDINANCES:"WATER" ARTICLE I AT SECTION 18-3 (f) RELATING TO CAPITAL IMPROVEMENT CHARGES, SO AS TO INCREASE • I THE CAPITAL IMPROVEMENT CHARGE FOR NEW CONNECTIONS TO $1,500.00: PROVIDING FOR SEVERABILITY; PROVIDING FOR CODIFICATION; AND PROVIDING FOR AN EFFECTIVE DATE. 11 BE IT ORDAINED BY THE VILLAGE COUNCIL OF THE VILLAGE OF i TEQUESTA, _FLORIDA, AS FOLLOWS: ! Section 1. Chapter 18 of the Code of Ordinances of the " Village relating to "Water" is hereby amended at Section 18-3 A II (f) to read as follows: in I; II "(f) Capital Improvement Charge. Each new connection to the 1 ': water system after the effective date of this sub-section shall pay a Capital Improvement Charge of One Thousand Five Hundred Dollars ($1,500.00) for each 5/8-inch by 3/4 inch c /fie 'meter or equivalent thereof at the time of the application for t(iV r� a new connection. Such payments shall go into a Capital 0�� ei Improvement Fund which shall be a separate fund to be used for Capital Improvements to the Water System or for payment of au debt service on the Water Revenue Certificates, Series 1976 or subsequent issues. In addition to the Capital Improvement Charge setforth herein, each new connection to the Water System located on that geographic area within the system known as Jupiter Island, shall pay a Capital Improvement charge of Two Thousand Three Hundred Ten Dollars ($2,310.00) for each dwelling unit, at the time of the application for a new connection. Such payments shall go into a Capital Improvement Fund, which shall be a separate fund to be used for Capital Improvements to the Water System related to the improvements for the uses on Jupiter Island." ;, Section 2. If any provision of this Ordinance or the 'application thereof is held invalid, such invalidity shall not affect the other provisions or applications of this Ordinance which can be given effect without the invalid provisions or_ applications and to this end, the provisions of this Ordinance Tare hereby declared severable. ;'Section 3. This Ordinance shall be codified and made a part rof the Official Code of Ordinances of the Village of Tequesta. ,Section 4. This Ordinance shall take effect immediately upon Zits passage and approval, as provided by law. 1 THE FOREGOING ORDINANCE WAS OFFERED BY Councilmember , and upon being put to a vote, the vote was as follows: FOR ADOPTION AGAINST ADOPTION ti II 2 1 The Mayor thereupon declared the Ordinance duly passed and adopted this day of , 1989. Mayor of Tequesta it 1 11 , 1� ATTEST: 1 1 Village Clerk I 1 1 1 1 1 1 1 1 c°t ' rc6 9 p4-p7GToc . SJOZ na ,Qq 11 GEE &JENSON Mp "j99a. Engineers-Architects- r • Planners,Inc. July 7, 1989 �FF�CF''S • Village of Tequesta Post Office Box 3273 Tequesta, Florida 33469-0273 Attn: Mr. Thomas G. Bradford, Village Manager Re: Water System, Capital Connection Charge Dear Mr. Bradford: Per your request we have reviewed the Water System's five year Capital Improvement Program and revised the Capital Connection Charge pursuant to expansion related items in the program. In addition, we have also prepared Capital Connection Charges for alternatives, based on a similar expansion capacity, utilizing for one alternative a combination of Conventional and Reverse Osmosis process, and in the other alternative Reverse Osmosis process only. The results of our analysis indicates that the estimated costs (Capital Connection Charge) per Equivalent Residential Connection (ERC) , for an improvement program utilizing a similar process to the existing treatment plant, would be $1,150. The estimated costs relative to an improvement program utilizing the alternative of Conventional and Reverse Osmosis process is estimated to be $1,500 per ERC the alternative utilizing solely Reverse Osmosis is estimated at $1,900 per ERC. Each of these Expansion programs considers additional potable water capacity to meet the projected maximum day demands through fiscal year 1996. The attached schedules provide the salient items considered in developing the Capital Connection Charge, (estimated cost per ERC for additional capacity) . The estimated construction cost includes allowances for contingencies and engineering. Funding Related Costs pertain to the reserve funds, interest during construction, underwriting costs and other issuance related expenses associated with revenue bonds, which, for the purpose of this analysis, have been included at 35 percent of the construction costs. The average daily demand per ERC is based on the metered amounts from all 5/8 inch meters in the system for a 12 consecutive month period. Design criteria maximum day factor of 1.7 is utilized to determine the Maximum Daily Demand per ERC. THe Maximum Daily Demand per ERC represents the amount of capacity required to serve each ERC. All amounts are rounded and are present 1989 values with no allowance for future inflation. One Harvard Circle • P.0.Box 24600 • . West Palm Beach,Florida 33416-4600 • 407/683-3301 • Telex 513472 G&J WPB 11/1411/ Village of Tequesta Attn: Thomas A. Bradford July 7, 1989 - Page 2 Anticipated future regulatory permitting may require treatment system standards in excess of present conventional facilities capabilities. Therefore, we have concluded that it would be prudent to initiate a program with a conventional 1.35 MGD immediate expansion and anticipate the future 1.8 MGD expansion to utilize reverse osmosis. This approach will provide the Water System flexibility to comply with anticipated future regulatory changes. It is our recommendation that the Village revise the current Capital Connection Charge to $1,500 per ERC. We further recommend that during the first month of each fiscal year the Capital Connection Charge be adjusted pursuant to the change in the Consumer's Price Index (CPI) , for such annual period preceding the fiscal year. In addition, the Capital Connection Charge should be reviewed whenever any significant changes occur within the Water System's Capital Improvement Program or rate structure. We thank you for the opportunity to be of service in this matter. Should you have any questions, please feel free to call. Very truly yours, Marco H. Rocca, CMC 62//(/-1;T:*Je.iq W. ichard Staudinger, P.E. MHR/mr 89-037 Encl. • GEE&JENSON Engineers.Architects,Planners,Inc. SCHEDULE p1 VIL WATER SYSTEMESTA POTABLE WATER ALTERNATIVE EXPANSION COSTS AND CAPITAL CONNECTION CHARGES CONVENTIONAL & CONVENTIONAL REVERSE OSMOSIS REVERSE OSMOSIS 1. ESTIMATED Construction $3,638,000 $4,742,500 $5,999,000 B. Funding Related 1,273,000 1,660,000 2,100,000 Total $4,911,000 $6,402,500 $8,099,000 2. EXPANSION CAPACITY IN gpd 3,150,000 3,150,000 3,150,000 3. DEMAND PER ERC A. Average daily demand in gpd 430 430 430 B. maximum daily demand in gpd 731 731 731 4. ESTIMATED ADDITIONAL ERC'S 4,309 4,309 4,309 5. CAPITAL CONNECTION CHARGE PER ERC $1,140 $1,486 $1,880 SAY $1,150 $1,500 $1,900 89-037 July 6, 1989 SCHEDULE 2 . VILLAGE OF TEOUESTA WATER SYSTEM POTABLE WATER ALTERNATIVE ESTIMATED CAPITAL IMPROVEMENT COST SUMMARY CONVENTIONAL & CONVENTIONAL REVERSE OSMOSIS REVERSE OSMOSIS 1. TELEMETRY, WELLS & REMOTE $ 60,000 $ 60,000 $ 30,000 2. CONNECTION CHARGE STUDY 7,000 7,000 7,000 3. WELL 25, 1.0 MGD (BACKUP) 138,000 138,000 N/A 4. WELL 26, 1.0 MGD 330,500 330,500 N/A 5. WELL 27, 1.0 MGD 1,265,000 N/A N/A 6. TREATMENT SITE PLAN 20,000 20,000 20,000 7. STORAGE & PUMPING (AT 1/3) 204,000 _ 204,000 204,000 8. CONVENTIONAL PLANT FACILITIES, 1.35 MGD 413,000 413,000 N/A 9. CONVENTIONAL PLANT FACILITIES, 1.8 MGD 550,500 N/A N/A 10. RO TESTING PROGRAM N/A 100,000 100,000 11. RO WELLS & PLANT FACILITIES, 1.35 MGD N/A N/A 2,488,000 12. STORAGE & PUMPING 550,000 550,000 550,000 13. RO WELLS & PLANT FACILITIES, 1.8 MGD N/A 2,920,000 2,600,000 TOTAL $3,638,000 $4,742,500 $5,999,000 NOTE: EXPANSION PROGRAMS PREDICATED ON OBTAINING WATER WITHDRAWAL PERMITS. ALL COSTS BASED ON 1989 DOLLARS. 89-037 July 6, 1989 • . Y v' a., il▪ lii Ay VILLAGE OF TEQUESTA ��• d Post Office Box 3273 • 357 Tequesta Drive � o Tequesta, Florida 33469 0273 • (407) 575-6200 • • v,�4 FAX: (407) 575 6203 h C• MEMORANDUM: TO: Village Council FROM: Thomas G. Bradford, Village Manager -72f, DATE: July 6, 1989 SUBJECT: Proposed Ordinance Increasing Building Permit Fees; Agenda Item The attached Ordinance increases the building permit fee from one percent ( 1%) of the value of the proposed construction to one and one-half percent ( 1 1/2%) . Palm Beach County and several other municipal agencies currently charge two percent (2%) . The building permit, fee increase is necessitated for two reasons: o To allow the Village to incrementally stay on par with other agencies in this regard. o To help minimize pressure on the ad valorem tax rate by generating non-ad valorem revenues (permit fees) which help Building Department revenues approximate expenditures. We have reviewed the need for this Ordinance at a previous Finance and Administration Committee Meeting. It is recommended that this Ordinance be adopted. TGB/jmm