HomeMy WebLinkAboutDocumentation_Regular_Tab 9A_7/13/1989 54
II ORDINANCE NO.
11
I AN ORDINANCE OF THE VILLAGE COUNCIL OF THE
I VILLAGE OF TEQUESTA, PALM BEACH COUNTY, FLORIDA,
I AMENDING CHAPTER 18 OF THE CODE OF ORDINANCES:"WATER" ARTICLE I AT SECTION 18-3 (f) RELATING TO
CAPITAL IMPROVEMENT CHARGES, SO AS TO INCREASE
• I THE CAPITAL IMPROVEMENT CHARGE FOR NEW
CONNECTIONS TO $1,500.00: PROVIDING FOR
SEVERABILITY; PROVIDING FOR CODIFICATION; AND
PROVIDING FOR AN EFFECTIVE DATE.
11
BE IT ORDAINED BY THE VILLAGE COUNCIL OF THE VILLAGE OF
i TEQUESTA, _FLORIDA, AS FOLLOWS:
! Section 1. Chapter 18 of the Code of Ordinances of the
" Village relating to "Water" is hereby amended at Section 18-3
A II (f) to read as follows:
in I;
II "(f) Capital Improvement Charge. Each new connection to the
1 ': water system after the effective date of this sub-section
shall pay a Capital Improvement Charge of One Thousand Five
Hundred Dollars ($1,500.00) for each 5/8-inch by 3/4 inch
c /fie 'meter or equivalent thereof at the time of the application for
t(iV r� a new connection. Such payments shall go into a Capital
0�� ei Improvement Fund which shall be a separate fund to be used for
Capital Improvements to the Water System or for payment of
au debt service on the Water Revenue Certificates, Series 1976 or
subsequent issues.
In addition to the Capital Improvement Charge setforth herein,
each new connection to the Water System located on that
geographic area within the system known as Jupiter Island,
shall pay a Capital Improvement charge of Two Thousand Three
Hundred Ten Dollars ($2,310.00) for each dwelling unit, at the
time of the application for a new connection. Such payments
shall go into a Capital Improvement Fund, which shall be a
separate fund to be used for Capital Improvements to the Water
System related to the improvements for the uses on Jupiter
Island."
;, Section 2. If any provision of this Ordinance or the
'application thereof is held invalid, such invalidity shall not
affect the other provisions or applications of this Ordinance
which can be given effect without the invalid provisions or_
applications and to this end, the provisions of this Ordinance
Tare hereby declared severable.
;'Section 3. This Ordinance shall be codified and made a part
rof the Official Code of Ordinances of the Village of Tequesta.
,Section 4. This Ordinance shall take effect immediately upon
Zits passage and approval, as provided by law.
1 THE FOREGOING ORDINANCE WAS OFFERED BY
Councilmember , and upon being put to
a vote, the vote was as follows:
FOR ADOPTION AGAINST ADOPTION
ti II 2
1 The Mayor thereupon declared the Ordinance duly passed and
adopted this day of , 1989.
Mayor of Tequesta
it
1
11 ,
1� ATTEST:
1
1
Village Clerk
I
1
1 1
1
1
1
1
1
c°t ' rc6
9 p4-p7GToc .
SJOZ
na ,Qq 11
GEE &JENSON Mp "j99a.
Engineers-Architects- r •
Planners,Inc. July 7, 1989 �FF�CF''S
•
Village of Tequesta
Post Office Box 3273
Tequesta, Florida 33469-0273
Attn: Mr. Thomas G. Bradford, Village Manager
Re: Water System, Capital Connection Charge
Dear Mr. Bradford:
Per your request we have reviewed the Water System's five year
Capital Improvement Program and revised the Capital Connection
Charge pursuant to expansion related items in the program. In
addition, we have also prepared Capital Connection Charges for
alternatives, based on a similar expansion capacity, utilizing
for one alternative a combination of Conventional and Reverse
Osmosis process, and in the other alternative Reverse Osmosis
process only.
The results of our analysis indicates that the estimated costs
(Capital Connection Charge) per Equivalent Residential Connection
(ERC) , for an improvement program utilizing a similar process to
the existing treatment plant, would be $1,150. The estimated
costs relative to an improvement program utilizing the alternative
of Conventional and Reverse Osmosis process is estimated to be
$1,500 per ERC the alternative utilizing solely Reverse Osmosis is
estimated at $1,900 per ERC. Each of these Expansion programs
considers additional potable water capacity to meet the projected
maximum day demands through fiscal year 1996.
The attached schedules provide the salient items considered in
developing the Capital Connection Charge, (estimated cost per ERC
for additional capacity) . The estimated construction cost
includes allowances for contingencies and engineering. Funding
Related Costs pertain to the reserve funds, interest during
construction, underwriting costs and other issuance related
expenses associated with revenue bonds, which, for the purpose of
this analysis, have been included at 35 percent of the construction
costs. The average daily demand per ERC is based on the metered
amounts from all 5/8 inch meters in the system for a 12 consecutive
month period. Design criteria maximum day factor of 1.7 is
utilized to determine the Maximum Daily Demand per ERC. THe
Maximum Daily Demand per ERC represents the amount of capacity
required to serve each ERC. All amounts are rounded and are
present 1989 values with no allowance for future inflation.
One Harvard Circle • P.0.Box 24600 • . West Palm Beach,Florida 33416-4600 • 407/683-3301 • Telex 513472 G&J WPB
11/1411/
Village of Tequesta
Attn: Thomas A. Bradford
July 7, 1989 - Page 2
Anticipated future regulatory permitting may require treatment system
standards in excess of present conventional facilities capabilities.
Therefore, we have concluded that it would be prudent to initiate
a program with a conventional 1.35 MGD immediate expansion and
anticipate the future 1.8 MGD expansion to utilize reverse
osmosis. This approach will provide the Water System flexibility
to comply with anticipated future regulatory changes.
It is our recommendation that the Village revise the current
Capital Connection Charge to $1,500 per ERC. We further recommend
that during the first month of each fiscal year the Capital Connection
Charge be adjusted pursuant to the change in the Consumer's Price
Index (CPI) , for such annual period preceding the fiscal year.
In addition, the Capital Connection Charge should be reviewed
whenever any significant changes occur within the Water System's
Capital Improvement Program or rate structure.
We thank you for the opportunity to be of service in this matter.
Should you have any questions, please feel free to call.
Very truly yours,
Marco H. Rocca, CMC
62//(/-1;T:*Je.iq
W. ichard Staudinger, P.E.
MHR/mr
89-037
Encl.
•
GEE&JENSON Engineers.Architects,Planners,Inc.
SCHEDULE p1
VIL WATER SYSTEMESTA
POTABLE WATER ALTERNATIVE
EXPANSION COSTS AND CAPITAL CONNECTION CHARGES
CONVENTIONAL &
CONVENTIONAL REVERSE OSMOSIS REVERSE OSMOSIS
1. ESTIMATED Construction $3,638,000 $4,742,500 $5,999,000
B. Funding Related 1,273,000 1,660,000 2,100,000
Total $4,911,000 $6,402,500 $8,099,000
2. EXPANSION CAPACITY IN gpd 3,150,000 3,150,000 3,150,000
3. DEMAND PER ERC
A. Average daily demand in gpd 430 430 430
B. maximum daily demand in gpd 731 731 731
4. ESTIMATED ADDITIONAL ERC'S 4,309 4,309 4,309
5. CAPITAL CONNECTION CHARGE PER ERC $1,140 $1,486 $1,880
SAY $1,150 $1,500 $1,900
89-037
July 6, 1989
SCHEDULE 2 .
VILLAGE OF TEOUESTA
WATER SYSTEM
POTABLE WATER ALTERNATIVE
ESTIMATED CAPITAL IMPROVEMENT COST SUMMARY
CONVENTIONAL &
CONVENTIONAL REVERSE OSMOSIS REVERSE OSMOSIS
1. TELEMETRY, WELLS & REMOTE $ 60,000 $ 60,000 $ 30,000
2. CONNECTION CHARGE STUDY 7,000 7,000 7,000
3. WELL 25, 1.0 MGD (BACKUP) 138,000 138,000 N/A
4. WELL 26, 1.0 MGD 330,500 330,500 N/A
5. WELL 27, 1.0 MGD 1,265,000 N/A N/A
6. TREATMENT SITE PLAN 20,000 20,000 20,000
7. STORAGE & PUMPING (AT 1/3) 204,000 _ 204,000 204,000
8. CONVENTIONAL PLANT FACILITIES, 1.35 MGD 413,000 413,000 N/A
9. CONVENTIONAL PLANT FACILITIES, 1.8 MGD 550,500 N/A N/A
10. RO TESTING PROGRAM N/A 100,000 100,000
11. RO WELLS & PLANT FACILITIES, 1.35 MGD N/A N/A 2,488,000
12. STORAGE & PUMPING 550,000 550,000 550,000
13. RO WELLS & PLANT FACILITIES, 1.8 MGD N/A 2,920,000 2,600,000
TOTAL $3,638,000 $4,742,500
$5,999,000
NOTE:
EXPANSION PROGRAMS PREDICATED ON OBTAINING WATER WITHDRAWAL PERMITS.
ALL COSTS BASED ON 1989 DOLLARS.
89-037
July 6, 1989
• .
Y
v' a.,
il▪ lii Ay VILLAGE OF TEQUESTA
��• d
Post Office Box 3273 • 357 Tequesta Drive
� o Tequesta, Florida 33469 0273 • (407) 575-6200 •
• v,�4 FAX: (407) 575 6203
h C•
MEMORANDUM:
TO: Village Council
FROM: Thomas G. Bradford, Village Manager -72f,
DATE: July 6, 1989
SUBJECT: Proposed Ordinance Increasing Building Permit Fees;
Agenda Item
The attached Ordinance increases the building permit fee
from one percent ( 1%) of the value of the proposed construction
to one and one-half percent ( 1 1/2%) . Palm Beach County and
several other municipal agencies currently charge two percent
(2%) . The building permit, fee increase is necessitated for two
reasons:
o To allow the Village to incrementally stay on par with
other agencies in this regard.
o To help minimize pressure on the ad valorem tax rate by
generating non-ad valorem revenues (permit fees) which
help Building Department revenues approximate
expenditures.
We have reviewed the need for this Ordinance at a previous
Finance and Administration Committee Meeting. It is recommended
that this Ordinance be adopted.
TGB/jmm