HomeMy WebLinkAboutDocumentation_Regular_Tab 4C_5/11/1989 how.. VILLAGE OF TEQUESTA
• _ ' a Post Office Box 3273 • 357 Tequesta Drive
4. Tequesta, Florida 33469-0273 • (407) 575-6200
� FAX: (407) 575-6203
C,
V=L I. MANAGER • S RE PORT
APR=L 2 4 — MAY 5 . 1 9 8
1. April 24, 1989 a) Letter to John M. LeRoux, Esq. , Jones,
Foster, Johnston & Stubbs concerning Tequesta
Drive Improvement Project.
2. April 25, 1989 a) A meeting was held by the Tequesta Downtown
Development Task Force at 9:30 A.M. in the
Village Hall Council Chambers
b) A Budget Review of the Police Department was
held at 2:30 P.M. in the Village Hall Council
Chambers.
•
c) Letter to Michelle Gensicke enclosing an
executed agreement for Recording Secretarial
Services.
d) Letter to Jacobs Ladder granting permission
to hold their Grand Opening Celebration on
Saturday, May 6th from 10:00 A.M. to 4:00
P.M. at the Tequesta Fashion Mall Parking
Lot.
e) Letter to Robert Fehlhaber relative to Publix
Leasehold in Tequesta Plaza.
f) Letter to Charles Jenkins relative to Public
Leasehold in Tequesta Plaza.
g) Letter to Patricia G. Frasca, Broker-Salesman
in reply to her letter pertaining to
Temporary Sign.
3. April 26, 1989 a) A Budget Review of the Water Department was
held at 8:30 A.M. in the Village Hall Council
Chambers.
b) A meeting was held by the Community
Appearance Board at 3:00 P.M. in the Village
Hall Council Chambers.
4. April 27, 1989 a) A regularly scheduled meeting was held by the
Village Council at 9:00 A.M. in the Village
Hall Council Chambers.
Village Manager's Report
April 24 - May 5, 1989
Page 2
b) Memorandum to Carl R. Roderick, Chief of
Police, enclosing copy of Disaster
Preparedness Reading Materials for his
information.
c) Memorandum to Department Heads enclosing
Safety News Pamphlet for dissemination.
5. April 28, 1989 a) Memorandum to Scott D. Ladd, Building
Official relative to Board of Adjustment;
Reappointment of John P. Turner.
b) Letter to Mrs. Jean H. Beck, Town Clerk, Town
of Jupiter advising of Tequesta's
representative of Indiantown Road and Bridge
Task Force.
c) Letter to John C. Randolph, Esq. , enclosing
draft of the Proposed Contract for
Professional Services for his review.
d) Memorandum to Scott D. Ladd, Building
Official concerning Written Communication
from the CAB to Village Council for Site Plan
Review Applications for his action.
6. May 1, 1989 a) Letter to Bill Wilsher, Director, Palm Beach
County Parks & Recreation Department with
regard to Plans for Coral Cove Park.
b) Letter to James O. Hilliard, CFE, CFA,
Administrative Assistant, enclosing
information relative to Taxing Authority
Address and Phone Number.
c) Letter to Michael Donoghue in connection
with Lighthouse Plaza Shopping Center.
d) Letter to James Pilz, President, Beach Road
Association pertaining to his letter relative
to No-Wake Zone.
e) Memorandum to Village Council in connection
with ENCON Service Along Country Club Drive.
f) A notice of the Tequesta Downtown Development
Task Force Meeting scheduled for Friday, May
5, 1989 at 9:30 A.M. was distributed to News
Media, Village Council and Task Force
members.
Village Manager's Report
April 24 - May 5, 1989
Page 3
7. May 3, 1989 a) A regularly scheduled meeting was held by
Community Appearance Board at 9:30 A.M. in
the Village Hall Council Chambers.
b) Letter to John LeRoux, Esq. , Jones, Foster,
Johnston & Stubbs, pertaining to Tequesta
Drive Improvement Project; Parcel 21.
8. May 4, 1989 a) Letter to Randy M. Whitfield, P.E. , Director,
Metropolitan Planning Organization of Palm
Beach County relative to Seven Member
Districts; Request for Tequesta Population
Per TAZ (Traffic Analysis Zones) .
b) Memorandum to Village Council relative to
Analysis of Employee/Population Ratio for
Tequesta.
c) Letter to Phillip J. Moan acknowledging his
letter pertaining to Beautification of
Seabrook Road.
d) Memorandum to Village Council enclosing
information relative to Planning Services for
Completion of Tequesta Comprehensive
Development Plan.
9. May 5, 1989 a) A regularly scheduled meeting was held by
Tequesta Downtown Development Task Force at
9:30 A.M. in the Village Hall Council
Chambers.
b) Memorandum concerning Interlocal Agreement
with the Solid Waste Authority for Joint
Solid Waste Management Grant Application.
10. The Water System Analysis is as follows:
APRIL MARCH MARCH
WATER QUALITY 1989 1989 1988
pH 7.4 7.5 7.2
M. Alkalinity . . . . 169 189 179
Total Hardness . . . 181 193 198
Calcium Hardness . 173 186 188
Color 11 12 12
Iron 05 05 . 11
Chlorides 89 97 99
Turbidity 22 21 .23
Village Manager's Report
April 24 - May 5, 1989
Page 4
The following is a summary of water pumpage usage for the month of
April 1989.
APRIL 1989 APRIL 1988
TEQUESTA WATER TREATMENT PLANT
Treated Water Pumped 50.791 m.g. 50.985 m.g.
Maximum Day 1.842 m.g. 1.896 m.g.
Minimum Day 1.440 m.g. 1.468 m.g.
Average Day 1.693 m.g. 1.699 m.g.
Backwash Water Used 1.962 m.g. 1. 518 m.g.
Hydrant Flushing .000 m.g. .000 m.g.
WATER PURCHASED FROM JUPITER
Total Pumped 33.434 m.g. 58.765 m.g.
Maximum Day 2.013 m.g. 2.200 m.g.
Minimum Day .167 m.g. 1.229 m.g.
Average Day 1. 114 m.g. 1.959 m.g.
TOTAL DISTRIBUTION SYSTEM PUMPAGE
Total Pumped 92.874 m.g. 112.562 m.g.
Maximum Day 4.012 m.g. 4.402 m.g.
Minimum Day 1.903 m.g. 3.102 m.g.
Average Day 3.096 m.g. 3.752 m.g.
Metered Services 4, 198 4,056
Rainfall 8.30" 1.83"
Jupiter Yearly contract at 1.5 m.g.d. . . . 547. 500 m g.
Received from Jupiter to-date 420.765 m.g.
126.735 m.g.
/mk