CURRENT ROAD CONDITIONS 2023 5
STORMWATER 6IMPROVEMENTSSTORMWATER EL
GENERAL ENVIRONMENTAL RESOURCES PERMIT GENERAL ENVIRONMENTAL RESOURSES PERMIT 7
EL PORTAL DRIVE 8IMPROVEMENTSSTORMWATER IMPROVEMENTS STORMWATER
EL PORTAL SIDEWALK ADDITION FY23 9SIDEWALK ADDITION
EL PORTAL VEGETATION REMOVAL RIGHT OF WAY 10RIGHT OF WAYVOTVEGETATION REMOVAL
FLUSH CONCRETE Flush Header Curb Provides stability to the edge of road and right of wayThis will allow drainage to be distributed evenly into the swale Install Flush Concrete Header
Curbs at intersections.HEADER CURB
ROAD PROFILE HIGHER 12ROAD PROFILE the road.o and from tproper drainage and provide a smooth transition This will protect the edge of road from cracking, facilitate replaced to meet
the existing road profile. Driveway Aprons that sit lower then the road profile will be THAN DRIVEWAY APRONS
Standard Approved Driveway Apron Detail
MILLING AND PAVING SCHEDULED FY23 14MILLING AND PAVING
APPROVED BUDGET AND COSTS FY2023 Approved Budget and Costs FY2023$111,030.00-$426,030.00$15,000.00$300,000.00663.553-411-403381.001-900-403Drainage Improvements104,936.27$531,748.73$773,285.00$546.35
0-210-301Total104.936.27$$1,280.00$1,280.00546.350-210-301ServicesStaking -Control Structure Survey106,216.27$$34,830.00$34,830.00546.350-210-301Inspection ServicesConstruction, Engineering
& 141,046.27$10,750.00$$15,000.00546.350-210-301Separate Permit and PO.Utilizing Terracon RepairTree Removal and Irrigation $151,796.27$69,523.73$75,000546.350-210-301Sidewalk Addition$221,320.00$41
5,365.00$560,000.00546.350-210-301Road Improvements$636,685.00N/A$773,285.00546.350-210-301301 Fund$636,685.00$136,600.00$138,285.00546.350-210-301Roads (Prep FY24)Engineering for Country
Club $773,285.00N/A$773,285.00546.350-210-301ImprovementsRoadRemaining BalanceEstimateBudgetedFundProject 15
EL PORTAL CAPITAL IMPROVEMENTS PROJECT COST$75,300.00Total $15,300.00Trench Steel Sheeting Open $15,000.00Trench Box $25,000.00Allowance Line Stop $19,500.00Line Deflect Existing
Water needed items may not be Pay : Contingency381.001-900-403Transfer To: 591.403 -900-Transfer From: 301Amount: $111,030.00Funds:of Utilities Department Appropriation
$957,778.73Total Cost$426,030.00Utilities Department$531,748.73Public Works DepartmentDepartments Shared Costs16EL PORTAL CAPITAL IMPROVEMENTS COST
PROJECT NOTIFICATION TO RESIDENTS Project Notification to Residents 17
SIDEWALK CAPITAL IMPROVEMENTS 18SIDEWALK IMPROVEMENTS Fiscal Year 2023Public Works Department
FY2022 SIDEWALK IMPROVEMENTS19
PRESENTATION TITLE20
TEQUESTA DRIVE NORTH 21SIDEWALK IMPROVEMENTS Fiscal Year 2023Public Works Department SEABROOK TO RIVERSIDE DRIVE
TEQUESTA DRIVE NORTH ROOT PRUNING 22SIDEWALK ROOT PRUNING
TEQUESTA DRIVE NORTH 23SIDEWALK ROOT PRUNING Fiscal Year 2023Public Works Department ROOT PRUNING
TEQUESTA AND RIVERSIDE DRIVE VEGETATION REMOVAL 24SIDEWALK ADDITION VEGETATION REMOVAL
REPLACE ASPHALT WITH CONCRETE 25SIDEWALK IMPROVEMENTS Fiscal Year 2023Public Works Department SEABROOK TO RIVERSIDE DRIVE
SIDEWALK IMPROVEMENTS$65,955.00$3,675.00$175,370.00$75,000.00$170,000.00663.652-210-301663.652-210-303Vegetation RemovalReplacementSidewalk BalanceEstimateBudgetedFundProject 26SIDEWALK
IMPROVEMENTS APPROVED BUDGET AND COSTS FY2023 APPROVED BUDGET & COSTS FY2023