HomeMy WebLinkAboutDocumentation_Regular_Tab 9_1/26/1989 11/11111/
1988 WATER USAGES (FINISHED)
Average Annual
Day (MGD) Max Day (MGD)
Jupiter Water Contract 1. 59 2 .53
Tequesta Water Treatment Plant 1.56 2 . 11
TOTAL 3 .15 4.42*
* Metered Maximum Day Usage from 9/88
CURRENT WATER SOURCES
Average Annual
Day (MGD) Max Day (MGD)
Jupiter Water Contract 1. 6/2 .0 2 .25
Tequesta Water Treatment Plant 1. 6 2.7 (1)
TOTAL 3 .2/3 . 6 4.95
(1) Contingent Upon Completion of Plant Expansion
88-037
GEE&JENSON Engineers,Architects,Planners,Inc.
1/11111/
ALTERNATIVES TO MEET FUTURE DEMAND
Long-term water supply alternatives may be placed in the
following broad categories:
1. Obtain additional treated water from Town of Jupiter.
2 . Expand or relocate the raw water supply source by
developing an additional wellfield.
3 . Build a reverse osmosis facility and wellfield.
4. Limit population growth and/or implement conservation
measures such that need for additional peak supply
capacity is reduced.
5. Encourage nen-potable water supply for irrigation purposes
at self courses.
88-037
GEE&JENSON Engineers,Architects,Planners,Inc.