Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 9_1/26/1989 11/11111/ 1988 WATER USAGES (FINISHED) Average Annual Day (MGD) Max Day (MGD) Jupiter Water Contract 1. 59 2 .53 Tequesta Water Treatment Plant 1.56 2 . 11 TOTAL 3 .15 4.42* * Metered Maximum Day Usage from 9/88 CURRENT WATER SOURCES Average Annual Day (MGD) Max Day (MGD) Jupiter Water Contract 1. 6/2 .0 2 .25 Tequesta Water Treatment Plant 1. 6 2.7 (1) TOTAL 3 .2/3 . 6 4.95 (1) Contingent Upon Completion of Plant Expansion 88-037 GEE&JENSON Engineers,Architects,Planners,Inc. 1/11111/ ALTERNATIVES TO MEET FUTURE DEMAND Long-term water supply alternatives may be placed in the following broad categories: 1. Obtain additional treated water from Town of Jupiter. 2 . Expand or relocate the raw water supply source by developing an additional wellfield. 3 . Build a reverse osmosis facility and wellfield. 4. Limit population growth and/or implement conservation measures such that need for additional peak supply capacity is reduced. 5. Encourage nen-potable water supply for irrigation purposes at self courses. 88-037 GEE&JENSON Engineers,Architects,Planners,Inc.