Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 5B_12/15/1988 VILLAGE OF TEQUESTAPost Office Box 3273 • 357 Tequesta Drive Tequesta, Florida 33469-0273 • (407) 575-6200 'VILLAGE R ' S REPORT NOVEMBER 28, 1988 - DECEMBER 9, 1988 1. November 28, 1988 a) Letter to Robert E. Smith concerning TAVT Newsletter; State Mandates. b) Letter to Brantley North, Commercial Service Representative, Florida Power & Light Co. , pertaining Village of Tequesta Utility Service Policy. c) Letter to Tom Wagner, Construction Services Designer 1, Florida Power & Light Co. , relative to clarifying Village of Tequesta Utility Service Policy. d) Letter to Rick Arras, President, Perkins Restaurants, Inc. . in connection with the proposed Perkins Restaurant, Tequesta. e) Letter to Mr. Alan Rothmann, Permit Engineer, Florida Department of Transportation, relative to request for median alteration at intersection of Intracoastal Circle and U.S. Highway One North (SR5) necessary for Intracoastal Villas Subdivision in Tequesta. 2. November 29, 1988 a) Memorandum to Village Council concerning Proposed Bank Atlantic at County Line Plaza; Site Plan Review. b) Memorandum to Scott D. Ladd, Building Official pertaining to Cypress Drive Drainage Project Areas Required to Provide On-Site Drainage. 3. November 30, 1988 a) Memorandum to Village Council pertaining to Notice of Appeal of Community Appearance Board Decision relative to Perkins Restaurant. b) Letter to John C. Randolph, Esq. , Village Attorney, relative to Preparation of Village of Tequesta Rights-of-Way Protection Ordinance. Village Manager's Report November 28 - December 9, 1988 Page Two - c) Memorandum to Bill C. Kascavelis, Finance Director/Clerk enclosing correspondence pertaining to Zoning Variance Application Refunds. d) Letter to Messrs. Edwin J. Nelson and William Hart, enclosing check for $300.00 refunding payment for a Zoning Variance Application. 4. December 1, 1988 a) A meeting was held by the Village Council at 5:30 P.M. in the Village Hall Council Chambers. 5. December 2, 1988 a) A notice of Public Safety Committee meeting scheduled for Wednesday, December 7, 1988 at 9:30 A.M. was sent to Committee members and news media. b) The Community Appearance Board held a meeting at 9:30 A.M. in the Building Department office. c) Memorandum to Village Council pertaining to Village of Tequesta Resolution No. 19- 87/88; State Mandates Without Funding. d) Memorandum to Village Council relative to Tequesta Drive Improvement Project; Right- of-Way Acquisition. 6. December 5, 1988 a) Letter to David Hinsa, Executive Director, Palm Beach County Municipal League regarding authorization of Tequesta Village Manager to vote in the absence of Tequesta designated representatives to the Palm Beach County Municipal League. b) Letter to John C. Randolph, Esq. , Village Attorney enclosing Revised Ordinance No. 379. c) Letters to four (4) Town and City Managers requesting information on Annual Salary Survey of their municipality. } Village Manager's Report November 28 - December 9, 1988 Page Three - d) Letter to John H. Flynn, President, Palm Beach Blood Bank, Inc. enclosing Village of Tequesta Proclamation pertaining to National Volunteer Blood Donor Month, January 1989. 7. December 6, 1988 a) The Tequesta Planning Commission held a meeting at 7:30 P.M. to discuss the possibilities of restoring the Tequesta Plaza (Old Publix) and Lighthouse Plaza (K- Mart and Winn-Dixie) . 8. December 7, 1988 a) Memorandum to Village Council enclosing interim financial statement for the fiscal year ended September 30, 1988. b) A Public Safety Committee meeting was held at 9:30 A.M. in the Village Hall Council Chambers. c) Letter to Kenneth G. Greenwood, Palm Beach County Forester, enclosing Village of Tequesta Ordinances in accordance with his request. d) Letter to Carlos Berrocal, Esq. , enclosing copy of Village of Tequesta Franchise Agreement with Centel Cable. e) Letter to Eugene Caputo, President, Executive Management and Engineering Consultants, Inc. , relative to Village of Tequesta Draft Comprehensive Plan. f) Letter to Jack L. Horniman, President, JLH Associates enclosing an executed copy of agreement for services. 10. The Water System Analysis is as follows: November October November WATER QUALITY 1988 1988 1987 pH 7.5 7.5 7.3 M. Alkalinity . . . . 195 195 161 Total Hardness . . . 197 197 179 Calcium Hardness . 190 190 170 Color 11 11 10 Iron 05 05 .07 Chlorides 98 97 n/a Turbidity 26 15 .17 Village Manager's Report November 28 - December 9, 1988 Page Four - 11. The following is a summary of water pumpage usage for the month of November 1988. NOVEMBER 1988 NOVEMBER 1987 TEQUESTA WATER TREATMENT PLANT Treated Water Pumped 50. 603 m.g. 40.139 m.g. Maximum Day 2.057 m.g. 1.719 m.g. Minimum Day 1.195 m.g. .635 m. Average Day 1.687 m.g. 1.338 m.g. Backwash Water Used 2.360 m.g. 1.053 m.g. Hydrant Flushing .000 m.g. .000 m.g. WATER PURCHASED FROM JUPITER Total Pumped 50.651 m.g. 42.181 m.g. Maximum Day 2.406 m.g. 2.171 m.g. Minimum Day .598 m.g. .503 m.g. Average Day 1.688 m.g. 1.406 m.g. TOTAL DISTRIBUTION SYSTEM PUMPAGE Total Pumped 98.439 m.g. 82.320 m.g. Maximum Day 4.028 m.g. 3.460 m.g. Minimum Day 2.655 Average Day m.g. 2.195 m.g. 3.281 m.g. 2.744 m.g. Metered Services 4, 125 3, 962 Rainfall 3.04" 6.95" Jupiter Yearly contract at 1. 5 m.g.d. . . . 547.500 m g. Received from Jupiter to-date 207.993 m.g. 339.507 m.g. /mk