HomeMy WebLinkAboutDocumentation_Regular_Tab 5B_12/15/1988 VILLAGE OF TEQUESTAPost Office Box 3273 •
357 Tequesta Drive
Tequesta, Florida 33469-0273 • (407) 575-6200
'VILLAGE R ' S REPORT
NOVEMBER 28, 1988 - DECEMBER 9, 1988
1. November 28, 1988 a) Letter to Robert E. Smith concerning TAVT
Newsletter; State Mandates.
b) Letter to Brantley North, Commercial
Service Representative, Florida Power &
Light Co. , pertaining Village of Tequesta
Utility Service Policy.
c) Letter to Tom Wagner, Construction Services
Designer 1, Florida Power & Light Co. ,
relative to clarifying Village of Tequesta
Utility Service Policy.
d) Letter to Rick Arras, President, Perkins
Restaurants, Inc. . in connection with the
proposed Perkins Restaurant, Tequesta.
e) Letter to Mr. Alan Rothmann, Permit
Engineer, Florida Department of
Transportation, relative to request for
median alteration at intersection of
Intracoastal Circle and U.S. Highway One
North (SR5) necessary for Intracoastal
Villas Subdivision in Tequesta.
2. November 29, 1988 a) Memorandum to Village Council concerning
Proposed Bank Atlantic at County Line
Plaza; Site Plan Review.
b) Memorandum to Scott D. Ladd, Building
Official pertaining to Cypress Drive
Drainage Project Areas Required to Provide
On-Site Drainage.
3. November 30, 1988 a) Memorandum to Village Council pertaining to
Notice of Appeal of Community Appearance
Board Decision relative to Perkins
Restaurant.
b) Letter to John C. Randolph, Esq. , Village
Attorney, relative to Preparation of
Village of Tequesta Rights-of-Way
Protection Ordinance.
Village Manager's Report
November 28 - December 9, 1988
Page Two -
c) Memorandum to Bill C. Kascavelis, Finance
Director/Clerk enclosing correspondence
pertaining to Zoning Variance Application
Refunds.
d) Letter to Messrs. Edwin J. Nelson and
William Hart, enclosing check for $300.00
refunding payment for a Zoning Variance
Application.
4. December 1, 1988 a) A meeting was held by the Village Council
at 5:30 P.M. in the Village Hall Council
Chambers.
5. December 2, 1988 a) A notice of Public Safety Committee meeting
scheduled for Wednesday, December 7, 1988
at 9:30 A.M. was sent to Committee members
and news media.
b) The Community Appearance Board held a
meeting at 9:30 A.M. in the Building
Department office.
c) Memorandum to Village Council pertaining to
Village of Tequesta Resolution No. 19-
87/88; State Mandates Without Funding.
d) Memorandum to Village Council relative to
Tequesta Drive Improvement Project; Right-
of-Way Acquisition.
6. December 5, 1988 a) Letter to David Hinsa, Executive Director,
Palm Beach County Municipal League
regarding authorization of Tequesta Village
Manager to vote in the absence of Tequesta
designated representatives to the Palm
Beach County Municipal League.
b) Letter to John C. Randolph, Esq. , Village
Attorney enclosing Revised Ordinance No.
379.
c) Letters to four (4) Town and City Managers
requesting information on Annual Salary
Survey of their municipality.
}
Village Manager's Report
November 28 - December 9, 1988
Page Three -
d) Letter to John H. Flynn, President, Palm
Beach Blood Bank, Inc. enclosing Village of
Tequesta Proclamation pertaining to
National Volunteer Blood Donor Month,
January 1989.
7. December 6, 1988 a) The Tequesta Planning Commission held a
meeting at 7:30 P.M. to discuss the
possibilities of restoring the Tequesta
Plaza (Old Publix) and Lighthouse Plaza (K-
Mart and Winn-Dixie) .
8. December 7, 1988 a) Memorandum to Village Council enclosing
interim financial statement for the fiscal
year ended September 30, 1988.
b) A Public Safety Committee meeting was held
at 9:30 A.M. in the Village Hall Council
Chambers.
c) Letter to Kenneth G. Greenwood, Palm Beach
County Forester, enclosing Village of
Tequesta Ordinances in accordance with his
request.
d) Letter to Carlos Berrocal, Esq. , enclosing
copy of Village of Tequesta Franchise
Agreement with Centel Cable.
e) Letter to Eugene Caputo, President,
Executive Management and Engineering
Consultants, Inc. , relative to Village of
Tequesta Draft Comprehensive Plan.
f) Letter to Jack L. Horniman, President, JLH
Associates enclosing an executed copy of
agreement for services.
10. The Water System Analysis is as follows:
November October November
WATER QUALITY 1988 1988 1987
pH 7.5 7.5 7.3
M. Alkalinity . . . . 195 195 161
Total Hardness . . . 197 197 179
Calcium Hardness . 190 190 170
Color 11 11 10
Iron 05 05 .07
Chlorides 98 97 n/a
Turbidity 26 15 .17
Village Manager's Report
November 28 - December 9, 1988
Page Four -
11. The following is a summary of water pumpage usage for the month
of November 1988.
NOVEMBER 1988 NOVEMBER 1987
TEQUESTA WATER TREATMENT PLANT
Treated Water Pumped 50. 603 m.g. 40.139 m.g.
Maximum Day 2.057 m.g. 1.719 m.g.
Minimum Day 1.195 m.g. .635 m.
Average Day 1.687 m.g. 1.338 m.g.
Backwash Water Used 2.360 m.g. 1.053 m.g.
Hydrant Flushing .000 m.g. .000 m.g.
WATER PURCHASED FROM JUPITER
Total Pumped 50.651 m.g. 42.181 m.g.
Maximum Day 2.406 m.g. 2.171 m.g.
Minimum Day .598 m.g. .503 m.g.
Average Day 1.688 m.g. 1.406 m.g.
TOTAL DISTRIBUTION SYSTEM PUMPAGE
Total Pumped 98.439 m.g. 82.320 m.g.
Maximum Day 4.028 m.g. 3.460 m.g.
Minimum Day 2.655
Average Day m.g. 2.195 m.g.
3.281 m.g. 2.744 m.g.
Metered Services 4, 125 3, 962
Rainfall 3.04" 6.95"
Jupiter Yearly contract at 1. 5 m.g.d. . . . 547.500 m g.
Received from Jupiter to-date 207.993 m.g.
339.507 m.g.
/mk