October 6, 1988
:9r. Gary F. Grimm
Director
Blue Lighting Operations Center
51 S.W. 1st Avenue, Suite 1016
Miami, Florida 33130
RE: Your ADM 2-03 BLOCC IM
Dear Mr. Grimm:
This is to confirm that we are still planning the
improvements explained in my letter to
your confirmation letter of August 19.you of August 11 and
g longer than we contemplated. It's just taking
Assuming we get proper approvals from the County and
Tequesta Village Council, we
plan to start the work in mid
November. We hope that you
could
Trespassing" signs before then. We wouldlikestoll your "request from
you to send a letter to Carl R. Roderick, Chief of Police,
asking him to enforce said signs. Please direct your
correspondence to:
Mr. Carl R. Roderick
Chief of Police
Village of Tequesta
357 Tequesta Drive
Tequesta, Florida 33469
Thank you for your attention and cooperation in this
matter. If you have any questions or need additional
information, please contact me at (407) 747-1192.
Sincerely,
rilz /17
equesta Planning Commission
JP/mk
cc: Mr. Tyrone Towil
Thomas G. Bradford, Village Manager
•
Carl Roderick, Chief of Police
,^ , j i
P.
I . .-' VILLAGE OF TEQUESTA \S
�z Post Office Boz 3273 • 357 Tequesta Drive �j
"' ��. - Tequesta.Florida 33469-0273 • (407) 746-7457 '
4 :1
PROPOSAL TO SICALYILIMIPIC NEAR THE 3SR=3DGE S R 7O7
This will provide information concerning improvements to both
sides of State Road 707 immediately
bridge. Included are actual plans, cost funding.andt of he inlandApprovals ewill
be required by The Tequesta Planning CommissionCommunityAppe Appearance
Board and the Village Council, in that order. Appearance
These improvements are required since the area has deteriorated
while growth in the North County has blossomed. Palm Beach County
continues to mow the partially grown areas on each side of the road
but has no plans to improve either the roadway or related areas. The
continual operation of vehicles in the sugar sand north of the road
and near the bridge has made it impossible for grass or even weeds to
grow. Pictures of the blemished areas will be available at each
presentation. The Tequesta Planning Commission studied this
situation and passed a motion earlier this
year
term plan for quick improvements to be followedbyta longerpana
dsmore
costly plan. This is the short term plan that will make substantial
improvements at moderate costs to be
paid
land involved lies within the Village of for Tequestat®andndwill The
presented on a 22"x28" diagram at each presentation.
The plan is to grade and cultivate the areas on both sides of
the bridge and for a distance of 300 feet west of the bridge,
followed by planting of sod adjacent to the road and sidewalks, and
random seeding the extremities.
e
restricting parking off the roadway, �iti does e hnotplan p
sto thenpublic
p caics f rom
walking to the inland waterway. In fact, the plan calls for
maintaining a natural walkway of grass or natural composites, around
the bridge and to the waterway.
This short range plan we believe, will encourage interest as
well as funding for a long range plan that would include trees,
flowers and the required water for total beautification.
Formal approvals for the short term plan have been or will be
obtained from the Palm Beach County, Permit Section of the Land
Development Division, and the current United States Government
agencies utilizing the land where any material changes will be made.
In addition to these formal agreements, we have coordinated with
those Village representatives that would be involved in the project.
These people included: Gary Preston, Director of Public Works &
Recreation; Carl Roderick, Chief of Police; G.Village Manager; and Dr. Stanley B. Jacobs, Thomas radf
Chairman, BPlannird,
ng
Commission.
•
2 _
The project cost will
approximately $1,000 for sod,Bahia tal to $7,300 which will include
posts and signs, $1, 850 for top soil, S500 for
woodeilizer and g , and $3, 950 for machine seeding along with
fertilizer
estimates andcut and Gary Rood Landscape Company
signs to be installed by the PublicsWorkston a&eMainten the timatemofe the soil
Maintenance Department and
Realizing the success of
tree project recently completed onrU.S. Highway ivate g1, we for m went otote
and interested bodies that regularly travel S.R. 707. The resultpalm
been various
positive and the following funding is proposed: has
o The Jupiter Inlet Colony, through the
Colony Garden Club
$1,000
o Jupiter Inlet Colony Town Commission
o Beach Road Association (16 1,300
Condominiums) 4, 500
o Village of Tequesta
Thee 500
preseThetiprivateorefundinghe approvals will be received prior to
the
theVillageCouncil. If the Village Council
be approvesvered by project but not the $500.00 from their budget, it will
be covered by heasametparty. party. Also, any overruns in cost will
party.
Relative to timing, we hope to have all required
understandings in time for q approvals or
meeting on November 3rd, with actualnwork obeginning n at ®byVmidallovember.
November.
Respe fully bmitted,
J . Pilz, 40.ber
uesta Pla,p ng Commission
JWP/mk
cc: Tequesta Planning Commission
Community Appearance Board
Thomas G. Bradford, Village Manager
•
•
• I . -i VILLAGE OF TEQUESTA
•
�t1•` y Post Office Box 3273 • 357 Tequesta Drive
3 Tequesta, Florida 33469-0273 • (407) 746-7457
October 4, 1988
Mr. Jim Peters
Permit Section
Land Development Section
Palm Beach County
P. O. Box 2429
West Palm Beach, Florida 33402
Dear Jim:
This is to confirm my phone call
ff last week and the plans
discussed with you on my two visits to your office.
The Tequesta Planning Commission improvements along Route 707 will vote on some minimal
followedp by necessary (your AIA) this coming Monday, October 10,
"The Village Council approvals of the "Community Appearance Board" and
The Plan is to lay Bahia grass sod for six ( 6 ) feet on either
side of the roadway followed by
distance of approximately 300 feet westnofmtheeding inlandas WaterwayeBrifor dg a
A11 of this land is within the Village of Tequesta. We have decided
not to propose the more formal landsca ine.
estimate of approval time, and p g plan for two reasons: your
more formal plan is now delayed for a our lack of required dollars. The
in our long range possibilities. Year or two, but we still have it
The U.S. Government and the Department of Customs is working with
us to limit parking off the road and to restrict trespassing inside
their property to the north.
restricted, the public will stillilbee Parking off the roadway will be
inland waterway for fishing, allowed walking access to the
important. diving and picnicking. We believe this is
With proper approvals plans call for this work to commence in the
last week of October or the first week of November. Please send your
letter of understanding so we can proceed on schedule. Thank
� you.
Sincerely,
James W. P
JWP/mk Planning Co fission
Attachment (original sketch)
cc: Thomas G. Bradford, Village Manager
Dr. Stanley B. Jacobs, Chairman, Planning Commission