HomeMy WebLinkAboutDocumentation_Regular_Tab 9B_6/23/1988 _. ,, VILLAGE OF TEQUESTA
.'•1 ` ,„ Post Office Box 3273 • 357 Tequesta Drive
�' F Tequesta, Florida 33469-0273 • (407) 746-7457
MEMORANDUM:
TO: Village Council
'FROM: Thomas G. Bradford, Village Manager
DATE: June 15, 1988
SUBJECT: Engineering Services Proposal for Tequesta Drive
Water Main Relocation
In regard to the above referenced, attached hereto, please
find the following:
A) Tequesta Drive Improvement Project Time Schedule
B) Correspondence from Gee & Jenson
C) Water Main Relocation Cost Estimate
D) Engineering Services Proposal
The Tequesta Drive Improvement Project necessitates the
relocation of the water main within the project area. It is
intended that the general contractor for the Tequesta Drive
Improvement Project will undertake the water main relocation as
a part of the overall project. All costs associated with water
main relocation will be paid for by the Water Enterprise Fund.
Accordingly, the engineering design for the water main
relocation must be completed for submission within the bid
documents prepared for the Tequesta Drive Improvement Project.
According to the latest Tequesta Drive time schedule, bid
documents are scheduled for preparation beginning August 1st.
Therefore, it is imperative that the water main relocation
engineering design work be completed in a timely manner in order
to dovetail with the Tequesta Drive Improvement Project.
For this reason, I have instructed Gee & Jenson to proceed
with the design based upon the engineering services proposal
attached hereto subject to Village Council approval on June 23.
I find the engineering services proposal to be customary
and reasonable and recommend the Village Council authorize the
Village Manager to execute the same on behalf of the Village.
TGB/mk
Encls.
cc: Thomas C. Hall, Water System Manager
Thomas C. Jensen, P.E. , Gee & Jenson
Wendy K. Harrison, Admin. Asst. to the Village Manager
•
TEQUESTA DRIVE SCHEDULE
1988
•
MAY JUNE JULY AUGUST SEPT. OCT.
Remaining Tasks
N cr, — N �p In N N N in N N N N In O N M
Roadway';Ffairs a \.�
Overlay Design G(• &J) gli..... .. r ,_ •,? .. ,.,.. ,,. �.:���:'� � �F�3, .,, ���`� .,. ' . . -
;. : ..' '4
Drainage Design(G&J) th....444,:,;} y
Cypress Dr. Outfall(Teq./Jup.) « '
Railroad Coord. ^^�
K
Quantities (GaJ) • .cit ....,1% 44,4n
Cost Estimate (G&J) ts:;z�' -
Permit ( :... ::>: K :m<>::.,,
s G& J) #' ;<<"
Bid Documents (G&J) ► :_°:' r ."":•.
Right--Of Way,'. �` ;:. '::.,,, P.. . :\ \ �'
R/W Maps (G&J) ^ f im diSii
Legal Description (G&J) :«: r '" k
Sketches (G a J) r
Apprasials(Calaway&Price) r:::' .
Acquire R/W (Teq.) ' as _' .r:. ',r
do sc, (; .,... ,�.:. o \, •::., \• ..<
y ate \ ..,\':.. ... '�\\.\\\��\,. \.,. ':�:i;.: �:z3�?>'f.< � \ �\\::�:\,.,
Design (G&J 1 `:,,., .., _ �• 3.°'"�. '�<,:.,'"\ �`����.`�\,. .."a.s
gation ( a J Iitz
I rti G ) ,i smom
s.
RS
t7F`�'G.aardhictiol!`.,.. \ ..: \;ft a:
Meeting (G&J/Teq.) � ,� y „ a
Coordination (Ga J) .,�,s" >:x::: -
Water Main (G a J) - .�
Traffic'`.Operatloiis\�\�-\\ •\ \'\ �W .\ ; s;: . :%• .. .
:` �Y\r � .\
Signing a Striping
Signals(G a J,Teq., P..B.Co.) * `uIto u _ ?` ax;w':
* Work item could extend into c• onstruction.
./
G
GEE &JENSON ,� `
Engineers-Architects-
Planners,Inc. (n•
f \V .
June 6, 1988
Mr. Thomas Bradford
Village of Tequesta
P. 0. Box 3273
Tequesta, FL 33469
Re: Tequesta Drive, Water Main Relocation
Dear Tom:
As we discussed, enclosed is our revised proposal denoting a
change in our Engineering fee. Also attached is a preliminary
construction cost for this project.
If you should have any questions, please call.
Very truly yours,
GEE & JENSON
Engineers-Architects-Planners, Inc.
7-ce
Thomas C. Jensen, P:E.
TCJ/ew
21558
One Harvard Circle • P.O.Box 24600 • West Palm Beach,Florida 33416-4600 • 305/683-3301 • Telex 513472 G&J WPB
GEE&JENSON ESTIMATE SHEET _ _
Engineers.,Prchitects. OF
Planners-inc V 1 LLAG6. of- �'�e( �6��t JOB NO. T IcJSST
20;0 Porn Beoch lakes Blvd. r c s(A W M Retzcsalic0 BY ATEt ••[s'7,
Grower No 4CCO
West Fbtn Beodt FL 33402 CH K E D
ITEM DESCRIPTION QUANTITY I UNIT UNIT ESTIMATED
COST COST
•
1. 16' evG 1 Soo Lf # 215-9 38 Zoo .
Fill 11,16 /50O LDS 1. 31350 .
3. • 8" K sit -r ►Pr il-VCMs
2 EA. IUD. 3,oar
�- rticvmsT Aer1, . 1!00 s"j 18. 1 ,
Gj. M t 5C.. C M -r&e• Jam-• I
1410. ea.. • ;-- - ate.
§ 4ell 7so•
OA co i,.36E,ic( - 41975
To`AL # 94 �zs.
II
GEE&JENSON June 6, 1988
Engineers-Architect •
s-
Planners,Inc.
Village of Tequesta
Post Office Box 3273
Tequesta, Florida 33469-0273
Attn: Mr. Thomas Bradford, Village Manager
Re: Tequesta Drive, Water Main Relocation
Gentlemen:
We are pleased to submit the following proposal for professional services in
connection with the relocation of the water main within Tequesta Drive between
U.S. 1 and Fiesta Avenue and the abandonment of the existing water main.
Gee & Jenson Engineers-Architects-Planners, Inc. , hereinafter referred to as
the Engineer, proposes to furnish professional services for the Village of
Tequesta, hereinafter referred to as the Client of the scope outlined below for
the fees stipulated herein.
Scope of Services
The Engineer will perform the following:
1. Prepare design drawings and specifications setting forth the requirements
for the relocation of the water main within Tequesta Drive, between
U.S. 1 and Fiesta Drive. Note that the existing crossing under the
railroad will be utilized.
2. Prepare permit support documents for the Client submittal to the
regulatory agencies.
3. Assist the owner in receiving bids and recommending award.
4. Attend two (2) meetings with. Client.
5. Review shop drawings as submitted by the contractor for conformance
with the design documents.
6. Prepare record drawings based on information as provided by the contractor.
7. Upon satisfactory completion of construction, submit certification of
completion documents to the regulatory agencies.
One Harvard Circle • P.O.Box 24600 • West Palm Beach,Florida 33416-4600 • 305/683-3301 • Telex 513472 G&J WPB
Village of Tequesta
Mr. Thomas Bradford
June 6, 1988 - Page 2
8. Provide construction observation services during construction.
9. Additional services mutually agreed upon by both parties.
Items to be Furnished by Client
At No Expense to the Engineer
Assist Engineer by furnishing, at no cost to the Engineer, all available
pertinent information including previous reports and any other data relative to
performance of the above services for the project.
Designate in writing a person to act as the Client's representative with respect
to the services to be performed under this Agreement. Such person shall have
complete authority to transmit instructions, receive information, interpret and
define the Client's policies and decisions with respect to materials, equipment,
elements and systems pertinent to the Engineer's services.
Please note special conditions for invoicing items necessary to perform the
services, that are ordered or purchased by the Engineer which should be
furnished by the Client under section "Fees to be Paid".
(3a) 6j Time of Performance
tems 1 through 4 of the Scope of Services will be completed within ninety
calendar days after receipt of Notice to Proceed except for delays beyond
the control of the Engineer.
Items 5 through 8 of the Scope of Services will be completed commensurate with
the construction schedule which we estimate to be ten (10) weeks.
Fees to be Paid
For Items 1 through 4 of the Scope of Services the Engineer shall be paid a lump
sum fee of Five Thousand Five Hundred Dollars ($5,500).
For Items 5 through 8 of the Scope of Services the Engineer shall be paid a fee
equal to personnel costs times a factor of 2.40.
We estimate the cost of Items 5 through 8 to be $5,800. It should be emphasized
that this estimate is for budget purposes only and should not be considered a
guaranteed amount.
GEE&J ENSON Engineers,Architects,Planners,Inc.
, I
Village of Tequesta
Mr. Thomas Bradford
June 6, 1988 - Page 3
In addition to the fees specified above, the Engineer shall be reimbursed for direct
nonsalary expenses, including, but not limited to, data processing, equipment
rental , automobile travel at $0.27 per mile, $0.49 per mile for four-wheel drive
and trucks, long distance telephone, subsistence, printing and reproduction,
plus Florida sales taxes, if applicable.
Invoices for services rendered are prepared monthly and are due and payable
within twenty-one (21) days from date of invoice.
Payments which are not received within sixty (60) calendar days from the date
of invoice will be considered sufficient cause for Engineer to discontinue
, performing and providing services until payment in full is received. If
Engineer is required to' take action to collect past due invoices the Client will
•
pay all legal fees and costs. Should a court decide upon payment of these
invoices the prevailing party shall receive payment of the Attorney's fees.
This contract shall be governed by the laws of the State of Florida, and the
appropriate venue for any actions arising out of the agreement would be West
Palm Beach, Florida.
Resident Project Services
On any project for which construction drawings and specifications were prepared
by the Engineer and a certification of construction is required by a regulatory
agency, the Client shall employ the Engineer to perform resident project services
for observation of the construction work. Unless the Engineer is engaged for
resident project services, they will not be in a position to certify the work
to those regulating agencies having jurisdiction and requiring certification.
Project representation may require one or more full or part-time project representa-
tives, depending upon the requirements of the project. The project representative
will endeavor to provide protection for the Client against defects and deficiencies
in the work of the Contractor. However, the furnishing of resident project
services does not guarantee the work of the Contractor, nor assume liability on
the part of the Engineer for job safety or the performance of the Contractor.
Termination _
This Agreement may be terminated by either party by giving thirty (30) days
advance written notice. The Engineer shall be paid for services rendered to the
date of termination on the basis of a reasonable estimate of the portion of
services completed prior to termination and shall be paid for all reasonable
expenses resulting from such termination and for any unpaid reimbursable expenses.
GEE&JENSON Engineers,Architects,Planners,Inc.
Village of Tequesta
Mr. Thomas Bradford
June 6, 1988 - Page 4
Acceptance
Acceptance of this proposal may be indicated by the signature of a duly authorized
official of the Client in the space provided below. One signed copy of this
proposal returned to the Engineer will serve as an Agreement between the two
parties and as Notice to Proceed. This contract will be binding on the parties
hereto and the parties' successors and assigns. Should this proposal not be
accepted within a period of sixty (60) days from the above date, it shall
become null and void.
Very truly yours,
GEE & JENSON
Engineers-Arc ' ects-P1 ers, Inc.
. Go a .E.
Senior Vice President
Accepted by:
THE VILLAGE OF TEQUESTA
By:
Date:
DLG/TCJ/jef
21558
GEE&JENSON Engineers,Architects,Planners,Inc.