Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 6A_6/9/1988 a T a VILLAGE OF TEQUESTA WATER DEPARTMENT z , ! / ,(o ��t� a Post Office Box 3474 • 357 Tequesta Drive s Tequesta, Florida 33469-0474 • (305) 746-4595 ��' �% a iz _ eft • co 4 Vox, I O MEMORANDUM: TO: Thomas G. Bradford, Village Manager FROM: Thomas C. Hall, Water System Manager al SUBJECT: Heritage Oaks Modifications DATE: June 3, 1988 Based on the information received from Gee & Jensen relative to the above, I recommend Stuart Engineering Contractors be awarded contract for this job. As you are aware, previous low bid was $29,725.00 and the contractor would not negotiate any lower. After further consultation with Gee & Jensen we were able to delete a portion of the job and submit for rebids with a more realistic figure. I would like Council approval so this job may proceed and be completed in a timely manner. TCH/j ... t GEE &JENSON Engineers-Architects- March 26 1988 Planners,Inc. i Mr. Tom Bradford Village of Tequesta Post Office Box 3273 Tequesta, Florida 33469-0273 Re: Heritage Oaks Water System Modifications Dear Tom: The rebid of the above project was conducted on May 25 , 1988 at 2:00 pm. Two (2) contractors submitted bids: - .Stuart Engineering Contractors $23,600 Vicon Construction $29,466 We feel that Stuart Engineering can adequately handle this project and recommend award to them for the amount shown above. Note that the rebid generated a savings of approximately $6,000 from the low bidder on the original bid. If you should have any questions, please don' t hesitate to call. Very truly yours, GEE & JENSON Engineers-Architects-Planners, Inc. Thomas C. Jensen, P.E. TCJ/jef 88060 cc: Tom Hall One Harvard Circle • P.O.Box 24600 • West Palm Beach,Florida 33416-4600 • 305/683-3301 • Telex 513472 G&J WPB