Loading...
HomeMy WebLinkAboutDocumentation_Regular_Tab 12_6/8/2023Agenda Item #12. Regular Council STAFF MEMO Meeting: Regular Council - Jun 08 2023 Staff Contact: Marjorie Craig, Utilities Director Department: Utilities Utilities Department Update qw Attached please find the monthly Utilities Department report. This document and any attachments may be reproduced upon request in an alternative format by completing our Accessibility Feedback Form, sending an e-mail to the Village Clerk or calling 561-768- 0443. PROJECT NAME: N/A Proposed: N/A PROJECTED TOTAL: N/A None. BUDGET: N/A ENCUMBERED: N/A Projected Remaining: N/A 23.0526.MAY for JUN VC Mtq Utilities Update MGCraig Page 183 of 768 Agenda Item #12. Village 345 Tequesta Drive Tequesta, FL 33469 of Tecluesta vy'0A 0! 7jo4•'�A S s �tF � coin To: The Honorable Mayor and Village Council Through: Jeremy Allen, Village Manager From: Marjorie G. Craig, PE, Director, Utilities Department Date: May 26, 2023 Re: Utilities Department Monthly Report The Utilities Department monthly report for May is found below: 561-768-0700 www.tequesta.org Stormwater • El Portal — contract executed, expect to issue notice to proceed and hold the kick off meeting in June • FDEP Vulnerability Assessment Grant/ Project — consultant continuing inland modeling; targeting late summer/ early fall for public outreach • Heavy summer rain — MaV24th —Tequesta experienced heavy rainfall on May 24t" and flooding was observed on Tequesta and Willow, but did drain fairly quickly, in a few hours. Lowering the weir at Tequesta and Cypress did not help as much as hoped but this area is low and has had historic flooding. The exfiltration trench at Willow was checked, has mulch from the rain runoff but did not appear blocked but it will get cleaned. Other possible options are being evaluated. Below are photos from May 24, 2023 and October 2022 Picture 1 - May 24, 2023 Tequesta Dr & Willow - Heavy Rain This document may be reproduced upon request in an alternative format by contacting the Village Clerk's Office at 561-768-0440 or by completing our accessibility form: https://bit.ly/3mnfeU4 Page 184 of 768 No Text Agenda Item #12. Pictures - October 2022 Heavy Rain Event- Tequesta & Willow Page 3 of 5 Village of Tequesta Page , of 768 Agenda Item #12. Water • Water Treatment Plant Projects - projects are in ongoing stages for the water treatment plant o The water plant now has a lab that is NELAC certified to perform bacteriological testing!!! This will reduce the length of time that customers are out of water service when there is a water pipe break or meter replacement 1 Figure 3-Joe O'Connor and Chance Fell with NELAC Certification for Performing Bacteriological Tests at the Water Treatment Plant o SCADA modifications for critical ongoing communication issues are being scheduled for implementation o Water tank repair contract — under consideration for approval by Council on this agenda o Preparing water tank painting contract — procurement o Water Treatment Plant Improvement Project — amendment #2 to the original agreement; modified scope developed for addressing hydraulic issues at the plant including pump number 7— work authorization for the design is on the agenda for consideration of approval o Membrane replacement design — Dover Engineering — in design for train 42 (there are three trains of membranes) Page 4 of 5 Village of Tequesta Page of 768 Agenda Item #12. Other • Online Payment System for Water Utility Bills — the new payment system "Invoice Cloud" successfully went live last week, replacing "Point to Pay' • Hurricane and Emergency Preparedness — utilities is working with the Fire Department on preparations for this year's hurricane season • Budget o FY24 draft budget recommendations have been at the forefront of utilities discussions • Asbuilt Scanning- scanning of our utilities asbuilts was successfully initiated with the goal of loading an asbuilt layer in our GIS system; there are many benefits to this effort • Summer Intern — Melanie Garro was selected as our new engineering intern o Learning about the Village and running a utilities department (some things so far): ■ Engineering plans ■ Water treatment ■ Stormwater/ NPDES permit/ stormwater requirements ■ Projects ■ Budget process o Vulnerability assessment — has been reviewing all documents and the draft model o Beach Road Phase I I —design meeting, field meeting o Coordinating time with the Loxahatchee River District (LRD) and the Solid Waste Authority (SWA) Page 5 of 5 Village of Tequesta Page of 768 Agenaa item wiz. M a 0 ", U F2 agwa� F� aqua Fr agtia FS s ryas F2 rya `c� �aa b F�% - O Fr Fra P v 3 F w qJP� Fly 2y N F P7 � tpJ m N `�2 N� Al o y�j y p ■ -GP' .'A+ 7 Z Ppga F LL 2 aq �a'a LL 22 . 2 ~a9 O a q wao N LL aq4. a' 2�r a0 wa tia 2F �o qo10 rF �O2 aq 2 a a:a:o����o�o� ° qO' O °lb a F� a Fr a O Fr a g4'af Fr s ryas Fr s aaS O Fr s aaS �b Fr �b F� ■ F b aryl. Q aG7 l II > = O c ra4 U' f0 > TFri✓ 6' N ai EO ° E _ b p ZP L ZP v Fr ■ qa - F y �, Cm 77 �9a ZP2 N7G 2� a � PP4 � a N rZP 91 k,ea F a�O2 ago�'O 22 �o I� a w O aq a ti �O2 0000000000 0000000000 aqo Off. ■ 2r q° d 000000oo000 0 0 0o io v ,� O Page 189 of 768