HomeMy WebLinkAboutDocumentation_Regular_Tab 10_8/10/2023Agenda Item #10. Regular Council STAFF MEMO Meeting: Regular Council - Aug 10 2023 Staff Contact: Marjorie Craig, Utilities Director Department: Utilities Utilities Department Monthly Report qw Attached please find the monthly Utilities Department report. This document and any attachments may be reproduced upon request in an alternative format by completing our Accessibility Feedback Form, sending an e-mail to the Village Clerk or calling 561-768- 0443. BUDGET AMOUNT N/A FUNDING SOURCES: N/A DID YOU OBTAIN 3 QUOTES? ❑ Yes 0 N/A AMOUNT AVAILABLE N/A EXPENDITURE AMOUNT: N/A IS THIS A PIGGYBACK: ❑ Yes 0 N/A COMMENTS/EXPLANATION ON SELECTION Not related to a procurement item N/A 23.0729.JUL for AUG VC Mtg Utilities Update pkq Page 110 of 250 Agenda Item #10. Village 345 Tequesta Drive Tequesta, FL 33469 of Tecluesta vy'0A 0! 7jo4•'�A S s � coin To: The Honorable Mayor and Village Council Through: Jeremy Allen, Village Manager From: Marjorie G. Craig, PE, Director, Utilities Department at Date: July 28, 2023 Re: Utilities Department Monthly Report The Utilities Department monthly report for June is found below: Stormwater 561-768-0700 www.tequesta.org • El Portal —joint project with Public Works — includes road/ sidewalk improvements o Received SFWMD dewatering permit o Structures on order (10 catch basins, 2 exfiltration trenches, and 2 yard drains) and once received, construction expected to take six weeks o Then swales and sidewalks will be installed o Completed project video with Doug and the Mayor on Friday July 141n • FDEP Vulnerability Assessment Grant/ Protect o Engineering intern, Melanie Garro, updated Council at the July 31't Council workshop o Working with JEA to close data gaps and if needed, apply for additional resiliency funding o Public outreach workshop to get feedback on the study and status is scheduled in Council Chambers for Wednesday, August 161" from 6-8PM • Dover Ditch — shared project with Town of Jupiter o All LRPI grants have been approved by the Governor which includes Dover Ditch o CMA performing design and permitting o CORPS permit estimated to take 6-9 months, possibly up to a year Water • Consumer Confidence Report (CCR) o The annual "Consumer Confidence Report" was posted and distributed last month, as required by the EPA • Water Treatment Plant Projects - projects are in ongoing stages for the water treatment plant o SCADA modifications for critical ongoing communication issues scheduled o Water tank repair contract with Crom — repairs completed — tanks are good — no internal issues found This document may be reproduced upon request in an alternative format by contacting the Village Clerk's Office at 561-768-0440 or by completing our accessibility form: https://bit.ly/3mnfeU4 Page 111 of 250 Agenda Item #10. o WTP Improvements — project is being modified per the approved revised scope o Membrane replacement design — Dover Engineering — in design for train #2 (there are three trains of membranes, all three will be replaced within the next year or so) o Unregulated contaminant monitoring rule (UCMR) pre-screening sampling : Pace has not finalized the results • WM#1 & #4 —Tequesta Dr and Country Club Dr o Loxahatchee River District still conducting sewer pipe lining o B&B Construction ordering materials and provided pre -construction submittals o Will be sending out letters to residents • WM#2 Beach Rd Phase 2 o Final design almost complete with meter and bypass modifications o This will be the next project bid with a target bid date by September Other • Our engineering intern has completed her summer with the Village and returned to OF and the marching band iVA6 Picture 1-Water Tank Inspection & Repair 1 (Water Treatment Plant Site) Page 2 of 2 Village of Tequesta Page , of 250 Agenaaimm wiu a \ ) : K G � « J I = � y& ) � . �:,% %9% � %$ } } } } } \ �o % � \ L k - >\ Ol / \� k 1 \ ~ \ R = « ��� . ƒ\ 1�,« \ � �§ � \ � � �� } • { % e ® � \ « » � s \ \ \ \ \ \ \ \ \\\\\\(\\ § E ° Page 113 7 250