Loading...
HomeMy WebLinkAboutDocumentation_Planning and Zoning_Tab 03_8/17/2023Agenda Item #3. Planning and Zoning Board , STAFF MEMO f� Meeting: Planning and Zoning Board -Aug 17 2023 Staff Contact: Lance Lilly, Senior Planner Department: Community Development TITLE SPR 1-23: Application from 250 BEACH ROAD DEVELOPER LLC for a site plan review to build a ten (10) story 34-unit multi -family 289,237 sq. ft. condominium building including one (1) monument sign, two (2) swimming pools, and a landscaping plan. The subject property is located at 250 Beach Road, Tequesta, FL 33469. SPR 1-23: Application from 250 BEACH ROAD DEVELOPER LLC for a site plan review to build a ten (10) story 34- unit multi -family 289,237 sq. ft. condominium building including one (1) monument sign, two (2) swimming pools, and a landscaping plan. The subject property is located at 250 Beach Road, Tequesta, FL 33469. This document and any attachments may be reproduced upon request in an alternative format by completing our Accessibility Feedback Form, sending an e-mail to the Village Clerk or calling 561-768- 0443. BUDGET INFORMATION: BUDGET AMOUNT N/A AMOUNT AVAILABLE N/A EXPENDITURE AMOUNT: N/A FUNDING SOURCES: N/A IS THIS A PIGGYBACK: ❑ Yes ❑ N/A DID YOU OBTAIN 3 QUOTES? ❑ Yes ❑ N/A COMMENTS/EXPLANATION ON SELECTIONN/A 8-11-23 SPR 1-23 250 Beach Road PZ Staff Report 250 beach road - DRC LETTERS Design Guidelines VOT 5.11.23 250 Beach Road LOMR Report D21120 Signed 2023 05-12 Access Easement Document TECO - NO Service Confirmation VOT - Water Confirmation Page 89 of 237 Agenda Item #3. Sewer Availability Letter Agent Consent Comcast Confirmation to Serve letter - Sufficient Capacity SCAD Letter PBC Endangered Species Assessment 230213 250 Beach Road 2-28-23 Traffic Statement Site Plan Application Justification 5.12.23 Location Map Architectural Plans Engineering Plans 8.7.23 250 Beach Road Page 90 of 237 Agenda Item #3. VILLAGE OF TEQU ESTA `= DEPARTMENT OF COMMUNITY DEVELOPMENT Staff Report — Planning and Zoning Board Public Hearing — August 17, 2023 1. PETITION DESCRIPTION- SPR 1-23 APPLICANT: Gentile, Glas, Holloway, O'Mahoney & Associates Inc. 1907 Commerce Lane, Suite 101 Jupiter, FL 33458 OWNER: 250 Beach Road Developer LLC. REQUEST: SPR 1-23: Application from 250 BEACH ROAD DEVELOPER LLC for a site plan review to build a ten (10) story 34-unit multi -family 289,237 sq. ft. condominium building including one (1) monument sign, two (2) swimming pools, and a landscaping plan. The subject property is located at 250 Beach Road, Tequesta, FL 33469. LOCATION: 250 Beach Road Tequesta, FL 33469 LOCATION MAP !I 1 Department of Community Development - Staff Report — 250 Beach Road - SPR 1-23 Page 91 of 237 Agenda Item #3. 2. PETITION FACTS a. Total Gross Site Area: 139,626 Sq. Ft. (3.21 Acres) b. Total Building Footprint Area: 45,516 sq. ft. c. Total Building Square Footage: 289,237 sq. ft. (main building) d. Density: 10.61 D.U./Acre Total: 34 Units e. Building Height: 10 stories / 10V-0" Above Average Crest of Dune f. Land Use and Zoning EXISTING LAND USE FUTURE LAND USE ZONING Multiple Family Medium Density R-3 SUBJECT PROPERTY Residential /Residential Residential (5.4-12.0 (Multiple Family DU per acre) Dwelling District) NORTH Multiple Family Medium Density R-3 300 Beach Road Residential Residential (5.4-12.0 (Multiple Family DU per acre) Dwelling District) SOUTH Multiple Family Medium Density R-3 200 Beach Road Residential Residential (5.4-12.0 (Multiple Family DU per acre) Dwelling District) EAST N/A N/A N/A Atlantic Ocean WEST Multiple Family Medium Density R-3 275 Beach Road Residential Residential (5.4-12.0 (Multiple Family DU per acre) Dwelling District) 3. BACKGROUND The subject site includes an existing five (5)-story multifamily condominium building "Regency Condominiums" that was built in 1967. This building consists of twenty-seven (27) units and one (1) swimming pool. In August 2022, 250 Beach Road Developer LLC. purchased the property with the intention to redevelop the subject site. On September 8, 2022, 250 Beach Road Developer LLC presented to the Village Council a conceptual plan for a 34-unit multifamily building. On September 29, 2022, following the conceptual presentation, 250 Beach Road Developer LLC submitted a Site Plan Review application to build a ten (10) story 34-unit multifamily condominium building on the subject site including one (1) monument sign, two (2) swimming pools, spas, and a landscaping plan. The applicant has proposed to demolish the existing building. In May 2022, the Village of Tequesta began the public participation process to prepare Design Guidelines and series of code revisions for the Beach Road Corridor (R-3 Zoning District). On January 12, 2023, the Village Council approved the subject Design Guidelines. The Design Guidelines incorporated urban design principles for the Beach Road Corridor pertaining to building design, site planning, landscaping, and the public streetscape. At the same meeting (1/12/2023), the Village also adopted Ordinance 16-22, which changed the landscape requirements within the Village and the R-3 Zoning District. 2 Department of Community Development - Staff Report — 250 Beach Road - SPR 1-23 Page 92 of 237 Agenda Item #3. Subsequently, on February 9, 2023, the Village adopted Ordinance 2-23, which incorporated the Design Guidelines into the Village Code and revisions to the site regulations in the R-3 Zoning District. Although the Village adopted new regulations, since the subject application was submitted prior to the adoption of the Beach Road Design Guidelines and code changes, the Applicant is not required to adhere to the guidelines and code modifications. Nevertheless, the Applicant provided a copy of their completed Design Guidelines checklist as part of their site plan application (see attached checklist). 4. DEVELOPMENT REVIEW The Development Review Committee (DRC) reviewed the subject application for compliance with Village Code, State, and Federal applicable regulations. The DRC includes Community Development, Law Enforcement, Landscaping, Building, Fire Safety, the Water Department, Civil, and Traffic Engineering. ZONING REVIEW R-3 Zoning REQUIRED BY CODE PROPOSED COMMENTS District Minimum 10,000 sq. ft. for the first multifamily 139,626 sf (3.21 In compliance Lot Size dwelling unit, plus 3,356 sq. ft. for each acres) additional dwelling unit to a maximum of 12 34 dwelling units dwelling units per acre. Minimum 80 ft. Lot Width: 292.95" In compliance Lot Width 200 ft. 3 3Minimum buildable lot depth cannot Lot Depth: include submerged lands, conservation 470.61' easement areas, protected wetlands, mangrove stands or similar protected areas. Accessory structures, not exceeding one story/ten feet in height, may be constructed on lots with less than the minimum lot depth. Setbacks (R-3) Front Yard Main Structure: 20 ft. Main Structure: In compliance Accessory: 0 ft. for an accessory structure Tower — 43' not exceeding one story/10 ft. in height used for the parking of vehicles only (covered parking) and provided that the design of the front of the covered parking structure includes fully landscaped grade and/or raised planters that provide a minimum of 10 ft. of landscaped width along the full frontage of the covered parking structure. Rear Yard Main Structure: 20 ft. plus 2 ft. for each Main Structure: In compliance additional 10 ft. or portion thereof over 50 ft. Garage 210.2' in height of the main building or structure. Accessory: Accessory: 10 ft. for any accessory one-story Sea Wall/Pool Deck building or structure. Plus 2 ft. for each 158.8' additional story of the accessory building or structure. 3 Department of Community Development - Staff Report — 250 Beach Road - SPR 1-23 Page 93 of 237 Agenda Item #3. R-3 Zoning REQUIRED BY CODE PROPOSED COMMENTS District Side Yard - Main Structure: 20 ft. plus 2 ft. for each Main Structure: 35' In compliance North additional 10 ft. or portion thereof over 50 ft. in height of the main building or structure. Side Yard - Main Structure: 20 ft. plus 2 ft. for each Main Structure: In compliance South additional 10 ft. or portion thereof over 50 ft. 32' in height of the main building or structure. Accessory: 26.5' Lot Max 35% 45,516 sf (33%) In compliance Coverage Building 11 stories/101 ft. measured from the average 10 stories / 101' In compliance height of the crest of the sand dune line, for Height crest of the Dune main building or structure east of Beach Road, and measured from grade west of Beach Road. 4 2 stories/20 ft. for any accessory building or structure. Parking Sec. 78-705 (8): Total Number: 73 In compliance c. Multiple -family: Two spaces per dwelling spaces (2 exterior, unit. 71 spaces in the REQUIRED: 68 spaces (for 34 residential garage - 2 per unit) units) ADA: 3 (interior) Landscape Min 30% 37% (51,753 sf) In compliance Open Space Per Sec. 78-331 (h)(7): All development New 6' sidewalk In compliance Sidewalks and/or major redevelopment shall provide a (Applicant will minimum five -foot -wide continuous sidewalk provide a new for pedestrian travel sidewalk) Public Streetscape Currently, the existing streetscape and utilities at the subject property include a linear sidewalk and overhead power lines. The Applicant is proposing a meandering sidewalk with a bench and increased landscaping to comply with the Beach Road Design Guidelines. In addition, the existing overhead power lines will be buried underground. Existing Easement The subject property has an existing easement on the northern portion of the property, which provides access for residents of Seamist to the Atlantic Ocean. The Applicant has proposed to improve the existing walkway and replace it with a new 5' walkway. The easement will be gated and only provide access for easement holders, and it will also include a Knox box for public safety access (Police and Fire Rescue). Signage The application includes one monument sign, which complies with Village Code Sec. 78-740 (b) "Freestanding sign: One freestanding sign shall be allowed, not to exceed 30 square feet in total area, with a maximum height of seven feet above finish grade. The sign shall meet the setback requirement of Section 78-739. Up to 50 percent of the approved sign may be used as a changeable letter reader sign. 4 Department of Community Development - Staff Report — 250 Beach Road - SPR 1-23 Page 94 of 237 Agenda Item #3. Landscaping and irrigation at the base of any such signage shall be required." See drawing SP-3 for square footage, material, color, and font. The applicant is proposing a sign that is six (6) feet two (2) inches in height and the sign copy area is 24 sf. Level of Service Per Division 2, Sec. 78-331, the subject application was reviewed for compliance with Level of Service standards. See attached review letter from Mr. David Cowan, P.E., Civil Engineering consultant from Chen Moore and Associates. Development Phases Infrastructure and buildings will be developed in one phase. Agency Approvals Per Division 2, Sec. 78-331 (g), the Applicant provided agency letters and statements as follows: (1) Palm Beach County Health Department. APPLICANT PROVIDED STATEMENT. "Letter/Copy of permit to follow, when a permit is obtained." (2) Tequesta Fire -Rescue Department (Fire Marshal). APPLICANT PROVIDED STATEMENT. "Letter/Copy of permit to follow, when a permit is obtained." (3) Loxahatchee River Environmental Control District (ENCON). PROVIDED (4) Department of Environmental Resources Management (DERM). Applicant: (5) South Florida Water Management District (SFWMD). APPLICANT PROVIDED STATEMENT. "Letter/Copy of permit to follow, when a permit is obtained." (6) Florida Department of Transportation (FDOT).� (7) Reserved. (8) Metropolitan Planning Organization of Palm Beach County (MPO)._ N A (9) Palm Beach County Traffic Engineering Division. PROVIDED (10) Martin County Metropolitan Planning Organization. N/A (11) Martin County Traffic Engineering Department. N/A (12) Florida Power &Light Company. PROVIDED (13) Telephone service provider, as applicable. PROVIDED (14) Solid waste purveyor. PROVIDED (15) Tequesta Water Department. PROVIDED (16) Other municipal, county, state and/or federal agencies as may be applicable. (17) Environmental Assessment Analysis (EAA). PROVIDED Additional reviews and letters will be provided to the Building Department as Hart of the nermittina process. BUILDING DEPARTMENT REVIEW The Village of Tequesta's Building Official, Mr. Jose Rodriguez, will further review the project once the Applicant submits construction drawings for permitting to the Building Department. 5 Department of Community Development - Staff Report — 250 Beach Road - SPR 1-23 Page 95 of 237 Agenda Item #3. TRAFFIC ENGINEERING REVIEW Please see the attached review letter from Mr. William Grieve, P.E. from McMahon Associates, Inc. SEWER, DRAINAGE,, AND WATER REVIEW Mr. David Cowan, P.E.J. Civil Engineering consultant from Chen Moore and Associates provided comments that have been addressed by the Applicant. Please see attached review letter. Further review will be conducted at the time the Applicant submits construction drawings for permitting. LAW ENFORCEMENT REVIEW Assistant Police Chief Jim McGrew, as part of the Development Review Committee, provided comments that have been addressed by the Applicant. FIRE SAFETY REVIEW Zachary Wichert, Fire Plans Examiner, as a member of the Development Review Committee, provided comments that have been addressed by the Applicant. Further review will be conducted at the time the Applicant submits construction drawings for permitting to the Fire Safety Department. LANDSCAPE REVIEW Please see the attached review letter from Mr. Stephen Parker, RLA, consulting landscape architect. PALM BEACH COUNTY SCHOOL DISTRICT The applicant submitted the School Capacity Availability Determination (SCAD) form to the Palm Beach School District. The School District reviewed the application and provided their analysis and recommendation, see attached SCAD form. The following table presents the impact review and recommendation provided by the School District on the attached SCAD form: .a s ed on the firrcl i r72s and ev .9 I uation of the pro l o s c-d �_I ev-e I o p -n c-rat , t •7 e . e -.,%i I I b_9 ne ati ve i rnp d ct on the publ it -sr hool sys#e ni. Give n tl 7 e re c e -7 t i I -,.-rep 0 t fees, effective J actuary 1, 2023, much of these i mpac t � -�,vi I I be :7 7 itigated, Th a 1'71 pad tees, however, will not fully cover impacts to the school system. Therefore, if the proposed development is approved by Village Council and if the Developer voluntarily agrees' S c hoo I D i strict Staff s Sc hoof District staff re -co r inie nds t he folly i ng condition to mitigate sti c h i nip ads. P e c o rnmend A on I r o rd er to address the scho o I ca pac ity d efi cien cy generated by this p ro posed - ev elo pme nrt at the Di strict el ementary an d Ii i gh sc hooll 1 eve 1, the property o n,e r s heal I `o rit ri bute a total of $13.r357.00 to the School District of Palm Beach County prior to the issuance of first bu i Id i ng perm it_ This vcl u rrkarry school capacity contribution is intended to supplement the required school i m pa ct fee (i m pact fee credit has al ready been app I ied) . P I ease note that t he sch ooI i m pack tee creel rt is cal cu I ated based o n the Net Im pact Cost per St udent, as cal car I ated in the Corr nty's later I m pact Fee 0 rd in a ncer wh ich was .adopted on Se pte m be r 13, 2022_ Based on the above table, the School District is recommending a $13,357 contribution. This amount is a voluntary contribution intended to supplement the required school impact fee that the developer will pay to Palm Beach County. 6 Department of Community Development - Staff Report — 250 Beach Road - SPR 1-23 Page 96 of 237 Agenda Item #3. FEMA LETTER OF MAP REVISION (LOMR) The Applicant is requesting to the Federal Emergency Management Agency (FEMA) a revision of the Flood Insurance Rate Maps (FIRMs). The subject FEMA application consists of the Letter of Map Revision (LOMR) amending the 2017 FIRMS (see -attached application). The Applicant shall provide the Village with the subject letter issued by FEMA prior to applying for a Building Permit. 5. FINAL REMARKS This development application met the requirements set in Section 78-334 notice of hearing. The notice of hearing was advertised in the Palm Beach Post on August 7, 2023. Per Village Code Sec. 78-334, the applicant posted the subject property with a public notice sign, see the below image. Staff is recommending the following condition of approval: 1. The Applicant shall provide the Village with the Letter of Map Revision (LOMR) issued by FEMA for the site prior to issuance of a Building Permit. 7 Department of Community Development - Staff Report — 250 Beach Road - SPR 1-23 Page 97 of 237 Agenda Item #3. Existing Site Conditions 8 Department of Community Development - Staff Report — 250 Beach Road - SPR 1-23 Page 98 of 237 Agenda Item #3. Department of Community Development - Staff Report — 250 Beach Road - SPR 1-23 9 Page 99 of 237 Agenda Item #3. Village of Tequesta 345 Tequesta Drive Tequesta, FL 33469 N `y "s Hate: May 31, 2023 To: Lance Lilly, Planner (CMA) Through: Marjorie G Craig, PE, Director, Utilities Department From: David Cowan, Jr.., PE, Utilities Engineering (CMA) Re: 250 Beach Road — Application for Site Plan Review 561-768-0700 www.tequesta.org The Utilities Department has reviewed the proposed plans for the above -referenced project for conformance with utilities requirements. The review included the following documents submitted to the department for review on May 25, 2023: i Response Letter 5.12.23.pdf Based on review of the items above, the following comments are offered: Engineering Comments: Preliminary Drainage Report 1 The level of service used for the retention in the report was a 3-year frequency, 1-hour duration storm. The 25-year frequency, 3-day duration storm is to be used. Applicant's Response: The Drainage Statement has been revised for the 25 year — 3 day storm. Villages Response: Be aware the total volume of the 25 year - 3-day storm will be the basis of review for storm water level of services per the Village Manual. Applicant's Response: Comment acknowledged. Village's Response: Comment Resolved. 2) Per the code, the system needs to provide a 95-percent reduction in pollutant loads for the design level -of -service storm event adopted in the Village Code, prior to discharge. Applicant's Response: Comment noted. BMP Trans will be submitted during construction permitting. Villages Response: Any changes to the site plan to accommodate the regulation will require a site plan modification. Applicant's Response: Comment acknowledged. Village's Response: Comment Resolved. This document may be reproduced upon request in an alternative format by contacting the Village Clerk's office at 561-768-0440 or by completing our accessibility form: https:1/bit.ly/3mnfeU4 Page 100 of 237 Agenda Item #3. 3} The current Tequesta storm water manual can be found at the following path, https://www.tequesta.org/1295/Stormwater, please review the guidance documents prior to resubmitting. Applicant's Response: Comment noted. Village's Response: Comment Resolved. 4} Complete the checklist within the manual with the next submittal. Applicant's Response: Complete construction drawings will be submitted to the Village during construction permitting. Villages Response: Any changes to the site plan to accommodate the regulation will require a site plan modification. Applicant's Response: Comment acknowledged. Village's Response: Comment Resolved. 5} Provide a letter from Palm Beach County confirming approval to discharge stormwater offsite to the County IVIS4. Applicant's Response: Included in this resubmittall is an email from Palm Beach County outlining drainage outfall to Beach Road. Village's Response: Noted Village's Response: Comment Resolved. Conceptual Engineering Plans �} As documented in the December 2021 Water Distribution System Improvements Plan prepared by Wright -Pierce, the existing 8-inch water main on Beach Road will be required to be upsized to a 10-inch water main to meet the required fire flow demand for the property. The Village will provide a plan marked up showing the limits required. Applicant's Response: Please provide the plan with limits of the required 10' water main. Village's Response: An exhibit of the limits of the improvement is below in red. t 1 0" AAA" K CCNST. CO"01 CL ASSE&WY F~ �Vown�" Go LOIN 1117 aw Not ?a. MAN M"r MOOW" :tA fact t rrs lace- "Cftf ffn* - % - M S ^00 N if 40 ts CUAMO W NX OMP-.71, 10' W 0 W WX'-. 1). ?� I ( . SY 314. = 93 U" 3144,01 Mc CL I I., yT X C1 W CL (W Um" ntt#�) 4-WA-;adst W wn, P Uj KPO APMOk%W4 iMislsl*6 dQL OAV Fair A 10 ti4 U,N, r'. .......... I. IL 4 X, 1W LOW r &4 sw MOON _19-JAP w%co r4voRAiv,,,v rco vw, LF WU bEA01RW(CR TL;j AtV Aft $TAMUM WAAL M OCU 03.0".. Mot M law aw CO VA AMM WTONOT ASMAKv � lx` ;1W.-O ECLAL Cmion, 6,00) cm 36 4TRI Odl for M (4) 4r 46'0 W KWK 4' 03OX sm. AW 3 tr t I' CO Ow t%P OU AAO !WIN!' OASDftv V64-9)4 i pGt " � A. 11�lp R 114 0 ar;1 1.M 1V ft 1 :61 *'MM '1A; 14 &u Applicant's Response: Comment acknowledged. Village's Response: Prior to building permit application the below reference agreement will need to be. Page 2 of 3 Page 101 of 237 Agenda Item #3. 7) A Utilities Developers Agreement is required to be executed for the proposed project. Applicant's Response: or noted. Village's Response: See Village -s Response comment six. Confirm with the Loxahatchee River District that no sewer improvements wi I I be required at part of this project. Submit a letter indicating the Luxe hatch ee River District"s response. Applicant's Response: We are working with the Loxahatchee River District for confirmation regarding sanitary sewer improvements. Village's Response: Noted Villoge"s Response: Comment Resolved. 9) Stormwater runoff will not be permitted to enter adjacent properties, Applicant's Response: Stormwater will only discharge through the proposed control Village-'s Response: Comment Re -solved. 10) There appears to be habitable space at the finished floor elevation of 8', the flood elevation at th is site is 10". Confi rm with the f lood plai in manage r the req uirements. Appl ica nt-'s Response: The' .E. elevation of 12 is based on the FERIA 2019 prel i m i na ry special flood haza rd map. Villages Response: Applican Cs response does riot address the comment. The finish floor appears to be below the Village.5requirements. Review Sec. 78-283. - Finish floor elevation regulations, including requirements in Article X11, flood damn prevention. Confirm with flood plain monager the requirements are meet. Applicant's Response: Simmons and White is coordinating with the flood plain manager with the new site plan layout and building location. Village-'s Response: Engineering will defer to flood Plain Manager on this comment_ Comment resolved with Utilities Deportment. Indicate on the plans the disposition of the overhead lines in front of the project location. Applicant"s Response, The one overhead line will be placed underground prior to construction. Village's Response: Comment Resolved. Villoge Response.- Previous advisory comments ocknowled ged. Comments to be resolved at building permit application. CC: Nilsa Zacarias, Community Devc1opment Director Page 102 of 237 Agenda Item #3. From: Lynne Britt <lbrittgtequesta.org> Date: February 27, 2023 at 5:13:35 PM EST To: Lance Lilly <llillygtequesta.org>, James Trube <jtrubegtequesta.org>, William Newbern <wnewberngtequesta.org>, Jose Rodriguez <jrodriguezgtequesta.org>, "Grieve, William"<wgrievegmcmahonassociates.com>, "Lercari, Natalia" <nlercarigmcmahonassociates.com>, Steve Parker <stevegpydg.com>, James McGrew <jmcgrewgtequesta.org>, Gustavo Medina <gmedinagtequesta.org>, Marjorie Craig <mcraiggtequesta.org>, David Cowan <dcowangchenmoore.com>, Brent Whitfield <bwhitfieldgchenmoore. com> Cc: Judy Jones <J ones gtequesta. org>, Jillian Leigh <jleighgtequesta.org>, Nilsa Zacarias <nzacariasgtequesta.org>, Elizabeth Spring <e spring gteque sta. org>, McKenna Page <mpagegtequesta.org> Subject: RE: 250 BEACH ROAD - resubmittal for review Hi Lance: There are no additional comments from the Building Department. Thankyou. Lynne Britt, CFM Village of Tequesta Building Support Administrator 345 Tequesta Drive I Tequesta, Florida 33469 Phone:561-222-9437 Email: lbritt(@tequesta.org www.tequesta.org To receive general, emergency and Friday newsletter updates from the Village of Tequesta, subscribe to our alert system: https://www.teguesta.or ll78JEmereenc -Ay lerts Page 103 of 237 Agenda Item #3. Page 104 of 237 Agenda Item #3. Village of Teu esta Department ciof Fire -Rescue Services 357 Tequesta Drive 561-768-0500 Tequesta, FL 33469 www.tequesta.org James Trube, Fire Chief To: Nilsa Zacarlas, Planning and Zoning Fm: Zach Wichert CFPE Fire -Rescue Date: May 25, 2023 Io­ Re: DRC Review- 250 Beach Rd fequesta The following comments were all previously provided regarding the Development Review of the proposed condominium at 250 Beach Road, Tequesta, and acknowledged by the developer. Only one further comment is made is made here. (See 1H.) 1. Fire Department access and operations: a. Fire lane signage. in accordance with NFPA 1 shall be provided in driveway at front of building. b. Driveways shall meet minimum clear width requirements for fire lanes in accordance with NFPA 1. Currently, the driveway on the north side of the building does not appear to meet this requirement. c. Driveway entry/exit grade shall meet NFPA I requirements. d. Provide at least 12 feet for minimum clear height for the canopy in front of the building for future Fire Department Vehicles f Equipment accessibility. e. At least one elevator accessing units should provide 4500# capacity with minimum 87" clearance for stretcher accessibility. f. Gated access if provided, shall be reviewed for acceptability for fire department access. This includes Knox Key access, and should also include radio activated access (Click2Enter) compatible with Palm Beach County Fire Rescue radio system. g. Knox Box access shall be provided for all common areas and shall be located where acceptable to the fire department. h. Unobstructed height for the Fire Access Road at the South of the building shall be 13' C" per NFPA 1: 18.2.3.5.1.2. Tree litribs that present a damage hazard to File -Rescue vehicles and prevent access for vehicles shall be maintained above this height. 2. Water Supply must comply with NFPA 1 and be capable of providing required fire flow. a. Fire hydrants shall comply with NFPA 1. b. Fire Lane signage shall be provided to prevent obstruction of fire hydrants and FDCs if deemed necessary by fire department. c. Wall hydrants may be required at east pool deck area due to distance from fire department access point. Tenant Separation/Fire Protection Construction Features: a. Tenant separation and separation from hazardous areas shall be 'in accordance with NFPA 1. 4. Life Safety Evaluation: a. Elevators, stairwells, hallways, corridors, and other components of Means of Egress shall meet requirements of NFPA 1. This document may be reproduced upon request in an alternative format by contacting the Village Clerk's Office at 561-768-0440 or by completing our accessibility form: https://bit.ly/3mnfeU4 Page 105 of 237 Agenda Item #3. b. Residences shall be evaluated for compliance with NFPA 1 / 101 related to occupant load and means of egress calculations. 5. Fire Protection and Detection Systems: a. Building shall be protected throughout by a supervised, automatic fire sprinkler and standpipe system in accordance with NFPA 1 / 101. b. Building shall be protected throughout by a fire alarm system in accordance with NFPA 1/101. c. Building shall be evaluated for compliance with fire department radio communications requirements in accordance with NFPA 1 / 101. Evaluation may determine need for installation of additional equipment for enhancement to radio communications system. (Note, we are on the Palm Beach County Fire Rescue dispatch system) d. Cooking equipment other than within private residences shall be provided with suppression and ventilation systems in accordance with Florida Fire Prevention Code. e. Fire extinguishers shall be provided in accordance with Florida Fire Prevention Code. G. Entire project will be constructed in accordance with currently adopted editions of the Florida Fire Prevention Code, NFPA 1, and NFPA 101. Page 106 of 237 Agenda Item #3. Lance Lilly From: James McGrew Sent: Wednesday, July 5, 2023 1:11 PM To: Lance Lilly Subject: 250 Beach Road Lance On July 5, 2023, at approximately 13:00, 1 spoke with Alec Dickerson in reference to 250 Beach Road. I advised Mr Dickerson I would like to see an electronic entry box besides a Knox box (which he stated was their plan) to gain entry into the building, and if there were any floors where you needed special access, we would need the codes for those floors. Mr Dickerson states there were certain floors where special access is needed but the builders would able to provide the override codes. He also stated he probably could add the electronic access box too. From the police viewpoint, I am okay with the project moving forward. Page 107 of 237 Agenda Item #3. Lance Lilly Subject: FW: [EXTERNAL] FW: 250 Beach Road From: steve@pydg.com <steve@pydg.com> Sent: Thursday, August 10, 2023 4:00 PM To: Lance Lilly <Ililly@tequesta.org> Cc: 'Lance Lilly' <Ililly@chenmoore.com> Subject: [EXTERNAL] FW: 250 Beach Road "This Email was sent from an external source. Please be mindful of its content* Hi Lance - Here's the approval memo. Steve Parker, PLA -----Original Message ----- From: stevekpydg.com <stevekpyd_ com> Sent: Monday, July 10, 2023 11:54 AM To: 'Lance Lilly' <llilly chenmoore.com> Cc: 'Alec Dickerson' <aleck2gho.com>; 'Dylan Roden' >; 'Emily O'Mahoney' <emilyk2gho.com>; 'Nilsa Zacarias' <nzac arias kchenmoore. com> Subject: RE: 250 Beach Road Hi Lance, I approve the revised landscape plan prepared by 2GHO, Inc., dated 7.07.23. Additional palms have been added to the north and west building foundation, maximizing the planting areas. Although both of these areas are still short of the required tree count, additional palms and trees have been added to the perimeter buffers to compensate. Please contact me with any questions. Thank you, Steve Parker, PLA -----Original Message ----- From: Dylan Roden <dylan(a�,2gho.com> Sent: Monday, July 10, 2023 7:50 AM To: stevekpydg.com; Emily O'Mahoney <emily 2gho.com> Cc: Alec Dickerson <alec(k2gho.com>; 'Lance Lilly' >; 'Nilsa Zacarias' <nzacarias kchenmo ore. com> Page 108 of 237 Agenda Item #3. Subject: RE: 250 Beach Road Hi Steve, Please see the attached revised Landscape plan for 250 per your comments. Please let us know if you have any other changes. Thank You, Dylan L Roden, PLA, ASLA Landscape Architect Dylan ,2GHO.com Cell 772.486.9545 Phone: 561.575.9557 x108 Fax: 561.575.5260 www.2GHO.com Gentile Holloway O'Mahoney, & Associates 1907 Commerce Lane Suite 101 Jupiter, Florida 33458 LA#00005 3 0 Follow Us On Twitter gGHOLandPlan The information contained in this transmission may contain privileged and confidential information. It is intended only for the use of the person(s) named above. If you are not the intended recipient, you are hereby notified that any review, dissemination, distribution or duplication of this communication is strictly prohibited. If you are not the intended recipient, please contact the sender by reply email and destroy all copies of the original message. All attached drawings, specifications and other documents, including those in electronic form, prepared by the consultant and the Consultants Sub -consultants are Instruments of Service for use exclusively to this Project. The Consultant and the Consultants Sub -consultants shall be deemed the authors and owners of their respective Instruments of Service and shall retain all common law, statutory and other reserved rights, including copyrights. -----Original Message ----- From: stevekpydg com <stevekpyd. com> Sent: Thursday, July 6, 2023 4:12 PM To: Emily O'Mahoney <emily_k2gho.com> Cc: Alec Dickerson <alec(k2gho.com>; Dylan Roden <d,j�(a�,2gho.com>; 'Lance Lilly' <llillykchenmoore.com>; 'Nilsa Zacarias' <nzacariaskchenmoore.com> Subject: FW: 250 Beach Road Hi Emily, 2 Page 109 of 237 Agenda Item #3. How about adding the palms as noted (see attached) to help with the foundation tree counts on the west and north sides. Sec. 78-409 of the Tequesta Landscape Code states "One canopy tree planted per 30 lineal feet, or fraction thereof of facade width. Trees may be grouped, but the minimum number of trees required must be met". The site plan should have been designed to accommodate the required number of trees, however maximizing the trees in the space you have, and adding trees to the perimeter buffer will be acceptable. Regards, Steve Parker, PLA Page 110 of 237 Agenda Item #3. TRANSPORTATION ENGINEERS & McMahon Associates, Inc. 2090 Palm Beach Lakes Boulevard, Suite 400 West Palm Beach, FL 33409 P. 561.840.8650 mcmahonassociates.com TECHNICAL MEMORANDUM TO: Nilsa Zacarias, AICP Village of Tequesta CC: R. Trent Ebersole, P.E. Natalia T. Lercari, P.E., LEED McMahon Associates, Inc. FROM: William A. Grieve, P.E. McMahon Associates, Inc. SUBJECT: 250 Beach Road McMahon Project No. M11172.24 DATE: May 24, 2023 McMahon Associates, Inc. (McMahon) has completed a review of the following: 1) Response Letter, prepared by 2GHO, Inc., dated May 12, 2023. 2) Traffic Performance Standards (TPS) from Palm Beach County Traffic Division, dated February 27, 2023. 3) Conceptual Engineering Plan, prepared by Simmons & White, Inc., dated May 11, 2023. 4) Site Plans SP-1, SP- and SPA prepared by 2GHO, Inc., date revised May 12, 2023. Traffic Analysis Review 1. Provide a copy of the letter from Palm Beach County Traffic indicating that development meets Traffic Performance Standards. Applicant's Response: The TPS Letter from PBC Traffic Division will be provided upon receipt (2023-03-07) TPS was provided on 2023-03-01 -Comment addressed. Site Plan Review (Traffic Circulation and Parking) McMahon conducted a review of the above -mentioned documents regarding parking and traffic circulation. The following issues did not meet the Village codes: 1. Per Village Code, Section 78-300: "All dumpsters in the village shall be located on the property serviced so as to be reasonably accessible for trash collection by the sanitation vehicles." "The sufficiency of the access of the dumpster shall meet the concurrence of the village and the franchised sanitation company." Provide concurrence of the access from the franchised sanitation company. Engineering I Planning I Design I Technology Transportation Solutions Building Better Communities Page 111 of 237 Agengp)tem #3. acanas May 24, 2023 Page 2 of 4 Applicant's Response: The Agent has met with the sanitation company, and, under their guidance, developed a staging area for (3 cubic yard) wheeled dumpsters. The provider works closely with the properties in this area to collect at a time specific on the requested days so that containers do not impact the community as a whole. (2023-03-07) TPS was provided on 2023-03-01 - No further comments. 2. Improvements such as sidewalk, driveways, etc. within SR 707 right-of-way will require a FDOT permit. Provide a copy of the FDOT permit, prior to Building Department Approval. Applicant's Response: Acknowledged. This also includes landscape and irrigation. (2023-03-07) Applicant Acknowledged that all FDOT permits are required prior to Building Department Approval. No further comments. 3. Provide traffic control devices i.e., stop signs and stop bars at the driveway location. Applicant's Response: Stop signs have been provided. (2023-03-07) Comment addressed. 4. Provide pavement and paver specifications on the Engineering plans. Applicant's Response: These details will be provided at time of permit. (2023-03-07) Applicant provided details on the Engineering plans. Comment addressed. 5. Does the Lobby overhang allow for emergency vehicles to access the lobby area? PROPOSED HANOZAP SIGN (TYP.} 1� �IW INYII 4C.VV I f9 6L ,3.ILt 14 6C U6I LISMIINLU - DURING FNAL DESIGN) , PROPOSED BRICK PAVERS (TYP.) POSED BUILDING E F.E..,T.B.D. PROP ED BUILDING OVER G (TYP,) �++,, ZONE }( PROP ED CONCRETE HLAD CURB (TYP.), f'+ ZONE VE [ELE. 32.( P POSED WATER SERVICE (TYP. ti ( E TO BE DETERMINED DURINC DESIGN} PROPOSED �mrrAF27 r MMHOLE Applicant's Response: Yes, the drop-off does allow for emergency vehicles to access via the additional pavement to the west of the overhang. Please see the revised plans. (2023-03-07) Noted the change was reflected on the Site Plan but the Engineering Plan does not reflect this change. Please provide Engineering Plans that reflect this revision. Page 112 of 237 Agengp)tem #3. acanas May 24, 2023 Page 3 of 4 (2023-05-22) -Applicant revised plans. No further comments. 6. Please verify if emergency vehicles can maneuver the north drive aisle including the turn in the northwest corner. Provide Auto turns around the property drive aisles. Applicant's Response: Turning the north corner in not applicable at this time. Please see the Auto turn exhibits by the Engineer. The lengths of the fire truck into the site were agreed upon. In addition, the fountain has been reduced to make sure there is more than enough room for the turning radii of an ambulance rescue vehicle at the entry. (2023-03-07) Provide verification from the Fire Department that the lane/drive on the north side of the building is not required for Fire Department Vehicles/Equipment accessibility. (2023-05-22) —Please provide verification from Fire Department once you have received. 7. The Engineering plan seems to indicate car stops blocking the interior parking spaces. Please clarify how these parking spaces work. Applicant's Response: Wheel stops have been removed. The intent is for valet double stacking of vehicles. (2023-03-07) No further comments. New comment due to revised parking layout. Page 113 of 237 Agengp)tem #3. acanas May 24, 2023 Page 4 of 4 1. The Site plan now seems to indicate interior resident parking spaces. Please clarify how these parking spaces work. Per Village Code, Section 78-703: "Each parking stall shall have appropriate access to a street or alley and maneuvering and access aisle areas shall be sufficient to permit vehicles to enter and leave the parking area in a forward motion, with the exception of a single-family and duplex areas." Additionally, the Engineering Plan does not match this revised parking layout. Applicant's Response: Based on a April 6, 2023 meeting held with staff, the site plan has been revised to indicate a code compliant parking configuration. (2023-05-22) -Applicant revised plans to comply with parking code. No further comments. If you have any questions, please feel free to contact me. Sincerely, William A. Grieve, P.E. Project Manager WAG/cec Q:\FL-WestPalmBeach-McMahon\pbgfs\Work\FL\11172M_Village_Of_Tequesta_TransportationServices\11172M_24_250 Beach Road\Correspondence\Comments\TechMemo_250 Beach Road 05222023.docx Page 114 of 237 Agenda Item #3. 2G -INC. Landscape Architects Manners Environmental Consultants 250 Beach Road Design Guidelines Checklist Per Village of Tequesta's Community Development Department: LA-CUUU530 Gearge G. Gentile FASLA M. Troy Holloway ALA Emily M. 0"Plahoney FA LA, PLA, LEEDIIAP, BO&C The following list is a tool to assist in the design and review of the proposed development. This checklist presents a summary of the design guidelines; however, it is not meant to be a substitute for the detailed descriptions of the design principles included in the subject document. The applicant will need to complete this checklist and provide an explanation of how each design element is accomplished in the development. I. Building Design Height and Massing 1. The building is NOT an urban form represented by only one rectangular block. Response: The building is composed of separate volumes and undulating geometry along the fagade as well as in plan view. 2. Height variations create human scale. Response: Using different heights from the street, lobby, and amenity deck, the building relates to the human scale. 3. Massing is broken down into smaller volumes to minimize visual dominance. Response: Both Street and beach facades are a composition of volumes in different scales to add hierarchy and visual interest. 4. Facades articulate vertical and horizontal intervals and do not resemble simple box forms. Response: The facades are defined by simple minimalistic lines, of balconies and structure, that relate to their respective orientation (street, ocean, or side) and provide depth and layering. 5. Recessing and projecting design elements avoid flat and monotonous facades. Response: The undulating geometry of the balcony, slabs, and frames meets this criterion and provides articulation in form and proportion. 6. Major wall offsets carve the building form to create opportunities for amenity spaces or pronounced entry ways. Response: The main entrance demarcates a spatial distinction through an offset within the frame that emphasizes hierarchy and verticality. The amenity level is part of the terracing of volumes creating a layered effect. 113, COMMERCE t-1 E, SUITE 101, JUPITER, FLORIDM Page 115 of 237 Agenda Item #3. 250 Beach Road Design Guidelines February 24, 2023 Page 2 7. Building step -backs to add visual interest and human scale. Response: The balconies add a layer of proportional detail as it relates to the human scale and the height of the amenity deck as it relates to the streetside. Articulations 8. Top articulations emphasize a distinctive profile (projecting parapets, upper -level step - backs, height variation, variety of roofline, etc.). Response: The building's roof top is defined by a parapet that terminates the structure, providing a balanced composition. 9. Skyline is defined by a variation of roofline projection planes that break up long lines and add visual interest and design elements (trellis, green roof, etc). Response: The parapet on the roof defines the end of the residential units but also helps conceal mechanical equipment with a perforated metal screen that further beautifies the building and reduces noise pollution. 10. Middle articulation (materials, color, balconies, windows, step -backs) to differentiate from top and ground articulations. Response: The floors and walls are clearly differentiated using a medium -dark warm brown color that contrasts from the light frames on the balcony and ground floor. 11. Fenestrations (doors, windows, skylines) are cohesive and complement the building Response: The undulating pattern on the floor plate is defined by the edges of the sliding glass doors and outdoor terraces (balconies) providing occupants with private outdoor living spaces. 12.Ground articulation (variety of materials, fenestrations, architectural elements, etc). Response: On the ground, the lobby and garage are differentiated with the use of different textures and materials. 13. The fagades include movement, diverse balconies, and architectural breaks along large expanses of walls. Response: The main frames define the overall composition in various proportions, as they break up into smaller squares, creating layering and depth while the rest of the building sets back creating the undulating balcony edges. 14.Windows and glazed areas provide a sense of balance and scale. Response: Windows are proportionate to the outside balcony. Building Materials and Colors 15. Building colors compatible with the recommended color palette. Response: Colors chosen are harmonious with the surrounding context. NA250 Beach Road - Fontainebleau 22-0614\Applications\2022 Site Plan Review\Agency Correspondence\1st Round of Comments\Design Guidelines VOT .docx Page 116 of 237 Agenda Item #3. 250 Beach Road Design Guidelines February 24, 2023 Page 3 16. High quality, durable, and attractive materials are appropriate for the corridor. Response: Concrete and wood -like synthetic veneer are durable and appropriate. 17. Primary and secondary building paint colors for visual contrast. Response: Colors chosen to complement and contrast with each other as they range from light to dark browns, soft textures as opposed to more texturized materials such as wood -like and stone -like veneers. Green Building Design 18.Green design practices, such as green roofs, solar panels, and other sustainable elements. Response: The project doesn't contain any green design practices. II. Site Planning Building Orientation 1. Site design and orientation provide a cohesive visual relationship between the scenic views and the roadway. Response: The building siting provides visual access to both the roadway and ocean. 2. Building orientation takes advantage of passive and/or active solar strategies. Response: The main orientation is N/S with a slight E/W rotation invites adequate natural light to all units. 3. Building resiliency, such as stormwater practices supported by FDEP. Response: Stormwater Best practices will be utilized as applicable to this project. Vehicular Access and Parking 4. Parking garage for resident and guest parking. Response: All parking is in a ground level structure under the building. 5. Surface parking screened/buffered from the adjacent roadway. Response: Surface parking is adequately buffered. 6. Driveway is NOT visually dominant. Response: The driveway to the front entry is dominant and celebrated with specialty paving, a fountain and unique project signage. Drive aisles going around the sides of the building to access parking are buffered. 7. Adequate light fixtures selected based on functional value, aesthetic quality, and environmental practices. Response: Outdoor lighting fixtures include matching post lights with building mounted lights along with bollards for the pedestrian circulation. All lighting will meet turtle lighting standards for Palm Beach County. Open Space NA250 Beach Road - Fontainebleau 22-0614\Applications\2022 Site Plan Review\Agency Correspondence\1st Round of Comments\Design Guidelines VOT .docx Page 117 of 237 Agenda Item #3. 250 Beach Road Design Guidelines February 24, 2023 Page 4 8. Attractive, well -integrated, and accessible open spaces on various portions of the building: roof, terraces, balconies, ground floor, etc. Response: The major outdoor space is the pool deck. The pool deck flows up into the terrace level with outdoor dining areas. Along the front of the building facing the road, there are two separate activity areas for residents at one story up. They include a BBQ and seating area on the south side. To the north is an active court sports area. The single biggest asset is the deep beach out to the ocean. It is accessed through a board walk system on the north side which goes over the restored dune. 9. Common areas are accessible and connected by a comprehensive, on -site pedestrian circulation system. Response: Outdoor common areas are accessible all around the building and through the building. The pool area is gates and secured with two points of egress off the deck. Once on the beach, one can walk for some distance, especially to the north. Refuse 10. Screening for trash receptacles and other refuse designed to be aesthetically pleasing. Response: No screening provided as the trash is kept within the building and only brought out shortly before pickup. 11. Design of receptacles and screening is compatible with the architecture of the building. Response: Not applicable. 12. Trash receptacles are hidden from the public street and views. Response: Trash receptacles will be hidden from the adjacent roadway within the building accessed on both the north and south sides, in the middle of that distance. Signage and Lighting 13. Signage complements the building and is compatible with the building architecture. Response: Signage and Lighting will be consistent with the building architecture. 14. Lighting enhances architectural character, ambience, and is consistent throughout the site. Response: Lighting will comply with this guideline and apply to Palm Beach County Turtle Lighting standards in the aiming, height and color rendition of the fixtures. 15. Ground signs landscaped to meet code. Response: The ground sign meets this with intent. Being placed in a fountain, the planting is outside the fountain wall. NA250 Beach Road - Fontainebleau 22-0614\Applications\2022 Site Plan Review\Agency Correspondence\1st Round of Comments\Design Guidelines VOT .docx Page 118 of 237 Agenda Item #3. 250 Beach Road Design Guidelines February 24, 2023 Page 5 16. Signage provides clear visibility so information is easily communicated. Response: The sign is in the center of the entry sequence providing clear wayfinding. Compatibility and Transition 17. Upper floors or side walls are stepped back so window areas and balconies are further from the property line. Response: Consistent with Village code, the west side (front) tower plane is setback much further than the first level. 18. Architectural design provides transition to mitigate height, bulk, and scale impacts. Response: Design approaches have been made to accommodate the above guideline. 19. Site design respects surroundings by minimizing the disruption of privacy and outdoor activities of residents in adjacent buildings. Response: The proposed site design will not create negative impacts to adjacent residents. III. Landscaping Landscape Buffers 1. Landscape buffers provide privacy and minimize water runoff. Response: The landscape buffers are dense and will minimize water runoff. Foundation Plantings 2. Foundation plantings complement the building's architecture. Response: Foundations plantings have been provided in a simple clean style. The required trees are placed with the buffer trees on the two sides since trees in a 4' planting area width against a tall solid building are not appropriate. 3. Foundation plantings soften and break up the building mass. Response: Heavy planting has been designed. 4. Plantings frame views and define building entries. Response: The layout of the building frames the entry. The landscape meets the design for creating desirable outdoor spaces while enhancing views from the upper residential levels. Plant Palette List 5. Plants selected from the recommended plant palette list. Response: The landscape plans comply. NA250 Beach Road - Fontainebleau 22-0614\Applications\2022 Site Plan Review\Agency Correspondence\1st Round of Comments\Design Guidelines VOT .docx Page 119 of 237 Agenda Item #3. 250 Beach Road Design Guidelines February 24, 2023 Page 6 IV. Public Streetscape 1. On -street amenities (benches under shade trees, planters, lighting, trash receptacles, bicycle racks, etc.) provided. Response: There is a bench sitting area to the south of the vehicular entry within the public realm. Tree planting within the right-of-way and in the buffer will create a refreshing shade dappled walking experience making the outside more useable year round. Pedestrian and Cyclist Pathway 2. Meandering wide sidewalks accommodate pedestrians and cyclists along the public right of way. Response: This project is redoing the public sidewalk to create a meandering 6' sidewalk consistent with the desires of the village staff. 3. Lighting, benches, and street furniture to support pedestrian use in the corridor. Response: A bench is provided along with shade. Landscaping and Lighting 4. Landscaping includes plant clusters, single plantings and shade trees. Response: Landscape includes all of the above. 5. Street lighting balances function, visual aesthetics, and environmental matters. Response: Being on the ocean, the lighting will be driven by PBC ERM. All lamps will be amber in color. There will be little to no decorative landscape up -lights on this project Utilities 6. Utilities are buried underground. Response: The one overhead line will be placed underground prior to construction. NA250 Beach Road - Fontainebleau 22-0614\Applications\2022 Site Plan Review\Agency Correspondence\1st Round of Comments\Design Guidelines VOT .docx Page 120 of 237 Agenda Item #3. 254 Beach Road FEMA FIRM Investigation Revised Coastal Analysis Prepared for: Font alneblcau Developmem 19950 West Ccnmtry- Club Drive, Ist Floor AventuraT FL 33180 Prepared by: Tomasello Consulting Engineers, Inc. 5906 Center Street Jupiter, Florida 33458 561-575-39 10 JaIlUary 2023 /Z 3 61ic-h—aird S �Toniasello P - F .4 15 Page 121 of 237 Agenda Item #3. 250 Beach Road FEMA FIRM Investigation Revised Coastal Analysis 1. Report 2. MT-2 Form 1 3. MT-2 Form 4 4. Maps 1, 2, 3 5. Appendix A —CHAMP/WHAFIS Model and TAW Runup Model 6. Appendix B — GIS and Imagery 7. Appendix C - LiDAR Page 122 of 237 Agenda Item #3. Tomasello Consulting Engineers, Inc (TCE) was contacted by the Mr. Richard Brewer concerning the Effective Federal Emergency Management Agency (FEMA) Flood Insurance Rate Maps (FIRMS) published October 5, 2017, for the subject property. The subject property is generally located at 250 Beach Road Tequesta, FL 33469 and is currently within the FEMA Coastal High Hazard Area (VE-zones). TCE was asked to investigate site -specific data and conduct site -specific coastal hydraulic modeling for the possibility of amending the 2017 Effective FIRMs VE-zones. 250 Beach Road CHAMP Inputs TCE setup the FEMA CHAMP model analysis based on using 2021 aerials and a Digital Elevation Model (DEM) from the new Palm Beach County (PBC) Coastal Study Technical Support Data Notebook (TSDN) for the subject property. The CHAMP model, CHAMP WHAFIS card inputs, WHAFIS charts, WHAFIS input and outputs for the transects can be found electronically in Appendix A. General Conditions In the setup of the general conditions, the parameters used in the CHAMP model were taken from the Effective FIS. The General Inputs are as follows: Table 10 iinnw ry of Coastal Stillwater E1ei-ations ELEVATION (feet NA Q ) FLOODING SOURCE AND LOCATIO 10-PE. C'E. T 2-PERCENT 1-PE C'E TT 0. 21-PE C'E. T ATLANTIC OCEAN Along the c o astlijae from the Marii� Cowit�.�.`P alin Beach County bo dan- exteiidingr south to Jupiter met 4.6 1 6. , Significant Wave Height: 24.6' Significant Wave Period: 13.8 sec. Transect Location and Topo ray One (1) transect was setup for the CHAMP model for the subject property. The transect location was chosen to represent the local features of the subject property. The transect includes the building, topographic and vegetation for inputs into the WHAFIS portion of the CHAMP model for the subject property. The subject property has a bulkhead seaward of the existing building. This bulkhead was studied using dune reservoir removal via the CHAMP model for the failed bulkhead scenario and the TAW methodology was used for the intact bulkhead scenario. The topographic information used in the CHAMP and TAW analysis is from a Digital Elevation Model (DEM) from the new PBC Coastal Study TSDN. Page 123 of 237 Agenda Item #3. CHAMP Results and Primary Frontal Dune Assessment The results of the WHAFIS analysis for the one (1) transect show that the velocity zone (3-foot wave) shifts seaward a maximum of approximately 165 feet. However, a Primary Frontal Dune (PFD) has been identified on the subject property by the Effective and Preliminary Flood Insurance Studies (FIS). Letter of Map Revision (LOMR) Case Numbers 17-04-2100P and 22-04-0040P have established that the effective PFD line had been drawn landward of the proposed PFD location shown in the LOMRs. 250 Beach Road is adjacent to the properties affected by these LOMRs and the PFD line for this request has been drawn 45' parallel to the existing bulkhead to match the general nature of previous LOMRs and is based on engineering judgement. The historical terrain on 250 Beach Road has been manipulated by anthropogenic activities and a profile from the DEM does not show a distinct change from a relatively steep to relatively mild slope that is not caused by the existing building. Conclusion The one (1) transect analysis provides scientifically correct data and engineering judgement that should be used to revise the effective FIRM panel. A signed and sealed topographic work map (Map 2) is included with this submittal showing the following information: effective, existing conditions, and proposed conditions 1 %- annual- chance- floodplain-boundaries, location and alignment of all transects, boundary of the subject property, certification by a State of Florida professional engineer, and the referenced vertical datum. The proposed revised FIRM is provided as Map 3. Appendix A contains the CHAMP, WHAFIS Model, and TAW Runup Model Appendix B — GIS and Imagery Appendix C — LiDAR 2 Page 124 of 237 Agenda Item #3. DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency OVERVIEW & CONCURRENCE FORM OMB Control Number: 1660-0016 Expiration: 1 /31 /2024 PAPERWORK BURDEN DISCLOSURE NOTICE Public reporting burden for this form is estimated to average 1 hours per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless it displays a valid OMB control number. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, Department of Homeland Security, Federal Emergency Management Agency, 500 C Street, SW, Washington, DC 20472 , Paperwork Reduction Project (1660-0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send your completed survey to the above address. PRIVACY ACT STATEMENT AUTHORITY: The National Flood Insurance Act of 1968, Public Law 90-448, as amended by the Flood Disaster Protection Act of 1973, Public Law 93-234. PRINCIPAL PURPOSE(S): This information is being collected for the purpose of determining an applicant's eligibility to request changes to National Flood Insurance Program (NFIP) Flood Insurance Rate Maps (FIRM). ROUTINE USE(S): The information on this form may be disclosed as generally permitted under 5 U.S.0 § 552a(b) of the Privacy Act of 1974, as amended. This includes using this information as necessary and authorized by the routine uses published in DHS/FEMA/NFIP/LOMA-1 National Flood Insurance Program (NFIP); Letter of Map Amendment (LOMA) February 15, 2006, 71 FR 7990. DISCLOSURE: The disclosure of information on this form is voluntary; however, failure to provide the information requested may delay or prevent FEMA from processing a determination regarding a requested change to a (NFIP) Flood Insurance Rate Maps (FIRM). A. REQUESTED RESPONSE FROM DHS-FEMA This request is for a (check one): F-1 CLOMR: A letter from DHS-FEMA commenting on whether a proposed project, if built as proposed, would justify a map revision proposedydrologY changes (See 44 CFR Ch. 1, Parts 60, 65 & 72)• All CLOMRs require documentation of compliance with the Endangered Species Act. Refer to the Instructions for details. Fx-1 LOMR: A letter from DHS-FEMA officially revising the current NFIP map to show the changes to floodplains, regulatory floodway or flood elevations. (See 44 CFR Ch. 1, Parts 60, 65 & 72). B. OVERVIEW 1. The NFIP map panel(s) affected for all impacted communities is (are): Community No. Community Name State Map No. Panel No. Effective Date Example: 480301; City of Katy; Harris County TX; TX 48473C; 0005D; 02/08/83; 480287 48201 C 0220G 09/28/90 120228 Village of Tequesta FL 12099C 0179F 10/05/2017 2. a. Flooding Source: Atlantic Ocean b. Types of Flooding: F-] Riverine Fx-] Coastal F-] Shallow Flooding (e.g., Zones AO and AH) F-] Alluvial Fan F-] Lakes F-] Other (Attach Description) 3. Project Name/Identifier: 250 Beach Road LOMR 4. FEMA zone designations (choices: A, AH, AO, Al -A30, A99, AE, AR, V, V1430, VE, B) C, D, X) a. Effective: VEX b. Revised: VEX FEMA FORM FF-206-FY-21-100 (formerly 086-0-27) (01 /21) MT-2 FORM Page 12k9S ?473 Agenda Item #3. 5. Basis for Request and Type of Revision- a. The basis for this revision request is (check all that apply) ❑ Physical Change [x-] improved Methodology/Data ❑ Regulatory Floodway Revision ❑ Base Map Changes ❑ Coastal Analysis ❑ Hydraulic Analysis ❑ Hydrologic Analysis ❑ Corrections ❑ Weir -Dam Changes ❑ Levee Certification ❑ Alluvial Fan Analysis ❑ Naturai Changes [X—] New Topographic Data ❑ Other (Attach Description) Note: A photograph and narrative description of the area of concern is not required, but is very helpful during review. b. The area of :revision encompasses the following structures (check all that apply) Structures: ❑ Channelization ❑ Levee/Floodwall ❑ Bridge/Culvert ❑ Dam ❑ Fill ❑ Other (Attach Description) Documentation of ESA compliance is submitted (required to initiate CLOMR review). Please refer to the Instructions for more 6,❑ information. C. REVIEW FEE Has the review fee for the appropriate request category been included? r-] Yes Fee amount- $ FX-] No, Attach Explanation Please seethe DHS-FEMA Web site at http://Www.fema.gov/forms-documents-and-software/flood- map-related-fees for Fee Amounts and Exemptions. D. SIGNATURES 1. REQUESTOR'S SIGNATURE All documents submitted in support of this request are correct to the best of my knowledge. I understand that any false statement may be punishable by fine or i rn p rison me nt under Title 18 of the United States Code, Section 100 1 Name: Eric Cohen Company: Fountainebleau Devleopment Mailing Address: Daytime Telephone, 305-682-4116 Fax No.: 19950 W Country Club Drive, 1st Floor, Aventura, FL 33180 E-mail Address: ecohen@fbdve.com Date'. 1/11/2023 Signature of Requestor (required) 2. COMMUNITY CO,NCURRENCr_ As the community official responsible for floodplain management, I hereby acknowledge that we have received and reviewed this Letter of Map Revision (LOMR) or conditional LOMR request. Based upon the community's review, we find the completed or proposed project meets or is designed to meet all of the community floodplain management requirements, including the requirements for when fill is placed in the regulatory floodway, and that all necessary Federal, State, and local permits have been, or in the case of a conditional LOMR, will be obtained. For Conditional LOMR requests, the applicant has documented Endangered Species Act (ESA) compliance to FEMA prior to FEMA's review of the Conditional LOMR application. For LOMR requests, I acknowledge that compliance with Sections 9 and 10 of the ESA has been achieved independently of FEMA's process. For actions authorized, funded, or being carried out by Federal or State agencies, documentation from the agency showing its compliance with Section 7(a)(2) of the ESA will be submitted. In addition, we have determined that the land and any existing or proposed structures to be removed from the SFHA are or will be reasonably safe from flooding as defined in 44CFR 65.2(c), and that we have available upon request by FEMA, all analyses and documentation used to make this determination. Community Official's Name and Title: Mr. Jose Rodriguez, Building Director Mailing Address-. Community Name: Village of Tequesta 345 Tequesta Drive Tecluesta, FL 33469 Daytime Telephone: 561-768-0450 ax No. E-mail Address: irodriguez@tequesta.org Community Official's Signature (required /t/) L4C-& Date: 01/13/2023 U V v MT-2 FORM Page 12pagS ?5f73 F EMA FORM F F-206-FY-21 -100 (formerly 086-0 27) (01/21) Agenda Item #3. 3. CERTIF11CATION BY REGISTERED PROFESSIONAL ENGINEER ANDIOR LAND SURVEYOR I his Certification is to be signed and sealed by a licensed land surveyor, registered professional engineer, or architect authorized by law to cerffy elevation information data, hydrologic and hydraulic analysis, and any other supporting information as per NFIP regulations paragraph 65.2(b) end as described in the MT-2 Form-,; Instructions. All documents submitted in support of this request are correct to the best of my Knowledge, I understand that any false statement may be punishable by fine or imprisonment under Title 18 of the United States Code, Section 1001. . Richard S. Tomasellc? FL P.E. 1523 Certifier's Name. License No., Expiration Date-, 02/28,12023 Company Name- Tomas it Consulting Engineers Mailing Add ress- 5906 Center Street Telephone No_ 561-575-3910 Fax No,: Jupiter, FL 33458 E-mail Address} dixietom@aol.com Signature: /2�� Ll�� V — Ensure the forms that are appropriate to your revision request are included in your submittal Form Name and-(N _qnjber� Re,quired if ... Riverine Hydroiogy and Hydraulics Form (Form 2) New or revised discharges or water - surface elevations Riverine, Structures Form (Form 3) Channel Is modified. add ition/revisi-on of bridge/culverts. addition/revision of leveeffloodwall, addition/revision of dam [�X_] Coastal Analysis, Form (Form 4) New or revised coastal elevations F-1 Coastal Structures Form (Form 5) Addition/revision of coastal structure F7 Alluvial Fan Flooding Form (Fornn 6) Flood control measures on alluvial fans Date. fli0 rZ3 Seal (Optional) FEMA FORM FF-206-FY-21 -100 (formerly 086-0-27) �O 1 /21) C; MT-2 FORM 1 Page 127 of 237 Agenda Item #3. DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency COASTAL ANALYSIS FORM (FORM 4) OMB Control Number: 1660-0016 Expiration: 1 /31 /2024 PAPERWORK BURDEN DISCLOSURE NOTICE Public reporting burden for this form is estimated to average 1 hours per response. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing, reviewing, and submitting the form. You are not required to respond to this collection of information unless it displays a valid OMB control number. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing this burden to: Information Collections Management, Department of Homeland Security, Federal Emergency Management Agency, 500 C Street, SW, Washington, DC 20472 , Paperwork Reduction Project (1660-0016). Submission of the form is required to obtain or retain benefits under the National Flood Insurance Program. Please do not send PRIVACY ACT STATEMENT AUTHORITY: The National Flood Insurance Act of 1968, Public Law 90-448, as amended by the Flood Disaster Protection Act of 1973, Public Law 93-234. PRINCIPAL PURPOSE(S): This information is being collected for the purpose of determining an applicant's eligibility to request changes to National Flood Insurance Program (NFIP) Flood Insurance Rate Maps (FIRM). ROUTINE USE(S): The information on this form may be disclosed as generally permitted under 5 U.S.0 § 552a(b) of the Privacy Act of 1974, as amended. This includes using this information as necessary and authorized by the routine uses published in DHS/FEMA/NFIP/LOMA-1 National Flood Insurance Program (NFIP); Letter of Map Amendment (LOMA) February 15, 2006, 71 FR 7990. DISCLOSURE: The disclosure of information on this form is voluntary; however, failure to provide the information requested may delay or prevent FF=N4A frarn r no a detQrMiA2tiQA r0aard'na a requested chancie to a (INIFIR) Fload Insur2nce Rate Maos (FIRM) Flooding Source: Atlantic Ocean Note: Fill out one form for each flooding source studied A. COASTLINE TO BE REVISED Describe limits of study area: 250 Beach Road, Tequesta, FL 33469 B. EFFECTIVE FIS The area being revised in the effective FIS was studied by detailed methods using (check all that apply): F-] Storm surge modeling F-] Wave setup computations Fx-]Wave height computations Fx-]Wave runup computations F-] Wave overtopping computations FX-]Dune erosion computations Fx-]Primary Frontal Dune Assessment F-] N/A (area not studied by detailed methods C. REVISED ANALYSIS 1. Number of transects in revised analysis: 1 2. Information used to prepare the revision (check all that apply): F-] Wave setup analysis (complete Items 3, 4, and 5 below) F-] Wave overtopping assessment (complete Items 4 and 5) F-] Stillwater elevation determinations (complete Items 3) F-] More detailed topographic information (complete Section E) F-] Erosion considerations (complete Items 4) F-] Accredited shore protection structure (attach completed Coastal F-] Structures Form -Form 5) Non -accredited shore protection structure (complete Items 4) Fx-]Wave runup analysis (complete Items 4 and 5) Fx-]Primary Frontal Dune Assessment (complete Items 5) Fx-]Wave height analysis (complete Items 4 and 5) F-] Other, attach basis of request with explanation 3. Stillwater Elevation Determination a. How were stillwater elevations determined? FX-]Effective FIS Report Date of FIS Report 10/05/2017 Transect Number 4 F-] Gage analysis (If revised gage analysis was used, provide copies of gage data and revised analysis.) F-] Storm surge analysis F-] Other (Describe): b. Specify what datum was used in the calculations: NAVD If not the FIS datum, have the calculations been adjusted to the FIS datum? ❑ Yes ❑ No Conversion Factor FEMA FORM FF-206-FY-21-103 (formerly 086-0-27C) (01 /21) Page 12pagg ?473 Agenda Item #3. C. REVISED ANALYSIS (continued) c. Was wave setup included in wave height analysis and removed for wave runup analyses?: X❑ Yes No d. Was an overtopping analysis performed for any coastal shore protection structures or natural land forms that may be overtopped?: X❑ Yes ❑ No Attach an explanation of the methodology utilized and describe in detail the results of the analysis. e. Is wave setup included? Fx_] Yes F-] No Source: FX_] Effective FIS Report F-] New Analysis If wave setup was computed, attach a description of methodology used. 4. Revised Analysis (i.e., erosion, wave height, wave runup, primary frontal dune, and wave overtopping) If DHS-FEMA procedures were utilized to perform the revision, attach a detailed description of differences between the current and the revised analyses, and why the revised analysis should replace the current analysis. If DHS-FEMA procedures were not utilized to perform the revision, provide full documentation on methodology and/or models used; including operational program, detailed differences between methodology and/or models utilized and DHS-FEMA's methodology and/or models. Also, attach an explanation of why new methodology and/or models should replace current methodology and/or models. If revision reflects more detailed topographic information and fill has been/will be placed in a V Zone, and is not protected from erosion by an accredited shore protection structure, provide a detailed description of how the fill has been treated in the revised analysis. Wave Runup, Wave Height, And Wave Overtopping Analysis Wave height analyses along a transect are greatly affected by starting wave conditions that propagate inland. Wave runup and overtopping analyses are typically considered when the stillwater elevation including wave setup is less thanthe crest of shore protection structures or natural land forms. a. Was an analysis performed to determine starting wave height and period for input into WHAFIS? If Yes, attach an explanation of the method utilized. If No, explain why these analyses were not performed. ❑ Yes ❑X No b. Was wave setup included in the reference water level used to calculate the dune reservoir volume? Z Yes [:] No c. Was wave setup included in wave height analysis and removed for wave runup analyses? Z Yes [:] No d. Was an overtopping analysis performed for any coastal shore protection structures or natural land forms that may be overtopped? Fx-]Yes F-] No Attach an explanation of the methodology utilized and describe in detail the results of the analysis. D. RESULTS 1. Stillwater storm surge elevation: 5.4 feet NAVD Datum 2. Wave setup: 2 feet 3. Starting deep -water significant wave condition: height:24.6' period:13.8 s 4. Maximum wave height elevation:8.32 feet 5. Wave runup elevation:12.12 feet 6. Estimated amount of overtopping: 0 cfs/feet 7. Has this revision changed the Limit Moderate Wave Action (LiMWA)? ❑ Yes Z No ❑ N/A 8. The areas designated as costal high hazard areas (Vzones) have: FX-] Yes F-] No F-] N/A Attach a description where they have increased and/or decreased. 9. As a result of the revised analyses, the V zone location has shifted a maximum of 0 feet seaward and 165 feet landward of its existing position. 10. Does the revision reflect the location of the primary frontal dune? Fx-]Yes ❑ No 11. The Base Flood Elevations have: F-] Increased Z Decreased a. What was the greatest increase? 0 feet b. What was the greatest decrease?10 feet 12. The special flood hazard area has: ❑ Increased FX-]Decreased F-1 Both Attach a description where it has increased or decreased. FEMA FORM FF-206-FY-21-103 (formerly 086-0-27C) (01 /21) Page 12paQg J473 Agenda Item #3. E. MAPPING REQUIREMENTS A certified topographic map must be submitted showing the following information (where applicable): effective, existing conditions, and proposed conditions 1 %-annual-chance floodplain boundaries, revised shoreline due to either erosion or accretion, location and alignment of all transects, correct location and alignment of any structures, current community easements and boundaries, boundary of the requester's property, certification of a professional engineer registered in the subject State, location and description of reference marks, and the referenced vertical datum (NGVD, NAVD, etc.). Note that the existing or proposed conditions floodplain boundaries to be shown on the revised FIRM must tie-in with the effective floodplain boundaries. Please attach a copy of the current FIRM annotated to show the revised 1 %-annual-chance floodplain boundaries that tie-in with effective 1 %-annual-chance floodplain boundaries along the entire extent of the area of revision. FEMA FORM FF-206-FY-21-103 (formerly 086-0-27C) Page 13Pagg 9473 (01/21) Agenda Item #3. Page 131 of 237 Agenda Item #3. Ei'ecli, A E 5 Pr-,)i)osed Arz5 Legend S-FLD-HAZ-AR FLO-ZONE A F VE Proposed_ SFHA- Changes Zone BFE X Effective PFD-LN Map 2 �Tvrias�NlrCon�suVma �Fmjnrt�-rjirLr-. Proposed SFHA Changes witli Topograpliy (NAVD) P 49.r: Page 132 of 237 Agenda Item #3. l Effec47yeeAE5 l Proposed AE5 Effective PFD LN Effective VE10 Proposed VE10 , IL jAl, Effective 22-04-0040P AE7 Proposed AE7 Effective (22-04-0040P) X \ Proposed X 22-04-0040P PFD_LN J II i�• III Effective VE10 Transect 1 Proposed X j Effective AE5 i H Proposed AE5 r I� Of t Effective PFD_LN Ao �► f �, \ Mop_• Effective VE10 Proposed VE10 r --� --, r,�-•tea. ,_�.e....... _ ; � ..w N , PI 0 125 250 375 500 Feet Legend S_FLD_HAZ_AR FLD_ZONE AE VE Proposed_SFHA_Changes Zone_BFE AE7 X Map 2 Proposed SFHA Changes with Topography (NAND) v it Proposed PFD_LN Effective VE12 Proposed VE12 J�� � � Tomasello Consulting Engineers, Inc. 5906 Center Street, Jupiter, FL 33458 209 Preston Plnes Drlve, Cary, NC 27513 Richard S. Tonnasello. P.E. P.E.# 15233 Agenda Item #3. �. FD ,an,��.yy r %. it 3� O fl .p '. lot- 0' L.L fth W ' u- Op 0 i CE ZY�1 M� s �y rrTT F+1 ^ �� LLIupQ t LL !! S 9 m 5 IJIML Mwu DOW MAWN fi 9H 0001A 1WHOO KWH LU LLJ ui uj 1xi l.1-! I 1 I V. Lz� aY i v 0 0 v o � O O w.. Lew 9[�. ` :nML lie Page 134 of 237 Aaenda Item #3. I Is J No od`00 „H- N 0. rro S 0 0 OZ J 31tl0S Joa �� \^ �G� ER \\NE ®®'' .�' ¢w~ o 133d NI INNS OIHdVdO Z �� vs � 'C v P� $ � � �.' - Q � �"� ��4 � C14 G\Aon oz o o� oz ~ ` v o'3lo P��P� MpN D gBIN a1,®� ti1,: J +�+o� o_av v NS\�oE ��Po�2��� �;�: ' o S= s Y o o oo 0 ul ul UO o^ o ( o ����® \N Nj BUR ' �',,,I, oo o� o ��� wp,SERP�pB °-- - Nw .®� LPN N�N'0 Na0 12p22 / uw L 10� °aN UJI Cie z&>z A-- J O O d ' , 1 MPP M w 'r -�' G VE,E� 12 IMPP 1209 tea' ��Qoa Z 7 10---------''------- --- - c� '�;�� W d d W Q MW w oa y .O ------------------- � .AA �' d Q a Y/ ✓AUK cD -�� , I, oo U�j\0 UP V c I 1. C V/ V ' w v GA NCD Z �W J o _w o0 aw cc w w 310,EY o ��°���� o LV mw z ° W `i ° O ` ■ PR(MARpMpSE��O PER__ ENGINEERS, _ \ m (MAP_ 1 9 9G w -- ZONEONEAp 199G0179G) / _ \19g� O e32i CGN 2L 5, mw a "5, i / �G \\GN �GUSS Q PGE OS O a i/ NS�R 155 F g95\ REGGR F o 0 00'Z£ o // �GGPsp PP QEO� �NjR Pvg�\G � �z v Q z p // Q .9), EGGR N GG Q o a - Q W PNp gEP J m F z ~ co o rn:rn W00 r Z _ OI O JIJ ZI LU QW O> 0 �Qa'� 3 Al ILLJ Z- uro:D w HIH O U) Ji / :3IW W J d 010 32.0'LD w Z W - / - - U) -_- m E �E,ER�9F� m ¢ 00- w 7ON12pg9�'___------ a lM?? - IONZS\DE79F1 0 - X D G01 0 � c� r � __' i ON E p 12 g9 ----- Z Z J Z - Q W _ Ui CL CL 6£'9£ 5E� gPC\1F R)V \ FOR �OSCPPEg� - GQ M SERRQENG EE1 FOR - PROPOS�� =o LLm s SEA BF5 P \pN_� o - > \NG F L\NE � E Cc �p1 oY� - mU' ip f�1535Pp.542 Q O A O �`� s °� ,ten _ M c� 1" Q CD M N 43 go itu KN�yjjdN A 2,w? PG5 �0 M tOR9• Iz zW I I 4 I I I 12la lC\ z xo ro c¢->1o��zEc¢.��z ���¢�� z - - - _ o z N HIM m m O O m>^^ 3 �� OEM!, wo- �n oi ? Q! o }o� N ¢WZEM 11, ¢ ¢ ak o�wo ¢I - o=a� - a - o io3a 4l5A1C1 � � � I `�-° x`_"ov� xw�� V ox0oon� 1 a9,lMy- _ I o o ._� oI v`"i �w¢urc�E �m� a �o>> A 141 ' ,p9 W o o ww J o��wwv oa- ��° m d N16°12 z oY� I m o �m o oo ahfixow A - m z�vmoi 1 v a 1 d w �=omv I o 2% 2Z O c I��o`MI J � ��oNRw a ZUwZ_- Y Iaao O YySJrn I w¢ >cmiomc� o z ¢z- - " ¢�; w wz ? ¢ woo--�a�mw ,n �z E �i ¢z. `anoaarn li .�� Y m o U Q S W w I Z - G O Z - 3 0 Q 0 w 0 0 Z¢ w Z 0 0 ~ ¢ VwiY w U Z m U i U' w Z Z W Q ' ¢ Z E? j¢ a O w W o-> Y U 6 Q O U 0 G O Z O? w0 0 -�? J- KZ ,yr�� I u -rc� x- o ¢ - ZZ m H I Oti O O �Od O w LL=U 30¢t/,w¢2 wmQ> O¢-•000 JO wOti NOS Q >w¢ o iaz ow oc� of 6�N� fY NZ¢O fY - ,�/1-LLB I -- 01 o - O�>zw¢ AN¢N - o�Uoa> owoz,Jwox¢wa o¢>~ � �a¢ i¢omw0Z1i>. 29 0 o- o¢-oo�as-SEE 61, _ - --- - ¢¢ Z�OOw �¢OVf�U �- J OZ�o60 A-OZO�� _ m �U - Nip o^moo xo Sao - m N�c� in o ,na¢m �==zo - O?��zo -'SAm a�v�vi �,�����- �' 0' �oz v, J 7 Maw sz = MI Man ¢ �3Izw ¢Z¢d� ~3� c�1-W - Vt>=c�J Aaenda Item #3. W IP IQ I I I V I V I I I I I I I fV 1d3 l3 33S I 3NIl HOl W I� I� I� I� I Y s� MOD D 00 O m m OI Cn I I / / o N o ~ J Wm _ [O � a w a w � 9z =zmui � L(I I I ~po= I z N 1 I O ui U w ICJ N I I �I I 0 MI w NIv v1 o+l NI I I I I I I I I I I Z I w I � E- I_ Z O W �1 z WI z1 W 01 I Y se tn^ NN D:C�NN] m 0: go a8xaLo Mg �Cnp Uci 9- Z W z- J J O H � o W I IN o I� N Z o I � I N I a O U + 1 CO 1 I' I I' 1 , Y II N O O1 In M� 1 wi 1 �pN I di�Q� 1 �d�pf Of MI U� Zw NI 1 Z I W 14� 1 I1 I 'W �? a 7� I `l� 1 I 1 1 I 1 1 1 1 I 1 1 I 1 I � Z W N{n IA V O w p N r d O M J U M r r a �o>cc; mY ,n •• cd N N p � Op�p�wp cri 0 �12L � Z m� ) 14-) [D ON W(D U dN J��N U OIOW �� 00U ,n JO JI- (T p=t N v M o, z Cr Z U p 'Z' 0 I I o 1 I 1 1 1 I 1 1 I 1 I 1 I Ln CA N W O) nj M W�=CN c-� YQ, 00 N J >In Lr; O Z (!1 M 0 C4001�0� W' C V= W L Y W N�N� W 1 �i�J�aln U�cLtom Ln ,n � oL Z�Ja(T w = Ln u Ol Z Z 1 I 11 I I I 'I 1 I� I I Q I c� I to IM N IW to I� I�^ I I I I I I I I I I I I IQ I� Ioo jyj IM In I I I I i Iao Imo' N Q Imo° I x Iv v I� w N lo � I 0 I IQ I`o to IM ly I 1 I I I I I I I 1., IN IW I� I I 1 I I I I I I I I I I I I N I� N I� ---------------- W -------- ------- 1HOIlI3A08 33S N 3NIl HOl W Imo' I (n - I c3 M 00 CC W O a0 I m Cn v d' OD N �m Q�O� I Um Z w I ?a / I / / O W 0 1� zr, E- J � JN C Of a Z N E- O M I N O LL ~ J W Wl�m ~ } N J Cl)ZQOa w d d w C� ¢ 00 m I I �002 I I O (A N I I I I I I I I I I I w ^~I Z� Cn 137.6' J J N O131.0' O O / U , z c I az o or M I z nd ZN I LnM L/ Ow¢ I �z 0 Qa O U d 69.1' M / / 77.2' Q I x I x I WI 108.6' r----------- --------------I o Z- Z UD oxr �0� I 118.8' Nod ------------- r----- ---------' 103.8' 110.3' I 'r- I IOB'4' / C-)� I / I on I 1 11 1 U 1 11 1 I - O I 1 1 I 1 aca H 11 1 , , W c 1 1 � 1 Z I 1 O 1 J 1 Q 1 M 35.7' ZI K I / O � / I / 85.7' U 88.1' 00 o I U I / I I I I I No Text Agenda Item #3. From: Horton, Sherry L. To: Alec Dickerson Cc: Emily 0"Mahoney Subject: RE: Service Availability - 250 Beach Road, Tequesta, FL Date: Wednesday, November 2, 2022 12:43:27 PM Attachments: imaae003.gng Hi Alec, Unfortunately there is no natural gas available on Jupiter Island. Due to the Intracoastal crossing and environmental permitting issues it is not feasible. Kind regards, Sherry Horton Account Manager TECO Partners/Peoples Gas 1363 Jupiter Park Drive Jupiter, FL 33458 Cell: 772 216-9622 WWW.PEOPLESGAS.COM Get New 5quipment c Cash Back Save .now on purchase and installation costs AND save even more in operating costs later. Peoples Gas warts to help you save moneys We offer rebate programs to help businesses like yours offset the casts of purchasing and installing new energy -efficient natural gas equipment. From: Alec Dickerson <alec@2gho.com> Sent: Wednesday, November 2, 2022 12:23 PM To: Horton, Sherry L. <SLHorton@tecoenergy.com> Cc: Emily O'Mahoney <emily@2gho.com> Subject: Service Availability - 250 Beach Road, Tequesta, FL Page 138 of 237 Agenda Item #3. CAUTION -External Email * * * * * Don't be quick to click! We're counting on you.? This email is from an external sender! Don't click links or open attachments from unknown sources. To report a suspicious email, click the Forward to Phishing button within Outlook for analysis by our cyber security team. If the button is unavailable, forward the email as an attachment to phis hingam,tecoenergv.com * * * * * Hi Sherry: Attached is our request for service confirmation at the above referenced location. The proposed redevelopment will be located on Beach Road in the Village of Tequesta. Please let us know if you need any additional information. Thanks, Alec Dickerson Senior Planner Office# 561-575-9557 x104 Alec&2gho.com www.2gho.com 110 I rfAm 2 Landscape Architects Planners Environmental Consultants 1907 Commerce Lane, Suite 1011 Jupiter, Florida 33458 561-575-9557 561-575-5260 Fax www.22ho.com The information contained in this transmission may contain privileged and confidential information. It is intended only for the use of the person(s) named above. If you are not the intended recipient, you are hereby notified that any review, dissemination, distribution or duplication of this communication is strictly prohibited. If you are not the intended recipient, please contact the sender by reply email and destroy all copies of the original message. All attached drawings, specifications and other documents, including those in electronic form, prepared by the consultant and the Consultants Sub -consultants are Instruments of Service for use exclusively to this Project. The Consultant and the Consultants Sub -consultants shall be deemed the authors and owners of their respective Instruments of Service and shall retain all common law, statutory and other reserved rights, including copyrights. NOTICE: This email is intended only for the individual(s) to whom it is addressed and may contain confidential information. If you have received this email by mistake, please notify the sender immediately, delete this email from your system and do not copy or disclose it to anyone else. Although we take precautions to protect against viruses, we advise you to take your own precautions to protect against viruses as we accept no liability for any which remain. Page 139 of 237 Agenda Item #3. From: Marjorie Craig To: Kasey Fyda; Jose Rodriguez; Lynne Britt Cc: Alec Dickerson; Emily 0"Mahonex; David Cowan Subject: FW: 250 Beach Road - Confirmation of Service Date: Monday, November 7, 2022 9:38:01 AM Attachments: image001.png image002.png Location Map.pdf D21120 Signed 2022 08-16.pdf Water Service 10.28.22. pdf Good morning, Attached are the documents sent to me for this project, as discussed. As I understand it, the project will be going through the DRC process. am copying the applicants on this email (I am forwarding the documents to the Building Department for the files). There is currently a water pipe along Beach Road. The details of the service will be determined at the time of development review. Sincerely, VILLAGE OF TEQUESTA Marjorie G Craig, PE rs Director, Utilities Department 345 Tequesta Drive I Tequesta, Florida 33469 1 www.tequesta.o[ P: 561.768.0459 1 Email: mcraigPteq uesta.org Values: Excellence I Ethics and Transparency I Quality of Life I Employees From: Alec Dickerson <alec@2gho.com> Sent: Wednesday, November 2, 2022 12:44 PM To: Marjorie Craig <mcraig@tequesta.org> Cc: Emily O'Mahoney <emily@2gho.com> Subject: [EXTERNAL] 250 Beach Road - Confirmation of Service Mimecast Attachment Protection has deemed this file to be safe, but always exercise caution when opening files. **This Email was sent from an external source. Please be mindful of its content** Hi Marjorie - Attached is our request for service confirmation at the above referenced location. The proposed redevelopment will be located on Beach Road in the Village of Tequesta. Please let us know if you need any additional information. Page 140 of 237 Agenda Item #3. Thanks, Alec Dickerson Senior Planner Office# 561-575-9557 x104 Alecna�gho.com www.2gho.com 2 G 0)Y , Landscape Architects Planners Environmental Consultants 1907 Commerce Lane, Suite 1011 Jupiter, Florida 33458 561-575-9557 561-575-5260 Fax www.22ho.com The information contained in this transmission may contain privileged and confidential information. It is intended only for the use of the person(s) named above. If you are not the intended recipient, you are hereby notified that any review, dissemination, distribution or duplication of this communication is strictly prohibited. If you are not the intended recipient, please contact the sender by reply email and destroy all copies of the original message. All attached drawings, specifications and other documents, including those in electronic form, prepared by the consultant and the Consultants Sub -consultants are Instruments of Service for use exclusively to this Project. The Consultant and the Consultants Sub -consultants shall be deemed the authors and owners of their respective Instruments of Service and shall retain all common law, statutory and other reserved rights, including copyrights. This email has been scanned for email related threats and delivered safely by Mimecast. For more information please visit http://www.mimecast.com Page 141 of 237 Agenda Item #3. LOXAHATCHEE RIVER DISTRICT 2500 JUPITER PARK DRIVE, JUPITER, FLORIDA 33458 TEL: (561) 747-5700 FAX: (561) 747-9929 D. Albrey Arrington, Ph.D. EXECUTIVE D I R E C T O R November 2, 2022 250 Beach Road Developer LLC 19950 W Country Club Dr. #10 Miami, FL 33180-4501 Email: ales 2 ho.com Re: 250 Beach Road, Tequesta PCN 60-43-40-31-12-000-1010 Sanitary Sewer Service Availability To Whom It May Concern: 1 ox ah atch e e river, o rg This letter is provided in response to a recent request by Alec R. Dickerson, Senior Planner, of 2OHO, Inc., concerning sanitary sewer service availability for the subject property. Please be advised that this property is served by a 6" private gravity service. Depending on the nature of redevelopment, continued service may require sanitary sewer system upgrades downstream of the development. Consistent with District policy, the Developer will be responsible for all costs associated with system upgrades to serve the redevelopment. Should you require additional information on this matter, please contact District Engineering Department at (561) 747-5700 Ext. 4052 Very truly yours, Kris Dean, P.E. Deputy Executive Director/Director of Engineering Services Cc: Alec R. Dickerson, Senior Planner M:\ENOINEER/FORMS\SEWER AVAILABILITY LETTERS\_250 Beach Road Developer LLC_20221102_250 Beach Road, Tequesta Sewer Availability Letter.docx .tames D. Snyder Gordon M. Boggie Stephen B. Rockoff Dr. Matt H. Rostock CHAIRMAN BOARD MEMBER BOARD MEMBER BOARD MEMBER Water Reclamation - Environmental Education - River Restoration Page 142 of 237 3 Agenda Item #3. October 20, 2022 Village of Tequesta Community Development Department 345 Tequesta Drive Tequesta FL, 33469 RE: 250 Beach Road To Whoin It May Concern: This letter is to serve as perniission for 2GHO, Inc. to act as the agent to prepare and submit all documentation and attend all meetings pertaining to the property as above described, as it relates to the land development approvals process for the aforementioned pro ect. Sincerely, 250 BEACH ROAD DEVELOPER LLC By: J/Ln Print Name: Siie[yl Kass Title: Authorized SignatoKy STATE OF FLORIDA COUNTY OF PALM BEACH The foregoing instrument was acknowledged before me by means of 2/physical presence or El online notarization this 4 day of Noveniber, 2022, by Sheryl Kass as Authorized Signatory of 250 Beach Road Developer LLC, a Delaware limited liAlity company, on behalf of the company, who is personally known to me or who has produe s identification.M - Iy Commission expires: d 3( rignatu of f person taking I know edgement GRETTEL SALES MY comMISSION # FAH 04WU EXPIRES: September 27,2024 Romed Thru Notary Pwvo ur4ewtefs Name typed, printed or stamped Page 143 of 237 Agenda Item #3. co ca st 3960 RCA Blvd Suite 6002 Palm Beach Gardens, FL 33410 01 /25/2023 Attn: Alec Dickerson 250 Beach Rd, Jupiter, FL, 33469 RE: 250 Beach Rd, Jupiter, FL, 33469 This letter is to confirm that the properties described above is within Comcast service area. Comcast currently has facilities behind the property located Underground and would need to re -design and plant built to provide service to the new building/location. The property owners or management group would also need to be put in touch with Comcast Residential and Business Services group as well to review contract/agreement regarding services for the above site/property. Upon availability, please send a set of final or approved plans that would indicate where utility easements are located for our design staff. If you have any questions or concerns, please feel free to contact me Thank you and we look forward to serving your property. Sincerely, awe i�6�� Daniel Tiburcio Construcion Spel 2 Daniel_tiburcio2@Comcast.com Page 144 of 237 Agenda Item #3. 4ii) Power & Light Company FPL November 4, 2022 Alec Dickerson/Whom it may concern Re: 250 Beach Rd, Jupiter Dear Customer: Florida Thank you for contacting FPL early in your planning process. At the present time FPL has sufficient capacity to provide electric service to your property. We have the ability to provide you service at 250 Beach Rd, Jupiter. 120/240v Open Delta configuration is currently available at this location. Please advise me early in the planning process once the final plans have been approved. This information will help us to provide you with the best service in accordance with applicable rates, rules and regulations. You may also respond to us through www.fpl.com. Please contact me if you have any questions. Sincerely, Robert Horn Associate Engineer A NEXTera ENERGY Company Page 145 of 237 Agenda Item #3. G� OL Dic THE SCHOOL DISTRICT OF KRISTIN K. GARRISON JOSEPH M. SANCHES, MBA PALM BEACH COUNTY, FL DIRECTOR CHIEF OPERATING OFFICER LLJ PLANNING AND INTERGOVERNMENTAL RELATIONS �hFc}REXCELL1�Al 3661 INTERSTATE PARK RD. N., STE 200 BEACH C00 RIVIERA BEACH, FL. 33404 PHONE: 561-434-8020 / FAX: 561-357-1193 WWW.PALM BEACHSCHOOLS.ORG/PLANNING SCHOOL CAPACITY AVAILABILITY DETERMINATION (SCAD) Submittal Date 04/07/2023 SCAD No. 23040601D — D. O. FLU /Rezoning/D.O. No. SPR#3-22 —Village of Tequesta Property Address 250 Beach Road Application Development Name 250 Beach Road Owner / Agent Name 250 Beach Road Developer, LLC / Gentile Holloway O'Mahoney SAC No. 009 Proposed D. O. 34 High -Rise Residential Units Jupiter Jupiter Jupiter Elementary School Middle School High School New Students Generated 1 1 1 Impact Review Capacity Available -5 251 -12 Utilization Percentage 101% 85% 100% Based on the findings and evaluation of the proposed development, there will be a negative impact on the public -school system. Given the recent increases in school impact fees, effective January 1, 2023, much of these impacts will be mitigated. The impact fees, however, will not fully cover impacts to the school system. Therefore, if the proposed development is approved by Village Council and if the Developer voluntarily agrees, School District Staff's School District staff recommends the following condition to mitigate such impacts. Recommendation In order to address the school capacity deficiency generated by this proposed development at the District elementary and high school level, the property owner shall contribute a total of $13,357.00 to the School District of Palm Beach County prior to the issuance of first building permit. This voluntary school capacity contribution is intended to supplement the required school impact fee (impact fee credit has already been applied). Please note that the school impact fee credit is calculated based on the Net Impact Cost per Student, as calculated in the County's latest Impact Fee Ordinance, which was adopted on September 13, 2022. 1) This determination is valid from 04/21/2023 to 04/20/2024 or the expiration date of the Validation Period site -specific development order approved during the validation period. 2) A copy of the approved D.O. must be submitted to the School District Planning Dept. prior to 04/20/2024 or this determination will expire automatically on 04/20/2024. School age children may not necessarily be assigned to the public school closest to their Notice residences. Students in Palm Beach County are assigned annually to schools under the authority of the School Board and by direction of the Superintendent, public school attendance zones are subject to change. April 21, 2023 School District Representative Signature Date Joyce C. Cai, Senior Planner joyce.cai@palmbeachschools.org Print Name & Title Email Address CC: Nilsa Zacarias, Director, Village of Tequesta Joyell Shaw, PIR Manager, School District of Palm Beach County The School District of Palm Beach County, Florida A Top High -Performing A Rated School District An Equal Education Opportunity Provider and Employer Page 146 of 237 Agenda Item #3. COASTAL SYSTEMS INTERNATIONAL, INC. 464 South Dixie Highway • Coral Gables, FL 33146 Tel: 305-661-3655 • Fax: 305-661-1914 COASTALSYSTEMS TEM www.coastalsystemsint.com INTERNATI0NAL FIELD OBSERVATION REPORT PROJECT: 413000 DATE: September 23, 2022 BIOLOGIST: Ms. Aubree Zenone, Coastal Systems International, Inc. (Coastal Systems) RE: THREATENED AND ENDANGERED SPECIES SURVEY RELATIVE TO THE ENVIRONMENTAL ASSESSMENT ANALYSIS FOR THE PROPOSED DEVELOPMENT AT 250 BEACH ROAD (PROJECT), VILLAGE OF TEQUESTA (VILLAGE, FLORIDA 1. INTRODUCTION Coastal Systems International, Inc. conducted a biological survey (Survey) for the presence of listed threatened and endangered species at the Project site, located at 250 Beach Road, Tequesta, Florida, on September 15th, 2022. It is our understanding that the Project proposes to construct a residential tower on the oceanfront parcel with a garage, landscape, hadscape, exterior lighting, and excavation and fill activities. The Village Code requires the completion of an Environmental Assessment Analysis (EAA) that includes a "list of endangered, threatened and rare species or species of special local concern found on the site" (Section 50-39). The results in this Field Observation Report (Report) highlight the efforts taken by Coastal Systems to identify these endangered, threatened and rare species (ESA Species) and the site Survey conducted to identify the presence of any such species. No Federally listed ESA Species were detected during the survey. A State endangered species, the Burrowing Four-o'clock (Okenia hypogaea) was detected on the dune associated with the Project. 2. METHODOLOGY To identify species of concern that may potentially reside on the Project site, a review of local species of concern, as well as any designated critical habitat, was conducted using preliminary data from several online resources. The following sections describe the study methodology used for identification of protected species occurrence or potential for occurrence, and then the Project site characteristics observed during the site Survey. 2.1 SPECIES OF CONCERN IN PROJECT LOCATION Using online resources, the approximate boundaries of the Project site were drawn and used to reference several databases containing critical habitat and species of concern location information. The online resources then highlighted any critical habitats in the Project area, any recorded occurrences of species of concern, and identified the likelihood of the presence of each potential species of concern. Page 147 of 237 Agenda Item #3. 413000 Field Observation Report - ESA September 23, 2022 Page 2 Web -based tools used for these efforts included: • United States Fish and Wildlife Service (FWS) Critical Habitat for Threatened and Endangered Species Portal • The FWS list of Federally Threatened or Endangered Species in Florida Counties • Florida Natural Areas Inventory (FNAI) database • FNAI Biodiversity Matrix Query Information on the species of concern identified in the online available resources, above, can be found in Exhibit A. Note that the area selection tool for the FNAI database only allows for a selection in a large area (1 square mile) of potential habitat. For this reason, species maybe identified that were not actually present or documented on the actual project site. The FNAI database showed four documented ESA species that included the Perforate Reindeer Lichen (Cladonia perforate), Leatherback Sea Turtle (Dermochelys coriacea), Nodding Pinweed (Lechea cernua) and the Burrowing Four- o'clock (Okenia hypogaea). One historically documented ESA species had been noted in the surrounding region, and nine ESA species were considered likely to be documented within the square mile region (Exhibit A). The historic documented ESA species included the Spottail Goby (Ctenogobius stigmaturus). The likely species included the Florida Scrub Jay (Aphelocoma coerulescens), Four -petal Pawpaw (Asimina tetramera), Loggerhead Sea Turtle (Caretta caretta), Green Sea Turtle (Chelonia mydas), Dark Tiny Sand -loving Scarab (Geopsammodius fuscus), Johnson's Seagrass (Halophila johnsonii), Beach Jacquemontia (Jacquemontia reclinate), East Coast Scrub Grasshopper (Melanoplus indicifer), and the Wood Stork (Mycteria americana) (See Exhibit A for FWS Critical Habitat for Threatened and Endangered Species Map and FNAI Matrix Query Results). As the Project site is located within the uplands and is not connected to tidal waters, the Biologist determined that there was no potential habitat for the Spottail Goby, Johnson's Seagrass, and West Indian Manatee. There was one critical habitat identified in the area surrounding the Project from the FWS Portal, for the Loggerhead Sea Turtle. Given that the Project will not affect overall beach width or quality, and the Florida Fish and Wildlife Commission (FWC) regulations ensure that the proposed tower uses appropriate turtle -safe lighting, the Biologist determined that there is no effect to habitat for the Loggerhead, Leatherback, and Green Sea Turtles. Twenty-four species of concern were identified on the FWS list of Federally Threatened or Endangered Species as occurring in the Project area and forty-three were identified by the FNAI Query Matrix. Of the total species identified from each list, forty-one were able to occur in the site uplands habitat: Bartram's Hairstreak Butterfly (Strymon acis bartrami), Beach Jacquemontia (Jacquemontia reclinata), Burrowing Four-o'clock (Okenia hypogaea), Celestial Lily (Nemastylis floridana), Coastal Vervain (Glandularia maritima), Dancing -lady Orchid (Tolumnia bahamensis), Dark Tiny Sand -loving Scarab (Geopsammodius fuscus), East Coast Scrub Grasshopper (Melanoplus indicifer), Eastern Indigo Snake (Drymarchon couperi), Eastern Black Rail (Laterallusjamaicensis ssp. jamaicensis), Florida Bonneted Bat (Eumopsfloridanus), Florida COASTALSYSTEMS Page 148 of 237 Agenda Item #3. 413000 Field Observation Report - ESA September 23, 2022 Page 3 Clapper Rail (Rallus longirostris scottii), Florida Filmy Fern (Trichomanes punctatum ssp. floridanum), Florida Leafwing Butterfly (Anaea troglodyte floridalis), Florida Mouse (Podomys floridanaus), Florida Panther (Puma concolor coryi), Florida Prairie Warbler (Setophaga discolor paludicola), Florida Prairie -clover (Dalea carthagenesis floridana), Florida Royal Palm (Roystonea elata), Florida Scrub Lizard (Sceloporus woodi), Florida Scrub -Jay (Aphelocoma coerulescens), Four -petal Pawpaw (Asimina tetramera), Gopher Frog (Lithobates capito), Gopher Tortoise (Gopherus polypheinus), Lakela's Balm (Dicerandra immaculata var. immaculata), Large -flowered Rosemary (Conradina grandiflora), Miami Blue Butterfly (Cyclargus thornasi bethunebakeri), Narrow -leaved Carolina Scalystem (Elytraria caroliniensis var. angustifolia), Nodding Pinweed (Lechea cernua), Perforate Reindeer Lichen (Cladonia pe�forata), Peidmont Jointgrass (Coelorachis tuberculosa), Pine Pinweed (Lechea divaricata), Piping Plover (Charadrius melodus), Puma (Felis concolor), Sand -dune Spurge (Chamaesy ce cuniulicola), Scrub Bluestem (Schizachyrium niveum), Small's Flax (Linum carteri var. smallii), Southeastern Beach Mouse (Peromyscuspolionotus niveiventris), Southern Hognose Snake (Heterodon simus), Tiny Polgyala (Polygala smallii), and the Wood Stork (Mycteria americana). These species were added to the field cards for the Survey. For a full list of species of concern reported by the FWS and FNAI, please see Exhibit A. 2.2 SITE CHARACTERISTICS AND SURVEY METHODOLOGY The Project area consists of one lot containing a total of approximately 2.3 5 acres of upland property, which is currently the Regency multi -family condominium, a series of parking lots, and a pool area (Figure 1). The proposed site improvements will not exceed the footprint of the existing upland development and intends to maintain the seawall demarcation between the upland landscaping and beach area. Figure 1. 250 Beach Road property, Project and Survey area highlighted with black lines. The property is easterly adjacent to Beach Road and is bounded to the north by the condominums at 300 Beach Road, and to the south by the Ocean Towers Condominium. The Survey was conducted on Thursday, September 15th, 2022, at 10:00 am by a biologist familiar with Florida COASTALSYSTEMS Page 149 of 237 Agenda Item #3. 413000 Field Observation Report - ESA September 23, 2022 Page 4 habitats and protected species. The Survey consisted of a thorough visual inspection of the property, using reference materials to aid in identifying species of concern. I SITE PHOTOGRAPHS M / •, cr�r cY• � !r \ e 1 � � 1 FiLyure 2. Area and Direction of each rebort bhoto. Photo 1. Looking east from South Beach Road. Photo 2. Looking south from northwest property. COASTALSYSTEMS Page 150 of 237 Agenda Item #3. 413000 Field Observation Report -ESA September 23, 2022 Page 5 Photo 3. Facing south from northern center. All Photo 5. Facing east from west center. 711 { T Photo 4. Facing south from west center. Photo 6. Facing south from center. Jr, . I:' I Photo 8. Facing south from northeast of property. COASTALSYSTEMS Page 151 of 237 Photo 5. Facing east from west center. 711 { T Photo 4. Facing south from west center. Photo 6. Facing south from center. Jr, . I:' I Photo 8. Facing south from northeast of property. COASTALSYSTEMS Page 151 of 237 Agenda Item #3. 413000 Field Observation Report -ESA September 23, 2022 Page 6 Photo 9. Facing south from northeast beach. f' Y4' nrt iti nr 1r[it a ril>I r u cur rrrin ILI II 1 I� III . plIII,IIIII 1777 t#11 1`�' rl! al 11 11 fill i Irtr�fll�tlr4In"I,III Ill III I[ all ■INII INlrlllll ■ 19R Photo 11. Facing west from east center beach. Photo 13. Facing west from southeast beach. Photo 10. Looking east from east center of property. Photo 12. Looking north from southeast beach. r .� �� a . '.. .. mow.•.. "iGa;' c.. Photo 14. Facing north from southeast property. COASTALSYSTEMS Page 152 of 237 Agenda Item #311 413000 Field Observation Report - ESA September 23, 2022 Page 7 4. CONCLUSIONS On the date of the Survey, the Project area consisted of approximately 3 8% permeable area, 50% impervious area (residential structure, parking lot, pool), and 12% vegetated sandy dune. The vegetation on site consisted of a mixture of native and exotic plants and trees used for landscaping. The dunes were vegetated with native species, with Beach Naupaka representing the only invasive species. The Project area is surrounded by a developed urban area of Tequesta, which consists of commercial, recreational, and residential opportunities. The developed and frequently manicured status of the landscape presents few opportunities for ESA species. The Burrowing Four-o'clock is a species listed as Endangered in the State of Florida. Care must be taken to avoid damage to this plant on the dune. Images of the Burrowing Four-o'clock may be found below, with the location shown in the vegetation map in Exhibit B. e p •. PL IN you s �4�t, A i w�.._ �."�-�°�'',. � '���, �• z�.1 il'`- v. R_ 7 NNZ i IT, TAR t 4k a a "•. ` M► . - f :- Photo 15. Burrowing Four-o'clock on property. File, AZ:TS F:AProject\413000\Permitting\ESA Survey\(22-09-23) ESA Survey 250 Beach Road.docx ■ ie, ^ �L t w s NJ 4 { : -P it y r�� f Photo 16. Burrowing Four-o'clock on property. COASTALSYSTEMS Page 153 of 237 Agenda Item #3. EXHIBIT A Page 154 of 237 Agenda Item #3. In Reply Refer To: Project Code: 2022-0085362 Project Name: 250 Beach Road 11N. ".%i &wlt 1'I I I 1 i° 1 A United States Department of the Interior FISH AND WILDLIFE SERVICE Florida Ecological Services Field Office' `r FL Email Address: fw4flesregs@fws.gov September 14, 2022 Subject: List of threatened and endangered species that may occur in your proposed project location or may be affected by your proposed project To Whom It May Concern: The enclosed species list identifies threatened, endangered, proposed and candidate species, as well as proposed and final designated critical habitat, that may occur within the boundary of your proposed project and/or maybe affected by your proposed project. The species list fulfills the requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.). New information based on updated surveys, changes in the abundance and distribution of species, changed habitat conditions, or other factors could change this list. Feel free to contact us if you need more current information or assistance regarding the potential impacts to federally proposed, listed, and candidate species and federally designated and proposed critical habitat. Please include your Project Code, listed at the top of this letter, in all subsequent correspondence regarding this project. Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the Act, the accuracy of this species list should be verified after 90 days. This verification can be completed formally or informally as desired. The Service recommends that verification be completed by visiting the ECOS-IPaC website at regular intervals during project planning and implementation for updates to species lists and information. An updated list may be requested through the ECOS-IPaC system by completing the same process used to receive the enclosed list. The purpose of the Act is to provide a means whereby threatened and endangered species and the ecosystems upon which they depend maybe conserved. Under sections 7(a)(1) and 7(a)(2) of the Act and its implementing regulations (50 CFR 402 et seq.), Federal agencies are required to utilize their authorities to carry out programs for the conservation of threatened and endangered species and to determine whether projects may affect threatened and endangered species and/or designated critical habitat. A Biological Assessment is required for construction projects (or other undertakings having similar physical impacts) that are major Federal actions significantly affecting the quality of the human environment as defined in the National Environmental Policy Act (42 U.S.C. 4332(2) Page 155 of 237 Agenda Item #3. 09/14/2022 � (c)). For projects other than major construction activities, the Service suggests that a biological evaluation similar to a Biological Assessment be prepared to determine whether the project may affect listed or proposed species and/or designated or proposed critical habitat. Recommended contents of a Biological Assessment are described at 50 CFR 402.12. If a Federal agency determines, based on the Biological Assessment or biological evaluation, that listed species and/or designated critical habitat may be affected by the proposed project, the agency is required to consult with the Service pursuant to 50 CFR 402. In addition, the Service recommends that candidate species, proposed species and proposed critical habitat be addressed within the consultation. More information on the regulations and procedures for section 7 consultation, including the role of permit or license applicants, can be found in the "Endangered Species Consultation Handbook" at: http://www.fws.gov/endangered/esa-library/pdf/TOC-GLOS.PDF Migratory Birds: In addition to responsibilities to protect threatened and endangered species under the Endangered Species Act (ESA), there are additional responsibilities under the Migratory Bird Treaty Act (MBTA) and the Bald and Golden Eagle Protection Act (BGEPA) to protect native birds from project -related impacts. Any activity, intentional or unintentional, resulting in take of migratory birds, including eagles, is prohibited unless otherwise permitted by the U.S. Fish and Wildlife Service (50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)). For more information regarding these Acts see https://www.fws.gov/birds/policies-and-regulations.php. The MBTA has no provision for allowing take of migratory birds that maybe unintentionally killed or injured by otherwise lawful activities. It is the responsibility of the project proponent to comply with these Acts by identifying potential impacts to migratory birds and eagles within applicable NEPA documents (when there is a federal nexus) or a Bird/Eagle Conservation Plan (when there is no federal nexus). Proponents should implement conservation measures to avoid or minimize the production of project -related stressors or minimize the exposure of birds and their resources to the project -related stressors. For more information on avian stressors and recommended conservation measures see https://www.fws.gov/birds/bird-enthusiasts/threats-to- birds.php. In addition to MBTA and BGEPA, Executive Order 13186: Responsibilities of Federal Agencies to Protect Migratory Birds, obligates all Federal agencies that engage in or authorize activities that might affect migratory birds, to minimize those effects and encourage conservation measures that will improve bird populations. Executive Order 13186 provides for the protection of both migratory birds and migratory bird habitat. For information regarding the implementation of Executive Order 13186, please visit https://www.fws.gov/birds/policies-and-regulations/ executive- orders/e0-13186.php. We appreciate your concern for threatened and endangered species. The Service encourages Federal agencies to include conservation of threatened and endangered species into their project planning to further the purposes of the Act. Please include the Consultation Code in the header of this letter with any request for consultation or correspondence about your project that you submit to our office. Page 156 of 237 Agenda Item #3. 09/14/2022 3 Attachment(s): ■ Official Species List ■ USFWS National Wildlife Refuges and Fish Hatcheries ■ Migratory Birds ■ Marine Mammals ■ Wetlands Page 157 of 237 Agenda Item #3. 09/14/2022 Official Species List This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the requirement for Federal agencies to "request of the Secretary of the Interior information whether any species which is listed or proposed to be listed may be present in the area of a proposed action' . This species list is provided by: Florida Ecological Services Field Office , FL Page 158 of 237 Agenda Item #3. 09/14/2022 I Project Summary Project Code: 2022-0085362 Project Name: 250 Beach Road Project Type: New Constr - Above Ground Project Description: Project proposes to demolish an existing multi -family tower and construct a new multi -family tower, with landscape and hardscape features. Project Location: Approximate location of the project can be viewed in Google Maps: htt s:// www.google.com/maps/@26.9538200499999971-80.0757754466814 `l _,I JUPtIL3F Ir1iel Colon Counties: Palm Beach County, Florida Page 159 of 237 Agenda Item #3. 09/14/2022 Endangered Species Act Species There is a total of 24 threatened, endangered, or candidate species on this species list. Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area. For example, certain fish may appear on the species list because a project could affect downstream species. IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA Fisheries1, as USFWS does not have the authority to speak on behalf of NOAA and the Department of Commerce. See the "Critical habitats" section below for those critical habitats that lie wholly or partially within your project area under this office's jurisdiction. Please contact the designated FWS office if you have questions. 1. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. Mammals NAME Florida Bonneted Bat Eumops floridanus Endangered There is proposed critical habitat for this species. The location of the critical habitat is not available. Species profile: https:Hecos.fws.gov/ecp/species/8630 Florida Panther Puma (=Felis) concolor coryi Endangered No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/1763 Puma (=mountain Lion) Puma (=Felis) concolor (all subsp. except coryi) Similarity of Population: FL Appearance No critical habitat has been designated for this species. (Threatened) Species profile: https:Hecos.fws.gov/ecp/species/6049 Southeastern Beach Mouse Peromyscus polionotus niveiventris Threatened No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/3951 West Indian Manatee Trichechus manatus Threatened There is final critical habitat for this species. The location of the critical habitat is not available. This species is also protected by the Marine Mammal Protection Act, and may have additional consultation requirements. Species profile: https:Hecos.fws.gov/ecp/species/4469 Page 160 of 237 Agenda Item #3. 09/14/2022 151 Birds NAME S'11`CJ S Eastern Black Rail Laterallus jamaicensis ssp. Jamaicensis Threatened No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/10477 Florida Scrub -jay Aphelocoma coerulescens No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/6174 Threatened Piping Plover Charadrius melodus Threatened Population: [Atlantic Coast and Northern Great Plains populations] - Wherever found, except those areas where listed as endangered. There is final critical habitat for this species. The location of the critical habitat is not available. Species profile: https://ecos.fws.gov/ecp/species/6039 Wood Stork Mycteria americana Threatened Population: AL, FL, GA, MS, NC, SC No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/8477 General project design guidelines: https:Hipac.ecosphere.fws. ov/project/KIIA5GFXGFCNTHTYAJYD2TCERI/documents/ generated/6954.pdf Page 161 of 237 Agenda Item #3. 09/14/2022 0 Reptiles NAME S'IAW S American Alligator Alligator mississippiensis Similarity of No critical habitat has been designated for this species. Appearance Species profile: https:Hecos.fws.gov/ecp/species/776 (Threatened) American Crocodile Crocodyl us acutus Threatened Population: U.S.A. (FL) There is final critical habitat for this species. The location of the critical habitat is not available. Species profile: https:Hecos.fws.gov/ecp/species/6604 Eastern Indigo Snake Drymarchon couperi Threatened No critical habitat has been designated for this species. Species profile: https://ecos.fws.gov/ecp/species/646 Green Sea Turtle Chelonia mydas Threatened Population: North Atlantic DPS There is final critical habitat for this species. The location of the critical habitat is not available. Species profile: https:Hecos.fws.gov/ecp/species/6199 Hawksbill Sea Turtle Eretmochelys imbricata Endangered There is final critical habitat for this species. The location of the critical habitat is not available. Species profile: https://ecos.fws.gov/ecp/species/3656 Leatherback Sea Turtle Dermochelys coriacea Endangered There is final critical habitat for this species. The location of the critical habitat is not available. Species profile: https:Hecos.fws.gov/ecp/species/1493 Loggerhead Sea Turtle Caretta caretta Threatened Population: Northwest Atlantic Ocean DPS There is final critical habitat for this species. Your location overlaps the critical habitat. Species profile: https:Hecos.fws.gov/ecp/species/1110 Insects STATUS Bartram's Hairstreak Butterfly Strymon acis bartrami Endangered There is final critical habitat for this species. The location of the critical habitat is not available. Species profile: https:Hecos.fws.gov/ecp/species/4837 Florida Leafwing Butterfly Anaea troglodyta floridalis Endangered There is final critical habitat for this species. The location of the critical habitat is not available. Species profile: https://ecos.fws.gov/ecp/species/6652 Miami Blue Butterfly Cyclargus (=Hemiargus) thomasi bethunebakeri No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/3797 Endangered Page 162 of 237 Agenda Item #3. 09/14/2022 z Flowering Plants NAME Beach Jacquemontia Jacquemontia reclinata Population: No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/1277 Florida Prairie -clover Dalea carthagenensis floridana Population: No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/2300 Four -petal Pawpaw Asimina tetramera Population: No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/3461 Tiny Polygala Polygala smallii Population: No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/996 Lichens NAME Florida Perforate Cladonia Cladonia per forata Population: No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/7516 Endangered Endangered Endangered Endangered Endangered Critical habitats There is 1 critical habitat wholly or partially within your project area under this office's jurisdiction. NAME Loggerhead Sea Turtle Caretta caretta https://ecos.fws.gov/ecp/species/1110#crithab STATUS Final Page 163 of 237 Agenda Item #3. 09/14/2022 USFWS National Wildlife Refuge Lands And Fish Hatcheries Any activity proposed on lands managed by the National Wildlife Refine system must undergo a 'Compatibility Determination' conducted by the Refuge. Please contact the individual Refuges to discuss any questions or concerns. THERE ARE NO REFUGE LANDS OR FISH HATCHERIES WITHIN YOUR PROJECT AREA. Page 164 of 237 Agenda Item #3. 09/14/2022 Migratory Birds Certain birds are protected under the Migratory Protection Act2. Bird Treaty Actl and the Bald and Golden Eagle Any person or organization who plans or conducts activities that may result in impacts to migratory birds, eagles, and their habitats should follow appropriate regulations and consider implementing appropriate conservation measures, as described below. 1. The Migratory Birds Treaty Act of 1918. 2. The Bald and Golden Eagle Protection Act of 1940. 3. 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a) The birds listed below are birds of particular concern either because they occur on the USFWS Birds of Conservation Concern (BCC) list or warrant special attention in your project location. To learn more about the levels of concern for birds on your list and how this list is generated, see the FAQ below. This is not a list of every bird you may find in this location, nor a guarantee that every bird on this list will be found in your project area. To see exact locations of where birders and the general public have sighted birds in and around your project area, visit the E-bird data mapping tool (Tip: enter your location, desired date range and a species on your list). For projects that occur off the Atlantic Coast, additional maps and models detailing the relative occurrence and abundance of bird species on your list are available. Links to additional information about Atlantic Coast birds, and other important information about your migratory bird list, including how to properly interpret and use your migratory bird report, can be found below. For guidance on when to schedule activities or implement avoidance and minimization measures to reduce impacts to migratory birds on your list, click on the PROBABILITY OF PRESENCE SUMMARY at the top of your list to see when these birds are most likely to be present and breeding in your project area. NAME BREEDING SEASON American Kestrel Falco sparverius paulus Breeds Apr 1 to This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions Aug 31 (BCRs) in the continental USA https://ecos.fws.gov/ecp/species/9587 American Oystercatcher Haematopus palliates Breeds Apr 15 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Aug 31 and Alaska. https://ecos.fws.gov/ecp/species/8935 Page 165 of 237 Agenda Item #3. 09/14/2022 4 NAME BREEDING SEASON Bachman's Sparrow Aimophila aestivalis Breeds May 1 to This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA Sep 30 and Alaska. https://ecos.fws.gov/ecp/species/6177 Bald Eagle Haliaeetus leucocephalus Breeds Sep 1 to This is not a Bird of Conservation Concern (BCC) in this area, but warrants attention Jul 31 because of the Eagle Act or for potential susceptibilities in offshore areas from certain types of development or activities. https://ecos.fws.gov/ecp/species/1626 Black Skimmer Rynchops niger Breeds May 20 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Sep 15 and Alaska. https://ecos.fws.gov/ecp/species/5234 Chimney Swift Chaetura pelagica Breeds Mar 15 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Aug 25 and Alaska. Great Blue Heron Ardea herodias occidentalis Breeds Jan 1 to This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions Dec 31 (BCRs) in the continental USA Gull -billed Tern Gelochelidon nilotica Breeds May 1 to This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA Jul 31 and Alaska. https://ecos.fws.gov/ecp/species/9501 Magnificent Frigatebird Fregata magni ficens Breeds Oct 1 to This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions Apr 30 (BCRs) in the continental USA Painted Bunting Passerina ciris Breeds Apr 25 This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions to Aug 15 (BCRs) in the continental USA Prairie Warbler Dendroica discolor Breeds May 1 to This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA Jul 31 and Alaska. Red-headed Woodpecker Melanerpes erythrocephalus This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. Reddish Egret Egretta ru fescens This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. https://ecos.fws.gov/ecp/species/7617 Breeds May 10 to Sep 10 Breeds Mar 1 to Sep 15 Page 166 of 237 Agenda Item #3. 09/14/2022 3 NAME BREEDING SEASON Ruddy Turnstone Arenaria interpres morinella Breeds This is a Bird of Conservation Concern (BCC) only in particular Bird Conservation Regions elsewhere (SCRs) in the continental USA Short -billed Dowitcher Limnodromus griseus Breeds This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA elsewhere and Alaska. https://ecos.fws.gov/ecp/species/9480 Swallow-tailed Kite Elanoides forficatus Breeds Mar 10 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to ,Tun 30 and Alaska. https:Hecos.fws.gov/ecp/species/8938 Willet Tringa semipalmata Breeds Apr 20 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA to Aug 5 and Alaska. Wilson's Plover Charadrius wilsonia Breeds Apr 1 to This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA Aug 20 and Alaska. Probability Of Presence Summary The graphs below provide our best understanding of when birds of concern are most likely to be present in your project area. This information can be used to tailor and schedule your project activities to avoid or minimize impacts to birds. Please make sure you read and understand the FAQ "Proper Interpretation and Use of Your Migratory Bird Report" before using or attempting to interpret this report. Probability of Presence (1) Each green bar represents the bird's relative probability of presence in the 10km grid cell(s) your project overlaps during a particular week of the year. (A year is represented as 12 4-week months.) A taller bar indicates a higher probability of species presence. The survey effort (see below) can be used to establish a level of confidence in the presence score. One can have higher confidence in the presence score if the corresponding survey effort is also high. How is the probability of presence score calculated? The calculation is done in three steps: 1. The probability of presence for each week is calculated as the number of survey events in the week where the species was detected divided by the total number of survey events for that week. For example, if in week 12 there were 20 survey events and the Spotted Towhee was found in 5 of them, the probability of presence of the Spotted Towhee in week 12 is 0.25. 2. To properly present the pattern of presence across the year, the relative probability of presence is calculated. This is the probability of presence divided by the maximum probability of presence across all weeks. For example, imagine the probability of presence Page 167 of 237 Agenda Item #3. 09/14/2022 151 in week 20 for the Spotted Towhee is 0.05, and that the probability of presence at week 12 (0.25) is the maximum of any week of the year. The relative probability of presence on week 12 is 0.25/0.25 = 1; at week 20 it is 0.05/0.25 = 0.2. 3. The relative probability of presence calculated in the previous step undergoes a statistical conversion so that all possible values fall between 0 and 10, inclusive. This is the probability of presence score. Breeding Season( ) Yellow bars denote a very liberal estimate of the time -frame inside which the bird breeds across its entire range. If there are no yellow bars shown for a bird, it does not breed in your project area. Survey Effort ( ) Vertical black lines superimposed on probability of presence bars indicate the number of surveys performed for that species in the lOkm grid cell(s) your project area overlaps. The number of surveys is expressed as a range, for example, 33 to 64 surveys. No Data( ) A week is marked as having no data if there were no survey events for that week. Survey Timef rame Surveys from only the last 10 years are used in order to ensure delivery of currently relevant information. The exception to this is areas off the Atlantic coast, where bird returns are based on all years of available data, since data in these areas is currently much more sparse. probability of presence breeding season survey effort no data SPECIES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC American Kestrel I I � I I� f � I I � � � � � � I � rllll IOW r I I I I�` I �4 1+++: i1+01 Mail y11A BCC - BCR American Oystercatcher ++++ ++++ ++_ I I I ++++ ++0+ +,+' ++++ BCC Rangewide ammm (CON) Bachman's Sparrow ++++,I I + ++ ++++ +E ++ _� I I I I I I �� I I I I ++ + ++++ ++++ BCC Rangewide + (CON) Bald Eagle Non -BCC Vulnerable t Black Skimmer BCC Rangewide +++++++++++I+++N++++++++++11+++I++Illll++++I++++ (CON) Page 168 of 237 Agenda Item #3. 09/14/2022 5 ��pl� Chimney Swift ++++ ++++ ++++ 1+++++++++++++++ BCC Rangewide � (CON) Great Blue Heron Jill +'++ +'" 11 1 1 1 T I I T I I I I I I I I I I I I I I I A I�BCC - BCR ILILI Gull -billed Tern BCC Rangewide (corn) MagnificenF gat bi dt BCC -BCR Painted Bunting ++++ ++++ ++++ ++� I I I I � ++++ +++-I- ++++ +++' ++++ ++++ ++++ BCC - BCR o Nor& Prairie Warbler BCC Ran ewide 11+1 i �� i� � I i i i i i i 1 i 1 I i 1 III+ +JTTTJ +1+ 11+1 (CON) Red-headed Woodpecker ++++ ++++ ++++ i+++ I +++ ++++ ++++++++ BCC Rangewide (CON) SPECIES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Reddish Egret 1 1-+++ F + ++ BCC Rangewide ' (CON) Ruddy Turnstone I I I I I"I rIll Jill Jill 11+1 Jill 01 1 I1 BCC BCR IMMEk � Short -billed Dowitcher BCC Rangewide (CON) Swallow-tailed Kite ++++ ++++ BCC Rangewide + I I + (CON) Willet -� � � � � I � I I I I I BCC Rangewide Jill'„+ IN++ IN$+ T71 NJ++ + 1„ 1"+ Jill (CON) Wilson's Plover ++++ ++++ ++++ �-+ - I I I I I I ++++ ++ + ++++ ++++ BCC Rangewide I I 1 + (CON) Additional information can be found using the following links: ■ Birds of Conservation Concern https://www.fws.gov/program/migratory-birds/species ■ Measures for avoiding and minimizing impacts to birds https://www.fws.gov/library/ collections/avoidinv--and-minimizinv--incidental-take-miv-ratorv-birds ■ Nationwide conservation measures for birds https://www.fws.gov/sites/default/files/ documents/nationwide- standard- cons ervation-measures.pdf Page 169 of 237 Agenda Item #3. 09/14/2022 Z Migratory Birds FAQ Tell me more about conservation measures I can implement to avoid or minimize impacts to migratory birds. Nationwide Conservation Measures describes measures that can help avoid and minimize impacts to all birds at any location year round. Implementation of these measures is particularly important when birds are most likely to occur in the project area. When birds maybe breeding in the area, identifying the locations of any active nests and avoiding their destruction is a very helpful impact minimization measure. To see when birds are most likely to occur and be breeding in your project area, view the Probability of Presence Summary. Additional measures or permits maybe advisable depending on the type of activity you are conducting and the type of infrastructure or bird species present on your project site. What does IPaC use to generate the list of migratory birds that potentially occur in my specified location? The Migratory Bird Resource List is comprised of USFWS Birds of Conservation Concern BCC and other species that may warrant special attention in your project location. The migratory bird list generated for your project is derived from data provided by the Avian Knowledge Network (AKN). The AKN data is based on a growing collection of survey, banding, and citizen science datasets and is queried and filtered to return a list of those birds reported as occurring in the 10km grid cell(s) which your project intersects, and that have been identified as warranting special attention because they are a BCC species in that area, an eagle (Eagle Act requirements may apply), or a species that has a particular vulnerability to offshore activities or development. Again, the Migratory Bird Resource list includes only a subset of birds that may occur in your project area. It is not representative of all birds that may occur in your project area. To get a list of all birds potentially present in your project area, please visit the Rapid Avian Information Locator (RAIL) Tool. What does IPaC use to generate the probability of presence graphs for the migratory birds potentially occurring in my specified location? The probability of presence graphs associated with your migratory bird list are based on data provided by the Avian Knowledge Network (AKN). This data is derived from a growing collection of survey, banding,, and citizen science datasets. Probability of presence data is continuously being updated as new and better information becomes available. To learn more about how the probability of presence graphs are produced and how to interpret them, go the Probability of Presence Summary and then click on the "Tell me about these graphs" link. How do I know if a bird is breeding, wintering or migrating in my area? To see what part of a particular bird's range your project area falls within (i.e. breeding, wintering, migrating or year-round), you may query your location using the RAIL Tool and look at the range maps provided for birds in your area at the bottom of the profiles provided for each bird in your results. If a bird on your migratory bird species list has a breeding season associated with it, if that bird does occur in your project area, there may be nests present at some point Page 170 of 237 Agenda Item #3. 09/14/2022 within the timeframe specified. If "Breeds elsewhere" is indicated, then the bird likely does not breed in your project area. What are the levels of concern for migratory birds? Migratory birds delivered through IPaC fall into the following distinct categories of concern: 1. "BCC Rangewide" birds are Birds of Conservation Concern (BCC) that are of concern throughout their range anywhere within the USA (including Hawaii, the Pacific Islands, Puerto Rico, and the Virgin Islands); 2. "BCC - BCR" birds are BCCs that are of concern only in particular Bird Conservation Regions (BCRs) in the continental USA; and 3. "Non -BCC - Vulnerable" birds are not BCC species in your project area, but appear on your list either because of the Eagle Act requirements (for eagles) or (for non -eagles) potential susceptibilities in offshore areas from certain types of development or activities (e.g. offshore energy development or longline fishing). Although it is important to try to avoid and minimize impacts to all birds, efforts should be made, in particular, to avoid and minimize impacts to the birds on this list, especially eagles and BCC species of rangewide concern. For more information on conservation measures you can implement to help avoid and minimize migratory bird impacts and requirements for eagles, please see the FAQs for these topics. Details about birds that are potentially affected by offshore projects For additional details about the relative occurrence and abundance of both individual bird species and groups of bird species within your project area off the Atlantic Coast, please visit the Northeast Ocean Data Portal. The Portal also offers data and information about other taxa besides birds that may be helpful to you in your project review. Alternately, you may download the bird model results files underlying the portal maps through the NOAA NCCOS Integrative Statistical Modeling and Predictive Mapper of Marine Bird Distributions and Abundance on the Atlantic Outer Continental Shelf project webpage. Bird tracking data can also provide additional details about occurrence and habitat use throughout the year, including migration. Models relying on survey data may not include this information. For additional information on marine bird tracking data, see the Diving Bird Study and the nanotag studies or contact Caleb Spiegel or Pam Lorin. What if I have eagles on my list? If your project has the potential to disturb or kill eagles, you may need to obtain a permit to avoid violating the Eagle Act should such impacts occur. Proper Interpretation and Use of Your Migratory Bird Report The migratory bird list generated is not a list of all birds in your project area, only a subset of birds of priority concern. To learn more about how your list is generated, and see options for identifying what other birds may be in your project area, please see the FAQ "What does IPaC use to generate the migratory birds potentially occurring in my specified location". Please be aware this report provides the "probability of presence" of birds within the 10 km grid cell(s) that overlap your project; not your exact project footprint. On the graphs provided, please also look carefully at the survey effort (indicated by the black vertical bar) and for the existence of the "no Page 171 of 237 Agenda Item #3. 09/14/2022 9 data" indicator (a red horizontal bar). A high survey effort is the key component. If the survey effort is high, then the probability of presence score can be viewed as more dependable. In contrast, a low survey effort bar or no data bar means a lack of data and, therefore, a lack of certainty about presence of the species. This list is not perfect; it is simply a starting point for identifying what birds of concern have the potential to be in your project area, when they might be there, and if they might be breeding (which means nests might be present). The list helps you know what to look for to confirm presence, and helps guide you in knowing when to implement conservation measures to avoid or minimize potential impacts from your project activities, should presence be confirmed. To learn more about conservation measures, visit the FAQ "Tell me about conservation measures I can implement to avoid or minimize impacts to migratory birds" at the bottom of your migratory bird trust resources page. Page 172 of 237 Agenda Item #3. 09/14/2022 Marine Mammals Marine mammals are protected under the Marine Mammal Protection Act. Some are also protected under the Endangered Species Act! and the Convention on International Trade in Endangered Species of Wild Fauna and Flora. The responsibilities for the protection, conservation, and management of marine mammals are shared by the U.S. Fish and Wildlife Service [responsible for otters, walruses, polar bears, manatees, and dugongs] and NOAA Fisheries3 [responsible for seals, sea lions, whales, dolphins, and porpoises]. Marine mammals under the responsibility of NOAA Fisheries are not shown on this list; for additional information on those species please visit the Marine Mammals page of the NOAA Fisheries website. The Marine Mammal Protection Act prohibits the take of marine mammals and further coordination may be necessary for project evaluation. Please contact the U.S. Fish and Wildlife Service Field Office shown. 1. The Endangered Species Act (ESA) of 1973. 2. The Convention on International Trade in Endangered Species of Wild Fauna and Flora (CITES) is a treaty to ensure that international trade in plants and animals does not threaten their survival in the wild. 3. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. NAME West Indian Manatee Trichechus manatus Species profile: https://ecos.fws.gov/ecp/species/4469 Page 173 of 237 Agenda Item #3. 09/14/2022 Wetlands Impacts to NWI wetlands and other aquatic habitats may be subject to regulation under Section 404 of the Clean Water Act, or other State/Federal statutes. For more information please contact the Regulatory Program of the local U.S. Army Corps of Engineers District. Please note that the NWI data being shown may be out of date. We are currently working to update our NWI data set. We recommend you verify these results with a site visit to determine the actual extent of wetlands on site. WETLAND INFORMATION WAS NOT AVAILABLE WHEN THIS SPECIES LIST WAS GENERATED. PLEASE VISIT HTTPS:/.FWS.GOV/WETLANDS/DATA/MAPPER.HTML OR CONTACT THE FIELD OFFICE FOR FURTHER INFORMATION. Page 174 of 237 Agenda Item #3. 09/14/2022 I IPaC User Contact Information Agency: Coastal Systems International Name: Aubree Zenone Address: 464 South Dixie Highway City: Coral Gables State: FL Zip: 33146 Email azenone@coastalsystemsint.com Phone: 3056613665 Page 175 of 237 Agenda VMem #3. FNAI Biodiversity Matrix 1018 Thomasville Road Suite 200-C Tallahassee, FL 32303 850-224-8207 850-681-9364fax www.fnai.org 1�rea,5 INVENTORY Florida Natural Areas Inventory Biodiversity Matrix Query Results UNOFFICIAL REPORT Created 9/14/2022 (Contact the FNAI Data Services Coordinator at 850.224.8207 or kbrinegargfnai.fsu.edu for information on an official Standard Data Report) NOTE: The Biodiversity Matrix includes only rare species and natural communities tracked by FNAI. Report for 1 Matrix Unit: 69107 Descriptions DOCUMENTED - There is a documented occurrence in the FNAI database of the species or community within this Matrix Unit. DOCUMENTED -HISTORIC - There is a documented occurrence in the FNAI database of the species or community within this Matrix Unit; however the occurrence has not been observed/reported within the last twenty years. LIKELY - The species or community is known to occur in this vicinity, and is considered likely within this Matrix Unit because: 1. documented occurrence overlaps this and adjacent Matrix Units, but the documentation isn't precise enough to indicate which of those Units the species or community is actually located in; or 2. there is a documented occurrence in the vicinity and there is suitable habitat for that species or community within this Matrix Unit. POTENTIAL - This Matrix Unit lies within the known or predicted range of the species or community based on expert knowledge and environmental variables such as climate, soils, topography, and landcover. Matrix Unit ID: 69107 7 Documented Elements Found Scientific and Common Names Global State Federal State Rank Rank Status Listing Beach dune G3 S2 N N Cladonia perforata G2G3 S2S3 E E perforate reindeer lichen Dermochelys coriacea G2 S2 E FE Leatherback Sea Turtle Lechea cernua G3 S3 N T nodding pinweed Okenia hypogaea G3? S2 N E burrowing four-o'clock Scrub G2 S2 N N Scrubby flatwoods G2 S2? N N htt s://data. la bins. or /ma in /FNAI BioMatrix/GridSearch.cfm?sel id=69107&extent=788171.7668 333071.4329 789781.1098 3346k.NED176 of 3�7 PP p 9 9 _ _ 7 9/14/22, 1:14 V#3. FNAI Biodiversity Matrix Agenda tem `1Documented- Hi ri ElementF n Historic ou d Scientific and Common Names Global State Federal State Rank Rank Status Listing Ctenogobius stigmaturus G2 S2 N N Spottail Goby 9 Likely Elements Found Scientific and Common Names Global State Federal State Rank Rank Status Listing Aphelocoma coerulescens G2? S1S2 T FT Florida Scrub -Jay Asimina tetramera G 1 S 1 E E four -petal pawpaw Caretta caretta G3 S3 T FT Loggerhead Sea Turtle Chelonia mydas G3 S2S3 T FT Green Sea Turtle Geopsammodius fuscus G 1 S 1 N N Dark Tiny Sand -loving Scarab Halophila johnsonii G2Q S2 T E Johnson's seagrass Jacquemontia reclinata G 1 S 1 E E beach jacquemontia Melanoplus indicifer G 1 S 1 N N East Coast Scrub Grasshopper Mycteria americana G4 S2 T FT Wood Stork Matrix Unit ID: 69107 29 Potential Elements for Matrix Unit 69107 Scientific and Common Names Global State Federal State Rank Rank Status Listing Acipenser oxyrinchus oxyrinchus G3T3 S1 E FE Atlantic Sturgeon Chamaesyce cumulicola G2 S2 N E sand -dune spurge Charadrius melodus G3 S2 T FT Piping Plover Coelorachis tuberculosa G3 S3 N T Piedmont jointgrass Conradina grandiflora G3 S3 N T large -flowered rosemary Dicerandra immaculate var. immaculata G 1T1 S 1 E E Lakela's balm Drymarchon couperi G3 S2? T FT Eastern Indigo Snake Elytraria caroliniensis var. angustifolia G4T2 S2 N N narrow -leaved Carolina scalystem Eretmochelys imbricate G3 S 1 E FE Hawksbill Sea Turtle Glandularia maritima G3 S3 N E coastal vervain Gopherus poly_phemus G3 S3 C ST Gopher Tortoise Heterodon simus G2 S2S3 N N Southern Hognose Snake Lechea divaricata G2 S2 N E pine pinweed Linum carteri var. smallii G2T2 S2 N E Small's flax Lithobates capito G2G3 S3 N N ' �� 177 of ;�7 https://data. la bins. org/mapping/FNAI_BioMatrix/GridSearch.cfm?sel_id=69107&extent=788171.7668,333071.4329,789781.1098733468fW /14/22, 1.14 V item #3. FNAI Biodiversity Matrix enda Go her Frog g Microphis brachyurus G4G5 S2 SC N Opossum Pipefish Nemastylis floridana G2 S2 N E celestial lily Peromyscus polionotus niveiventris G5T1 S1 T FT Southeastern Beach Mouse Podomys floridanus G3 S3 N N Florida Mouse Poly_gala smallii G1 S1 E E tiny polygala Rallus longirostris scottii G5T3? S3? N N Florida Clapper Rail Rivulus marmoratus G4G5 S3 SC N Mangrove Rivulus Roystonea regia G2G3 S2 N E Florida royal palm Sceloporus woodi G2G3 S2S3 N N Florida Scrub Lizard Schizachyrium niveum G1G2 S1S2 N E scrub bluestem Setophaga discolor paludicola G5T3 S3 N N Florida Prairie Warbler Tolumnia bahamensis G 3 S1 N E dancing -lady orchid Trichechus manatus latirostris G2G3T2 S2S3 T N Florida Manatee Trichomanes punctatum ssp. floridanum G4G5T1 S1 E E Florida filmy fern Disclaimer The data maintained by the Florida Natural Areas Inventory represent the single most comprehensive source of information available on the locations of rare species and other significant ecological resources statewide. However, the data are not always based on comprehensive or site -specific field surveys. Therefore, this information should not be regarded as a final statement on the biological resources of the site being considered, nor should it be substituted for on -site surveys. FNAI shall not be held liable for the accuracy and completeness of these data, or opinions or conclusions drawn from these data. FNAI is not inviting reliance on these data. Inventory data are designed for the purposes of conservation planning and scientific research and are not intended for use as the primary criteria for regulatory decisions. Unofficial Report These results are considered unofficial. FNAI offers a Standard Data Request option for those needing certifiable data. htt s://data. la bins. or /ma in /FNAI BioMatrix/GridSearch.cfm?sel id=69107&extent=788171.7668 333071.4329 789781.1098 334680.77�33 178 of ;�7 PP p 9 9 _ _ 7 Agenda Item #3. EXHIBIT B Page 179 of 237 Agenda Item #3. u —Z Z: 0 E,- T F Z: z u OrCATA 14 —'L96 LA Mir%= lil k: 0 L-: LL� LL� L-� L-: LL: LL: LL LL : u: Ll� Ll: c/i cri Ll: V5 V5 Ll: v5 vi Li c/i (/i vi vi Li Li U; cri c/i cli Z ce vi LL cA In In ui ui vi 6 cD ^ M o6 cq O i0 r-� o� r-� q n N n n —N 4: uD aq cq N r-� N c> 6 .6 "i M L) U- Lw 0 z - Z < < < m v) < < < < < < < < < < < < < < < < < < < < z a a a < 0 U < < < < < < < < fl < < < 0S < < 0 CD < < < < < < < < < < < - < - < o o - z oll Cl - - - - - - - - - - - - - - - < oz < < < < < < < < < < < < < < < < < u < < m m m m m m m m m < 0 m m 0 0 m m m m m m m m m m m w m m < m m m m m m m m m u m m < u u m m m m m m m m m m m w � M I I .< -< < < < < 0 < < R 0 0 < < < < < < < < < < < < < < -< < uj o w Z 0+ IiM+0, + ++ o + + + 10 t I �- + 0 + + 11 t 000 + + + ++4. 0 0 l.n 410, nl,n 01 O Ln C14- LM ,o 7-� Vol C'4 0 �p 0% Ln CD N jV11 LU < M < a < < >- < M < < 0 M Fn M M Z"n 0 3s-=EMooc)05;0 M 3 u = = = 0 0 u M - Lu L.0 z C) 0 z 0 q- L.JL Q z 3 z ¢ 0 < w 0 CD M M M u M M M M Fl x 0 x 0 0 x 0 tt PW WID 5. Ll LLJ U M < 5mPZZd3S—dVMSV0 NOliVilOIA-00HDV]009Z\ZZoZid]S\buiddoA\DooZIt\13@foid\:j Agenda Item #3. Department of Engineering and Public Works P.Q. Box 21229 West Palm Beach, FL 33416-1229 (56 1 ) 684-4000 FAX: (561 ) 684-4050 www.pbcgov.com N Palm Beach County Board of County commissioners Gregg K. Weiss, Mayor Maria Sachs, Vice Mayor Maria G. Marino Michael A. Barnett Marci Woodward Saga Baxter Mack Bernard County Administrator Verdenia C. Baker February 27, 2023 Robert F. Rennebaum, P.E. Simmons & White, Inc. 2581 Metrocentre Blvd, Suite 3 West Palm Beach, FL 33407 RE: 250 Beach Road Project #: 230213 Traffic Performance Standards (TPS) Review Dear Mr. Rennebaum: The Palm Beach County Traffic Division has reviewed the above referenced project Traffic Impact Statement, dated November S, 2022, pursuant to the Traffic Performance Standards in Article 12 of the Palm Beach County (PBC) Unified Land Development Code (ULDC). The project is summarized as follows: Municipality: Tequesta Location: East side of Beach Road, just north of Old A I A PCN: 60-43-40-31-12-000 Access: Access driveway connection onto Beach Road (As used in the study and is NOT necessarily- an approval b%. the County throup-h this TPS letter Existing Uses: Mid -rise Multi -Family Residential = 40 DUs Proposed Uses: Demolish existing development and build: Mid -rise Multi -Family Residential = 34 DUs New Daily Trips: (28) New Peak Hour Trips: -2 (01-2) AM; -3 (-2/-1) PM Build -out: December 31, 2027 Based on the review, the Traffic Division has determined that the proposed development generates less trips compared to that from the existing development, and therefore, meets the TPS of Palm Beach County. Please note the receipt of a TPS approval letter does not constitute the review and issuance of a Palm Beach County Right -of -Way (R/W) Construction Permit nor does it eliminate any requirements that may be deemed as site related. For work within Palm Beach County RIW, a detailed review of the project will be provided upon submittal for a RIW permit application. The project is required to comply with all Palm Beach County standards and may include RIW dedication. No building permits are to be issued .by the Village after the build -out date specified above. The County traffic concurrency approval is subject to the Project Aggregation Rules set forth in the Traffic Performance Standards Ordinance. The a roval letter shall be valid no loner than one year from date of issuance. unless an application for a Site Specific Development Order has been_ approved. an application for a Site Specific Develo �ment Order has been submitted. or the "An Equal Opportunity approval letter has been su erseded b another approval �roval letter for the same Affirmative Action Employer" � ��— ro e printed on sustainable and recycled paper Page 181 of 237 Agenda Item #3. Robert F. Rennebaum, P.E. February 27, 2023 Page 2 If you have any questions regarding this determination, please contact me at S 61- 684-4030 or email HAkifaj)bcov.orQ_ S incerely, Hanane Akif, P.E. Professional Engineer Traffic Division QB:HA:cp ec: Nilsa Zacarias, Village Planner, Village of Tequesta Quazi Bari, P.E., PTOE, Manager — Growth Management, Traffic Division Alberto Lopez, Technical Assistant III, Traffic Division File: General - TP5 - Mun - Traffic Study Review F:ITRAFFICIHA\MUNICIPALITIESIAPPROVALS120231230213 - 250 BEACH RQAD.DOCXn Page 182 of 237 Agenda Item #3. SIMMONS & WHITE 2581 Metrocentre Blvd West, Suite 3, West Palm Beach, Florida 33407 0 561.478.7848 1 F 561.478.3738 www.simmonsandwhite.com Certificate of Authorization Number 3452 SIMMONS WHITE ENGINEERING I PLANNING I CONSULTING I SINCE 1982 TRAFFIC EQUIVALENCY STATEMENT 250 BEACH ROAD VILLAGE OF TEQUESTA, FLORIDA Its Prepared for: t ���_:�-;� s'� Fountainebleau Development x 00 'awar J A" ,r 19950 W. Country Club Drive St , .VR7 ! ra., •. h.i 1 FloorWas - Aventura, Florida 33180 �'- � ; :r..�• }�� � a- .. " ' , �" j Job No. iri 2o VA r obe� ki�n­'i�eau.� E. Date: November 8, 2022 t' FL Reg. No. 41168 Page 183 of 237 Agenda Item #3. 250 Beach Road Project 22-208A Page 2 1.0 SITE DATA The subject parcel is located on east side of Beach Road, north of old A1A in the Village of Tequesta, Florida and contains approximately 3.21 acres. The Property Control Numbers (PCN) for the subject parcel are 50-43-40-31-12-000- (1010:5080). The subject parcel is currently developed with a 5-story condominium facility containing 40 multi -family units. Proposed site development consists of demolishing the existing improvements and constructing a 34 unit multi -family condominium facility with project build -out of 2027. Site access is proposed via a full access driveway connection to South Beach Road. For additional information concerning site location and layout, please refer to the Site Plan prepared by 2GHo. 2.0 TRAFFIC GENERATION The traffic generated by the existing/vested development has been calculated in accordance with rates published by the Palm Beach County Traffic Division and the ITE Trip Generation Manual, 11 th Edition as shown on Tables 1, 2, and 3. Table 1 shows the daily traffic generation associated with the existing vested use and Tables 2 and 3 show the AM and PM peak hour traffic generation, respectively. The traffic generated by the existing 40 multi -family condominium facility may be summarized as follows: Exlsting8Lested Development Daily Traffic Generation = 182 tpd AM Peak Hour Traffic Generation (In/Out) = 15 pht (3 In/12 Out) PM Peak Hour Tragic Generation (In/Out) = 16 pht (10 In/6 Out) The trip generation by the proposed 34 multi -family condominium facility is shown on Tables 4, 5 and 5 attached to this statement and are summarized as follows: Proposed Development Daily Traffic Generation = 154 tpd AM Peak Hour Traffic Generation (In/Out) = 13 pht (3 In/10 Out) PM Peak Hour Traffic Generation (In/Out) = 13 pht (8 In/5 Out) The decrease in traffic generation as a result of the proposed modifications is shown in Table 7 and maybe summarized as follows: Daily Traffic Generation = 28 tpd DECREASE AM Peak Hour Traffic Generation (In/Out) = 2 pht DECREASE PM Peak Hour Traffic Generation (In/Out) = 3 pht DECREASE Page 184 of 237 Agenda Item #3. 250 Beach Road 3 Project 22-08A Page i. 3.0 CONCLUSION The attached tables document the daily, A.M. and P.M. peak hour traffic generation for the proposed redevelopment. The proposed project will generate a reduction of 28 trips per day, 2 AM peak hour trips, and 3 PM peak hour trips from the existing use. Therefore, this project meets the requirements outlined in the Palm Beach County Traffic Performance Standards. sa: x:lDocumentslTrafflcDralnage&Structuralltgs.22208a Page 185 of 237 Agenda Item #3. Z W a O J W LU C� 0 w H N W Z H N X W 0 V v C 0 a C a F— u FE its u M a m G Ln N m G N N N N N N W_ a N i-+ E 3 U a X Page 186 of 237 Agenda Item #3. co Q L C 'w V C. U_ [G i U M Gu m O Ln N 00 0 Cq A N r4 cn t5 W_ E3 d C E v 0 Page 187 of 237 Agenda Item #3. N 00 U) a [L� H W Z a ■w CL M L L) 0 Ln N 00 0 N t N N N N 0 N Ln I— U W w CL .000 Vi C Gi E V D in x Page 188 of 237 Agenda Item #3. VILLAGE OF TEQUESTA Department of Community Development 345 Tequesta Drive Tequesta, Florida 33469 Ph: 561-768-0451 / Fax: 561-768-0698 �.tequesta.org APPLICATION FOR SITE PLAN REVIEW DRC PLANNING &ZONING BOARD � Meeting Date: _ VILLAGE COUNCIL � Meeting Date: _ INSTRUCTIONS TO APPLICANTS: ------------------- - - - - -, ' DEPARTMENTAL USE ONLY Ck. # Fee Paid: _ Intake Date: � PROJECT #: ------------------------, 1. Please complete all sections of this application. If not applicable, indicate with N/A. 2. Provide all required documents as shown on the attached checklist. If not applicable, indicate with N/A. All construction, additions, and/or alterations within the Village, except in districts R-1A and R-1, must be reviewed by the Planning & Zoning Board. The Planning & Zoning Board meets the third Thursday of every month at 5:30 p.m., as needed in the Village Hall Council Chambers, 345 Tequesta Drive. The applicant will be informed by letter of their scheduled meeting date. The Planning and Zoning Board shall have general authority as outlined in Sec. 22.53. After review and recommendation by the Planning & Zoning Board, applications will be heard by the Village Council for final approval. The Village Council meets regularly on the second Thursday of every month at 6:00p.m., in the Village Hall Council Chambers. I. PROJECT DESCRIPTION &OWNER/AGENT INFORMATION PROJECT NAME: 250 Beach Road PROJECT ADDRESS: 250 Beach Road, Tequesta, FL DESCRIPTION OF PROJECT: Multifamily redevelopment consisting of 34 units Property Control Number (PCN), list additional on a separate sheet: See attached sheet Estimated project cost: approx. $62,000,000 Property Owner(s) of Record: 250 Beach Road Developer, LLC Address: 19950 W. Country Club Dr. #10, Miami, FL 33180 Phone No.: Fax No.: E-mail Address: Applicant/Agent (if other than owner complete consent section on page 3): Name: 2GHO, Inc. - George G. Gentile. FASLA, Emily O'Mahoney, FASLA, Alec Dickerson Address: 1907 Commerce Lane, Suite 101 Jupiter, FL 33458 Phone No.: 561-575-9557 Fax No.: 561-575-5260 E-mail Address: emily@2gho.com/alec@2gho.com 1 Page 189 of 237 Agenda Item #3. A) ZONING DESIGNATION R-3 II. LAND USE & ZONING B) FUTURE LAND USE DESIGNATION Medium Density Res C) Existing Use(s) Existing 40 unit Condominium Building D) Proposed Use(s), as applicable 34 unit residential condo building III. ADJACENT PROPERTIES Name of Business/ Land Use i Zoning i Existing Use(s) I Approved Use(s) Subdivision ------------------------------------------------------------ Designation t------------------------------------t------------------------ Designation --------- t---------------------------------------- t----------------------------------------------- NORTH ' Island House/Savoy'; Med. Dens. Res '; R-3 '; Condominium '; Same ---------------------------------------------------------------------------------------------------------------------------------- SOUTH Ocean Towers Med. Dens. Res ---------------------------------------- ----------------------------------------------- R-3 Condominium I Same EAST ;Atlantic Ocean I NA I NA NA I NA ---------------------------------------------------------------------------------------------------------------------------------- WEST iSea Mist i Med. Dens. Res ---------------------------------------- ----------------------------------------------- R-3 i Condominium I Same IV. APPLICANT'S STATEMENT OF JUSTIFICATION Provide a statement of use from the applicant that the submitted site plan is consistent with the goals, objectives, and all other provisions of the village comprehensive development plan, and further that the projected use is specifically authorized by development ordinances and regulations. The statement shall include, but not be limited to, specific references to those sections of the comprehensive plan relating to the proposed development. Attach additional sheets if necessary. See Justification Statement 2 Page 190 of 237 Agenda Item #3. V. OWNER/APPLICANT ACKNOWLEDGEMENT AND CONSENT Consent statement (to be completed if owner is using an agent) I/we, the owners, hereby give consent to 2GHO, Inc. to act on my/our behalf to submit this application, all required material and documents, and attend and represent me/us at all meetings and public hearings pertaining to the application and property I/we own described in the application. By signing this document, I/we affirm that I/we understand and will comply with the provisions and regulations of the Village of Tequesta, Florida Code of Ordinances. I/we further certify that all of the information contained in this application and all the documentation submitted is true to the best of my/our knowledge. Owner's Name (please print) Owner's Signature Date George G. Gentile Applicant/Agent's Name (please print) Applicant/Agent's Signature Date VI. APPLICATION FEES (1) Pre -application meeting. A pre -application submittal meeting shall be held with the owner and/or applicant and his/her design team and the community development director and his/her development staff. FEE: A $300.00 fee applies. (2) Review by the Development Review Committee (DRQ. The Community Development Director or designee shall submit such application for departmental staff and consultant review within 30 days of receipt of a completed application. FEE: a $400.00 fee applies. (3) Review by the Planning and Zoning Board. The Community Development Director or designee shall submit such application for Planning and Zoning Board review within 45 days of receipt of a completed application. FEE: a $300.00 fee (final approval) OR a $500.00 fee (recommendation to Village Council) applies (4) Review by Village Council. Within 45 days of review by the Planning and Zoning Board, the Community Development Director or designee shall then submit such application, including the recommendations of the Planning and Zoning Board, for Village Council review. FEE: a $300.00 fee plus an additional fee based on the estimated cost of work applies. FTo cover all additional administrative costs, actual or anticipated, including, but not limited to, engineering fees, consultant fees and special studies, the applicant shall compensate the village for all such costs prior to the processing of the application or not later than 30 days after final application approval whichever is determined as appropriate by the village. Failure to make such payment may be grounds for not issuing a building or zoning permit, certificate of occupancy or completion. Costs associated with advertising for public hearings and other public notice requirements are the responsibility of the applicant. The fee shall be paid prior to such application being scheduled for a public hearing requiring notice. Owner's Signature to Acknowledge 3 Page 191 of 237 Agenda Item #3. VII. APPLICATION SUBMITTAL REQUIREMENTS AND REVIEW PROCESS The applicant will submit to the Village of Tequesta Department of Community Development the following documents for review by the Development Review Committee (DRC), forty-five business (45) days prior to the meeting date: 1) Seven (7)11x17 sets and Three (3)full size sets of professionally prepared site plans showing all existing and proposed structures, setbacks, parking and loading layout, ingress and egress, sidewalks and walkways, exterior lighting layout, dimensions of street frontages, property lines and all signage. 2) Fourteen (14) 11x17 sets and Two (2) full size sets of Landscaping Plans in accordance with Village of Tequesta Code of Ordinances, Division IV, Landscaping. 3) Fourteen (14) 11x17 sets of multi -dimensional color renderings and/or photographs are to be provided. The Planning &Zoning Board requires an exact rendering of the proposed modification, construction or addition. Color photographs or prints as close to the actual colors to be used must be supplied. Since color printers often do not display the correct color, it is recommended that samples of the paint chips, as well as a sample of the support materials (i.e., canvas, wood, metal, etc.) be provided. 4) One (1) CD disk with PDF files including the completed application. 5) Any other documents, maps, photographs, or drawings that may help clarify the position of the applicant. NOTE: All renderings, models, drawings, photos, etc., will become the property of the Village of Tequesta. Pre -application meeting APPLICATION SUBMITTAL DEADLINE Deadline is 45 business days prior to P&Z Meeting date DRC Meeting Held within 2 weeks of application submittal DRC comments provided to Applicant within 1 week of DRC meeting IF Re -submit application Planning & Zoning Board Meeting — Deadline is 2 weeks following receipt of recommend approval DRC comments (3rd Thursday of each month) 41 Village Council Meeting —final approval (2nd Thursday of each month) 4 Page 192 of 237 Agenda Item #3. Vi l 1. SITE PLAN REVIEW APPLICATION SUBMITTAL CHECKLIST GENERAL (1) A completed application signed by owner, agent/applicant. Authorization must be attached if applicant is other than owner. (2) Required application fees. (3) Statements of unity of title, warranty deed, or purchase contract of the subject property. (4) General location map, showing relation of the site for which site plan approval is sought to major streets, schools, existing utilities, shopping areas, important physical features in and adjoining the project, and the like. (5) A recent aerial photograph of the site. SURVEY (1) A signed and sealed boundary survey (not more than one year old) and legal description of the property, including any and all easements of record as well as existing topographical conditions of the site. (2) Existing streets and roadway improvements (medians, driveways, signage, etc.) and existing structures within 100' of the project boundary. (3) Existing utilities within 100' of the project boundary. (4) Existing trees identified by caliper and species. SITE PLAN (1) A site plan containing the title of the project and names of the architect, engineer, project planner and/or developer, date, and north arrow, and based on an exact survey of the property drawn to a scale of sufficient size to show: a. Boundaries of the project, any existing streets, buildings, watercourses, easements, section lines, and water and sewer lines, well and septic tank locations, and other existing important physical features on the site and on property adjacent to the site. b. Tabular project data to include: Total gross site area in acres & square feet --- -------------------------------------------------------------------------------------------------------- Total number of units (multi -family) --- -------------------------------------------------------------------------------------------------------- Total square feet of each primary structure --- -------------------------------------------------------------------------------------------------------- Total square feet of accessory structures --- -------------------------------------------------------------------------------------------------------- Total footprint of each building in sq ft & ------------------------------------------------------------------------------------------------------------ Overall mean building height & number of stories ------------------------------------------------------------------------------------------------------------ Finished floor elevation for all structures --- -------------------------------------------------------------------------------------------------------------- Total project density in units per acres, if applicable --- -------------------------------------------------------------------------------------------------------------- Total proposed off-street parking spaces ------------------------------------------------------------------------------------------------------------------ Height and location of proposed fences and/or walls ------------------------------------------------------------------------------------------------------------------ Proposed drive aisle width ------------------------------------------------------------------------------------------------------------------ Proposed sidewalk width 3.21 ac or 139,626 sf ------------------------------------------------------------------- 34 ------------------------------------------------------------------- See Architectural Data Sheet ------------------------------------------------------------------- ------------------------------------------------------------------------------------- 101' based on average crest of dune ------------------------------------------------------------------------------------- 13.5' ------------------------------------------------------------------------------------- 10.61 d u/ac = 34 units ------------------------------------------------------------------------------------- 73 spaces ------------------------------------------------------------------------------------- ------------------------------------------------------------------------------------------------ 15' and 20' ------------------------------------------------------------------------------------------------ 4' walk on north side - Ex. sw on Bch Rd. 0 Page 193 of 237 Agenda Item #3. c. Provide site data and setbacks: Lot coverage Impervious area Open space area --------------------------------------------- r - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - r - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - T - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - TOTAL SQ FT 145516 1877873 1827652 ---------------------------------------------------, PERCENT (%) OF SITE 33% 63% 59% Front Side 1 Side Rear Primary structure 43' 35' (north) 32' (south) 268' - Tower Accessory structure d. Plans and location for recreation facilities, if any, including buildings and structures for such use. e. All mechanical equipment and dumpster locations, screens and buffers. f. Refuse collection and service areas. g. Access to utilities and points of utilities hookups and location of all fire hydrants close enough for fire protection. h. Plans for signage including size, location and orientation. i. Project information on beds, employees, seating, etc. as necessary depending upon the type of development. j. Exterior lighting of all buildings, parking areas and the overall site, addressing glare, traffic safety, economic effect and compatibility and harmony with adjacent properties. k. Proposed topographic considerations including natural vegetation, berms, retaining walls, privacy walls, and fences. (2) Required floodplain management data: a. Flood zone designation b. Base flood elevation C. Coastal high hazard design considerations ENGINEERING PLANS (1) Proposed access (ingress/egress) to project, drive aisles, driveways, streets and sidewalks with dimensions and turn radii for internal and external vehicular traffic. (2) Proposed traffic control signs. (3) Preliminary storm drainage and sanitary sewage plans or statements. If the village determines that the drainage and/or sewage plans require independent review, the applicant shall pay for such review by an independent engineer. (4) Plans for the extraction of fill and mineral resources and alterations or modifications to the slope, elevation, drainage pattern, natural vegetation and accessibility of the development. (5) A comprehensive traffic study, provided by an engineering firm. The study shall be paid for by the applicant and shall include but not be limited to the following: a. Future right-of-way dedications. b. Intersection improvements. c. Traffic control devices. d. Traffic generation analysis. e. Distribution and assignment of traffic access. f. Additional roadway needs. 6 Page 194 of 237 Agenda Item #3. g. Traffic safety standards, including the separation of pedestrian and vehicular traffic. h. Compliance with Palm Beach County Performance Standards Ordinance. LANDSCAPE PLANS (1) Landscaping plan, including types, sizes and locations of vegetation and decorative shrubbery, and showing provisions for irrigation systems. Plans shall also provide delineation of existing trees and information as to which trees will be reused or removed. Landscaping plans shall comply with section 78-400. In addition, landscaping plans shall include irrigation plans in accordance with section 78-398, and shall demonstrate compliance with Florida Friendly Landscaping design standards as required by section 78-394, as applicable (See section 78-392 for applicability). (2) Plans shall provide clear sight lines. (3) Location of light poles. (4) Provide landscape plan data: Required Provided - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - t - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - t --------------------------------------------------------- Number of trees (including percent native) 1 78 118 (82%) ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- --------------------------------------------------------- Number of shrubs (including percent native) 982 14472 (87%) ----------------------------------------------------------------------------------------------------------------- --------------------------------------------------------------------------------------------------------------------------- Amount of groundcover (including percent ' native) included in shrub data (80%) ----------------------------------------------------------------------------------------------------------------- ; Total percent of native vegetation 50% 83% ARCHITECTURAL PLANS (1) Architectural elevations and color renderings for buildings in the development, and exact number of units, square footage and types, together with typical floor plans of each type. (2) Type of construction of all buildings per Florida Building Code. (3) Color finishes and material examples and/or samples for all structures including roof, walls, trim, pavers, etc. ADDITIONAL REQUIREMENTS (1) Environmental impact study/assessment. All proposed new development and major redevelopment, as part of the site plan review and subdivision review process, shall submit a environmental statement describing how the proposed development will affect the estuarine water quality of the class III waters of the village, and also an environmental impact assessment study prepared by a qualified ecologist or other professional qualified to do such an assessment. The study shall meet the requirements Ch. 50 Article II, pertaining to environmentally sensitive lands. (2) Notification of neighboring jurisdictions of any external impacts that a proposed project might have within those jurisdictions and assessment and mitigation of those impacts shall be required. (5) If common facilities (such as recreation areas or structures, common open space, etc.) are to be provided for the development, statements as to how such common facilities are to be provided and permanently maintained. Such statements may take the form of proposed deed restrictions, deeds of trust, surety arrangements, or other legal instruments providing adequate guarantee to the village that such common facilities will not become a future liability for the village. (6) If development is to occur in phases, those phases should be clearly delineated on the site plan and identified in the plans and requirements appurtenant to that site plan, and each development phase shall be subject to site plan review by the village. 7 Page 195 of 237 Agenda Item #3. (7) The substance of covenants, grants of easements or other restrictions proposed to be imposed upon the use of the land, buildings and structures, including proposed easements or grants for public utilities, if applicable. (8) A statement that the development/redevelopment will provide the necessary infrastructure to meet the following level of service standards pursuant to the criteria outlined in Sec. 78-331(h): a. Traffic (roads and rights -of -way) b. Sanitary sewer c. Drainage d. Potable water e. Recreation f. Fire flow requirements g. Pedestrian walkways (9) A statement from the applicant or landowner that all pertinent permits are concurrently being sought from the applicable county, state, and federal agencies listed below. Include a copy of the letter/document with the application. Such permits shall be secured prior to the issuance of a building permit for any development on property included within the site plan. a. Palm Beach County Health Department b. Palm Beach County School District c. Tequesta Fire -Rescue Department (Fire Marshal) d. Loxahatchee River Environmental Control District (ENCON) e. Palm Beach County Department of Environmental Resources Management (DERM) f. South Florida Water Management District (SFWMD) g. Florida Department of Transportation (FDOT) h. Metropolitan Planning Organization of Palm Beach County (MPO) i. Palm Beach Traffic Engineering Division j. Martin County Metropolitan Planning Organization k. Martin County Traffic engineering Department I. Florida Power & Light m. Telephone service provider, as applicable n. Solid Waste purveyor o. Tequesta Water Department p. Other municipal, county, state and/or federal agencies as may be applicable. 8 Page 196 of 237 Agenda Item #3. 2GI -INC. LA-CUUU530 Landscape Architects Planners Environmental Consultants Gearge G. Gentile FASLA M. Troy Holloway ALA Emily M. 0"Plahoney FA LA, PLA, LEEDIIAP, BO&C 250 BEACH ROAD TEQuEsTA, FLORIDA SITE PLAN REVIEW JUSTIFICATION STATEMENT NOVEMBER 10, 2022 REV. MAY 129 2023 Introduction/ Request: On behalf of the Owner, Beach Road Developer LLC, 2GHO, Inc. respectfully requests review and approval regarding the property located at 250 Beach Road, in the Village of Teq uesta . The subject proposal will bring another one of kind building design into the Village, which will be marveled for years to come. The Owner's overall development program consists of a site plan for an infill redevelopment consisting of 34 multi -family, condominium units, and amenities area located on ± 3.21 acres. The Owner will demolish the existing 40-unit structure, and rebuild a tower with 34 units; a six -unit decrease. About the Developer: Fontainebleau Development has a world-renowned reputation in transforming ordinary into extraordinary. For more than 50 years, the owners have continually imagined and realized what many can only dream. From buildings, to cities, to world -class entertainment and hospitality experiences, Fontainebleau Development has always had the unrelenting vision to go above and beyond. The development tea m's residential philosophy is a recipe that gets at the heart of exclusivity - with enviable locations, innovative design, forward -thinking amenities, state-of-the-art technologies, personalized service, quality construction, as well as curated materials and finishes. They have partnered with Phil Perko, a Jupiter resident who has years of experience delivering quality residential projects. His knowledge of the local communities in the northern end of Palm Beach County and the Fontainebleau experience makes for an exceptional development team to bring the proposed project to reality. 113-1 COMMERCE LANE, SUITE 1 1 f JUPITER, FLORIDA ; .' 5 & l— 1 5—IZ55 1 2 W40. C OM Page 197 of 237 Agenda Item #3. 250 Beach Road November 10, 2022 Rev. May 12, 2023 Page 2of9 Compatibility with Surrounding Properties: The subject properties are uniquely situated on Beach Road, bordered on the east by the Atlantic Ocean and by other residential condominiums to the north south, and west. With this location, it allows the owner and design team a mechanism to truly design around and with the environment. Below is a chart showing the surrounding land use and zoning. Property Future Land Use Zoning Subject Properties Residential Low Densities/Medium R-3; Existing Residential Density Residential Multifamily Residential North Residential Medium Density R-3; Island House/Savoy Multifamily Residential South Residential Medium Density R-3; Ocean Towers Multifamily Residential East N/A N/A Atlantic Ocean West Residential Medium Density R-3; Sea Mist Multifamily Residential Project Justification: Over the last few years, the owner has diligently researched the housing market in the Village of Teq uesta, and has determined that the current market trends are excellent to offer a well -designed redevelopment project that provides a modest impact to growth and services in the area. The proposed redevelopment will not have any traffic impacts on the surrounding roadway network, and will bring an increase to the taxes and values of the parcels. It is important to note that this development will contain 6 less units than what currently exists. Further, the project will have no impact to the existing surrounding land uses. As Teq uesta continues to distinguish itself as a premier destination in northern Palm Beach County for locals and visitors alike, the applicant is excited to bring this project for consideration by the Village Council for approval. Benefits of Infill Redevelopment: As South Florida's real estate market has matured, it faces a challenge similar to other mature markets: the increasing scarcity of developable land. Already faced with limited availability of vacant land due to geographic constraints, the rapid and dynamic growth of the South Florida counties (including Palm Beach) over NA250 Beach Road - Fontainebleau 22-0614\Appiications\2022 Site Plan Review\Application Materials\Justification 5.12.23.docx Page 198 of 237 Agenda Item #3. 250 Beach Road November 10, 2022 Rev. May 12, 2023 Page 3of9 the past several years has left developers with fewer g reenfield development options, particularly along the coast. Early signs of property redevelopment appeared in the acquisition of golf courses for conversions. However, these represented a limited supply and came with potential environmental issues. In addition, this product could not supply premium locations along the coastline. Since waterfront development was some of the earliest development in South Florida, a vast array of aging product is potentially available for redevelopment, and most of these sites (the subject property being one) are occupied by condominiums. Last, the State of Florida recently enacted legislation to address safety concerns for condominiums and cooperative buildings by imposing a slew of stringent obligations on associations that will ultimately substantially raise condominium maintenance costs or require substantial out-of-pocket expenses for special assessments. The high cost of performing retrofitting work on aging condominiums, exacerbated by new legal requirements and the soaring costs of property insurance, and construction materials have created a unique incentive for existing unit owners to sell out to redevelopers often receiving a substantial premium over fair market value of their units. This directly enhances the public welfare objective, and creates public benefit. The balance of the benefits results in a brand new fully ADA compliant development that meets all of the current building codes. Consistency with the Village's Comprehensive Plan: With this proposed development, the owner will remain consistent with the following Goals,, Objectives, and Policies of the Village of Teq uesta's Comprehensive Plan Future Land Use Element. GOAL: 1.0.0 - PROVIDE FOR THE DEVELOPMENT OF SUITABLE AND COMPATIBLE LAND USES WHICH WILL PRESERVE, ENHANCE, AND ARE WITHIN THE ESTABLISHED CHARACTER OF THE VILLAGE OF TEQUESTA. Response: The proposed redevelopment of the property not only aims to ensure consistency with the existing zoning designation, it will also provide for a development that is compatible with the surrounding areas. NA250 Beach Road - Fontainebleau 22-0614\Appiications\2022 Site Plan Review\Application Materials\Justification 5.12.23.docx Page 199 of 237 Agenda Item #3. 250 Beach Road November 10, 2022 Rev. May 12, 2023 Page 4 of 9 Policy 1.1.2 - Table FLU - 1. Future Land Use Districts, Density and Intensity Standards Response: The proposed development is consistent with the maximum density standards indicated in the Medium Density Residential category, and does not exceed the allowable 12 dwelling units/acre. Objective: 1.2.0. - Continue to monitor conditions in the Village in order to identify and evaluate renewal or redevelopment Response: The proposed project is directly consistent with the above objective. The owner has a unique opportunity to redevelop an existing residential community into a high-class residential product that will enhance the Beach Road corridor. This proposal qualifies as a redevelopment project as the site will efficiently use the existing land, and infrastructure resources, promoting a more compact form of land use and development. The owners are reinvesting in the area, by providing the mechanism for a higher economic return to the Village of Tequesta, which will in turn, promote a quality delivery of services to the potential end users, and general public. Policy 1.3.1 - Through the implementation of planned unit development, mixed -use and other innovative regulations, encourage the development of housing types within a physical setting that permit both comfortable and creative living, while affording both privacy and sociability. Response: The concept of the proposed project is to provide a high-class, extraordinary, creative design that will foster comfortable and creative living, while affording both privacy and sociability. It proposes to remove an antiquated older condominium building and replace it with a structure that will meet the current structural and other building code requirements for coastal construction. The overall design, which will be discussed in more detail elsewhere in the narrative, aims to create a luxurious floor plan as well as amenity areas for the future owners. Policy 1.3.5. - Maintain residential densities in accordance with the standards prescribed in Table FLU-1 and the Land Development Regulations. Response: As previously stated, the proposed project maintains a residential density in accordance with Table FLU-1 . NA250 Beach Road - Fontainebleau 22-0614Wpplications\2022 Site Plan ReviewWpplication Materials\Justification 5.12.23.docx Page 200 of 237 Agenda Item #3. 250 Beach Road November 10, 2022 Rev. May 12, 2023 Page 5of9 Policy 1.3.6 - Require adequate parking, suitably arranged and attractively landscaped, in all developments. Response: With this submittal, the applicant has provided a site and landscape plan. The site and landscape plans show full compliance with all sections of the code. The parking as proposed is in excess of the code and provides for guest parking which is not a code provision for this district, at the time of this initial submittal. Policy 1.3.7 - Strive for compatible developments that will benefit the Village and compliment the aesthetic character of the community. Response: The proposed development is consistent with surrounding existing area and aesthetic character of the community. The design plays to the existing nature (Atlantic Ocean, Intracoastal Waterway, and nearby Coral Cove Park), and only aims to compliment, as the development is expected to become a highly valued asset in the Village of Tequesta. The multi -story residential building is compatible with similar multifamily buildings to the north and south along the Beach Road corridor. Policy 1.3.12 - As part of the Site Plan Review process, compatibility with adjacent land uses shall be demonstrated. Compatibility is defined as consistency with the Future Land Use Map and compliance with Village land development regulations. Response: As the site is surrounded by water to the east, and residential to the north and south, this development is consistent with the adjacent land uses. Moreover, the existing uses are residential, and the applicant is proposing to redevelop the subject property with residential in a multistory condominium building. Policy 1.5.7 - Ensure that adjacent land uses are protected by strictly enforcing setback, height, landscaping and signage provisions within the Village land development regulations. Response: The proposed development will not be a detriment to the adjacent land uses to the north and south, as they are both residential uses. NA250 Beach Road - Fontainebleau 22-0614Wpplications\2022 Site Plan ReviewWpplication Materials\Justification 5.12.23.docx Page 201 of 237 Agenda Item #3. 250 Beach Road November 10, 2022 Rev. May 12, 2023 Page 6 of 9 Site Plan Review: Section 78-331 states that all permitted uses, development and redevelopment activities are required to go through the Site Plan Review process. The submitted application package contains all necessary documents as stipulated in the development application and zoning code. The project scope is consistent with Section 78-175(a) of the Village's zoning code as it provides lands within the Village of Tequesta for a higher density range of multi -family residential uses. Project Overview: The vision behind the proposal is to infuse the surrounding elements of nature to create a tropical modern na utica I-themed structure that proposes articulated masses that addresses height, width, and materiality to create a building that relates to its context and climate. The height of the building is articulated in layers as the tower rises from the street front and waterfront. On the streetside, the lowest layer is a more solid single - story podium that creates a Porte Coche re and conceals all parking from the road. Above this, the building creates additional outdoor active spaces adjacent to its indoor amenities. The second level; which is primarily an amenity level, expresses its more public functions towards the street front and transitions to a pool deck and small dining terrace on the waterside. These waterside functions provide a direct connection to the outdoor open spaces and takes advantage of the ocean views. The width of the building is articulated into three zones: the center portion, with more glass, creates a sense of entry and transparency connecting the building to the coast. The two ends create a feeling of two buildings which help balance the solidity and transparency of the building. The material and color palette for the project relates to the coast. The warmer tones relate to the beach and sand. The interplay of materials such as limestone, wood, and warm colored stucco help reinforce the different components and zones that articulate the building form. The lower levels integrate natural stone that help anchor the building to the ground and creates a more solid base. Landscape elements further soften the layered podium and connect it to the regional flora. The middle portion of the tower is articulated very differently to address the needs of the units. A layered limestone colored grid and structural fagade create recessed usable terraces that help promote shade and naturally ventilated outdoor spaces. By recessing the terraces behind the structure, we are able to increase the usable space behind and enhance the amount of shading the terraces provide. Visually, they also add depth and shadow to the fagade. The double story grid helps break up the scale NA250 Beach Road - Fontainebleau 22-0614\Appiications\2022 Site Plan Review\Application Materials\Justification 5.12.23.docx Page 202 of 237 Agenda Item #3. 250 Beach Road November 10, 2022 Rev. May 12, 2023 Page 7of9 and allows the secondary grid to create an interesting interplay. The top of the tower, further setback, help mark the skyline and creates private rooftop terraces. The position of the tower balances the separation from the street front and the waterfront. It allows for outdoor uses and landscape opportunities on both fronts. The property also maintains its beach access for all residents of Teq uesta via a deeded access as shown on the site plan and survey. Finally,, the proposed site plan adheres to all R-3 zoning regulations, as shown on the site data on sheet SP-1. No deviations from the code are requested with this application. Public Beach Access: As shown on the submitted survey, there is a recorded access easement on the north portion of the property. The Owner will maintain, and enhance this easement, and additionally provide for a 5' walk to the beach. Beach Road Corridor Design Guidelines: The development team understands that the Village has recently adopted design guidelines for the Beach Road corridor. While these guidelines ARE NOT applicable to this project, the design team has provided explanation on how the proposed project will meet the guidelines. This document has been provided as part of this application. Trnffirm As this is a residential redevelopment project, with 6 less units than what currently exists, the proposed project will generate a reduction in 28 trips per day. The development will have an insignificant impact on the surrounding roadways, and will be in compliance with Palm Beach County Traffic Performance Standards. Please refer to the traffic report prepared by Simmons and White for additional information. Landscaping: The landscape theme is reflective of a casually organized tropical feel with a back bone of native material that can withstand the salt air winds. The proposed plan will meet all current requirements as stipulated in the Village's code. NA250 Beach Road - Fontainebleau 22-0614\Appiications\2022 Site Plan Review\Application Materials\Justification 5.12.23.docx Page 203 of 237 Agenda Item #3. 250 Beach Road November 10, 2022 Rev. May 12, 2023 Page 8of9 Site Plan Considerations: The owner would like to stress that the proposed redevelopment project is not a detriment to the community and aims to provide the Village of Tequesta with a valuable asset for years to come. The subject redevelopment provides for the following: 1. Consistency with the goals, objectives, and policies of the Village of Teq uesta's Comprehensive Plan as described herein; 2. Consistency with applicable countywide land development regulations. The Owner will be submitting a School Concurrency Application, in addition to a traffic statement to the appropriate Palm Beach County agencies for their review. Additionally, through the review process the Owner will seek permits from the other applicable jurisdictional agencies. 3. Designed to comply with all of the applicable provisions set forth in the Village of Tequesta zoning code. 4. Compatible with the existing character of the area. As the site is surrounded by the Ocean on one side, and residential on three sides, the proposed property will not be a compatible with the surrounding areas; 5. Insignificant impact on traffic, as shown on the submitted traffic statement prepared by Simmons and White; 6. Use of the existing facilities/infrastructure on site, holding to the true essence of infill redevelopment. Prior to this submittal, we have requested confirmation of availability of service letters from the applicable utility and service provider agencies in the area. The confirmation letters will be forwarded to the Village of Tequesta Community Development Department upon our receipt; 7. Will not present any negative light and air impacts to the adjacent properties; 8. Expected increase in property values in the adjacent areas, and stimulation of the Village of Teq uesta's tax base; 9. Will not create any noise or visual pollution to the adjacent areas; 10. Will work in synergy with the surrounding parks and water, and will not have a negative impact on the adjacent natural systems or public facilities; NA250 Beach Road - Fontainebleau 22-0614\Appiications\2022 Site Plan Review\Application Materials\Justification 5.12.23.docx Page 204 of 237 Agenda Item #3. 250 Beach Road November 10, 2022 Rev. May 12, 2023 Page 9of9 Conclusion: To recap, the Owner, who is responsible for building several high -end products domestically, and internationally are proposing a site plan for i nfi I I redevelopment consisting of 34 condominium units, and amenities located on ±3.21 acres. As previously mentioned, this is a 6-unit decease from what exists today. The Owners have been extremely diligent in working with Village staff, and the design team; even being considerate enough to use local consultants familiar with the area to ensure that the final product is sensitive and respectful to the existing community. This narrative has demonstrated that the proposal is consistent with particular elements of the Village Comprehensive Plan, and will not be a detriment to any goals, objectives, and policies. Additionally, the submitted site plan shows total compliance with all elements of the Village's code, and requests no variances. With the approval of this project, Tequesta will further their mission in establishing itself as premier destination in northern Palm Beach County. On behalf of the Owner, 2GHO, Inc., respectfully request review and approval of the submitted application package. The project team at 2G HO, Inc. consists of George G. Gentile, FASLA, Emily O'Mahoney, FASLA, and Alec Dickerson. NA250 Beach Road - Fontainebleau 22-0614\Appiications\2022 Site Plan Review\Application Materials\Justification 5.12.23.docx Page 205 of 237 Agenda Item #3. 250 Beach Road Tequesta, Florida MEMO A erial Location Map a III 10927922 Page 206 of 237 Aaenda Item #3 c 69tCC VONOIJ b1SEif1�E]1 SLII'ZL£'SOE 1 Z l9l7) E'90E EE SEE I3 `IAViw 3nN3nV Nvo 006Z 1�3 i iN�� q� P#!� zzN o a3Aa3Sla SiHOIaAdOO 17V N01131aslanr ONIAVH S3W OOHinv 1V1N3WNa3noO aNVIVOOl3l3V011ddVllV30lVAOJddV NlalAa101103FBASSINMOHS 1N31NI NOIS3a' 0000 lVNOI1VNl131NI UVZ1NMOHS tl01N0103LNOTJtl dO N011tlZIdOHlntl O I ■y /� O � M _ ■ 3AO 3 1vJ I`VR/ Qy J O 1 ab0�l H�b�B H1f10S 09Z /�'�O�/���'/��� J J I' 30VIN 39 013i1V li Vd M 210 3lOHM HI11JMIMV5G HlJON011OM 3H1NI SONIindlN3S3H1O0El30d ANtl iO N011tllndINVW OINOtl1J313 ?JO SNOIlOn00TJd3> SNOISSIWSNVNl S3Id00 ON'dT oo lVN0I1VNi131N1 VOIN010311NDdV 30 A A dOld 321V SONIMVOC 363H1 NI 031VOICNI SNOIS3a llV N N E 3 N N U U Z N N L 2 V a LU m 2 Lo O 0 CN J LL cf) LU LU FM z Q J d ry O O Z LL ap zaO w zQ�� zz Qd-0J z�00 a EL 0 0 0 w Q �OLJLw QQ>> > z 0 LU � o o W W J J p O JL�LLL NMM JJW W Q H J J U)� w w CD CD � Q w w J J O z z z = W QQpp� N�wwW QQwwX0Lu �� W J J p JJ Q; 0tmQzp}JJJW zQm>>0 Z Q J O p z Q Q a O m m= 2 2 2= w~a�L.LDz00LLF- cD>9wuoow--Quwwq�n��QQo Z 0oc~ncwn0�Q���LU 0w�Oz0�0mm� O r N M I U) CO I` W M O N co I Lo CO I` QO M T T r r r r r r r r oaaaaaaaaaaaaaaaaaaaa ,- _A& -A- -1---.A-- 7 - mT A a y 7 f A A 1 JIM Agenda Item #3. c 69�EE `dal�l0IJ `d1S�f1��1 `�` 7 a O� HOVEM H1f10S os SLII'ZL£'SOE 1 Z l9l7) E'90E EE SEE I3 `iwviw 3nN3nv Nv0006Z Lrli II�i��at/ �.1 c11 ci�Q /� //�� zzN o a3Aa3S3a SiHOIaAdM 17V N01131aslanr ONIAVH S3W OOHinv 1V1N3VINO3AOO ❑Ntl lV001 313V011ddV llV30 lVAOdddV ❑iINDIS3GOOOIVNOII1NMOH5 1N31NI N`0153a'dJO N011VZ1 Ni131N1 tl01N0103LOSS3d0 33HI IiJOH11M N3111 JM d0 S5ldd 3 MH .1n OHM 30tlIN 39 013i1tl liiVd NI 210 3lOHM SONIindlNV 3 8b�l �dl�dd N /y, V voiNo I ' / ii IOU V 1�V/7 I, a vHI io OlN0O0El30d ANtl iON011tl1 dINV IVISN tl10313?O SN dI0000N011 SNOINI VOILA lS31d00 ON'dNJ00ltlNOI1VNi131N1 tlOIN010311ND21V d0 A A dOOd 321V SONIMVOC 363H1 NI 031VOICNI SNOIS3a llV a E 3 N co U U Z L L Q� LL 06 M (N c6 Q.1 Qj Ln 00 i N a--1 n6 o bD L m Q LL LL V) In (n ro LL, M M k7 0 0 Q ai of < Q N N C7 N U n0 Q N M M f6 V) N O L OO 0 L LL LL LL LL LL LL LL LL LL LL LL N to V) Ln V) V) N Ln Ln Ln V) to M M M M n'n M M M a) M � 00kJo w w w w ww w w N M M r, —I -, -, r- r4 r, n r, r, r,r� n n r-I c-I O N fV N N N N r4 N r-I fV N LL LL LL LL LL LL LL LL LL LL LL N Ln (n V)L/) V) V)Ln A V) ci7 L/) M N r4 N N N N N N M 00 � LT LT � Ol a) a) Off') a) Q MM M ri rl ri rl ri ri r-I ri CD ri (3 r1 N N N N N N N N N N V) Q N -0 + i N f6 > (JI •L L O N O V Z Z 4O 1 O O N LL LL LL LL LL LL LL LL LL LL LL LL Ln (/) L/') (n (n (n Ln V) V) Ln to V)a) CT)LT Ol Ol Ol L71 a) a) 00 N N M m M M M m m r'n'1 fV 0o N N N N N N N N N N l0 N M LL ul) LL LL Ln LnIzzi- O O q:3- E Ln N Q O O r i r-I M r-I r-I Ln O NO N 0 s a - (6 O U v) m Z D N L.L. LL L.L. LL LL L.L. L.L. LL LL N V) Ln Ln cn Ln Ln Ln Ln N N LLn n n n r` r` n n n O m m M M M M M M r, O L' Lri Lri Lri Lri Lri Lri Lri N LL LL LL LL LL LL LL LL LL N V) V) Ln V) V) Ln Ln Ln N V) 00 m 4a O N O LA N N to � � _ O Q L O E� O 00 00 00 00 00 00 00 00 r� Ln M 0 0 00 0 0 0 0 O 0 (7 G (7 Ol Ol Ql dl Ol l0 l0 r-I ri ri r-I r-I r-I r-I r-I r-I o N M 0 � CE U- Z c I + m N 0 0 0 0 0 0 0 0 0 N r4 X Q + o ate+ CO N N N N N N N N O O + [o ri r-I r1 ri r1 ri ri ri O 1 00 N m Lr) r q r-1 r l r l O 1 00 N to j J 4J `F > 0) 00 r- W Ln Rt M N - ro o D LU I� O M LO Q1 N Ln 00 M r1 p M N r I r-I O a) LT LO ri ri ri a) 00 I- w Ln � M r-I + r-I + + + + + + + + + + + LL LL O O O r-I r-I r-I r-I r-I r-I r-I r-I in O O O n n r- r- r- r QNl Ln O r-I r-I r-1 c-I r-I c-I c-I c-I c-I c-I r-I O 3 0 o a)oo r, LD Ln m - }I o O ai v v v w 75 v E SM tsuD oc -0 w J J J J J J J J Q X op .Q .0 C QJ bA x (� C C Q H N v Ln C + mU C 0 0 0 =1 SL 6 VUE'90E oo zzoz o m a3Aa3s3a siHolaAdllv �No11o1as1anr 1 Z l9l7) 0'S0£ ONIAVH S3IWOOHinv 1V1NAVINa3Aoo c ££l££I3•iwViw 3nN3AV NVo 006z ❑Ntl lV001 313VOIlddV llV30 lVA0addV 1 69tCC `d I NOIJ ` is3 no31 ❑NV-oEjjn 01103 rHnS51NMOH5 �i ^, 1N31NI NOIS30' dH00 lVNOI1VNa31NI \ r l��IIN�ra/P��T14�Q vNEN IUdLnoavdoNo11vz1aoHlnv ^\ N INJM.055l dVlM .nOOHM Nb�Id 31 `�` /y, 77 30VIN 39 013HV laVd NI HO 3lOHM N a V O �I H O Y E38 H 1 f o S O s V 3H1 NI SONIMVaO 3S3H1 O 0El3 dd 0 voiN I ' /7�'I IOU ANtl dON011tllndINV IVISN alOdl3a0 >� V 1-V/7 I, a SNOIlOn O0ad3a SNOISSIVISNtlal S31d00 (D `Y � nN'da00 WN011VNa31NI VOINn10311NDHV d0 ALH3d OHd 3HV SONIMVOC E 36 3H1 NI 031VOICNI SN01S3011V 3 U L � U7 C� _` I J • r I: 1 J I ' C C Agenda Item #3. SL66'ZL£'S0E zzoZo � a3Aa3s3a siHolaAdoo llv'No1101No 1 Z l9l 7LE'90£ ONIAVH S3W OOHinv 1V1N3VINa3noo c ££l££I3 `IAViw 3nN3nV NVo 006Z ❑Ntl lV001 313VO1lddV llV30 ltldOaddV O 69-VEE `dGNOIJ ` is3n�E]1 ❑NV-oEjjn0vJON01S51NMOH5 wdNE)dla �OOV M 1N31NI NOIS30' dH00 lVNOI1VNa31Nl l��I,N��a�JP��T,4�Q vNEN IU3LnoavdoNo11vz1aoHlnv N3IN 3055l Id dMH H. � p `�` /y, 77 30VIN 39 013HV laVd NI HO 3lOHM N a V O A H O Y E38 H 1 f o S O s V 3H1 NI SONIMVaO 3S3H1 O 0El3 dd Q voin I ' /7�'I IOU ANtl iON011tllndINV IVISN a10313a0 (D V 1 �V/7 I , a SNOIlOn O0ad3a SNOISSIVISNtlal S31d00 M �iJ � nNdH001VN011VNH31Nl VOINn10311NDHV "-' O p Z d0 ALH3d OHd 3HV SONIMVOC E 36 3H1 NI 031VOICNI SN01S3011V a 3 U L � U7 C� N I F-- J T Q + O N _I N + �••� a i L s= a O to �, a.) U Q S N Ln N X O_0 (1) " 3 M c -c a) ° o c CD +' M W o O O !Z — O N O Q >Z O a1 bn ' }' [0 qA iJ E .cam= 3� �>.s=� �a� a LM o +' v'- o+,s GX1 C N `0 i . E •, C N c�6 N bA O L >r aA V N 4, t]A i w 3 U o f O f6 }' M M N O V V V E V Z= o O N L taA Q i N U 3 i OJ 41 i O LU 0 o N }' a. O cn V "a — 4-1 M O i O N }' .0 w M ++ t U > c6 U N O • v dA = > > p f6 i L V O vi = ca a) cas E M.N �� a3 >.N aM C • z Y Q d Q o o , ~ N r N (Dw ' LZ W z W W �w cn � J ¢Q W V JO w + -i - CL W CDJ o� Q o a�� w � Q W °C N oc o Q N DC CC CC rn C3 w Q Q Q Q Q ¢ Q Q z I o c~n c~n U) c~n c~n c~n U) c) + oYC • w — — N f— f— f— f— f— J W z z z z z z w • _I c M O _ - - T 1 N N Cm _ \ - C! Q + O - N N T _ T N CD_ O \ T 2 1 + O O co �� 1 T -1 CD � C13 1 N O 1 = J J T � c cD � c 7 C3 C_3 CN + + + + + + + + + = _ = 04 _ o CT)ti co �n c T J J J JLLJ J J J J LU J w C� T I.L LU II Lo CD 00 CD z LLJ j > > w w w w O + o oLLJ _ Z W LU 0 x L l Z l Z8-10 L Z8-10 l Z8 10 Z8 10 L Z11 8 10 l Z8 10 Z8-10 L ZL IOZ z H W D "l l l l l G l l O O WC/5 W N O CC co - W CC O O a I®G uj Q I I15 IOV 1H90H ONICIlin8 a iso(jo Jd 3M 0 IS L '1H MONHO Y U W O 0- CD _ 3NI1 LdldNd 1SIM LU o o O z w O CC CC U _I U M J I C� 1 Q Q + Q + (!� + ggenaa item ;Fa. SL 6 VUE'S0E asWr a3Aa3s3a siHolaAdllv'No110lz No � oo 1 Z l9l7) 0'S0£ ONIAVH S3IWOOHinv 1V1NAVINa3Aoo c ££l££I3'IAViw 3nN3AV NVo 006z ONV lV001 313VOIlddV llV 30 lVA0addV O 69VEE ` ON01� ` isEinc)31 0NV-oEjjnNlalAa�0v JO N01S51NMOH5 wdN�dia CN �OOV 1N31NI NOIS30' da00 lVNOI1VNa31Nl l0�IIH'D-Nt/MNIR710 vNEN IU3LnoavdoNo11vz1aoHlnv N3IN 3055l Id dMH .00HM p `�` /y, 77 30VIN 39 013aV laVd NI a0 3lOHM N a V 0� H O Y E38 H 1 f 10 S O s V 3H1 NI SONIMVaO 3S3H1 O 0El3 O0 voiN I ' /7�'I IOU ANtl iON011tl1 dINV IVISN a10313a0 (D V 1 •V/7 I , a SNOIlOn O0ad3a SNOISSIVISNtlal S31d00 M �iJ � ON da001VN011VNa31NI VOINn10311ACHV "-' O p Z d0 A A dOOd AaV SONIMVOC E 36 3H1 NI 031VOICNI SN01S3011V 3 U L � U7 C� (/7 (Z) Ln (�0 r-I IZI- r-I � Ln M 4-J o�'�° + > � ca . . Q .y v J c�s� U }, +r o ca O LW W � s 'o }? U o o v M O c o CiC QO tA a-- � �Ln B U CO C N�sv•v0 O 3 --. J O +r E vi � N N ?� Q l6 O ++ S a O O J .. LL Q U �C N vi c — ca O > M 4-4 u 3 dA � p O LL Q t/i `� O v v > o 4,1 to r- " M a O LU LL % 0 z r-I ++ +�.+ d,0 +,U�,� j Ul `n tea) O GJ i OA sa,� O Q O O . Lri M 1 i U� Lj O-0 s N N *0 Q' U z JO W ��o— N U E� +,���U� N� (U !E L•r�� i� LL LL �nn \ Q • LU cV aA ++s bn U O s � +.+ i O O 0 V LU O LU COo O p -1 0 ++ a) +� O tiA v >' to v N c .� � t O L� 3 � O � O O LL 0_N O =5 C) " u J :n � i 0) -0cD = -c U� 0 Q LAL- cc Q 69-VEE ` GN0]J `` iS3n03i a`d0�t1 HObE39 H1f10S 09Z ZZOZ O a3Aa3S3a SiHOIaAd00 llV'N01101aSWr ONIAVH S3WOOHinv 1V1N3VINa3n00 ❑Ntl 1V001 315V011ddV 11V JO 1VAOaddV ON M31N3a 01103r3nS SI NMOHS 1N31NI NOIS3a00001VNOI1VNa31Nl V0IN010311n0TJV d0 NOUVZIa0H1nv N3111 JM 30 SS3ddX3 3H11nOH1IM 30VIN 30 01 1laVd M a0 3lOHM /�'�O� /���' /I'��� SNOU 3tl H1 NI SONIMVaa 3S3H1 j0 NOIlaOd J J INiO Nouvi 1dl NVW 01NOO10313 dO 0 OTJd3a SNOISSIVISNVNl S3I000 ON da001VNOI1VNa31Nl VOINOlO311NOaV d0 ALa3d OOd 321V SONIMVaa 36 3H1 NI 031VOICNI SNOIS3a 11V — I i - f / - - \ / - - j / - NVId N001=1 a3SIAMI 13A31 aNnouo 1N32 uno Agenda Item #3. SL 6 VUF'S0E zzoz o � a3Aa3s3a siHolaAdoo llv'No1101No 1 Z l9l7) 0,90£ ONIAVH S3W OOHinv 1V1N3VINa3noo c ££l££IJ IIAViw 3nN3nV NVo 006Z ❑Ntl lV001 313V01lddtl llV30 ltldOaddV O Ory 69-VEE `dGNOIJ ` is3n031 ❑NVM31�3H,uvJONHnS51NMOH5 NVId NOMA CN Z 13A31 1N31NI NOIS30' dH00 lVNOI1VNa31Nl 10�IIN'D-a\/N'N4710 vNEN IU3LnoavdoNo11vz1aoHlnv N3ILI JM 01 a5V d d N1 HO aiOHM Q 30VIN 39 013HV laVd NI HO 3lOHM `(y��. ■■/�■■ ��/�■■ CIVO�l HOVEM Hinos 09Z HINIouIMVa03S3HN0Ol0E1HOd AJLIN3WV 1N3NN ■\/ - Q M�iN I ' /7�'I IOU ANtliON011tllndINV IVISN alOdl3a0 (D V 1 �V/7 I , a SNOIlOn O0ad3a SNOISSIVISNtlal S31d00 �iJ oNda00 WN011VNa31NI VOINo10311NDHV "-' O Q Z d0 ALH3d OHd 3HV SONIMVaO E 36 3H1 NI 031VOICNI SN01S3011tl 3 U L � U7 C� / I " I - - , ------- - - � I --- ' I 3 I I I 00 I O®O I-L K r I I LU I I aK IIf t I.L1 J /�,^` { Z O I J 11 /'� �j '`� ¢ 0 ■ d �. 010 z K I O K Z — i I Q � J LL U) r ¢ � II (� W CO Z U) p (D _Z }} 2 W o Z p o 00 F ZLLJ ALLI LL LL ¢� ¢wLL Qwz� cNo z O= 9 00 W V M J W M � � LU / LLL0 -F / � $ Z -F y LL c0 \ / J LLI cD U v 5 � r / in ¢ r N r-_ / O U r LL I �wLLO _ < 0] ¢ U LL Of LJ W Q W LJ SUM � 00 i / o I I K / / I I— I I I I � ' Agenda Item #3. =5L l 6'ZL£'50E 'asl r N�d�d 03�a3s3a s1HOla�doo llv'No1101z No 1 Z l8l ZLE50E ONIAVH S3WOOHinv 1v1N3v�INa3n0O c E£�££l3'iwviw 3nN3nv Nvo 008Z ❑Ntl IVOOl 318VO1lddV llV30 lVAOHddV O co Ory 69��� `dal�l0�� `d1S�f1��1 ❑iNlNOS3GOOOIVNOIIINMOHS 1N31NI N01530'dHOO ItlNOI1VNa31Nl 110 01 � 0 I S� w � � l��IIH bVN�Jl'�Q vo1N01o3LnoHvJON011vz1a0Hinv v\ „ N N3111 Jo 30 a5V 1d 33H HC aOO1M Q `�` /y, 77 30tlIN 38 013Htl laVd NI HO 3lOHM a V O� H O Y E38 H 1 n O S O s V 3H1 NI SONIMtlaO S=HlIVISN 0 N011HOd M r b�IN01��1�l1b�/d ANVJo ouvindlNVWO1N0H10313H0 �d3IdAi a3SIAMI 7 I, a SNOIlOn00ad3a SNOISSIVISNtla1 S31d00 � ON dHoO WN011VNH31Nl VOIN010311NDHV 30 A1H3d OHd 3HV SONIMVOC E 36 3H1 NI 031VOICNI SNOIS30 llV 3 U L � U7 C� - / j� it III li I — — II III, Ilia Ilia Ili i I I i li li li I I I i I li %, III ICI III, �� ez oU- m�v ��� o m `� LL wooa03e I II LL L: m o 311ns ndvwlad ®®p H � � � I I I m iF wood ,q N3H0117l o iV3d`J - I WOod038 N3HO-Ll III III )d038 3 VWldd I WOIy.e� m lINS ��p ---- u -J ®WI -� - O® — 3OI33 p III ® wood o Lv3ao �,�{II I ®®p o N3HO11N - � O o wood O a o - linvn Lv3ao a z;o N30 c ® rovls * s w a .gLl a.e ,y N30 N30E 0 " N3HO11Y lrv'. s -1rowo a3e I III III ® `� � � s wooaa3a I I II 9 - - e "® zw M e ID;O woaa03a .ol,s� � N30 a � £ WOOd07 N u / bW f � swooa03s I , ''°Z W002J038a.� i - -- Agenda Item #3 c 69-VEE VO N01� b1S3 n?D3i � 5L66'ZL£'50E 1 Zl8l7LE'S0E E£�££IJIMM 3nN3nV>lV00067 10=1IIHOMV NOIS'FIQ zzozo a3Aa3s3a siHOlaAdoo lIV'No1101No 9NlAVHlV001E WOOHinv JN3WNa3ddV ONtl INON NlalAal0dtllltl3SSINMOHS 0NV-oEjjn 01103f3NSSINMOHS 1N31NI NOIS30' da00 IVNOI1VNa31Nl tlNEN IU3LNOaVd0 33Hl n Hlfltl N3111 JM 30 553adX3 3H11NOH11M 30VIN39013aVlaVd NIa0310HM 00� a 3 J?��d� N 3 � 4 �3ATI N CN N o r 77 ab0�l H�b�B H1f10S D�V M�'�O I ' /7�'I I�U� V 1 �o I , J 3HINISONIMVa03S3H1jONO13dO ANtli0N011tll dINtlWOINOtl1J3130 SNOUDV 00ad3a SNOISSIWSNtlal S31d00 oN'daoo lvNoo IIAOdoaa AaV SONinNndaa 363H1 NI 031VOICNI SNOIS30 lltl I V O I d AI a 3 S I A3 21 �iJ E � 3 a (0 U 0 N U) L N 72i O E] z c O ® O w l f] Z ®w _ ° U 13 �]cl 27 c D ui 0� ® Q o o \ M J -0 O O� LL �' /^'� O Fc- + vJ w ® 13 - 9 7 v, W �O - on C° _ w O \ O p m Oa 2 9" OO \ m LEI LLI 000 D o� \ h O Q Q \\ \1 c `\ \ C dl - N �P Z ❑U❑ \ U + vJ w o O - - Cl) o M 0 0 � _z N Y \ D �� p ® 4 w O 12'-1" ®fl �0 m ❑, �� 0013 CD w ® !,1 LLJ N 12'-8" 6'-5"El- - .- 17' - - - - - - N W p oN w ® IL \ L� Al ° k n o Y HUP \\ \\ \ LJ - Q J ® - 23'- -- Cl LL Q O \ 13'-1"- B' I LIY w p O Lo z \\ \ \ Lo \ 2 \ \ O� pp \ io 96 __• _ w H ao ao \ O N p pp p o ®o JLL ® ® + Q \\ \\ \\ \\ LLI m 4' p of o < LJ + VJ \ Ld_ M o N 2of 00,0 Ln 0 co Z V J \ D � - W �2 p 0 UP 6 42' 8" wo \ of \ ® LU 1) � 0 -- o Cl) \ 14'-3" 0'-10" 27' 10" - -- - -- \ 1 1 1 1 1 1 1 Agenda Item #3. c 69�EE `dal�l0IJ `d1S3f1031 `�` � SL 6 VUF'S0E 1 Z l9l7) 0'90£ ££l££I3 `iwviw 3nN3nv Nvo 006Z Lr=1 I1117-INYM 111710 zzoz o O3Aa3s3a siHOlaAdoo llv'No11O1No ONIAVH S3uIOOHinv 1V1N3VINO3AOO ❑Ntl lV001 318VOIlddV llV30 ltldOtddV ❑iINDIS3GOOOIVNOIIINMOHS 1N31NI lalAa0'da00lVNOISIN OHS VOIN0103lInDaV d0 N011VZ1a0H1nV N3111aM30SS3adX33H11nOH11M 30YIN 3O 01 aaV IaVd NI a0 alOHM NVId �00H O ^1 N Ory Q r /y, 77 a V O� H O Y E 8 H 1 n O S O s V 7 I, a b��N01031 / I�U� 3H1 NI S`J NIMtlaO IN OIN O N01 3 W ANtliOD 0dEtllndINV IVISN tl10313aO SNOIlOn00ad3a SNOISSIVISNtla1 S31d00 ON da00 WN011VNa31NI VOIN010311NDaV dO A A dOOd 3aV SONIMVOC 363H1 NI 031VOICNI SNOIS30 llV E 3 � U U7 L C� JZ Q W UW Z U Q L7 _ LL U wo II I , u II LL 0 I I o � VI I LU'- W Q > ■ ii z II 0 o w w > I 1 J W O I 1 � I i � Z 1 J 0 H LU w o Agenda Item #3. SL L ZL£'S0E zzoz o H V O3Aa3s3a siHOlaAdoo llv N01101No I Z L9 L ZLE'90£ ONIAVH S3WOOHinv lVIN3VINO3AOO N c E£L££IJ,IAViw 3nN3nV NVo 0067 ❑Ntl IVOOl 318VO1lddV llV30 ltldOtddV 69�EE `dal�l0IJ `d1S3f1��1 ❑iINDIS3G000IVNOIIINMOHSCN 1N31NI N01530 uvJ O OUVZ1V0Hinv 103„HOMY NO,S710 V01N0103 OSS3doN011VZ1aOH1NV «0- '/�3 3 - N OI1 3 S M CD N3111 JM 30 S5lad 3 MH .1n OHM N `�` /y, 77 30tlIN 39 013atl laVd NI a0 3lOHM a V O� H O Y E38 H 1 n O S O s V 3H1 NI SONIMtlaO 3S3H1 O 0El3 dd voin I ' /7�'I IOU ANtl iON011tl1 dINV NISI a1J313aO V 1 �V/7 I , a SN0110n00ad3a SNOISSIVISNtlal S31d00 ON daoo lVN011VNa31Nl VOINOIO311NDaV "-' O Z d0 A A dOOd 3aV SONIMVOC E N 36 3H1 NI 031VOICNI SNOIS30 llV a 3 U L 3NI1 LHIdOdd 1SV3 q 0 N U Q m C/J S lIHVMOIIV uvol3S HV3d oil .0[ 0I .09 L o w U mCD m LU 2 N J FLU _0 Q _F- u- C Q � w Y J N ti J O + d N N C7 z � I Q w J N Q p 1 J z ¢ w w U cl: U w CD � • w � �• ;M w Z � � H O `Z Q Z + J W = p L � Q O Q U) Z > ED w _ + CCN EE p Q N f � z -- w w cn cn cl) n cn V m o 0�: 92 E E oc ac cr �_ CD F- + 72 q _ W N Z z z Z Z Z w } �2 O m N T N O] N N O N f J ~ O ool m ti cfl ch r �_ J J J J J J W On O Z w w w w w w w w CC > > > r X w W LL zl ..0l zz z- z- 0-.��f8-�� COL f8-.0L ���8 COL ��� COL �8 COL �8 COL �L �OZ O N 1H913H 9NIciiins a3SOdO2Jd .0-.9L'1HMONV6 -- — — — —. — --- CL oLU i— OL�k .0[ k .0[ k 0L �k 05 Y CD r 0 U _ d Y p N p[ m �—_ LL U w J O ¢ LL.-- o mo- zO v= F 3lHVMOTV KVH13S 1NOHd o o o 0 ¢ N m w p ¢ m z U� Y z o Q W U O ¢ (/) ¢ W CD m S U N Q 3NI1 LH3dOdd 1SIM zl o �I IIo o z C-0 co U U M J > > ro w } Q + V + Aaenda Item #3 c 69tCE `dONO-IJ visEi 1DE]1 � SL 6 VUE'S0E 1 z l 6 UC,g0£ ££ ££��`iwviw 3nN3nv�vooasz O3Aa3s3a siHOlandoO n7v'Noole NQ u asWr ONIAVH S3 W OOHinv IV1NAMNO3AOO ❑NtlltlOOl3alAalD1103FB SSINMOHS ❑Ntl-oEjjn01103 f9nS51NMOH5 1N31NI NUS3n' da00 IVNOI1VNa31Nl N011b�/�3 3 M (V O r T" `�`/y, H 7 (V O A H O Y E1 8 H 1 n O S 0 s V 1331lH0HV N'. S90 /� //�� M�1N0I'/7�'II�UM V i o I, a V tl01N0103LD SS3ddX33 lln HllM N V"JM O055l dVlM .nOIHM 30VW SNIM3 VlSgHNIa03,OHM 3H1 NI SONIMtlan OIN j 0E13 Hd ANtliONdEl'NOISSI01NOa1J313tl0 SN0110n Ntla1 531d00 SNOINI ■A■ �Nlail■ ■8 1S3M VV N \iJ CD 5 Q U WN011 ON'da00lVNOI1VNa31Nl V01N010311NDaV VOI d0 AL dMd 3aV SONIMVan 363H1 NI 031VOICNI SN•JIS3D �]V '-' O C) E 4 UJ O N N U U7 Z (D L Q) 17 I I 1HOOH ONla-ling GASOdO�1d O CV = — — — W W i T i 11 co CZ)Il— M CO I` Lf) r - CV CY) LAM CV ap W� = T W � W� W� W CY) W N W -I W r W O W Q) m J 6 T Q T-- � — � C3-j � CO � I` � CO � LI) ::> �:> CM �> rLLJ DO Q H- + + J + J LU + J LU '� J LU + J LU �J + J LU + J LU + J + LU OJ + C/) + CD z > LL LU CD CV M Cr I L c -�- c) m CD r cD OO Q + Q + No Text Agenda Item #3. SL1, 'UF'j0E asWr co a3Aa3s3a siHolaAdoo 17v No11o1z No � 1 Z 681.7) 0'90£ ONIAVH S3ILIOOHinv Iv1N3v�INa3nooVd HA M L £E l£E ��`IWVIW 3nN3nV NVO OO6Z ❑Ntl ltlOOl3alAal01103FB SSINMOHS NOI1Y/ \3 3 odI 6 9 -VE E `dO N O I J` i s Ei n� E]1 ON -oEjjn D11O NOUVZ1 NMOH5 1N31NI NOIS30'0000 IVNOI1VNa31Nl lD�ItHOHV MOIS71Q tlNEN IU3LnoavdoNo11vInOHInv N3111JM d055lad 33H11nOOH' N `�`/y, 77 HI NI SNIMVHV=HN ONOIl HM ONId-lIf18 HINON a V O �I H O Y E38 H 1 f o S O s V 3H1 NI SONIMVaO IN OIN d0 N01 3 dO vomo I ' /7�'I Ouv ANtl i0NdI L NOIS IVISI a1J313 a0 V 1 �V/7 I , a SN0110n00ad3a SNOISSIVISNtlal S31d00 � �iJ U ON dHoo IVN011VNH31NI VOIN010311NDHV "-' O O Z d0 ALH3d OHd 3HV SONIMVOC E N 36 3H1 NI 031VOICNI SNOIS30 �]V 3 U L Cn C� Z — wQ Lu w - fl O J Z ¢ W J_ 0 W W ul J) uj OULU ofW ~ (n Z_ LL Q J LU Q O a_ Q � m < 1HJI3H JN1GTn8 43SOdObd 3M r = T T c'? T \ W W M x r_ W W tJJ W W � Q) m O + + J + LL?JJ + J + J + LIJJJ + J + J + L?JL + J } H C J C` X W - w = � LLJ N J W Z - J 1 U u? <p 0 + 1 69VEE `dGNOIJ `` iS3nO3i a`d0�t1 HObE39 Hinos 09Z SL I I'ZL£'SOE zzN o a3Aa3S3a SiHOIaAdOO IIV N01131aslanr 1 Z l9l7) E'9oE ONIAVH S3IilaOHinv 1V1N3VINa3noO EEl£E lJ IWVIW 3nN3nV NVO OO6Z aNtl ltlOOl 318VOalAaI ddtl11tl301VIOOHS N OI1 Y / \3 3 aNtl M01103r3n5 SI NMOHS dV 1N31NI N`JIS3a' d2001VNOI1VNd31Nl 10=11 IHOMV NOISFIS] VOINoio3Lnoav 3o NOUVZ1a0Hinv HI SS IMS53ddX3 3H11nOH1IM o N I a i I n s H i n o s 3 IIN 39.13i l li Vd M d0 310HM Y i � aL /��� nOw 3H1NI5`JNIMNOISSI3H130NS3ld Od JJ J I' ANtl 30 NOuvindlNV" DINOtl1J313 W SN0110n00TJd3>J SNOISSIVISNVLII S31d00 ON daoo 1VN0I1VNa31nu VOINOIO3llnnaV 3O n A doad 3av SONIMvaa 36 3H1 NI 031VOICNI SNOIS3a 11V II I I I N o r N (D o a d Z � m m 3 O L � U7 C� Aaenda Item #3 c 69�CC `dal�l0IJ `d1S�f1��1 SLII'ZL£'SOE 1 Z l9l7) E'90E EE SEE I3 `iwviw 3nN3nv Nvo 006Z zzN o a3Aa3S3a SiHOIaAdOO 17V N01101aslanr ONIAVH S3W OOHinv 1V1N3VINa3noO aNVIVOOl E18V011ddV1lV30lVAOJddV ❑iINOIS3G000IVNOII1NMOH5 1N31NI N0153a O 1 o r ,A V + `�`/y, 77 a V O� HOVE39 H1f10S os voiNo I ' / ii IOU V 1 �V/7 I, a uvJ OUVZ1V0Hin tlNEN IU3LOSS3d0 33HI IiJOHIIM N3IN JM 30 S5ldd 3 MH .1n DHM HI N1 SNIMV21tl=HN ONO1OOd 3Hio SONIindlNV OlNOOOEl30d ANtl iONd,L NOIS IVISN tl1J313?JO SNOIlOn00TJd3>J SNOISSIVISNVLIl S31d00 ON "DO WN011VNi131N1 VOINOlOH11NCHV d0 A A dOOd 321V SONIMVOC 363H1 NI 031VOICNI SNOIS3a llv �b� 2131�dW N la E 3 O N N U Q U Z N L F- Z a _ 2 o w � v� a Q o a w o CY w w 2i aw Ww� w �� ��o� zz pw aN w� w "Zw a0Xo Wp X w <J00 w coc/)�zWO Zcep cnOC QF-w� g�Lz > aU) a�x C��� cn�= 0< C7Q �0 Z� �0J t00-U) tiJ> 1`m ti� M Z U) w 75 C7wL ZN anti Q ao ti � O z O N ci J 1 i 0 / 11 :l! I {�• �, ��Jn, I I Alp- q -war, Mama WE (' 1 .. •fy' � �.� I 'lii r t ��� •i7', - - 1 x' � IJ III. J - .. I �3 Y'zatii I I - , , �'� /� � _I • : ,i "t_ �` � � j�fi '.i: ,.fir +'}r � .a� 1 r 'I WIT 7A. >E MOM # - = — �"` 3,;.�.• It`d No Text No Text m of �D Z V 0 Y d U w w mIt z w z z w m J w WCD Z Z W w w J O z o a W w O > W Q X d O z O W O >o z Q W W d Q Z Z Z Q Q Q z Z Z w V J W F W W Z Q Q Q U W Z U w Z Z Q Q Q VI W >W Q w Z w O Z— o^ 0a 0a �a �a �a Oa W Ow S w w w Z w �O w0 'O 0 O O 0 � wp O M V Q w W W o W W O W Z W W W W W W H oo wz w w w W U w c� c� �> w> <> w> w> w> c>> c>> x> H 0'OV > U Q w o 0 U 0 0M UM UM Qm wm om wM M O U' �S O O (n W L� U C� — w U W m W— W Ul W W cn W w W w W W Z w m w d' � C9 , J CD U U CD CD U' o o U 0 0 CD o CD o o CD U Z Q Z w Z Z Z Z Z Z Z Z Z W Z W Z W Z W Z W Z W Z W Z W Z W H V m W -- � m o m o m m m m m o m o m to 3 d ti m v) cn cn v) cn vc � vc cn v n n n n w w tv)< 00 w w w w w w w w w� w� w� w� w� w� w� w w� �8 x x— m x ' I — I N wN -�, <U N z U W Q Q �_ o 00 w o S U + i O o 0 Z N Jw co II w z z o Q J� UQ O �J o O ZQ U O > o o S O O>/ w O U)vo c? O O Z SSA WZ wv O ' i i i N i � / a S Ll d w I WW N 0 T) / J + N / vl l[+ O U O � os i /(n o oo �. to o 3: w + / ww / o W ~ > o / Z W w I o z W Q —9 + / �x z w � m so � �,+ / ,+ i 0 m CL w z o I ss / L o I s I 0 Z I s+ �, s` O no p + Z �' / Xv xs Qw I I W Q..CDo / V wW Q O Q J i I e `* . �C s+ Ir a / I Q O s 9 i iLLI 0 o U I // i�cn + sF �� / 9s+ + // 9+ W p z9+ I z n. �Q w w 9l+ S �lz z I _� x + / w J w s9 a" w o O O — Q _ >i z w m + W U m + o. —V e. I;NO I O A cn w Z W (. U U_ xx s. s. / s x O �' a m 9 ss 9+ I`v I Cl) m 0 0. In + w 9+ cow s+ s9R RR o, I U w Q +e. +o- + z w �y o vo e m ° / / £ J o c� X + +9 9+1 0 wI+z U + o I �C+ g9+ s s9 9+ L w z 9 o z s o w I I 9�+ + I Q w e — U / s + z w <(a o — 3 — w w ,� s9 0 1 _ — z 38 — _ — — + i U �� I .� 8 J -rw w o. z i 1N� bdb NC 8d Uv w�w> e e o Hi_No� oo Ld \N(03A b1 Iw \/10 oOzoNbo - los o oI 03 d D U o w I + in R — — I 1 _ � v" ` << s Sz . dl , 0 Luo > = o a U 8 b o + - . �N C� W Q w J '--� x+ O I1 o+ a a 1, Q �—I 1 `+ ���N � �Io m Q � O - o� w Z � � Ld cn 0 / o i Ld lz u II Q -o — — — r _ m _ — — — `1 o Q I e� o 90 z as I I _ _ — X� �— — I - 1 1 s U a o, I II �� / — _ VERED 1 I s. ` +I o z o �� OW3 _ + sfii o RKIN o l o w i CC) E MO Ep — —_ J \\ z I III w— o N o N��NNoa o f o I o To \ _ Owe/ w w� I —_-- �. NI1SI \ om I w ww 1 O - o� s x m I Q O o c �+ 1 O O > > \ M 0r ^o _ O os. O Q m �x� `�o x Ix .—W _— o s i o= /`cn of +g w° W > s has `+ I Ld Q 8 r + U I + UJ Ow// I zOm+'D oc—o W � �J S w�m = ro aN Oo o o \ 0� <z W I Iz w�" _ axe o Y eo so o o C x Q I �9 �z � w o z —+J `- w cn o w� e o, zono w e a r xw + o O�> w / Q� _ z� o I NO a Ol °1 m� 'o s - t— X~�z— o cn O_ - w od I151 - _� I rn. Op wm - o w o o 0 o Z� I x \ Q_>/ o_ 4 z g o� '+ w / w o �a =Yo / x — U 8+/�0 _ z w x x— ++ w —+ W w � .. om W / /Qw� i s+ cl�U �wo� + `o o �a w.�. 86a owl/ 2-jzwH \ Jo ww + x \ I 0 wU�UUo I w 0,r wV \ 0 O ow aJYF I x I ww oO wwc / / / ow V) + 1 0 o w Q o wLU U oLd w \ w U In z0 00 / / � m� i e sc / + i\ it U z J too I o u o � m / s°+ / o of o x w �W z wwm z� /X / o � w-'r —tx o 0 / x d 0 W m U W Z 1 6 o Z W + rn^ w F 6 \ — / o .~.., m w 1 O m /� 8 �` e+ ....... aw/°"w / /�`� /' ems° p 8os a� IQ x w / 8 O9 0 o w° v / 6 Xt 5 oNw ° �t o / d° s + N S o w LLJ —° / / ' g+ rMi _o a_ 4 / c+� � � O. — w� / �M °w / _ ear �9� o- ^ �o � ^ w Z "CD �c � � — �* —O M M-z oZ n Y m i I - /xas a 8+/} x `- II II II 'n cJ ,� + w i°°M a z w—L, x �z_ N 4 J W m `°°"" / w -w O / / `+I `+ " �r / i`°o�e% �+ , ' W ^ z0 0 0 0 j s io �' J o z Q w O/ �° / M/`° /%g�'�",� ��% F w �O w W w O+� Q Q �"j '' s� s W > w > > o o x Q> �°"ro °o r a W O� 0-'w w z I z- Y z — x w w / -� - U. . o ,w Mi */ `�+ ' ' 1, w a o_ .�-%ew x o z cn °� o x w* J �� °„w �./° 9 Q z W w cn W �, W ,z, J Q w— — w W� M s r ( 1 o �J z �> mo C, o �o ow \��• Uo'o zw zw wd3 �O�s w U r �cn Q o ✓8 O Z z -� a%"z — m m O /c� wm w m z = z Q w o, Z _ zw a P,G 3 a w o z V Q �> o = z PG oo z v o w w w ��' �� Q z w c� z x o "ono w - z °o Q xo rn m z� xwxW�W zw CD�o O Q [n O c�/ �-* w Z of CD z w v o^z � 9 z F w o�g�� w�/sN Xo cn w ��R�ovo ovwi X�> onao cn xo /sANw w z w t Raj o Wzz oQo wcn G �A, L �W W� n hZo WW-r-�J� Lo QS j • � op Z3� �"j2 � m � 0� pR p a'i 3 OO�DCYI RD W x w W o z N O d' p W N H Z_ W J (n d !n w H U Zm W O > J WU' o _ W.-• d JQ O Z W O O I J M, Z d 09 W CNRO Of O op ~Q g > Wo WQ ¢ 3� p 00° 3 210 3Sl10H1H9f1 3 ¢ o > J o'=' U- U � �0' z a � o ¢ of w O z r� p �~ o a a �3iz \ 0 �o d o o mrm o < Q rn� mo �z O a a W a �w 3 \ ¢3 v30- Q o� LU p �� w 0W LL W x w z 0 wF� ��� w z� Wes~ w �JJ o w w Z �wowuxi a �� w w 0 cn o .L Q .00 0 F- ¢W OW m off¢ m z w w O W U (n p p 2 9 Q U 00 00 WZ j Z LO 1¢Q 0 o Z ww O> J�UQ ~ 0 0cx> z z 0 0 0 0 0 00 0ww w g o� w90 0 woo O>0 on o o Q ciOF�� ♦� O H O O N O' N 0 W N O VI J N }_ o LLI f W N ~ w (3 w O cD cD Z H O W LLJ F ap a F- a a d CL ��FWF w d= wQFwF a 3m� _w U�¢aF�m "�. z �Z X K �Q �a W W d' �Q QO W -t LO N� xo x x x dQ' f xN00 d Q C3 0 d W li a d d 3 d.� O (n L� d 3 a d N .� in w w w w w (n O N O) I Q H 1Z+1 p W Ir W U Lj 0I0 o cnn w m w ap W 0 Wlyl =U' M W z F < N Z ai Z V U V J M F5 4 < J W W N Z 0 z 0 HW M N LL o w� �� a O wN °o -H �- o ai a� z o �" Z< a vi r a O w mo �w a o o� razz¢ �� w 0 z wv m z N Wl�l 03 lwi . - O O o Q = Q Q lJ.l wK F Zw (Oil lyUj < O J r 0 C � c c Q< Q Q Q N Z Z N o o Z Z O m N OQ' m D Mzz Q F< 5 �¢ w Q a o o o Q ^ �_� W g� a rno o aF wm a O O W S S = O o' m a Z� Z UZ NO O m fn OI J ?� z w� ,/� m Q' <. OQ z=�¢� SSA 0 z > Q U O ~ o W 0 0 Q w W / Z ZZ Z a w0 za M F O o� cn�. �/ x� O o<woP mm<00Z< z Dw U wm_m az ut F:o wow c� _ �Q U a a< m $W <oa g o N w Y w U E U� I- zw ,a- - lnW / I o / �g d zm � o m V� o zzLU oa 0w U) o o s 0 z o o /O 0 0 I/f ,L o T z o � X - V7 O w o w s o _ z o 00 � I / xI o c o + i =o w< m� `6 � \ mww m ` \ Ooo o o z EL >o w cL I o Q J _ J Z \ 0 oN +Pp _ `�,w \\zoo o u 0'a z o wuw,af oDo + oom oocD 0 w w m /� U ozo 0m O c o d K o J a cn cn m m o 0f0O w z w >J wm o z wW 0 - 0 0 Elf s 4 o o;zo _+ ' w0 O W w J 6 UowaJYo \ /o w<L, W W w Um Z Q m �W z Y m m o Z w y Q \moo m w sg \Q � m w n o m o W 9 o o i m / U Y m o n J ^i S moc0 wW J UlJIc ��+I cxicc ; cx>~wl- ,n�<> rZQ pd aXQ 'n �� ¢ �zovo� �waiL�l �. f 0 0w w0 wz 9� 30 Q w w m W J N 0 UZU �O F,F� �j W ¢o �z Woo w�z www oN L,¢d o- i a� ow U CO) mZz �z o oFz Z�m o. Ma 00 W wEo < wJ z zo GLOM zo. N� s Y M 9 i �-. <0 x �ln �< p� <M a Jm NZ N IN Z a �J<7 J 7 > aU U�� 6U J� / wW WV)Z F wwz WU J iO Z�U Jm m< / Vlvl c�iz M m r1 4 �iE a old 62,w 62 A <ao- o / i s � / a / 6+ II 1 8 w + a aU Z Z+ 7 CIZ, z W� r�< zz + ww W z �1 1- L` w m c0-n- gZ inoo W j d w J / 0 0Nz a..W INw e Z o�+ + lig_ w Iwm o p oP a liw oo �3 lily N a� r zxW^ - w ro Oz 0 J Q NC9d� Z O W z ag �0 �9 0 ll 01), It z H t P ~�zvUN K 0 S O o r m z p IL z � it oCD a++m W W Op LCCD CD In m /� o , w II II II x N +/80 z o 0 0 Z G� J + a s oo te Z +, pa o ~ Pam- r �+ oy0o wo�WQNw F a ^^ o '0=zwz o10zwwoo0 �0 0 > z X o :oo n > Q wVw0� N z�o>daQa � PG o O0www¢oo Q > °,-z m Q=>a . �z x LLJ sQam o0 z�Q w� JxO cD> NpzooNJ n z 0 Uczx� � �¢N zL` v>i w/�- x �w zzN CD zw U oW\HHIO cn m �, g�� w � w�SN X z a 3(n cn �k � C) �w v� ¢ w� X�> ona o xo mC) X w �0o X wmz XUQ w s,. .�N w _ ,�a w. - w Q �2: z F c� z z 0 H zN cW)00 M N w IOz3JQN¢ OZ0Q po 2 W OwWVaZ QaF QwJ W0d mz0 aa0� ¢ F wWa w0 ao 0m, 0zvi0�� QJU JZ W H Z Zw U=oE of OOW?d F7 0N0 w0N�033, ~Z� 88z- w�� om30V)mw�m U U Z �a�pzo-i V) 0zcx� m¢¢ -i ~ J N ¢0 O-jj 5;zOQ J W'< dQfnOU HO H O W x U U Q J U H ¢JH~ZOZ OZ W a W W¢ w W Y U HH,M mW W(nw 00 Z N (n H U LL,I J co -Z VI Z�Qf=�3Fo¢W ¢ o-Ou, � , tJ-<Waaua oaQ�Q`�m�z Lo fi ^Qa^Z0JZa^W 0��KL)z o�zwo ZNH=0fl)2 ~ <0n00 Z oZ5 � •o aj W m��CF �Jti (�elu 0N2 Z3� j= 00 Nt m I U m z N � -1 V X C-D_LL � CUcu 2-5 `N 10-wU N�m�n3 uptaojd `u4sanba j P130HOgg weld a4TS Toojd punoaD � y K W Z � r M y y y y Q C lJl < O Z (p �• H < Se J O O Z H W C LL O y C C < < H J \ \ y N~ U O C 2 w W o w LL g w < Bi N �- O w w SJ SS 0 0 N H 7 g M < O O f0 LL a � S K J e F N� rqi h h d O 1 6 Ci ia t t c z W "" �..� H wLL _ Z W m W Z '—' � c s o Z J L � O a �• 1 y W z 6 2 h C O O O J Z O m a Z o a Om LL U JO m z z �. O w � O Z O O p o p u v n 0 O o O_ U n a 0. w T � oif c a ec a ¢ w a a z a w a O Z 0 �m V qi YJ 7 U c C 10 2 o m F 0 ci 1= 0 0 ci m F F 0 m F 0 m F L c20 O O O c o, T LL a w � 5 W T N d i o J w tr \\Ej r IL Au �\ Q Q u o \\ _ Q LL \\\\ Z � � U\ �J IL �,�\t E C i w* c r o 0 0SI936 * a 4 F J 0 t 0 N _-----------w o w J o co o a 4 Cl Z Voco >Q� b i 2s61°zo e m o� J w Qq encia item im. yGCC-D MQ3 q uptaoj4 'u4sanb@j -7zM X % LL C14 LL P130H g t-- CU = CD u �SIDU JK cn = > z 2-5 C) -el(l 041S JOOjLj Puoz)as cu Q) 1 0- LU C—) Tj) 1, J) X a cc<c M 0 > z 2 g z 0 0 z z 0 W W CL bo CL E M 6 z t,o 0 .2 M tio c NM W tlo 0) aa < 0 0 (D M Ln lu lu Al - - - - - - - - - - - - - - - - / ------------- A( enda Item #3. 4n uptaoj,4 'u4sanb@j y,\1 E C T C-D 7M LL P130H ll;)13 a a 0 9 g z 12, 0 CU 1114 -IZF JK C-> CD ul 6 d) `j 4 ca 6 z cn SIDT6 V 2-5 sli,1349(1 04is 6490, 1- cu -M C:) q S -U-Z �5 LUC-) T Lu `D- 3: LU LU LLI C) T� •r--j tu- ci u aw4-1 It @Lu lu igLU n-I olu () a -A LLI n Cli w 6z < _ zq L bi N- w x w w Cli z lu iv X 0 G w 0 -Z Z of ff —j E z tu U- 0 j CD M tLIq W w w W 50 w w z�z 0 wwo _0 W>-1 -1 L6 Z -1 (6 LLI 0 W ww w z Z q Enoo 0-0- mod) z J) iy jv F =5 =5 0 ITW l000z EGO A E E -A U- x 3: x w 0 Lu -q C14 0 Z LL11 d) Lw 0 LL q L d) z W UAW~ Wx w 0 z w z z C, w �t 0 0 0 E E j -10 � E4 -D OL LU (V L6 (3 0 w N uo TL W- -q 0 Z 0 o I: LU o -Z 1-3 4 T lu WT I z qt-U- w E n 0 Z 10 LL- (L 0 v iv EZZ<2 Z i-3 i-3 L-) 0 1 w q 00oz z z 17 0 -1 Y- Y- -A U- j7) -:3 W 4 z -fin w r 4-1 v ly- z 0 w ff LLI LL Y- (f) (f) mu q 'z CL G TO Ci -1 w W -Z Z q 0 y LW IL MZL L n q tLI 0 DGIU wo 0 (L z -1 0 z X M w Ora 4-j x LU U- 14- xf . n -- G (2, wow OL -Z WLUO (a CD :tl -1 --:3 4 F- P d) > Eaa ,)OLop<Lz OL \900�jmc) vcn 0() n - C) w LU lu w w > ff V +S) 'o OU- iW lu-Gj-U i z w+- ZL f- zo w0 U zwluuq ff zZqi W 10 13 6WENIV E60 A E E -A � 0 Qq enaa item ia. — upt.�oj� `u4sanbaj 5 S I059 z G �\t Ec r m ^I X o o� ry o 0 0 �p%�d * U `�LLP130H Ogg CU o U a' V s m o o .o ��3rSIDU * 4 F Q) z N C-�p CD C� T t) Jl ca o a ; Q� s 3 SHU4aQ a4is i p -> .o 1 0- L.L� ill 3 C C< glda(] I p}S 6u»Iapd IM Oz4N m 0 cp z N � z®gyp W>1--Vo w—w4mm (S)>�� LU in z u� 3vw 0� zlwLaOL �N 4ID -wNOZ II To X w Z O 1 4 ,S)NQ HOW (K 0Oz�� X ww ��:j Z U U w ,S) d)0ow" N X Lu U 4m ~ yj wW 0- Z� (K w-1� 4- wZ X w z o *� i�I z r 00r � X LLLL®ex z ww1:-1v C ' Q4wU,j � T'1 N N --Im X nn°' z QQuQw "'Omm -I d) LLI U UO z �(Y- ww o Ll! z� w-1N `...� Fn dwcid) O LLI� LL U NIL��O w 4wq Y Mz �� -1LLz4w >1 3 O�wZ m�LL QQw4w wLL wn ® O m Lu 44w~z4 m� w3: w W 4 m U-1 ~ Qq onaa item im. up�aoj,4 'u4sanb@j Q) d) \IECT C-D 7M a C14 _ �,, _ � P13oH 14��a a Ogg n Unqm UlCU C-5 CD aduospuu�JK cn SIDU z 2-5 U-el (I rj Q) CN 0- WC--) • • 11 Q� ���� � I lilt ' '� �li IIIIIIilllll!!I!i'lll � � ; `'��d,� �. ,I i li � i lip � 11. ��+ . i�� IOilil, _ II �,� _ If —M IZ7 7, 9 la 11w . , • 4B 49 dp 4�,A 0!"1 0 4r, �h��II �-_I--� � � -� .ter== � ..,:;ly 1 I I I v idt = = I.- _ / / ® _�' • Q :fir; i Ina-, i" aat S, ONO �W.MMWI 'PRINT AZ. cgg 4�= EVAN! 1011 M _. ;:= / — '® , Ida _ 4� �%I� ' � ;� ��` �- — �, � � � 4p 4p - I'M Lon. NO i I nil �� 4� �� "�D;� _ _ �iIIIIIA • rig ���e`� i ' , jI 41 dp d� .os ��� - , it �150 11 eval Md "Ma PUT Timm? MORE I 0%goss wr.'� WM- -..4 A M 2 ia 1� A( enda Item #3. d) up�aoj,4 'u4sanb@j ,�\l E C T Q) 5 SooGry z ^I 4K LL P130H 14 13 a C-D a Ogg CU C-5 CD JK �I V cn > 2 2 u4u(j 2y 4sirl 4u-el(l L� T 3: ; - , N � adlez)spu C:) q s " cu Q) 0- LU C—) J) 1, J) LK < a M 1P Z< W, J) w M 0 M z 0 o , wwFF 12 Ir Cc) - >w Zw Wa 0 cl > U) �:: af F- < z 8 7, 8 WW < -of < 0 LWL 0- W 32 Cl) 30; OL - ., 0� 2 00 37 U IL W 3z: K U2, 0 IL �¢.Zo.w 0, (if 0 w a z < < oz 05 Z, L :5 � < 3:0 < w IL � �- M F U) < 0 g 'D , W 0 L,) aw� o 0 < (D � < D 2� z Z, 'a < 3: F- < Z< ff§. Z, Z Z 0 (Z) <, < w W. W. W. 9 0 0 0 z fr M UN U) o M, - o 0 (1) < M 0 L) C) 0 w C.) z < < 0 ') co D < < < fr < 2 � 3:== F , M 0 < . � (:) 0 < (D < 0 -0 0 Q Q 0 oc 0 f 0 0()F-�- ZOLU . 0 < of (f) (-g 0 a) C) L) 'D 4) L) aj z 0 K w .13) Z< Ft F- F a, z 4-0 > I-- I- ir w T- '! -5 co M co Co 2 'q F 0 p M ;� = 0 w 3: 0 cq 0 (q (i M cli tN - Go ;t j L I- - - �-- M E ID N cm (6 LU z E < , <E 0 D W Z=D �a- -J0 < w Of =Moow D T- OIDLUW -F--<F -- .a 3C) w af cr W=WWWDO�:Z r- 0 �- 0 CM F- w Lp r-- CM <0, z F- w < W w LU co c .2 C: 2 =� w Q� LL 0 0O _j W w = ( F- .< w LL 0 F 0 3� Z3 0 M 0 0 F- 0 z N Cl) LL 0 LL LL LL Cb Nco M z z w w 0 7, 0 (n (n M M w w w w M LU w w LU LU w 0 0 w LU M M M M LU w w w w w w w w M D D D W w w w LU LU w w w w uj DO DO DO 6 Fl- F'- F- F- (n U) w 0 w w w -.R R W) N cli co a) (n U) ry) U) (n (1) Cl) U) U) U) co LU LU Lu M M M M W w w w w w w w w E Q� LU w w w w LU LU w w w w LLI C2, C3, M w w M (r (r Ir It ly 0� (h cr C3 M F- F- F- F- F- F- F-- F-- F- 'n (n w cn 'D 0) w N CD M — — — 00 W 00 Lo W w C-4 F, C" C4 CD LL L L L L L L L L L —j CD c2 C.D 0 4-J C-) M M M -C C3 45 < Lu > LU rl CL 0 cm w CL W� co W co z F U) co LL, F M -., >. w M of U) D C0 Er of < D LL, z (Y 0 Lur LLI 0 U) =3 < w o a: af I CD o < o 0 w o Cd z w U) w z LL, S) G w CD 3: G r = z U) U) (D CL CD M CL —j —j a- CL CO co a. U) U) < w 0� w < W z LU ❑w Z' 'z LU LU❑ Q F, 5) 0- w w w D CL z W z < w w zw <w sotf 0 Cf) CD F- CO C) =z, N 5:0- C) LU 2 - R, LU C) W < �j = = W z z Lu Lu W LU 0� w LU w W LU F- Lu F- C) oe w CL IL z F- LU 0 w > U) W [a U) 03 CO 0- 0 W a- LU F-:❑ w U) < z w Z_M < < 0 < < < < < 2 F- F- LU U) LL Lu W W 0 w C) n LL co co 3: ca co co I CO U) i CS U) F-- �e F CO Q� W w Z w < or: (D ❑ w w < LU co o o 0 0 0 0 0 0 3 IWO 10 10 10 LLI F L) 'n af M < < LU w w w = Lu IL L) LU 0- a- EL F-- F-- F-- L) L) o- F-- z LU LU C) w❑ >❑ C) 0� C) af Of > > C) C) n :4 F- < F- 0 LLJ < T LL � = 2 � Z Zj -j -j co _3 -j -j _3 -j -j -j Zj z _3 -j -j S w LLI Lu 0 D Lu LU Q� D D Q� Lu < � [L C-) < D 0 LU D D M: 0: z Cd W LL F- n ;t LL LL w C) 2 LL 0) co < C-) C) F- LL LL M W LL LL LL M LL LL LL LL LL LL LL LL W LL LL LL w w w w w -4—J Z z z z z z z Z: z Q) z z z z z > > > > > > 2 > > > > > > > > > > > > > > > > > 8 > > > > > > O (D 0 CD (D Z 9 z z b 966 6 b b 6 C8 6 6 0 6 6 6 C6 (.6 6 C6 C6 C6 U5 ui J - - - - 0 5 0 (n - 5 0 o 0 < < < < < < < < - - - - - - a IL a. ;t <, ;t U) co U) (1) a. Ir Of (n W� L�Ll W w w (L (D 0 2i M M M M 0 CL (D 0 W z z W- Z 2 K < < . . . . . . . . 1: F- co U L) 4-) 0 < w N. F-: F-: F-: F-: F-: F-: F-: F-: W_ Lu w C� M 0 N LU d d C5 (5 (5 d d d CL F- IL IL 9L U) (n U) (n z W c) F- F- F- F- F- z = x o N X x . (D m �o co co �o a Nt co 60 oo 0 b zo N 0 �o ;;T EO (D N E, 0Tf L) u o < w 0 0 ❑ w co L� 0 0 0 LLJ IL 0 z LL < < IL 0 0- < 0 0 a- < 0 U) 0 5 U) 0 F- 2N 0 a- LU W w C) :E❑ 3: U) L) a� ce 0- w w F-- z U) Z Z C) < L) , 2 co w w L) z < 0 0 < 0 < 5 LU LZ o a� 5 z = Lu -< 8 w W, -Z w < Co F- F- z < a- < < < < (D LLJ w U) z 2N < F- F-- a < w 4 0 LLJ w 5 < < Z M > z < Lu Z Z < U of D ft� -- w Lu 1) LLJ w z - LU = = a D D L F- z < w F F z w F 0 Cl() Z = w co z z w z OD ZE 0 > z F- 0 co M) < (L < < < =) < < u U < w 0 0 CD Lu❑lu 0 (.D T U) 0 C) < 0 0 0 D 0 cl� W Z 0� fr < 0, cl D F- Q� z a M z L) () W W w 0 0C < < co M :�� < (D 0 LU 0 0 W EL z < LU > > 0 W z Of g: 0' (D < z >- 10 0 Er 0 z Elf z < 2 < < Lu F z < < of < < =j < w LLj 0❑ 2 Lu [if 0 =� 0 D < < 0 < LU 0 LU 0 < Lu Lu 0� < Lu 0 Lu 0 Lu Lu < L) (D V) (n (D (0 00 L) (D M Q EL a: t2 L) o C.) (.3 co U) (D U) co U Cf) M 00 co w co < [if X O� W LU 0 > D < 0 0 w 0 2 C) of < (1) w 0 ❑ (1) C� U) w W� > z < IL F- c') w Lu w z 0 cp 0 W Lu Cl) z F2 F=, UJ w 2 co < D < D Lu C� Z) < < 8 8' =n =u), 0 > pi) < D) (D CO < F- L 9 QQ w w LL, =� < - Tu <z o u = LLB , , z 'o < F-- 0 LU Z< W, W, W, LU CC w w w 0 LL, (-) < Eu w :D7 1 0 < F- 2 < < Z < W F- < 0 z < W D 0 0 0 < LLj 'LL, z 2 z z of < z} w C) 2 z < 1-- 6 o a. < z Lu CL U) C) F-- < z < w -i C3 w -i C-) U) < (D < � 0- < 00 IL CL z w 02 LOL�l < < < < < < D 4 0 0 M Z II 0 oe af LU LU < < 2 < 0 Oa 0 < 00 2 0- < X x x Q Lu < F- z 0- - - < < 0 0 Z U) X C) (L < < � o C) -- Z U) cn ❑Lu Lu w w o 0 0 z In 0 z F- < < < w z z < < 0 0 z P: < W, > 0� Lu < 0 0 0 0 < < 0 U) < 0 0 0 w of 0 > 0 0 2 =) -j CO Fa Z) C) Z Z Z) 2 C) F-- 0' 0 L) z 2 < (D x 'If z z U) 0 0 0 0 af 0 0 < 0 0 0 :E o of 1 0 [if [if R w Z C u) 0 II 0 D o 2 < 0 (D LU 0 M M C) C) C) C) y M 0 a_ Or! U) F- F- F- M W< < ED C) C) C) C) C) lul) S > co < C) Lu w C0 co 0 0 F- (60 w z M C3 >- > N M N a a F 1 (1) 0 IM a (3 M . 11 w U) (n z z w 0 >- 4-1 LU 2 LU D D ca w .. Of Lu _j >- M 0 o > 0 LLJ (D CO M 0 >- li C) >- z > > w co < >- Z M Z IL F- W > 11. LU M Lu 0- X 0 = . : - Lu (D D w u) Lu z z < C) w (L x il� Q� C) D =) 0 W (L LU 0� Q� a- LU 0� F-- ct F- �e ED C) (.) Q (.) �e CL �e c2 L) 0 EL X CO F- F- R < L) C) C) 0 L) IL U) �e < C-) LU LU - CO �7 < ---4 0 z 0 a-41 < Lt] CO LL A( encla Item #3. 4n up�aoj,4 'u4sanb@j y,\1 E C T d) z ^I C-D 7M W --1 0) LL 8) P130H 14 13 a a Ogg CND — ca 5F. P_8 P N C > an di UU CD2F5 o K q Q z �T3dS @duospwej SIDT6 _QQ 0 . (u D q Q aLU C) <a LU 2 Z LU x Z) 0 w M LU O� i-P 0 z < 1� LU L=u L6 z 0 01 LU Z Z LMD Zo -,:5 0 12� c�L F-- , 0 ❑ 0 '0 � Of < L9 0 ,f Tu LL, LL''-- >J 11 CO LU Lnue IZD < T 0 < 0 <- OLL >L'< , _< LL LL E n � Z LU 0 (L LIJ 0 a- 0 Cf) 0 (D 01 D L) if 0 LLJ Z 1, LD CO LU z w IL z z LOL, z ­_ Z 0- L) ELIL�l Lu r C) LU 0 �,s 0 -Z L U LLJ LLI M M 78-- 'A L�u > F-- 0 - < LL, n- 3: Cf) 3: � ,I) U) 0 ow 00 F0_ :2:) . . . z , lw�l Z< LU Z - - z .0 FZ F F-- LL, < 0 (5.f (D F-- T 0 0 LL U) LU 0s Fz- 0 < 0 CL < LILE, M, 1< M. <= 0 e 0 C:O:) F-- LU 0 0 z �L 8 Lz, w F-- L'Ll 0z L.) �-, -, p Lui M M < T 0 LU LU LL > 0 < F< - E 0- LU LU >__ 0 z 0 0 LU M G� Po ❑-U 0 0<1 U 0, < z w z < >: OW ow 0�0f2z T 0 LU LL, 0= g L ZQ z LU co 0 LU s W. (D 0 < 0 L'd < T <z W- < ILL L) LU LU LLU) L.L, L.0 02 7" co� , ��, =, >,: (n zo- E cz z P LU F-- (D LL < - 1 0, R) gq . -C, E, -< 2� CS LU LL' FC) E :�M200 M C-0 Co LU 0 >- U) i 0 T W 02 LU CD z LU U,) F= F= Ct) LU O'� LL CL z z F< M LL, _LZL, 1.) . LU LL, LU of - 00 > - - 0� z LU 0 CD < L) LLJ <� 10 6 -L, zo 3: �'e LZ ae F-- 0 Cn Lu L-U LLJ L) Z c U z Z< �i '= �m :-i 2 L, F (D ow, 0 z C) Z M L 2 . � :� z ZO -Z Z) LD T -Z 'T T LU L�u 0� (j 0 0 LU < LU < 5 E ­__ > U LL, L L z LU 'z UL11 W, ill� 31: ii 'LL LU 5 W, U.) 2 W L) F-- 0 L-U L. LL), 3: Q C) L) > WM 2 >� OR 0 F-- < <� < F< 0, Tu F< z 0 < 0, 10 zHO <U J M . 0 < 0 F.- �01 :� < < Lu U) U, LO) LU F, LO) IL af C=) LL LL, z 'D O� L.L' L>L' I'D -< 6) < po: -Z =< !0! Z. 0. co _,"50. - 31 < <z 0 2 LL, LO) =0 C<,) L-U LU =U3 LU ID < Z M CLI LU < LU LU 2 Z) t 0 < 1, < CLL), Z < 3L >� L2U W <z > I M Cf) Uj z : = SQ - U, z � w 16 F :Z) < LCL" .0 7. z < L>L, <, 6 8 6 0 2. ME -Z, < 'F' <> 12 K) <' < < IL < L�u < 0- z cd 0 Z< % 'C��) < 1�02>zt'>,= < L s w 22d6D=T0 LL 9 0 ZO 6 6 2N cl 0 0 < 3: T<: 126: LILJ UZI LL - P LL, LL [L < L6 6 Mz 2 20 0 2 1­ z 1<1) EWE LU L�u LLI 0 5 > 0 0 0 - W. 9, CC) Z 0 M 6 -0 2 E T -Z 16 10 L, Zj ww 1, 1z U-j T3 9 P-) 2 L T �E Z,-, F - 0 LU L 0 x J, LU LT < 0 LU 2 t >U - E 3: LL, >w F-- ae 0 L Z<� 3: < > 0 Z OLL, Fz- -Z LU z 10 LZL, F-- 0 LU ZO M T: 0<� z 2� Z OZ 2 0.1 21 0 s ,L Z, < L-U 0-2 t LMLI '0 �'j Cc, < Q� Z< 3 w - 9 . -< LLJ > L.Ll 0 ': L T >w z > �Z, 91 6 < M, I ­- � F-- C) ­__ 3: D -7 M L-Lj Hy LL, W- Z, 4 cd <z 0, '0, < 0 0 W z 6, W, 1< z 6 - 0 0 21 L2L, W, P F-- < LL, F< I t: -, v) (S) L LL, -Z g T OF � 1011 30: :2 F-: 2 0< LLTy 0 in 5J 1. 9 U"j ZN 8 0 Lou Z< Uw) IS8' Lu IL w < < 5� 0, _LLJ Z F-- IL_u LU -Z�24<w < E-OHQ92 z 2 :0] z z LaL' LZL' C) <' >0 < W, R (Z) W. N '0' po < z < C6 z cl) T 0, <2 2 10� 0-1 LO) z It Z, �, 00 z 0- -0 � 0 Z, LU 0 w cd �- 3 =0 5 2 U z 0 T z M < Z LL LU) P<: LMLI z D-. LU 6 L - < (LU F-- z 1.1 2 F-- 2 <z 1j,—L, LU 011� "6) L, LLj L < F= CIL > LU CF-L 0 L I :":: " , — 1z 3:, 0H.92.0% IL <z Ec�,j 0, z Lu U) Z- z >- 0 of s C, 70 Z. U5 LL 7, ❑L.Ll L-U z z 0 z U) C`l_ 0 Lou 0 (L wz > - > L 0 < LU L-L, '00 0. L.L, < C, 20 LU 0 F, < 5 0 LZ w 20 po: (0 u) z C, - -< L 0-0 0 ):7 ❑0 < 0 LL, LZ 0 C) Zz LU Z�, Z< LLI 0 0 -❑2 LL, 9 3: L2L] =0) Z�, 0z Eu, 2 2, t3: - L. L-U Q) Cl) L) F-- 3: >0 7: < U) w 0 0- < Z, Lu LL)i U) LL C) L>u LL, Lu U 0 P: 0 L 0 LL" � LU Cc, LCLI ") < 0 C<,) L>L, F-- F-- (D F-- Z) 0 C6 < LU < I C) U) CO M LU M '0 LU Z6 0 MD 7 LL U Do 0 D < U LLJ LU 'n I- LZ LQ� -) ON T ­-0. L-U L,) - (=,) L2L, 0 z 0 F, w C) 0 0 F-- U) LU z ___ <00gZ) 0 (D I x D 0 .=! 0 (D .0� FF- P LLI Z Qf 5 65 ") "L ox % 'z cd 2 0 CLU Cd WZZOE,�L'. L < w E 0 > 0 Z � z < x 1: E 1, z LU . D M LD 11 0 LU < - [L z 0 < 0 < 0 M Z < � 0 U5 Cd w , L) < 0 x 2 (D Z) 2 < 0 0 U F Z) CO co x w0p:M0Ez 0 < < z cf) a LU 0❑LU U) < I Cf) Ji IL cf) Lu z 9i 0 __F 0 2- >-Im z co C) 0- < LU LU 0 Z) Z (n w 2 Uj Ji LU z F-- L -0 7-0 j Z (D LD P <.j, Ld, w < Lu (D F �U-uj _ () < <Z ZO 13 D_ 0 LU I 0- Z (5 :1 3: JJ x L) Lu (D Lu z z U) T 1,4 N N T Z 0 LL, NF _N C) C� - < Z LU LU 12� z (if L) < D a LU 1: F-- 0 C) > LU CO LU LL c � a Lu w 0, 11.1 >, U-) w Lu 0 z C) x 0 z §W, 0 LU Z < , LU < < Z z 0 2 < LU 0 f 0 2! 0 Cf) N� LU U) 0 F- > Z' . z 5 z . z C) LL � 2 05 U) Ne 00 0 < (5 z 0) CO < U) < 0 Z < LL] LD z 0 C) R)F )LL 0 0 w 0 LU Ile LU (L of 0 2 < LU IL W co a- 0 - w _ W x LU E Lu ___ : LLJ (j) D C) x w > z C) =i M 0 0 x < LL, 0 0 = 0 0 < X 0 < 0- LU 0 Lu Lu 1: 0 X w X M Lu r) < c-) c5o Lu ca (Dl­-_2 Il­-0 LU � 03 0) M 0) IL L) < < 0� 0 L<L 0 005 M< x 2 < LU < < C) 0 Z:) L) co =1 LU D x 0 0 z < 0) 12� 0 LU < w Ewo cw) 0 X U) P LLJ < < 0 IL, 0- J_ co lei 61j M 0iMI N N C6 C6 LU 01 Lu z ci 0 cz, z LLJ ll� M 0 = - " z < M cj� Lo, 0< U_ Ly Q I: L < L) (D Uj L) co O_ = < D C,; LU Q 0 n Uj Lij 11 U) D LU 0 W >_ 3: z ❑FO CD OH: U<i z U_ 0 LU < z Ji .0 LU z 0 0 1 Z LLJ Z< ZWC,)1=-0Z7 < 0 wa� 0 w U) U) LU < <0 I'S I Cl) 0� w X < -Z LU LU z D Ji L) LCU) F, L 1,� W, 0 Z< 'S C) uj U) LU < Z Z U,1 0 w - M of ao L) iL 0 F-- f If Cc) ?Z: L) . L) M, 0< 9 Z. F JJ < 1E z z < < z 0 fr w< 0< 0, 6 'L'U 7- LZ , 2: W- s C() < 0) z< 0< <, 0, LQU� lij > EO-0 -00 < , 7 ;�OEW3:2E LLi < p 0j 0 "n co a. ;z '.0 �0: Z1 "f 0 Ljj 'L UNJ 0 Z < C6 =w' 25 Ji in Z-: 826 a. . 0. '.'� w < z < UJ W < I)f < j '02 0 Z) Z, 9 w LU 20, z w F, (n z < LMU 'Z�l >j 0< LU 0 z '0 IL < G� Ly W Z) Q� < 0 Z) 21E 2! 0 1, 9 <3 < ou S <' co z F-- < N �1: Of z co ji L 0 13: 6- �< =� = >0 g= 0 Uj IL U om < of 0 z 0 M a' < 0=PT2":=,6 0 s: z 0 FS -Z 3: 8 Sp < a_ < Ln Q_ - �, '0 2� <z L6 0 1 z LU oo z 0 w (n 1Fjj '2 F-- z w - i- Ld F 2 < LOU mo- 11� 0 Ji F2-!: D� z z < " I J_ U_ 2 U-j Lj l, 1< Ljlj� >J<j co = z I-) < ID IL C<) 0) w 26 Z< Lu z LU - - W LU C:" 0 u2ji 1. LU L'u) U_ W, 0 V) z , � < < < DOMU LU I sj u1i L16 2!: z <z Z. 1< Ix -M U) �0- cf) of 0 CD 0 IL Ji >- Uj < z CL M LU w < I)f co P: 'ZD ­- 0 0 (If M = M :<2 a� 6 2 - < 0 LU zi 0 (D 0 z < 2E 2 3: < ­11 2 20 0 U_ F- .1 6- < LQU� z < z 2 cl LU �i -, 8 < 0 LU < D � w � z < U U) a' z � ­_ ` - = z M < UK) ',J�J� Z- - z 0 c) n L, , z 0, 5 ae Z) >� fr 0 D 0 0 ae W 8 t <z � � 1 W- LZ - - <z -Z, 0,1 '< Df W < -- 07 < I<L z U) J19­ z - <, LU < Z Z) U) LU A 0 z Cl) 0 (3- � :E ­_ '< LU 0 LU "Joi 0 '-'� LU :,:) -�j <z z of 0 cn JJ Uj P Lou Z Uj - 0 �� 07 ❑1=3 z - of z U � 0 < M a, � Z 0 a 1� L Lu z zo U) F- d f9 < CLUL of U5 Z 0 LU 1, U < L Lj A F , D� z C) LIU, O� ou z< -Z lij LU LU Z 0 Q� c) < < z 0 0 < WT , Ji 80, 0" U> < 2 10 'D N ___2 <Z Z 0 z 2 . z i LU Uj < � LLi W. �0� '0 -, t >- 2 L) 0. Z U, M CCU0 Z z co .2 Fz- I> zo) >0 3: M� lk� >2 <1 LxU 0 0 It Z) tz U) C) Z, p > < 0< 1.� 0 U) Fl- 3; wz L= -1: <0 =1 0< =0 Z 0 LU z MIX LU Y) - o LU CL 9 8 8 < UZI �0_ 1:: Z< W, W, z 2 0 Z LU fr �) J_ >: M N 2 < 1 0. Z. 0 w �t: ,, ­__ c Lu ef Wo - w (D 0 Z< OZ s Ll x .j x __ , , z 0 ::i Lu -7 z LU 0 1E L>U af P: on (if ___ "Jnj C-) Ly ji 2 LU O_ z 0 0 z< - 7 Of L>u< 0 LU W� F- ct) < cr� 7 C) W. > 5, z 'S T "Ji 2� :LU:l of - Uj zo 9 0. 0, Z 0< 0 0 �- I , =J) , 0 Ld Z TL w 1�jj UW 01 z < ','f 6 7, 'z 9 F L z =0, 0 zo: 9 2 C) 0 F-- Z 65 00 2� LIU lc�l IM, >0 C) 0z Cc) FO 0 0z L) Z 0 C14 I z U_ ZO Uzi z 0, P: g < W. E209 2 W, 0 0 U.) 2 P. >0 E QW2 OZ. < E C) z < z z C) 0< S z LU co 6 00 W Z Z 0- N X LD ` 0 LU 2 < 0 L, UJ 0, YLU Uj 0z UJ Co 00� E 11 L) W J� - ` U) j < 8 U� 0 lw'� In I, J) no < < �'u )" 'L Z z 1,JJ C6 w 0 Z "f z Z L�u 9 -1 U) 0 0, = 0 0 >0 E < F-- K 0 0 < - < 0, D L-U 0 � LU Lu W z = F-- z U) 2 z zz�-, .2 P LU ,UJ Z, F, .0 -Z, l", <, UTJ z < - Z, 0 LO) < < 0 1� 2 :� � R 3: LU 0 co 08t-ww-z:i�W�WtM8 < 2 C) M LU yj W z C) ZW W� U5 L'10j -, 0,� § lz C., z E F= S, 2 > L LU > Z z 0. zo, "J�j <OZ z-- z P,: >< FF- FZ :�E IWO 'ji < 0 Co CY 2 LU U 7) ff z z to < �,SP:010<,w Z jj -_ < 2 1,1� 0 0- LU Z Z LU 0- < '10D LU) < 0 z 1>1 I-) U) (0 w Z (< Ni K �; �� �_ _ 2 w - - JJ L�u 1�4 2! C, z 0. D, < U) LO) Uj M LU - < 2� = T ; 0) f 0) 0 (0 W JJ:: 1, F__ < "7 0 < P 10 LU 09 >, z< G< E r7 3� =< W < LMU Lj < F__ 0 __ U) Z C, -Z Lij M LU C0 a� 0- a- a- 0- CC� F__ Uj z 3�. 0- 05 U,1 Uj 2 LZU 2 00 0 2) W 'tr C) C_D < U " z z z E lzjj :LzU M , ji F w w w < ZZCO ME > oftfoDnsass p � -- M Z 0 (n w < (<n UZ N N F- 0 U - w U) w �, CD F' Z, 0 0 - - ' LU li L E '0 < LU LU Q� co Wu - M z 2 M L) L) 0 5 z z < Z 2 Z) 0 , Z 0 LU LU '< 2 Of ID 0 2! Z, 3Z: CO 3: � LU 0 < < 0 Lq 0 a- Jj < z LU 21 Z z C.) C6 F-i I co < < Z Z Z < -j Ljj 0 M <M E 8 0 0 JJ U 0 J Lu C/) U- P- 8 P = ­- 0 D LU r)f L: 7� LU CO �E < w Z 0 L) -cn W z 2<: 2 a, 0. :17) 1. LU 3z: ,f < < U) z U) (D - LIJ > < < In C) < P = n- x LU M z , 0 0, L2,j < U, oo LU Cl) 2 _j 0 < UJ Z) � 7 0 F 0� Z LQ.) 20 8, 1�0, 0, Cc) < Z LU U-- , U_ 0 0� 0z0,&0z2,- <, 0 C=) 1 0 < x ln� x x I L) U < UJ 'i yj < 0 0 UJ 0 Z LU C� CO �- UJI C) - D U) 0- C) z (2 10� cn < E n- LU L) Luji) z Z- C�-) y < U) C) E 5 C) C) j E-) < z U=) no- 4-1 < o) Uzi < =� >- WMF--000000 < 2 U) U CO - :5 -0 8 <w L6 >- Lxjj 0� po C) LU < >- >- < < < F-- M 0 < M M M M M M co F-- 0 5 Ld 2 E LU -E cf) < 0 0 Ljj < U) Z) oc 5 E: Fw Uj 0 1� ­__ "f < z Uj F 3C > 0 Lu -z' 0 C6 0 z "f z < F 6i 6� 0� 0 0 C� Lu �5 0 2 U5 < z 0 d LU < LU ji 0 U) LU z z CD < F- < z Uj (0 F.- < 0 C.) (n 0 < UJ , = t; U) z 0 0 U) 0 af 0 >: 0 ffl < 2 2 L) 0 V) 0 C) z t Of Lu CL U) 0 Lu �L < 0 L�l �� 6 - 0� uj F-- , CL 0 0) < z >- z 11 < U) 1i 0 z < F< ❑< U-J < , < LU M w x Lu F. Lu < < < < Lij 2 , 3: 0 LU 7j 6 M U) 0 :5 Z Z 25 :: __ ).: 'D - - 2� --, I, I " 'i (j " ::, Lo l� . 0 U) < LU < LU IN N < LU O� LL > E Uj < 0 U) < W < 0 66 Z LL Z 00 > < co < cn Z Lu z D T:: Lu 0 , i= C,) 0 C6 2 <0 0 D M LU LU M U) < IN 0 C� C) C") 51 w 0 Z: co 20 0 z (0 2 LU Q� < 0� Z - [n Z z w < Uj 7 0 < LU < 13� Z f - < z E z LU LU < 0 LLJ (D z Z: IL cj Z 0 F K ___ >_ LU < F- M p c < > > w w 1 1: Q) > LU < FZ 2E C-) D LL < z ow z LU LU < 01 Z 0 LU 0 Z< z U) CL C� = 0 -) � LU = 0 =i [if 2 LU M: M LU of LU Q� CD < 0 C) LU M: 00 0 < 0 0� E F-- of < - 0 LLJ M 0 IL ED Ly w D Z z LL, 0 < 00 � D 0 � = C) W < W W 0 IL 0 = Lu F-- < > (D CL [if IL < LU LU = LU < < E 0 C) :E z (D 5- IL IL IL (1) F_ co 0 U5 0 (0 2 E M U) co C() E U LLJ IL 2 co C) IL ❑Q� 2 M < < C U7) < 0 0 F� 0 < C) 0M0 z U) IL < I- [L �Lu z _j IL [L 0 a. 0 2 CY a. F- LL a. j 661 1 661NININI 41 Ll 1161 l 66 N MI ZZWW 0 a.: ,u r 4 1 2 5: , LU � n E I ()Pa_z ZW 0 0: r Lu 0 j, a Z Ck a Qq r LU T SEA,! ,q w 0, J, �, Q. X LU 1, o IL IC �uJ UN U � 'a U, < .00 Q. an p 2 a LIU) (y Hap (L -�j y IS 2 D P veffi-,q� - !I M. Tw a x - FK 6 L!. (Lian LU - 0 - in � t 11) 0 71 iz I I LU LU K�jaP Coo d) "'09 1-12 - d) W LU D 4 1 V _j f- 01 g-,-Iz LU > 00 Uj A iu 0 9 W. C, U1 LU M 0 LA o 0 10 z Z L,U I d) Lu >Quj �n - q (I- Lu q LU LU f,j W11 T�l L LA lu U q � T IL 11- '40 woo 94: - .40 < I La w �q I Cd 04 M, Lu- "T t Cd A Ld n 113 I) 0 0 � , , q arom� lun z Cd w T ad bj0 1- c Tw q e r Hpp Cd -4-J ID qiq0 0 2 LLI L3U: .,-q U -0 q II III Fo Cd a- LU 4_j 7, Uj LU OF LU Cd y Q) iu�p F- A '0 C, Q) I'q ID P LU (L W t 4 a o LU LU IU;t U, V <do -3z 'T A Q a � w - �0,4,_j OQ 0140� 3: d� I E v M :z 0 Z _j -q LU Vtz-100 _JD - �3 , _1 1 , Z T !! 0 w 31 LL, 0 0 qK1., THM390 1 Opt V W1 0 _00 FFL cd t -A i Ila 0- m20 §5TQWRX.LL1R W. q Oj 4 0 LU zT z Q �N L) I LU LU Qj LU @ T T 2 - . z h - 10 J LU Z. 0 LLU Qb >- Uj 0 0 LU,0 o W,04 i r- _j N F, S, 0 q LU 3: o V - � 0 d) LU (L D , T �zi q 41 T1011 P, 1=1 .1 "q 0 Ll LU LU 3: LU < LU 0 0 . 0 LU 7z P 0 T Iq LU Z- ' 2, a ':' N.� _j U LU u Zi I a 4- p 5 6 wo 0 DOD, z _j< > C) qF 04 0 -a Z U 0- LU LU z x , 2 LU KM o 0 3: r, i LU ILI w U,1 Z LU LU Z, 9 _j -up LU cq Tf q o LU LU *4 ", q t C, d),q - T q g T 13� 0-11 .11" $_4 9z, a a my , a 0, LU 0- Fps Z' Lu >- _j- I I I M Q ; nI U Z _JJ cd 3: LU , -1 0 < x � ��O z 1,3 � 4 U) LZU t Cc, a 2 'M I X, 9 -2 vu 11 t Lau a 0 W T Lou z 9 U 3: - Z z lei 4 � 0 _j �r�n :o:i Uj,0 n X:� a UWJ .--I , 11 LU 0 "Et 11 T -I Luo 0, LU 4 IV 2 J (1) LU 11, a wzYq LULQ _j X LU Uj 4j Cc, <, - LL, 956 LOU -0 LU Ulu 4-1 X T1, �11'j -1 .0 Cd LU M 14 a �u t 66 0 o 4-) n _j < ! - Z .. Tr �= U j7 ':e ' " 43 ��l - LU :Ez D U YT m0 ;1 liz 2= W, u 4,j ) z 9 -Q (1- 00 (M - a 1 11 UFUF LU ILI U1 - (y (1) w �T� 4 ILI Lai U - t = - - i L�u farm- L, Z. 0-1 1: d) R R �T �z E­ aw o b,0 10 Lu 0 � - d) -1 LUM IZOW _11 LU fn -1 ILI, qo :6y � d) n Cd -4 11 4-1 0 LU w Pq K! T: A cd E_=I I 1=1 I LdfF u Cd 43 ly M r fJ�LU , co In p t LU > C t zM 0-W U Ct �q - r 101 PH - w 0 4 z�.zl I 1=1 I I (L Wr- LA LyU 7 3 d< 0 LU d w � Nm -j L z 0 IIF LU < 0� fft =Iff a WN LU 0-40OmmF W OT mp WT -11 �7 �0 o .4 0. °wmJ LU Z, LU R t 3: _Jq ZU D C T W d) LU z % 9 4 1-� , N L) <- 1) <- wu �� I KS Il-- Q 61, put goo 1: rL 1: Y XP< 11 ly I LU 3: L) L) 0 U, oo� 00 x _j W s LU:r a DV g .4, -5 4- A 0 3,):, P < a r " � v o < CdLU W U, 4 T J:-'r on w t 0 LU d) T 4 W 3: Buz LU Q 3: U Ow 0 1 z , oz U z LU D !9 La -,I o p 7 _j 0 Z w Z w 4 _j � R 4� 4 L r u 0 Y )_ 3: R 3: z z d) Ho Lu M Ld) L) 'S ? Qq enaa Item ia. C-D— upt.�oj� `u4sanbaj 5 s G Fu m X o o �p��tEC) tEC)�11 Q M W m LL o o LL Paz „ 0 �P130H Ogg N 6 E �maryi o 6 ..> ���3 � Q ~ Qi �� U z° N � — 0 0 al alp o 0 0 1SI93b J N C 5 r r = QCID (� o a ; Q� s 3 uLjd uoi�isodsiQ aa.�� NJ0- LU C-) T toalX 3 CCQC�� N 1�O1l— II O II ��� wW wa I Abu ��i i LWLI / N N LLI w M Lu I I w wQl Z�ZII + ww c i WT X XwXw �� w w lu w (a 13 2� I = r each goad A( enda Item #3. 4n uptaoj,4 'u4sonb@j y,\1 E C T u Qj d) z ^I X :F CD 4K 42 G 42 ri Q) C-D 7M 1 13 LL P130H 14 13 a a Ogg CU 4 lC_�p CD cn 2-5 j > C) �SIDU z -eqo(j 2� S94ON @@jLL Q) S11 1_00 u CU C:) a; -U-z �5 Q) 1 0- LU C—) J) 1, J) LK Z Nw z w 4 p K W z w z 0 c, D4 wu q kj w q) W11 W. TH 0 lWv W c, 34 'o pr 1: 'D 1106 Ila > 'D (Y�NZuL11 X LL 1fl LU M " oz, Wo > M�_ 9 LL, C, -4 A W zwu -4 z LL1 jv � -0 � LL, o Zq z E V cf) 20 1 Lo, -4 4 0 IL (L w y Yo LL zo LU LLI Lu 0 LL, EIL L.L I _j , W LL, MLL, LLI voowo� n ly z Z. -4 -3 L2L:, T Eqwqww,qzww - :z W 0 IL > 1 'al Ql ff I a C� 0 - 74 -4 q 11 Q IL W W - Lu z Ej 0 LU L) a W L W -4 L-L, M cl Lff, LL 1,: ID o- 1: 11 0 W w " LL, L.L, W1 Z, Ly (1) LH -4 y v j 0 LVL, 04 In 0 -ajo L�Li ->4 M q \LZL, W. "D Y: (Dl ILL" W, W LL:, -1 LL E 4,,3 LL, IL u: -1 LLI (A ff > 0 (J LIJ LLI U I-- LL WZWD M W IS 9, 2-: ,�DLA W zUWw W To La - -4 -4 W 7 f CA z 1 > 0 NS -M6,nvo>J�2-, V [fl z .1 z a 1: Q)t Iff > 0 . �,r z- 'o [, -1 , LU I �3 6 CA, W [L 0 M z _W, y WW 13 y � 0 OHL W. y 1,21 W 11Z W Z ID 1: 0 [Lj) Q E 1,1) W, L.H v Z, W > 0 w A ff ff , x 1 aoW,WWqTWW, Z W W , ,1 -1 z [L a L 4 n ") �- 6 4 � M -,q W 7, " � 0 Lu J 'o 0 z :Wz 1011 f Z r-j 61-- 7 __qj Wj 10 I � ff ly,: Tm v x LL), W '0. -4 WT 10 10 1),ff 7 � IL W W E 0 W w -1 z'n v 0) W E z W v Mc, 1,H) OL W Q ()-,(3 CL V_ z (Y 0 0 IV C.) W I [L 1): 4 , W 7 , , - 0 W �4 Z 0 O��Nu�Ozwm® W OW -qj a --ql err -1 1 �L:f 0 -4 , z ly M o - 6) (D -4 z > 0, zw W< a > � W w 10 W lo -4 -4 cl 100/4 1 "1 F:,q v :DWWWz A, - T z W W (/ W W W [L WD IV L < a W M � w 0 0 Z -> Es (L W 0 UW Ld 1: W D V K L 21 E P., a 6) (D W TH 4 01 A �3 14 > z l -40 -WIL W 0 LU ID d) d) q C/0 - ff E z 0 -4 > 14 7 4 �z V L a 0 6) ID W D d) C� 0 4) --1 14 0 -Wq Oq K � , - (3 L�,o I-- :,Zq ow, 'a 6 n Wq w W JO > vi C1 Z n -, �z 4 LL W t1j < 0 W a/ [a 7! Z1__ D-�A,,Dqd wo p ta z D [-- E W10 0 -4 W a )7,00 q t2i 2()� O:ZD MJ) l Wo W �F: WIM-W I E 0 � 0 U , a L) gw Q " -4 PLC R�Q Z W 6 ILI 6) 11) -1 -1 dd)) a, 0 f:0 o 'D W aj LWH 6 y � � a- a- Z 0 q 0 Y: 6 LWL 0 1 q z 6 7 all: 0 �C,. 0 ""A z F: W < d)l x 0 _,q W Yl �q W 0 q -4 1: 0 , 0,00 01,100- [a �F Z Ifl Op W W �z 0 W 0 z IV (L W V [LI q 0 -1 NU 4 �- ,, I/ - 1004zom i� M 0 F 0 W -W W ti, q f) E 0 W K W 0 U1,00aL [-- tu a- 'I � 0 [L1 0 n �-L 0 W �- -4 4 Wo'M q - w , "'n W l U/ q W ML MT W q LL o W 0 T > 4 0 W W 0 > F 0 ou a/ WZ 0 M Z, , 11 1: 1: 0,4 M4 v 0 W 0 0 owo- CI- q -MD W 0 d),D� (),ntu()Z�o JWW F: :z M Cl < � y Z Z 1: M < 0 0 W 0 0 01 W z tLI 0,4 W 0 Z z f1j , Op 0 W -1 0 1: ci LH 0 '1 W 0 W q 0 W d),q > :z W 0 z )� (y z z 0 ozooz M v 1 0 1fl M V 1fl M W W w 0 LH 0 (D W 0,07 W 0 W >� � W — x M -40- W (y IL V Il'o (Y 1 0 W z z qu , W I Wl� q a/ 0 0 W W W 0 LL 05 z z WTI W 0 0 W 0ow, W Z 0 W W W O'D o W LH W LH <60 0 ot �W W W 0 1: 0 'D '1 7 W IL Z A Lu W 0 0 L V W IV W W [LI 0 W frffw '2 0 z I,] W Z 0 W w , -1 -4 T W ly W Z() M Mal tu< aa Awqo W W AAq W awl T w Lff 4 -1 W Ol ID M�Mm D/ z WW 0 W > q W Aoq< M I . . .V0 OL qZWOW19 I I-L-4 V (t W , E 0 41 W M a- 1: (16) 1 U:: d) E z -qz a" 6) 0 a "I'd) F Y: W (Y C) ID I W ,D W WQ M q,) - a 0 0 0 L) IL - z H- A(D Q 04 OZ >W gY L) w 0 1 Wzpw 0 W W q Aj w D W w I-- LU 'D a J mo"<o q, 0 1fl ():z W WE: KwWz Oo ffum?WW d,,� I � V_[fl2[L>w j Z, zW>4W1--o0oW4 M oci I , W - 0 W Z [11 �::z MUW, �_,Qwz 4--)LL Wz1--W -4"-Jo _j -xq avy ->oow�o<, 44 W I M :t 0 ,- D _1 0 �oow M Avw� M M ff n a zo W -1 , a [-- �- 0 z v aq z -WqM-L n M � I = Z z O'D z 6 0 2!W-1 a DW Wa z 00 01191, - -WW-1LLVWoZu VMA 6 Z, T 0 W W>W -4 1W Z I I 1-- 0 Ul W 0 W �,z W 0 -Wo 7WOO NZ N Z l 0 IL v x C) 0 0 z W A JE1 qo Doff rUff 4� C.) 0 M 0) z Z,<,3O:JMAO ly W,ty-_q)[L -qu-I-J �Wz �ikzqq 1W (L �z 0 W < > 0 Zoo -W [jj U'vo 0 W z �Laq OiL ZUiv 12b W�::V:fl> ow L) [fl Q W q 0 [LI F: Y: WqW 'o-14 of Ewnwmwa 1�va OWE UMKWO} 0 v M I k 0 r , L , — LLO!r, w I E �0:1: I nv K 00 00 70AJ11) (),n d) 0 qz"(YOW A)J� �x WX -O-Z-11DILI 0 -, �- 0 UW,- [LZJO,d)�) 10 W 0 M 0 WD I a , 121 W:z 0- ID z - d)­W J�,w2v a Z Z U d) ()'I E () w ()E owja:w V :z I d) � V I C) -0-vV,60ow > 0 > > 0 ozv�, qo-,Zy: L" <4 ��i WJ d) 4ni 'D �Woo�()D jl z W z Q u j z ff -1 W Z< — Ev W 16 0 X W "DO M W WX 0 DIY 0 0 W 7 In E Z W I:tLj ZwWllxW L" ui _j �v I � � 0 0 W M � owwoff W 4 M d LL 10)� wo��Ew� , (a 4vu�